Pregunta 1 For which of the following elements does the Asset Explorer give a clear overview of the activity for an
Correcta asset?
 
Puntúa 1.00 sobre
1.00  (Select three options)

Seleccione una o más de una:


a.
Planned value
 
Perfect!

b.
Posted and planned depreciation
 
Excellent!

c.
Depreciation parameters
 
Such a genius!

d.
Asset Explorer is designed to provide an overview of all the listed elements except for
settled value. Settled values will be shown as the aggregate of all settlements and will
represent the asset value. 

Respuesta correcta

https://tic.uis.edu.co/ava/mod/quiz/review.php?attempt=888976&cmid=277058 1/11
12/8/2019 Test your Knowledge-EAM
Pregunta 2 EAM
Correcta In addition to the posting key, what other value is necessary when posting to an asset account?
Puntúa 1.00 sobre  (select one answer)
1.00

Seleccione una:
a. Order type
b. Transaction type That is the answer!!

c. Account type

Respuesta correcta

Pregunta 3 EAM Which of the following are technical objects? (that may have maintenance tasks carr ed upon them)
Correcta
Coose two, please
Puntúa 1.00 sobre
1.00 Seleccione una o más de una:
a. Functional Location Good!

b. Work center
c. Bill of Material Good!

d. Cost center

Respuesta correcta

Pregunta 4 EAM
Correcta
You have created a bill of material for similar pieces of equipment. In the equipment master record, which
Puntúa 1.00 sobre eld do you use to assign the bill of material to the piece of equipment?
1.00  (Choose one answer)

Seleccione una:
a. Construction type
You are correct! The Construction Type eld is used to record a BOM that is applicable to many
equipments that are similar in their construction. This eliminates the need to have individual BOMs
for each equipment.

b. Evaluations
c. Usage
d. Counter


Respuesta correcta

https://tic.uis.edu.co/ava/mod/quiz/review.php?attempt=888976&cmid=277058 2/11
12/8/2019 Test your Knowledge-EAM
Pregunta 5 In the corrective management process, which is the phase after the control phase?
Correcta  (Choose one corect answer)
Puntúa 1.00 sobre
1.00 Seleccione una:
a. Planning
b. Excecution
Once the control phase is completed, the order is released, shop oor papers are printed, and so on.
The next activity is Execution. Planning is the rst activity once a noti cation is received. Completion is
the last activity in corrective management. 

c. Completion

Respuesta correcta

Pregunta 6 EAM 21
Correcta
For which reference objects can a maintenance noti cation be created?
Puntúa 1.00 sobre  
1.00  (Choose two)

Seleccione una o más de una:


a.
Functional location (with or without an assembly) 

b.
Equipment (with or without an assembly) 

c.
Material without serial number

Respuesta correcta

https://tic.uis.edu.co/ava/mod/quiz/review.php?attempt=888976&cmid=277058 3/11
12/8/2019 Test your Knowledge-EAM
Pregunta 7 EAM
Correcta Which of the following elements are included in a maintenance order?
Puntúa 1.00 sobre  
1.00 (Select three)
 
 

Seleccione una o más de una:


a. Order operation
b. Settelment rule
c. Object list
d. Activity report

Respuesta correcta

Pregunta 8 EAM
Incorrecta A non-stock item is assigned to a maintenance order, the order is released. Which of the following is
Puntúa 0.00 sobre created?
1.00  
 (select one)

Seleccione una:
a. An inventory reservation
b. A purchase requisition
c. A purchase order
d. A Material documents

Respuesta incorrecta.

Pregunta 9 EAM 24
Correcta Which step comes after creating the purchase order in the nonstock material procurement process ow?
Puntúa 1.00 sobre  (Choose one answer)
1.00

Seleccione una:
a. Technical completion

b. Goods receipt Once a purchase order has been created for a non-stock material, the next
step in the process is the receipt of the goods. Technical completion is performed once the
maintenance work has been completed. An invoice will be processed after the goods have been
receipted into the warehouse. 

c. Invoice

Respuesta correcta

https://tic.uis.edu.co/ava/mod/quiz/review.php?attempt=888976&cmid=277058 4/11
12/8/2019 Test your Knowledge-EAM
Pregunta 10 EAM
Correcta Which of the following activities can be performed after you release a maintenance order?
Puntúa 1.00 sobre  
1.00  (Please choose three)

