Sei sulla pagina 1di 102

目次

1 Design condition 1
1.1 Pile condition 1
1.2 Member in use and allowable stress 1
1.3 Pile arrangement plan and side view 2
1.4 Stratum data 3
1.5 Spring const.,bear. capacity, pull-out capacity & 2nd moment 3
1.6 Acting force 4
2 Stability analysis 5
2.1 Pile-axix perpendicular directional spring constant 5
2.2 Stiffness matrix of pile foundation 7
2.3 Calculation of pile reaction and displacement 9
3 Cross section anlysis 12
3.1 Pile section force 12
3.2 Section force chart 49
3.3 Pile body stress 86
4 Fundamental pile calculation result list 94
5 Preparative calculation 96
5.1 Horizontal directional soil reaction coefficient 96
5.2 Pile axis directional vertical spring constant 97
5.3 Maximum side friction force 98
5.4 Calculation of bearing capacity, pull‐out force 99
- 1 -
1 Design condition
1.1 Pile condition
・Pile type :Steel pile pile
・Construction method :Hammering pile(hammering)
・Pile head joint condition :Rigid connection
・Pile end condition :Hinge
・Pile type :Bearing pile
・Allowable displacement of pile Normal time : 15.0 (mm)
Earthquake time : 15.0 (mm)
・Young's modulus of pile body : 2.00 ×105 (N/mm2)
・Number of piles : 8
 ・Rust thickness outside : 1.2 (mm)
 ・Inner rust thickness : 0.6 (mm)
Type Pile D(mm) Designed pile length(m) Cross section Pile length(m) Steel pipe thickness(mm) Material θx(deg) θy(deg)
1 1600.0 66.00 1 30.00 25.0 SKK490 -9.500 0.000
2 36.00 18.0 SKK400
2 1600.0 66.00 1 30.00 25.0 SKK490 -6.700 6.700
2 36.00 18.0 SKK400
3 1600.0 66.00 1 30.00 25.0 SKK490 -6.700 -6.700
2 36.00 18.0 SKK400
4 1600.0 66.00 1 30.00 25.0 SKK490 0.000 9.500
2 36.00 18.0 SKK400
5 1600.0 66.00 1 30.00 25.0 SKK490 0.000 -9.500
2 36.00 18.0 SKK400
6 1600.0 66.00 1 30.00 25.0 SKK490 6.700 6.700
2 36.00 18.0 SKK400
7 1600.0 66.00 1 30.00 25.0 SKK490 6.700 -6.700
2 36.00 18.0 SKK400
8 1600.0 66.00 1 30.00 25.0 SKK490 9.500 0.000
2 36.00 18.0 SKK400

1.2 Member in use and allowable stress


Unit:N/mm2
Allowable bending Allowable bending Allowable shear
Increase compression stressσca tension stressσta stressτa
No
coefficient
SKK400 SKK490 SKK400 SKK490 SKK400 SKK490
1 1.50 210.00 286.30 210.00 283.60 120.00 157.00
- 2 -
1.3 Pile arrangement plan and side view

15 900

15 9 0 0



------ Design soil face(Normal time)
------ Design soil face(Earthquake time)
(a)Plan view (b)Side view(Bridge axis perp.dir.)

Pile head coordinate(m)

No X Coord. Y Coord.
1 0.000 6.000
2 -4.243 4.243
3 -6.000 0.000
4 -4.243 -4.243
5 0.000 -6.000
6 4.243 -4.243
7 6.000 0.000
8 4.243 4.243

Coordinate direction of each direction is shown in figure(a)


Pile type number
Matrix 1 2 3 4 5
1 NG NG 4 NG NG
2 NG 2 NG 6 NG
3 1 NG NG NG 8
4 NG 3 NG 7 NG
5 NG NG 5 NG NG
- 3 -
1.4 Stratum data
α・Eo(kN/m2) γ(kN/m3) f (kN/m2)
Layer Average
No Layer type N value Normal Earthquake γ γ’ f fn
1 Cohesive soil 0.0 0 0 10.00 0.20 0.0 0.0
2 Cohesive soil 2.2 6160 12320 15.90 6.10 22.0 22.0
3 Cohesive soil 2.0 5600 11200 16.31 6.78 0.0 20.0
4 Cohesive soil 21.0 58800 117600 17.78 8.44 150.0 150.0
5 Sandy soil 16.0 44800 89600 18.39 9.25 32.0 32.0
6 Sandy soil 32.0 89600 179200 18.36 9.29 64.0 64.0
7 Cohesive soil 19.5 54600 109200 17.67 8.47 150.0 150.0
8 Cohesive soil 19.0 53200 106400 18.52 9.19 150.0 150.0
9 Cohesive soil 20.0 56000 112000 18.28 8.97 150.0 150.0
10 Cohesive soil 31.0 86800 173600 18.00 8.70 150.0 150.0
11 Cohesive soil 45.5 127400 254800 17.98 8.77 150.0 150.0
12 Sandy soil 50.0 140000 280000 17.59 8.40 100.0 100.0

