List of Quality Control Plans and Approval Rev 3/2008
Status
Prepared by: T C Dube Date: 4/04/08 Doc :
_______________________________________________________________________________
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties
without express authority is strictly forbidden.© Alstom Power Service (SA) Pty Ltd, Quality Controller (Page 2 of 12)
List of Quality Control Plans and Approval Rev 3/2008
Status
Prepared by: T C Dube Date: 4/04/08 Doc :
04 M13102
STV 91/005 Moving blades
M13101
STV 91/008 Blades
M13111
STV 91/011 Fixed blades
M13112
30/430 92/049 Valve body
forging
BS970 92/061
722M24T
30/227 92/095
STV 92/114 Diaph. Rings
M16101
STV 92/187 Moving blades
M13131
STV 92/398
M13134
STV 92/414 HP controllers
M13122
_______________________________________________________________________________
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties
without express authority is strictly forbidden.© Alstom Power Service (SA) Pty Ltd, Quality Controller (Page 7 of 12)
List of Quality Control Plans and Approval Rev 3/2008
Status
Prepared by: T C Dube Date: 4/04/08 Doc :
5 machined Parts
Moving Blade 92/018
Manufacture
Hard Faced 92/022
component
manufacture
Manufacture of 92/030 HP STG1
spacer band nozzle plate
diaphragms
Manufacture of 92/036
nitrided / nito-
carburised
components
Manufacture of 92/037
white metalled
components
reinstallation of
turbine and
generator oil piping
Dismantling, QCP 11.6
cleaning and
reinstallation of
lubrication oil
piping local to
coolers and pumps
Exchange of valves QCP 11.7
and supply of the
required
components as
specified for the
lubrication oil relay
systems
Dismantling, QCP 11.8
cleaning and
reinstallation of the
oil vapour extractor
fans piping from top
of oil tank to the
turbine hall roof
Inatallation of three
new drains
QCPU4936/KOM7/0
6
_______________________________________________________________________________
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties
without express authority is strictly forbidden.© Alstom Power Service (SA) Pty Ltd, Quality Controller (Page 9 of 12)
List of Quality Control Plans and Approval Rev 3/2008
Status
Prepared by: T C Dube Date: 4/04/08 Doc :
QCPU4936/KOM7/0
7
_______________________________________________________________________________
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties
without express authority is strictly forbidden.© Alstom Power Service (SA) Pty Ltd, Quality Controller (Page 10 of 12)
List of Quality Control Plans and Approval Rev 3/2008
Status
Prepared by: T C Dube Date: 4/04/08 Doc :
QCPU4936/KOM7/0
8
_______________________________________________________________________________
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties
without express authority is strictly forbidden.© Alstom Power Service (SA) Pty Ltd, Quality Controller (Page 11 of 12)
List of Quality Control Plans and Approval Rev 3/2008
Status
Prepared by: T C Dube Date: 4/04/08 Doc :
_______________________________________________________________________________
We reserve all rights in this document and in the information contained therein. Reproduction, use or disclosure to third parties
without express authority is strictly forbidden.© Alstom Power Service (SA) Pty Ltd, Quality Controller (Page 12 of 12)