Seleccione una o más de una:


a. Print shop papers
Once a maintenance order has been released, all the activities listed can be performed except for
release payment for goods. Releasing a payment for goods is an activity in the procure-to-pay process
where nance approve the dispersal of monies to a vendor for the procurement of materials. This
activity has no relation to maintenance orders. 

b. Post goods issue Once a maintenance order has been released, all the activities listed can
be performed except for release payment for goods. Releasing a payment for goods is an activity in
the procure-to-pay process where nance approve the dispersal of monies to a vendor for the
procurement of materials. This activity has no relation to maintenance orders.

c. Release payment for goods


d. Enter time con rmations Once a maintenance order has been released, all the activities
listed can be performed except for release payment for goods. Releasing a payment for goods is an
activity in the procure-to-pay process where nance approve the dispersal of monies to a vendor for
the procurement of materials. This activity has no relation to maintenance orders.

Respuesta correcta

Pregunta 11 EAM
Correcta Which of the following are used to con rm the time required to work on a maintenance order?
Puntúa 1.00 sobre  (Plase choose two)
1.00

Seleccione una o más de una:


a. Individual entry
Time con rmations can be entered in an individual transaction or entered as part of the completion
con rmation. A book entry cannot be used to record time in an SAP system. 

b. Book entry
c. Overal completion con rmation Time con rmations can be entered in an individual
transaction or entered as part of the completion con rmation. A book entry cannot be used to record
time in an SAP system.

Respuesta correcta

https://tic.uis.edu.co/ava/mod/quiz/review.php?attempt=888976&cmid=277058 5/11
12/8/2019 Test your Knowledge-EAM
Pregunta 12 EAM
Correcta In which of the following ways can a maintenance order be completed?
Puntúa 1.00 sobre  
1.00  (Choose two)

Seleccione una o más de una:


a.
Complete the maintenance order and noti cation separately
 

Maintenance orders can be completed separately to a noti cation, or completed together with the
noti cation. If there are outstanding noti cation tasks, the maintenance order cannot be completed
together with the noti cation. 

b.
Complete the maintenance order together with assigned noti cations
 
Maintenance orders can be completed separately to a noti cation, or completed together with
the noti cation. If there are outstanding noti cation tasks, the maintenance order cannot be
completed together with the noti cation.

c.
Complete the maintenance order with outstanding tasks

Respuesta correcta

Pregunta 13 Which of the following data can be found in the maintenance history of equipment?
Correcta
 (Select two)
Puntúa 1.00 sobre
1.00 Seleccione una o más de una:
a. Order data
Maintenance history stores data from orders and noti cations. Depreciation data resides in Asset
Accounting. System data is not stored in a maintenance history. 

b. Data from maintenance noti cation Maintenance history stores data from orders and
noti cations. Depreciation data resides in Asset Accounting. System data is not stored in a
maintenance history.

c. Depreciation data
d. System data


Respuesta correcta

https://tic.uis.edu.co/ava/mod/quiz/review.php?attempt=888976&cmid=277058 6/11
12/8/2019 Test your Knowledge-EAM
Pregunta 14 EAM
Correcta Creating an internal order allows which of the following options? (Mark 2 of the options)
 
Puntúa 1.00 sobre
1.00  

Seleccione una o más de una:


a. Monitor overhead costs incurred for a particular purpose
b.
O set postings of accrued costs to cost centers
c. Monitor costs incurred in the production of a xed asset
d. Replace the managerial accounting parts of Sales and Distribution (SD)

Respuesta correcta

Pregunta 15 EAM-
Correcta An internal order is created to collect costs for a xed asset. Which of the following processes transfers
these costs to the xed asset?
Puntúa 1.00 sobre
 
1.00
 

Seleccione una:
a. Order settlelment
You are correct! An internal order used to collect costs for an asset will only transfer the costs to the
asset de ned in the settlement rule at the time of order settlement. Order release is a status that
allows the posting of costs to the internal order. Order creation is a status assigned when the internal
order is created.  

b. Order release
c. Order creation

Respuesta correcta

Pregunta 16 EAM
Correcta
Which of the following elements are examples of possible receivers of an internal order settlement?
Puntúa 1.00 sobre  Select two correct options
1.00

Seleccione una o más de una:


a. Cost center Perfect!

b. Cost element

c. Asset
Internal orders can be settled to cost centers and assets. Settlement to a cost element is not possible. 

