Sei sulla pagina 1di 1

Install Sheet-Piping Insulation

Progress Tracking
Insulation
Install
material &
Insulation
Banding
Fabricate metal Clear Punch
(learn
Cladding covering list
more
(aluminum
about
cladding)
insulation

Work Pack

Weighting

Individual
Man hour

Progress

Progress
Drawing

material)
Project

Overall
(Meter)
Quantity
Area
Item

20% 35% 35% 10%

1 ISO-011 A WP-001 150.0 338 0.03 100% 100% 100% 100% 100% 0.032
2 ISO-012 A WP-001 100.0 225 0.02 100% 100% 100% 100% 100% 0.021
3 ISO-013 A WP-001 225.0 506 0.05 100% 100% 100% 100% 100% 0.048
4 ISO-014 A WP-001 200.0 450 0.04 100% 100% 100% 100% 100% 0.043
5 ISO-015 A WP-001 180.0 405 0.04 100% 100% 100% 100% 100% 0.039
6 ISO-016 A WP-001 255.0 574 0.05 100% 100% 100% 100% 100% 0.055
7 ISO-017 A WP-02 250.0 563 0.05 100% 100% 100% 100% 100% 0.054
8 ISO-018 A WP-02 240.0 540 0.05 100% 100% 100% 100% 100% 0.051
9 ISO-019 A WP-02 200.0 450 0.04 100% 100% 100% 100% 100% 0.043
10 ISO-020 A WP-02 200.0 450 0.04 100% 100% 100% 100% 100% 0.043
11 ISO-021 B WP-02 200.0 400 0.04 100% 100% 100% 100% 100% 0.038
12 ISO-022 B WP-02 190.0 380 0.04 100% 100% 100% 100% 100% 0.036
13 ISO-023 B WP-02 260.0 520 0.05 100% 100% 100% 100% 100% 0.050
14 ISO-024 B WP-02 340.0 680 0.06 100% 100% 100% 100% 100% 0.065
15 ISO-025 B WP-03 320.0 640 0.06 100% 100% 100% 100% 100% 0.061
16 ISO-026 B WP-03 260.0 520 0.05 100% 100% 100% 100% 100% 0.050
17 ISO-027 B WP-03 260.0 520 0.05 100% 100% 100% 100% 100% 0.050
18 ISO-028 B WP-03 320.0 640 0.06 100% 100% 100% 100% 100% 0.061 Enter % complete
19 ISO-029 B WP-03 260.0 520 0.05 100% 100% 55% 0.027 for each work step
20 ISO-030 B WP-04 240.0 480 0.05 100% 100% 55% 0.025
21 ISO-031 B WP-04 150.0 300 0.03 100% 100% 55% 0.016
22 ISO-032 B WP-04 200.0 400 0.04 100% 100% 55% 0.021

Progress Summary by Project Area-Piping Insulation Progress Summary by Work Pack-Piping Insulation

Work Pack)
Weighting(
Work Pack
Weighting
Man hour

Progress

Progress

Progress

Progress
by Work
by Area

Overall

Overall
Project

(Meter)
Quantity

Pack
Area

A 2000 4500 0.43 100% 42.9% WP-001 0.238 100% 23.8%


B 3000 6000 0.57 87% 49.9% WP-02 0.379 100% 37.9%
WP-03 0.270 92% 24.8%
WP-04 0.112 55% 6.2%
Total 5000 10500 1.00 92.7% 1.00 92.7%