TECHNICAL DEPARTMENT-CIVIL (Replace by the Doc. No.

TEC-CSInnn-MET-DoR-
Project Name) (Rev No.) 001
Insert Main
METHOD STATEMENT Issue Date 02 January 2013
Contractors Logo
Method statement for ( Replace with the title of this Rev. Date NA
method statement) Pages 1 of 5

METHOD STATEMENT FOR (REPLACE BY DESCRIPTION


OF THE METHOD STATEMENT)

PROJECT : (Replace with the project’s name, at location , city name)

CLIENT : (Replace with the client’s name)

MASTER DEVELOPER : (Replace with the master developer’s name)

PMC : (Replace with the PMC’s name)

LEAD CONSULTANT : (Replace with the lead consultant’s name)

SUB-CONSULTANT : (Replace with the sub-consultant’s name)

MAIN CONTRACTOR : (Replace with the main contractor’s name)

SUB-CONTRACTOR : (Replace with the sub-contractor’s name)

TABLE OF CONTENTS
1. REVISION RECORD...............................................................................................................................3
2. PURPOSE...............................................................................................................................................4
TECHNICAL DEPARTMENT-CIVIL (Replace by the Doc. No. TEC-CSInnn-MET-DoR-
Project Name) (Rev No.) 001
Insert Main
METHOD STATEMENT Issue Date 02 January 2013
Contractors Logo
Method statement for ( Replace with the title of this Rev. Date NA
method statement) Pages 2 of 5

3. REFERENCES........................................................................................................................................4
3.1. Contract documents............................................................................................................................4
3.2. Contractors Submittal.........................................................................................................................4
4. DEFINITIONS / ABBREVIATIONS..........................................................................................................4
4.1. Definition.............................................................................................................................................4
4.2. Abbreviations......................................................................................................................................4
5. RESPONSIBLITY....................................................................................................................................5
6. EQUIPMENTS/ TOOLS / MANPOWER/MATERIALS.............................................................................5
7. PROCEDURE..........................................................................................................................................5
8. HEALTH, SAFETY AND ENVIRONMENT..............................................................................................6
9. ATTACHMENTS......................................................................................................................................6
9.1. Inspection Checklists..........................................................................................................................6
9.2. Inspection Test Plan...........................................................................................................................6
9.3. Risk Assessment................................................................................................................................6
9.4. Technical Data sheet (TDS)...............................................................................................................6

1. REVISION RECORD
This page is a record of all revisions of the document identified below by number and title. All previous revisions
are hereby superseded and are to be destroyed.
Rev Date By Chkd. Approved Description of Revisions
0 First issue
TECHNICAL DEPARTMENT-CIVIL (Replace by the Doc. No. TEC-CSInnn-MET-DoR-
Project Name) (Rev No.) 001
Insert Main
METHOD STATEMENT Issue Date 02 January 2013
Contractors Logo
Method statement for ( Replace with the title of this Rev. Date NA
method statement) Pages 3 of 5

Signature field
Revision
Revision
Number
Date
Prepared by Checked by

Reviewed
By Construction Technical QA/QC MEP Co-
Manager Manager Engineer HSE Officer ordinator Sub-contractor

Approved
By Project
Manager

2. PURPOSE
The purpose of this Method Statement is to close Defect Notice DN/S/0149 dated 06/03/08 and DN/S/0150 dated
06/03/08. It defines the procedure for sequence of works for removing the top 250mm of the cast beam without cutting
any existing rebars installed followed by cleaning, fixing the beam-slab connection steel. Slab steel and recasting with
the post tension beam/slab is covered in a separately submitted method statement Casting of Post Tension Slab and
Slope.
3. REFERENCES
3.1.Contract documents
1. Project Specification :- Division 3, Section 03300
TECHNICAL DEPARTMENT-CIVIL (Replace by the Doc. No. TEC-CSInnn-MET-DoR-
Project Name) (Rev No.) 001
Insert Main
METHOD STATEMENT Issue Date 02 January 2013
Contractors Logo
Method statement for ( Replace with the title of this Rev. Date NA
method statement) Pages 4 of 5

