ROUGH CONSTRUCTION MATERIAL CALCULATION FOR RCC FRAMED STRUCTURE

CEMENT CONCRETE/SAND/AGGREGATE(BAJREE)

ELEMENT S.NO MEMBER NUMBER LENGTH WIDTH HEIGHT/THIKNESS VOLUME


(meter) (meter) (meter) (Cum)

A) FOOTING 13 1.50 1.50 0.45 13.16

B) COLUMN 9 0.45 0.30 3.20 3.89


COLUMN 1' X 1.5'

COLUMN
C) 1' X 1' 4 0.30 0.30 3.20 1.15

PLINTH BEAM
A) 1' X 1.5' 1 61.59 0.30 0.45 8.31
BEAM
MAIN BEAM
B) 1 NO OF STORIES 61.59 0.30 0.45 8.31
1' X 1.5'

A) ROOM SLAB 0 0.00 0.00 0.15 0.00


B) BATH SLAB 2 2.13 2.74 0.15 1.75
SLAB C) CORRIDOR 0 0.00 0.00 0.15 0.00
D) STAIR 1 1.00 3.60 0.15 0.54
E) BALCONY 1 1.00 3.65 0.15 0.55
Total Volume = 37.67
Number of Bags of cement 43 grade OPC (M15 Mix 1:2:4 ) = 241 Bags

Course sand in standard tipper size (4.5 cum capacity) = 4 Tipper


Aggregate 20mm in standard tipper size (4.5 cum capacity) = 9 Tipper
STEEL HYSD 415 GRADE OF STEEL

NUMBER OF DIAMETER OF LENGTH NUMBER OF Development Length LENGTH


COLUMN SPACING
ELEMENTS REBAR (meter) BARS /Lap (meter) (Meter)

FOOTING 13 16MM DIA 120MM C/C 1.50 13 0.30 244.05


13 16MM DIA 120MM C/C 1.50 13 0.30 244.05

COLUMN
9 16MM DIA - 3.20 4 0.45 115.65
1' X 1.5'

9 12MM DIA - 3.20 2 0.45 58.05

COLUMN 4 16MM DIA - 3.20 4 0.45 51.65


1' X 1'

4 12MM DIA - 3.20 0 0.00 0.00

HORIZONTAL TIES 13 8MM DIA 150MM C/C 1.40 21 0.08 388.34

BEAM
PLINTH BEAM
1 16MM DIA - 61.59 2 0.45 123.62
1' X 1.5'
1 12MM DIA - 61.59 4 0.45 246.79
MAIN BEAM 1 NO OF STORIES 16MM DIA - 61.59 2 0.45 123.62
1' X 1.5'
1 NO OF STORIES 12MM DIA - 61.59 4 0.45 246.79

VERTICAL TIES 2 8MM DIA 150MM C/C 1.40 411 0.08 1149.67
SLAB
ROOM SLAB 0 12MM DIA 150MM C/C 0.00 0 0.15 0.15
0 12MM DIA 150MM C/C 0.00 0 0.15 0.15
BATH SLAB 2 12MM DIA 150MM C/C 2.13 18 0.15 77.97
2 12MM DIA 150MM C/C 2.74 14 0.15 77.97
CORRIDOR 0 12MM DIA 150MM C/C 0.00 0 0.15 0.15
0 12MM DIA 150MM C/C 0.00 0 0.15 0.15
STAIR 1 12MM DIA 150MM C/C 1.00 24 0.15 24.15
1 12MM DIA 150MM C/C 3.60 7 0.15 24.15
BALCONY 1 12MM DIA 150MM C/C 1.00 24 0.15 24.48
1 12MM DIA 150MM C/C 3.65 7 0.15 24.48
Total Volume = 3221.60
TOTAL 16MM DIA REBAR IN LENGTH (METERS) 903 RM
TOTAL 12MM DIA REBAR IN LENGTH (METERS) 805 RM
TOTAL 8MM DIA REBAR IN LENGTH (METERS) 1538 RM

16MM DIA REBAR = 14.3 Quintal


12MM DIA REBAR = 7.2 Quintal
8MM DIA REBAR = 6.1 Quintal