1.5 Spring const.,bear. capacity, pull-out capacity & 2nd moment


-Pile axis directional spring constant Kv(kN/m)
Normal time 451176
Earthquake time 451176

-Allowable bearing capacity, pullout force (kN/1 pile)


Normal time 16180
Allowable bearing capacity
Earthquake time 16180
Normal time 6756
Allowable pullout force
Earthquake time 6756

-Horizontal-direction soil reaction coefficient kH(kN/m3)


Layer thickness(m) Bridge axis direction Bridge axis perp.dir.
LayerNo
Normal Earthquake Normal Earthquake Normal Earthquake
1 10.000 10.000 0 0 0 0
2 11.800 11.800 3100 6200 3100 6200
3 2.000 2.000 2818 5637 2818 5637
4 2.600 2.600 29593 59186 29593 59186
5 3.600 3.600 22547 45094 22547 45094
5 '0.900 0.900 22547 45094 22547 45094
6 7.100 7.100 45094 90188 45094 90188
7 6.700 6.700 27479 54958 27479 54958
8 2.300 2.300 26774 53549 26774 53549
9 3.100 3.100 28184 56367 28184 56367
10 7.500 7.500 43685 87369 43685 87369
11 6.400 6.400 64118 128236 64118 128236
12 2.000 2.000 70459 140918 70459 140918

'
shows layer-divided at the point of section aspect change
- 4 -
-Pile body ross section moment of inertia of area I(m4)
No 1 cross-section 0.035562072
No 2 cross-section 0.025162045

1.6 Acting force


No Abbreviation load Overdesign Vertical Horizontal Moment Horizontal Moment
case name factor force V(kN) force Hx(kN) My(kN.m) force Hy(kN) Mx(kN.m)
1 EXETREME 1.50 6909.3 31.0 5850.0 1289.0 124400.0
2 EXETREME 1.50 9086.9 1292.0 136986.3 24.0 10208.0
3 EXETREME 1.50 6534.4 1292.0 136986.3 24.0 10208.0
4 QUASI 1.50 5592.5 714.0 77791.0 0.0 0.0
5 FATIGUE 1.50 5647.6 366.0 38713.0 2.0 2798.0

Bridge axis perp.dir. Bridge axis direction

My

Mx
Hx

Hy
- 5 -
2 Stability analysis
2.1 Pile-axix perpendicular directional spring constant
(1)Bridge axis direction
a) Pile-head rigid connection
1)Normal time
K1 K2 K3 K4
type
(kN/m) (kN/rad) (kN.m/m) (kN.m/rad)
1 10759 100663 100663 1328367
2 10760 100669 100669 1328403
3 10760 100669 100669 1328403
4 10759 100663 100663 1328367
5 10759 100663 100663 1328367
6 10760 100669 100669 1328403
7 10760 100669 100669 1328403
8 10759 100663 100663 1328367

2)Earthquake time
type K1 K2 K3 K4
(kN/m) (kN/rad) (kN.m/m) (kN.m/rad)
1 14126 122419 122419 1474562
2 14128 122427 122427 1474607
3 14128 122427 122427 1474607
4 14126 122419 122419 1474562
5 14126 122419 122419 1474562
6 14128 122427 122427 1474607
7 14128 122427 122427 1474607
8 14126 122419 122419 1474562

(2)Bridge axis perp.dir.


