Ø1/2"@0.25
Muro Reforzado
.50
F'C=210Kg/cm2 Terreno
.25 Ø3/8"@0.25
Natural
7.40 742.017 m.s.n.m.
.15
Ø1/2"@0.25
Terreno
Natural
Muro Reforzado
NPT 736.195 m.s.n.m. TUBERÍA DRENAJE PVC Ø4"
F'C=210Kg/cm2
GRAVILLA FINA P/FILTRACIÓN SARDINEL f'c=175kg/cm²
.20 Ø1"@0.25
.40
Ø1/2"@0.25 1.65
Terreno
Natural
735.00 m.s.n.m.
Zapata
Ø1/2"@0.25 F'C=210Kg/cm2
DETALLE TÍPICO DE DRENAJE DE TUBERÍA
Ø5/8"@0.25
.75 .25 1.75 ESCALA 1/50
Ø5/8"@0.25
Ø5/8"@0.20 Ø5/8"@0.20
.40
.60 .60 RELLENO SELECCIONADO 5.72
.30 .30 Ø3/4"@0.25 COMPACTADO
Ø1"@0.25
1.00
2.80
N.F.S.Z. 2,50
732.92 m.s.n.m.
Muro Reforzado
F'C=210Kg/cm2
SubZapata
32.60
Concreto F'C=100 Kg/cm2
Mezcla 1:10 C:H+30%P.G. DETALLE TUBERÍA DE DRENAJE EN PLANTA
ESCALA 1/4
2.75 Ø5/8"@0.25
.10 .10
ORIFICIO DE 3mm. DE DIÁMETRO
Terreno
DETALLE TÍPICO DE PERFORACIÓN DE TUBERÍA DE DRENAJE Natural
ESCALA 1/100 NPT 736.195 m.s.n.m.
Ø1"@0.25
ESPECIFICACIONES TECNICAS
Ø3/4"@0.25
CONCRETO CICLOPEO
TIPO IV ESTRIBOS
MORTERO : TIPO P1 1:4 (CEMENTO-ARENA)
Longitud de Anclaje con Gancho ( dg SubZapata
f'c = 210 kg/cm2
L 20 cm
Concreto F'C=100 Kg/cm2
VIGA 1/2"
5/8" 25 cm Mezcla 1:10 C:H+30%P.G.
3/4" 30 cm
CURADO d
1" 40 cm
4.80
Zapatas : L R 12 db
d (cm) 12db (cm)
Columnas, Vigas, Losas y Veredas :
MURO DE CONTENCION 01
3/8" 5.5 11
1/2" 7.5 15
5/8" 9.5 20
COLUMNA
3/4" 11.5 24 ESC 1:25
Ø L Rmin. 1" 15 32
NOTA :
PLANO DE REPLANTEO:
ING. CESAR E. AGUIRRE MALDONADO
UBICACION: INSPECTOR:
D-01
ARQ. JHONATTAN F. AGUILAR CALISAYA
DISTRITO :Ciudad Nueva
DETALLE DE MURO DE CONTENCION PROVINCIA :Tacna
REGION :Tacna
FECHA:
ESCALA:
DICIEMBRE-2018
N°03
INDIC.