CONTENT
1 Introduction
2 Process
3 Advantage
4 Cost
5
5 Result
INTRODUCTION
Maintaining the integrity of pipeline
Inhibitors Biocides
Scrapers PL Replacement
In-Situ Coating
Coating Specification
•Coating type: Polyamide cured epoxy
•Core constraints:
•Surface to be coated must be clean and dry (Nace 2, near white metal finish)
•Line must be clear of sediment
•Pot life (6 hours <25 degrees Celcius)
•Pipeline required to be dry with relative humidity 10o C below ambient relative humidity
Receiver Launcher
Chemical cleaning
Step 2
HCl
Inspection
Step 3 Passivation, chemical and air drying
H3PO4 MEK
Step 4
Coating
Inspection
SUMMARY OF THE PROCESS
Corroded
Cleaned
Coated
Applicable Effectively coats Low PL Reducing Increase
to any type internal downtime the cost for efficiency
of PL discontinuities, maintenance
bends,dents
USD
Internal coating
•This is the minimum cost of internal coating regardless the length and diameter
RESULT