a) Pile-head rigid connection
1)Normal time
type K1 K2 K3 K4
(kN/m) (kN/rad) (kN.m/m) (kN.m/rad)
1 10759 100663 100663 1328367
2 10760 100669 100669 1328403
3 10760 100669 100669 1328403
4 10759 100663 100663 1328367
5 10759 100663 100663 1328367
6 10760 100669 100669 1328403
7 10760 100669 100669 1328403
8 10759 100663 100663 1328367
- 6 -
2)Earthquake time
K1 K2 K3 K4
type
(kN/m) (kN/rad) (kN.m/m) (kN.m/rad)
1 14126 122419 122419 1474562
2 14128 122427 122427 1474607
3 14128 122427 122427 1474607
4 14126 122419 122419 1474562
5 14126 122419 122419 1474562
6 14128 122427 122427 1474607
7 14128 122427 122427 1474607
8 14126 122419 122419 1474562
- 7 -
2.2 Stiffness matrix of pile foundation
1.Relation between disp. at the center of the bottomslab and external force by disp. method
V Azz Azx Azay Azy Azax δz
Hx Axz Axx Axay Axy Axax δx
My = Aayz Aayx Aayay Aayy Aayax αy
Hy Ayz Ayx Ayay Ayy Ayax δy
Mx Aaxz Aaxx Aaxay Aaxy Aaxax αx

