1 2 3 4 5 6 7 8 9 10 11 12

CREATED CHECKED APPROVED DATE INITIAL RELEASE


EEP000094-01021480065-2-ST-DET-0219 REVISION 00 DK VD SKM 19.12.2019

A A

BILL OF MATERIALS ASSEMBLY MK'D : GR3-RBR2 ASSY QTY : 4

Item Qty./ Profile Size Wt./Meter Length Wt./Item Total Total Wt. Material
Mark Assembly Qty.
361 1 ISA50X50X6 4.50 1581.63 7 4 28.01 E250
Total 28.01
B B

SUMMARY OF STEEL
GRID LOCATION SR.
GR3-RBR2 TR-2-TR- +8.045 DESCRIPTION TOTAL WT.
GR3-RBR2 TR-2-TR- +10.954 No.
GR3-RBR2 TR-2-TR- +8.045
GR3-RBR2 TR-2-TR- +10.954 1 ISA50X50X6 28.01
TOTAL IN KGS. 28.01
C C

2 - 18 Ø HOLES 361 2 - 18 Ø HOLES


28

28
40 70 1362 70 40
1582
D D

E E

00 INITIAL RELEASE DV VD SKM 19.12.2019

REV. DESCRIPTION CREATED BY CHECKED BY APPROVED BY DATE


F F
PROJECT
FEROZE GANDHI UNCHAHAR THERMAL POWER PROJECT
STAGE-IV (1x500MW)
WET FLUE GAS DESULPHURIZATION SYSTEM
EEP-000094
EMPLOYER

G G
FGD CONTRACTOR

GE POWER INDIA LIMITED


4 NOs. RAFTER BRACING REQD. MARKED AS GR3-RBR2 QFGDM SUB CONTRACTOR

GE COMPANY, USA
H LEPTON PROJECTS PVT. LTD. H
NTPC DRAWING NUMBER Rev. No.

B.O.Q OF BOLTS - -
Rev. No. Sub-Contractor`s Drg./Doc. No. Rev. No.

ASS. BOLT TOTAL NOS. OF ASS. TOTAL NOS BOLTS GE DRAWING NUMBER

MKD. SIZE LENGTH BOLTS NOS. OF BOLTS STANDARD REMARKS EEP000094-01021480065-2-ST-DET-0219 00 - -


Prepared Scale Type Format
DK NTS A3
GR3-RBR2 16 40 4 4 16 8.8XOX Site Checked Title
I VD I
Approved Approved (QFGDM)
DETAIL DRAWING OF CONVEYOR
We reserve all rights in this document and in the
information contained therein. Disclosure to third parties
SKM NA (LC-1A/1B, GR3
Language
without express authority is strictly forbidden. Date
19.12.2019
No. of sheet Sheet No.
1 of 1
RAFTER BRACING, GR3-RBR2 en
© General Electric Company and/or its Affiliates, 2018 1
1 2 3 4 5 0 6 50 7 100 8 9 10 11 12