MAINTENANCE ORGANIZATION EXPOSITION

Issue No: 2 Issue date: 25 Jun 2014 Revision No: 5 Revision Date: 19 Oct 2015 Page No: 1.35

PART 1 – MANAGEMENT
Chapter : 1.9 Scope of work
Part 145.A.20/AMC 145.A.20 - Part 145.A.42 (c) - Part 145.A70 (a) 9 - Part 145.A.75 (a) (b) (c) (d) (e) – Part 145.A.80/AMC 145.A.80

1.9 Scope of work


1.9.1 Aircraft Maintenance
The table below establishes the limitations with respect to products and activities identified on the
Approval schedule attached to the Competent Authority Approval Certificate (Reference EASA.145.0581)
issued to Tulpar Technic.

RATING TC HOLDER AIRCRAFT MODEL LIMITATION MAINTENANCE LEVEL BASE LINE

Line maintenance up to and

F
including 2A-check or
equivalent according to

ia D
MSG-3 program, defect
Boeing 737-300
THE BOEING Boeing 737-300/-400/- rectification, minor repairs
A1 Boeing 737-400 X
COMPANY 500 (CFM56) and modifications, engine
Boeing 737-500
Tr t P
CFM-56-3B1/-3B2/-3C1 and
APU GTCP85-129, GTCP36-
280, APS2000 on-wing
maintenance.
Line maintenance up to and
r
including 800 Hours check,
l
Pe

24 Months check, defect


Bombardier BD-100-
BD-100-1A10 rectification, minor repairs
A1 BOMBARDIER 1A10 X
(Challenger 300) and modifications,
(Honeywell AS907)
Honeywell AS907 engine and
Honeywell GTCP 36-150[BD]
eX

APU on-wing maintenance.


A1 Line and Base maintenance
up to and including 30000
Hours check, up to and
including 5000 Flight Cycles,
up to and including 96
Months check, defect
rectification, minor and
CL-600-2B19 major repairs and
(Regional Jet series Bombardier CL-600- modifications, General
BOMBARDIER Electric engine and X X
100/200/Challenger 2B19 (GE CF34)
Honeywell GTCP 36-150[RJ]
850) APU up to and including
3500 APU Hours, on-wing
maintenance, APU change.
Scheduled component
replacement including
undercarriage change.
Aircraft weight and balance
check.
MAINTENANCE ORGANIZATION EXPOSITION
Issue No: 2 Issue date: 25 Jun 2014 Revision No: 5 Revision Date: 19 Oct 2015 Page No: 1.36

PART 1 – MANAGEMENT
Chapter : 1.9 Scope of work
Part 145.A.20/AMC 145.A.20 - Part 145.A.42 (c) - Part 145.A70 (a) 9 - Part 145.A.75 (a) (b) (c) (d) (e) – Part 145.A.80/AMC 145.A.80

A319-110 series Line maintenance up to and


A320-111series Airbus including 400 FH/3MO and
A1 AIRBUS A320-210 series A319/A320/A321 defect rectification, minor X
A321-110 series (CFM56) repairs and modifications.
A321-210 series
Line maintenance up to and
Boeing 737-600
Boeing 737- including 150 FH/70
THE BOEING Boeing 737-700
A1 600/700/800/900 Days/450 Flight Cycles and X
COMPANY Boeing 737-800

F
(CFM56) defect rectification, minor
Boeing 737-900
repairs and modifications
A2 NIL
A3
A4
NIL
NIL
ia D
Tr t P
*The limitation relative to the maintenance checks/tasks is addressed as referenced in TC Holder
data (i.e. MRB/MPD).

1.9.2 Engine maintenance


r
N/A to Tulpar Technic scope of work
l
Pe

1.9.3 Component maintenance

Rating ATA Designation P/N


eX

“SAFT” batteries
C5 24
“Marathon” batteries
Refer to Tulpar Technic Capability List (Form 055).
“Honeywell” wheels
C14 32 “Goodrich” wheels
“Meggitt” wheels

Component Maintenance Division Manager is responsible for managing Tulpar Technic Capability List
(Form 055) for the aircraft components that are maintained by Tulpar Technic. Each new revision must be
submitted to Accountable Manager and Quality Manager for approval. Signed list should be sent to EASA
for the final approval before entering the new revision of the Capability List into the force.
MAINTENANCE ORGANIZATION EXPOSITION

Issue No: 2 Issue date: 25 Jun 2014 Revision No: 5 Revision Date: 19 Oct 2015 Page No: 1.36a

PART 1 – MANAGEMENT
Chapter : 1.9 Scope of work
Part 145.A.20/AMC 145.A.20 - Part 145.A.42 (c) - Part 145.A70 (a) 9 - Part 145.A.75 (a) (b) (c) (d) (e) – Part 145.A.80/AMC 145.A.80

1.9.4 Specialized services


Such activities can be performed during aircraft Line and Base maintenance, in Wheel Workshop and
NDT Workshop.
RATING LIMITATION DETAIL OF LIMITATION
Liquid Penetrant Inspection (PT) No limitations
D1 Eddy Current Inspection (ET) No limitations
Ultrasonic Inspection (UT) No limitations

F
1.9.4.1 Maintenance Away From the Approved Locations

ia D
Tulpar Technic may perform works away from the approved locations, subject to the condition
specified in MOE 2.24.7.
Tr t P
1.9.4.2 Other Specialised Activities.
Tulpar Technic may perform aircraft painting in accordance with MOE 2.24.9
NOTE: Aircraft painting is a Base maintenance task.