2.Stiffness matrix element


Azz =Σ(Kv・cos2θ+K1x・sin2θx+K1y・sin2θy)i
Azx =Axz =Σ(Kv・cosθ・sinθx-K1x・sinθx・cosθx)i
Azay =Aayz =Σ(Kv・X・cos2θ+K1x・X・sin2θx+K2x・sinθx+K1y・X・sin2θy)i
Azy =Ayz =Σ(Kv・cosθ・sinθy-K1y・sinθy・cosθy)i
Azax =Aaxz =Σ(Kv・Y・cos2θ+K1x・Y・sin2θx+K1y・Y・sin2θy+K2y・sinθy)i
Axx =Σ(Kv・sin2θx+K1x・cos2θx)i
Axay =Aayx =Σ(Kv・X・sinθx・cosθ-K1x・X・sinθx・cosθx-K2x・cosθx)i
Axy =Ayx =Σ(Kv・sinθx・sinθy)i
Axax =Aaxx =Σ(Kv・Y・cosθ・sinθx-K1x・Y・sinθx・cosθx)i
Aayay =Σ{Kv・X2・cos2θ+K1x・X2・sin2θx
+(K2x+K3x)・X・sinθx+K4x+K1y・X2・sin2θy}i
Aayy =Ayay =Σ(Kv・X・cosθ・sinθy-K1y・X・sinθy・cosθy)i
Aayax=Aaxay=Σ{(Kv・cos2θ+K1x・sin2θx+K1y・sin2θy)・X・Y
+K3x・Y・sinθx+K2y・X・sinθy}i
Ayy =Σ(Kv・sin2θy+K1y・cos2θy)i
Ayax =Aaxy =Σ(Kv・Y・cosθ・sinθy-K1y・Y・sinθy・cosθy-K2y・cosθy)i
Aaxax =Σ{(Kv・cos2θ+K1x・sin2θx+K1y・sin2θy)・Y2
+(K2y+K3y)・Y・sinθy+K4y}i
Here, Azz :Spring in vertical direction(kN/m)
Azx =Axz :Coupling spring by vertical and hor. X direction (kN/m)
Azay =Aayz :Coupling spring by vertical and X direction rotation(around Y axis)(kN/rad,kN.m/m)
Azy =Ayz :Coupling spring by vertical and hor. Y direction(kN/m)
Azax =Aaxz :Coupling spring by vertical and Y direction rotation(around X axis)(kN/rad,kN.m/m)
Axx :X direction hor. spring(kN/m)
Axay =Aayx :Coupling spring by X dir. hor. and X direction rotation(around Y axis)(kN/rad,kN.m/m)
Axy =Ayx :Coupling spring by X dir. hor. and Y direction hor.(kN/m)
Axax =Aaxx :Coupling spring by X dir. hor. and X direction rotation(around X axis)(kN/rad,kN.m/m)
Aayay :X direction rotation(around Y axis) spring(kN.m/rad)
Aayy =Ayay :Coupling spring by Y dir. hor. and X direction rotation(around Y axis)(kN/rad,kN.m/m)
Aayax=Aaxay:Coupling spring by Y direction hor. and Y direction rotation(around X axis)(kN/m)
Ayy :Y direction hor. spring(kN/m)
Ayax =Aaxy :Coupling spring by Y dir. hor. and Y direction rotation(around X axis)(kN/rad,kN.m/m)
Aaxax :Y direction hor. (around X axis) rotation spring(kN.m/rad)
V :Vertical force action at the origin(kN)
Hx :Hor. force in X direction action at the origin(kN)
Hy :Hor. force in Y direction action at the origin(kN)
My :Moment around Y axis action at the origin(kN.m)
Mx :Moment around X axis action at the origin(kN.m)
Kvi :Spring constant in pile axis(kN/m)
K1xi to K4xi:Spring constant in pile axis perpendicular dir. in X dir.(kN/m,kN/rad,kN.m/m,kN.m/rad)
K1yi to K4yi:Spring constant in pile axis perpendicular dir. in Y dir.(kN/m,kN/rad,kN.m/m,kN.m/rad)
Xi :Hor. coordinate of pile head in X direction(m)
Yi :Hor. coordinate of pile head in Y direction(m)
θi :Angle by pile axis and vertical axisAngle by pile axis and vertical axis(rad)
θi :Combined angle of X and Y direction
θxi:X direction angle
θyi:Y direction angle
δz :Vertical disp. at origin(m)
δx :Original hor. disp. in X direction(m)
δy :Original hor. disp. in Y direction(m)
αx :Rotation angle around X axis(rad)
αy :Rotation angle around Y axis(rad)
Note)i in formula indicates i th pile。
- 8 -
a) Pile-head rigid connection
1)Normal time
Azz Azx Azay Azy Azax
Axz Axx Axay Axy Axax
Aayz Aayx Aayay Aayy Aayax
Ayz Ayx Ayay Ayy Ayax
Aaxz Aaxx Aaxay Aaxy Aaxax
3513683 0 0 0 0
0 134053 920537 0 0
= 0 920537 74676145 0 0
0 0 0 134053 920537
0 0 0 920537 74676145
2)Earthquake time
Azz Azx Azay Azy Azax
Axz Axx Axay Axy Axax
Aayz Aayx Aayay Aayy Aayax
Ayz Ayx Ayay Ayy Ayax
Aaxz Aaxx Aaxay Aaxy Aaxax
3514416 0 0 0 0
0 160622 734473 0 0
= 0 734473 76031295 0 0
0 0 0 160622 734473
0 0 0 734473 76031295
- 9 -
2.3 Calculation of pile reaction and displacement
PN
PHx
Mty =
PHy
Mtx i
Kv・cosθ Kv・sinθx Kv・X・cosθ Kv・sinθy Kv・y・cosθ δz
-K1x・sinθx K1x・cosθx -K1x・X・sinθx-K2x 0 -K1x・Y・sinθx δx
K3x・sinθx -K3x・cosθx K3x・X・sinθx+K4x 0 K3x・Y・sinθx αy
-K1y・sinθy 0 -K1y・X・sinθy K1y・cosθy -K1y・Y・sinθy-K2y δy
K3y・sinθy 0 K3y・X・sinθy -K3y・cosθy K3y・Y・sinθy+K4y i αx
δzi= (δz+αy・Xi+αx・Yi)・cosθi +δx・sinθxi+δy・sinθyi
δxi=-(δz+αy・Xi+αx・Yi)・sinθxi+δx・cosθxi
δyi=-(δz+αy・Xi+αx・Yi)・sinθyi+δy・cosθyi
Where, PNi:Pile direction reaction(kN/unit)
PHi:Pile axis perpendicular direction reaction forec(kN/unit)
Mti:Pile-head moment(kN.m/unit)
Kvi:Pile axis direction spring constant(kN/m)
K1i-K4i:Pile axis perpendicular direction spring constant(kN/m,kN/rad,kN.m/m,kN.m/rad)
Xi,Yi :Pile head coordinate(m)
θi:Angle by pile axis and vertical axis(rad)
θi ・・・X,Ydirection combined angle
θxi・・・X direction angle
θyi・・・Y direction angle
δz:Original vertical disp.(m)
δx:hor. disp. at origin(X direction)(m)
αy:Original rotation angle(around Y axis)(rad)
δy:hor. disp. at origin(Y direction)(m)
αx:Original rotation angle(around X axis)(rad)
δzi:disp. in pile axis direction of pile head(m)
δxi:Pile-headのPile axis perpendicular direction disp.(m)(X direction component)
δyi:Pile-headのPile axis perpendicular direction disp.(m)(Y direction component)
Note)i in formula indicates i th pile, x is X direction, y is Y direction
a) Pile-head rigid connection
(1)EXETREME(1.00)
・Original acting force ・Original disp.
Vo = 6909.3 (kN) δz = 1.97 (mm)
Hxo = 31.0 (kN) δx = -0.34 (mm)
Myo = 5850.0 (kN.m) αy = 0.00008247 (rad)
Hyo = 1289.0 (kN) δy = -1.99 (mm)
Mxo = 124400.0 (kN.m) αx = 0.00169042 (rad)
・Pile reaction
Line Row X(m) Y(m) PN(kN) PHx(kN) Mty(kN.m) PHy(kN) Mtx(kN.m) δf(mm)
3 1 -6.000 0.000 679.79 -9.24 118.36 -191.60 2446.07 1.99
2 2 -4.243 4.243 3824.02 -0.85 39.82 -202.50 2548.00 3.08
4 2 -4.243 -4.243 -2350.00 -18.86 208.31 -198.44 2510.03 2.80
1 3 0.000 6.000 5239.96 -11.91 143.28 -212.81 2644.50 3.98
5 3 0.000 -6.000 -3489.91 -11.91 143.28 -205.83 2579.16 3.33
2 4 4.243 4.243 4100.18 -23.80 254.50 -203.38 2556.22 3.41
4 4 4.243 -4.243 -2073.84 -5.79 86.01 -197.56 2501.81 2.56
3 5 6.000 0.000 1070.26 -16.23 183.70 -191.60 2446.07 2.12