2. Contract Drawings :-
3.2.Contractors Submittal
3. Project Quality Plan :-
4. Project Safety Plan :-
5. Material approvals
Sr. No. Description Material Sub. No. Rev No. Date Remarks
1
2
3
6. Shop Drawings approvals
Sr. No. Description Shop Dwg. No. Rev No. Date Remarks
1
2

4. DEFINITIONS / ABBREVIATIONS
4.1.Definition
1. Client -(Replace with clients name)
2. Developer -(Replace with developers name)
3. Consultant -(Replace with consultants name)
4. PMC -(Replace with PMC name)
5. Contractor -(Replace with contractors name)
4.2.Abbreviations
1. Engineer- Representative of “Name of engineering consultancy”
2. ICL - Inspection Check List
3. IR - Inspection Request
4. ITL -Independent Testing Laboratory
5. ITP - Inspection and Test Plan
6. ITR -Inspection & Test Requests
7. MET - Method Statement
8. MIR - Material Inspection Request
9. MSDS - Material Safety Data Sheet
10. PPE -Personal Protective Equipment
11. PQP -Project Quality Plan
12. PTW -Permit To Work ( Working at Height or enclosed spaces)
13. RA -Hazard Identification and Risk Assessment
14. RFIA - Request for Inspection and Approval
15. TBM - Temporary Bench Mark
5. RESPONSIBLITY
6. EQUIPMENTS/ TOOLS / MANPOWER/MATERIALS
7. PROCEDURE
1. Survey & Marking: The surveyor shall mark out -3.9 levels on the beam. Concrete above this level shall be
removed.
TECHNICAL DEPARTMENT-CIVIL (Replace by the Doc. No. TEC-CSInnn-MET-DoR-
Project Name) (Rev No.) 001
Insert Main
METHOD STATEMENT Issue Date 02 January 2013
Contractors Logo
Method statement for ( Replace with the title of this Rev. Date NA
method statement) Pages 5 of 5

2. Grinder Cutting: A grinder cutter shall be used to cut along the marked line taking care not to cut the reinforcement
rings
3. Breaking & Cleaning: The beam shall be chiselled to Level -3.9 along the edge cut. Hilti breakers, chisels and
hammers shall be used. Once the required level of the beam is reached the steel shall be brushed cleaned of
loose concrete.
4. Fixing of Steel Reinforcement: When the adjacent slab steel is ready to be tied, the beam steel shall be rechecked
using the latest shop drawing and any missing or loose bars shall be tied securely. The reinforcement bars shall
be fixed in accordance to the approved shop drawings and project specifications. The quantity, bar splices,
spacing, rebar sizes and bending shall be verified. The fixing work shall be checked to ensure that all rebars were
fixed properly in the proper location. The slab / band beam reinforcement consists of a 12mm dia. L-bar and a
12mm Dia U-bar.

The L-bar shall be drilled and grouted, as shown above, using Fosroc Lokfix as per the attached data sheets.

5. As shown above, the placement of the U-bar shall be done with the slab reinforcement.
6. Side form spacers used shall be concrete block spacers and their sizes shall vary as per concrete cover
requirement of steel. The steel fixing for the Post Tension Slab is described in detail in a separate method
statement, Casting of Post Tension Slab and Slope.
7. All MEP installations shall be checked to ensure none are damaged. An air compressor shall be employed to clean
the area and remove all the accumulated debris.
8. Details of casting the Post Tension Slab (slope filling, waterproofing, blinding, scaffolding, etc.) are included in a
separate Method Statement -Casting of Post Tension Slab and Slope.
9. Pouring of Concrete and Curing
10. Since the cut beam is recast with the Post Tension slab, the procedure is described in a separate Method
Statement -Casting of Post Tension Slab and Slope.

8. HEALTH, SAFETY AND ENVIRONMENT


9. ATTACHMENTS
9.1.Inspection Checklists
9.2.Inspection Test Plan
9.3.Risk Assessment
9.4. Technical Data sheet (TDS)