Respuesta correcta
https://tic.uis.edu.co/ava/mod/quiz/review.php?attempt=888976&cmid=277058 7/11
12/8/2019 Test your Knowledge-EAM
Pregunta 17 EAM
Correcta Which of the following are true statements regarding internal orders?
Puntúa 1.00 sobre  
1.00  (Select three)

Seleccione una o más de una:


a.
Internal orders can settle costs to Financial Accounting (FI)

b.
An internal order can be true or statistical

c.
A statistical order requires a settlement rule

d.
Internal orders collect costs

Respuesta correcta

Pregunta 18 EAM
Correcta After a user creates and saves a xed asset record, an _____________(EAM) record can be created in SAP
Enterprise Asset Management (EAM).
Puntúa 1.00 sobre
 
1.00
 

Seleccione una:
a. Equipment
You are correct! There is a standard switch in Customizing that enables the creation of an Equipment
Master once an asset master is created. 
 

b. Internal
c. Order Settlement 

d. Asset

Respuesta correcta

https://tic.uis.edu.co/ava/mod/quiz/review.php?attempt=888976&cmid=277058 8/11
12/8/2019 Test your Knowledge-EAM
Pregunta 19 EAM
Correcta Commitments are created for an internal order when which of the following documents are created?
(choose two answers)
Puntúa 1.00 sobre
 
1.00
 

Seleccione una o más de una:


a. Purchase order
Commitments are costs that will be incurred sometime in the future. In an internal order, you can see
commitments for purchase orders and purchase requisitions. Material and accounting documents are
not commitment documents, because they are not a future-dated cost; these sorts of documents
re ect actual processes that have already occurred. 

b. Accounting document
c. Material document
d. Purchase requisition Commitments are costs that will be incurred sometime in the future.
In an internal order, you can see commitments for purchase orders and purchase requisitions.
Material and accounting documents are not commitment documents, because they are not a future-
dated cost; these sorts of documents re ect actual processes that have already occurred.

Respuesta correcta

Pregunta 20 EAM
Correcta During an internal order settlement, the system transfers the costs from the internal order to the
equipment record.
Puntúa 1.00 sobre
 
1.00
 

Seleccione una:
Verdadero
Falso

Good!

Pregunta 21 A Maintenance Plant is a plant within which the operational systems of a company are installed?
Correcta  
Puntúa 1.00 sobre  
1.00
Seleccione una:
Verdadero
Falso 

You are correct! Corporate assets that are required to be maintained are de ned within a maintenance
plant. 

https://tic.uis.edu.co/ava/mod/quiz/review.php?attempt=888976&cmid=277058 9/11
12/8/2019 Test your Knowledge-EAM
Pregunta 22 A maintenance planning plant is the organizational unit in which maintenance requirements are planned.
Correcta  
Puntúa 1.00 sobre
1.00 Seleccione una:
Verdadero
Falso

You are correct! Maintenance planning is carried out in a maintenance planning plant. 

Pregunta 23 EAM
Correcta
Functional locations are hierarchically ordered structures and could be used, for example, to represent a
Puntúa 1.00 sobre technical system.
1.00  

Seleccione una:
Verdadero
Falso

Good!

Pregunta 24 A piece of equipment must be assigned to a functional location.


Correcta  

Puntúa 1.00 sobre  


1.00
Seleccione una:
Verdadero
Falso

YOU ARE CORRECT! In Plant Maintenance, objects that can be maintained can be represented using
functional locations or equipments, but both objects do not have to be used together. 

Pregunta 25 A piece of equipment must be assigned to a functional location.


Correcta  
Puntúa 1.00 sobre  
1.00
Seleccione una:
Verdadero

Falso

YOU ARE CORRECT! In Plant Maintenance, objects that can be maintained can be represented using
functional locations or equipments, but both objects do not have to be used together. 

https://tic.uis.edu.co/ava/mod/quiz/review.php?attempt=888976&cmid=277058 10/11
12/8/2019 Test your Knowledge-EAM
Pregunta 26 EAM
Correcta An asset master record is always assigned to one company code for a given time period.
 
Puntúa 1.00 sobre
1.00  

Seleccione una:
Verdadero
Falso

Perfect!

Pregunta 27 Internal order settlement can occur periodically or at the end of the life of the order.
Correcta  
Puntúa 1.00 sobre  
1.00
Seleccione una:
Verdadero
Falso

Internal order settlement can be carried out at any time. 


 