PNmax = 5239.96 (kN) ≦ Ra = 16180.00 (kN) : OK


PNmin = -3489.91 (kN) ≧ Pa = -6756.00 (kN) : OK
δf = 3.98 (mm) ≦ δa = 15.00 (mm) : OK
(2)EXETREME(1.35)
・Original acting force ・Original disp.
Vo = 9086.9 (kN) δz = 2.59 (mm)
Hxo = 1292.0 (kN) δx = -3.23 (mm)
Myo = 136986.3 (kN.m) αy = 0.00187425 (rad)
Hyo = 24.0 (kN) δy = -0.83 (mm)
Mxo = 10208.0 (kN.m) αx = 0.00014693 (rad)
- 10 -
・Pile reaction
Line Row X(m) Y(m) PN(kN) PHx(kN) Mty(kN.m) PHy(kN) Mtx(kN.m) δf(mm)
3 1 -6.000 0.000 -3612.61 -238.35 2954.49 -23.72 278.71 4.69
2 2 -4.243 4.243 -1984.22 -229.18 2868.65 -17.71 222.45 3.77
4 2 -4.243 -4.243 -2451.71 -230.74 2883.30 -31.18 348.50 4.20
1 3 0.000 6.000 1481.29 -223.45 2815.08 -29.75 335.18 3.52
5 3 0.000 -6.000 820.32 -223.45 2815.08 -20.57 249.25 3.28
2 4 4.243 4.243 4753.48 -237.24 2944.05 -37.67 409.25 4.99
4 4 4.243 -4.243 4285.99 -235.67 2929.40 -11.21 161.70 4.38
3 5 6.000 0.000 5914.22 -247.53 3040.42 -23.72 278.71 5.53

PNmax = 5914.22 (kN) ≦ Ra = 16180.00 (kN) : OK


PNmin = -3612.61 (kN) ≧ Pa = -6756.00 (kN) : OK
δf = 5.53 (mm) ≦ δa = 15.00 (mm) : OK
(3)EXETREME(0.90)
・Original acting force ・Original disp.
Vo = 6534.4 (kN) δz = 1.86 (mm)
Hxo = 1292.0 (kN) δx = -3.23 (mm)
Myo = 136986.3 (kN.m) αy = 0.00187425 (rad)
Hyo = 24.0 (kN) δy = -0.83 (mm)
Mxo = 10208.0 (kN.m) αx = 0.00014693 (rad)
・Pile reaction
Line Row X(m) Y(m) PN(kN) PHx(kN) Mty(kN.m) PHy(kN) Mtx(kN.m) δf(mm)
3 1 -6.000 0.000 -3935.87 -239.64 2966.56 -23.72 278.71 4.81
2 2 -4.243 4.243 -2307.50 -230.09 2877.18 -16.79 213.92 3.85
4 2 -4.243 -4.243 -2774.99 -231.66 2891.83 -32.09 357.04 4.31
1 3 0.000 6.000 1158.03 -223.45 2815.08 -28.46 323.11 3.47
5 3 0.000 -6.000 497.06 -223.45 2815.08 -21.86 261.32 3.30
2 4 4.243 4.243 4430.20 -236.32 2935.51 -36.76 400.72 4.88
4 4 4.243 -4.243 3962.71 -234.76 2920.87 -12.12 170.23 4.29
3 5 6.000 0.000 5590.96 -246.24 3028.35 -23.72 278.71 5.42

PNmax = 5590.96 (kN) ≦ Ra = 16180.00 (kN) : OK


PNmin = -3935.87 (kN) ≧ Pa = -6756.00 (kN) : OK
δf = 5.42 (mm) ≦ δa = 15.00 (mm) : OK
(4)QUASI
・Original acting force ・Original disp.
Vo = 5592.5 (kN) δz = 1.59 (mm)
Hxo = 714.0 (kN) δx = -2.00 (mm)
Myo = 77791.0 (kN.m) αy = 0.00106632 (rad)
Hyo = 0.0 (kN) δy = 0.00 (mm)
Mxo = 0.0 (kN.m) αx = 0.00000000 (rad)
・Pile reaction
Line Row X(m) Y(m) PN(kN) PHx(kN) Mty(kN.m) PHy(kN) Mtx(kN.m) δf(mm)
3 1 -6.000 0.000 -1990.09 -137.06 1694.49 0.00 0.00 2.76
2 2 -4.243 4.243 -1200.06 -132.36 1650.52 3.68 -34.45 2.35
4 2 -4.243 -4.243 -1200.06 -132.36 1650.52 -3.68 34.45 2.35
1 3 0.000 6.000 708.26 -128.82 1617.40 -2.83 26.44 2.01
5 3 0.000 -6.000 708.26 -128.82 1617.40 2.83 -26.44 2.01
2 4 4.243 4.243 2616.68 -136.36 1687.91 -7.68 71.83 2.79
4 4 4.243 -4.243 2616.68 -136.36 1687.91 7.68 -71.83 2.79
3 5 6.000 0.000 3406.61 -142.71 1747.38 0.00 0.00 3.29
- 11 -
(5)FATIGUE
・Original acting force ・Original disp.
Vo = 5647.6 (kN) δz = 1.61 (mm)
Hxo = 366.0 (kN) δx = -0.91 (mm)
Myo = 38713.0 (kN.m) αy = 0.00052958 (rad)
Hyo = 2.0 (kN) δy = -0.26 (mm)
Mxo = 2798.0 (kN.m) αx = 0.00004073 (rad)
・Pile reaction
Line Row X(m) Y(m) PN(kN) PHx(kN) Mty(kN.m) PHy(kN) Mtx(kN.m) δf(mm)
3 1 -6.000 0.000 -631.22 -65.72 819.56 -6.95 80.76 1.18
2 2 -4.243 4.243 -174.00 -63.59 799.61 -6.34 75.10 0.98
4 2 -4.243 -4.243 -299.95 -64.02 803.67 -7.95 90.13 1.06
1 3 0.000 6.000 804.27 -63.06 794.72 -10.20 111.16 1.07
5 3 0.000 -6.000 626.20 -63.06 794.72 -4.49 57.75 0.91
2 4 4.243 4.243 1730.53 -68.05 841.42 -11.99 127.88 1.55
4 4 4.243 -4.243 1604.58 -67.62 837.36 -2.31 37.34 1.34
3 5 6.000 0.000 2061.70 -71.42 872.97 -6.95 80.76 1.70
- 12 -
3 Cross section anlysis
3.1 Pile section force
1) EXETREME(1.00) ( 3, 1)pile

Pile-head rigid connection


Acting force at pile head X direction Y direction
H (kN) -9.24 -191.60
M (kN.m) 118.36 2446.07
Perpendicular direction X direction Y direction
spring constant
at pile head
K1(kN/m) 10759 10759
K2(kN/rad) 100663 100663
K3(kN.m/m) 100663 100663
K4(kN.m/rad) 1328367 1328367
Mt (kN.m) 2448.93
Mmax (kN.m) 297.89
Z (m) 21.381
1/2Mmax(kN.m) 1224.46
S (kN) 191.82
Z (m) 6.383
Z (m) δx(mm) M (kN.m) S (kN)
0.000 1.994 2448.93 191.82
0.500 2.798 2353.02 191.82
1.000 3.519 2257.11 191.82
1.500 4.161 2161.19 191.82
2.000 4.727 2065.28 191.82
5.000 6.714 1489.81 191.82
8.000 6.817 914.34 191.82
10.139 6.141 504.02 191.82
11.000 5.763 349.94 166.39
14.000 4.242 31.57 91.74
17.000 2.742 223.59 40.00
20.000 1.511 292.18 8.78
22.103 0.863 296.60 3.45
23.000 0.643 292.08 6.48
24.131 0.413 283.13 9.15
26.000 0.141 240.29 32.69
26.767 0.065 213.62 36.38
29.000 0.064 131.31 35.63
30.417 0.094 83.59 31.47
31.330 0.098 56.32 28.27
32.000 0.095 38.96 23.57
35.000 0.055 4.48 6.90
38.000 0.017 11.88 0.59
38.528 0.013 11.41 1.17
41.000 0.001 7.55 1.71
44.000 0.005 3.04 1.20
45.322 0.005 1.66 0.89
47.000 0.004 0.47 0.55
47.654 0.004 0.15 0.43
50.000 0.002 0.48 0.14
50.797 0.001 0.57 0.07
53.000 0.000 0.55 0.07
56.000 0.000 0.28 0.09
58.401 0.000 0.10 0.06
59.000 0.000 0.07 0.05
62.000 0.000 0.02 0.01
64.890 0.000 0.02 0.01
65.000 0.000 0.02 0.01
66.918 0.000 0.00 0.00

*Mmax:Maximum moment of underground part, 1/2Mmax = 1/2・max(Mmax,Mt), Mt:Moment at pile head


- 13 -
2) EXETREME(1.00) ( 2, 2)pile

Pile-head rigid connection


Acting force at pile head X direction Y direction
H (kN) -0.85 -202.50
M (kN.m) 39.82 2548.00
Perpendicular direction X direction Y direction
spring constant
at pile head
K1(kN/m) 10760 10760
K2(kN/rad) 100669 100669
K3(kN.m/m) 100669 100669
K4(kN.m/rad) 1328403 1328403
Mt (kN.m) 2548.31
Mmax (kN.m) 326.55
Z (m) 20.917
1/2Mmax(kN.m) 1274.15
S (kN) 202.50
Z (m) 6.293
Z (m) δx(mm) M (kN.m) S (kN)
0.000 3.083 2548.31 202.50
0.500 3.861 2447.06 202.50
1.000 4.562 2345.82 202.50
1.500 5.185 2244.58 202.50
2.000 5.732 2143.34 202.50
5.000 7.579 1535.91 202.50
8.000 7.496 928.59 202.50
10.138 6.677 495.97 202.50
11.000 6.242 333.91 174.89
14.000 4.542 69.69 94.51
17.000 2.905 260.42 39.43
20.000 1.583 323.77 6.82
22.102 0.895 322.56 6.62
23.000 0.662 315.39 9.64
24.129 0.421 303.06 12.32
26.000 0.137 254.25 35.83
26.765 0.059 225.33 39.31
29.000 0.073 137.14 37.87
30.415 0.103 86.66 33.25
31.327 0.106 57.90 29.78
32.000 0.102 39.59 24.71
35.000 0.058 5.60 7.03
38.000 0.018 12.80 0.76
38.526 0.013 12.24 1.34
41.000 0.001 7.98 1.85
44.000 0.006 3.15 1.27
45.318 0.006 1.70 0.94
47.000 0.004 0.44 0.57
47.650 0.004 0.12 0.45
50.000 0.002 0.54 0.14
50.793 0.002 0.62 0.07
53.000 0.000 0.59 0.07
56.000 0.000 0.30 0.10
58.397 0.000 0.10 0.07
59.000 0.000 0.07 0.05
62.000 0.000 0.02 0.01
64.885 0.000 0.02 0.01
65.000 0.000 0.02 0.01
66.913 0.000 0.00 0.00

*Mmax:Maximum moment of underground part, 1/2Mmax = 1/2・max(Mmax,Mt), Mt:Moment at pile head


- 14 -
3) EXETREME(1.00) ( 4, 2)pile

Pile-head rigid connection


Acting force at pile head X direction Y direction
H (kN) -18.86 -198.44
M (kN.m) 208.31 2510.03
Perpendicular direction X direction Y direction
spring constant
at pile head
K1(kN/m) 10760 10760
K2(kN/rad) 100669 100669
K3(kN.m/m) 100669 100669
K4(kN.m/rad) 1328403 1328403
Mt (kN.m) 2518.65
Mmax (kN.m) 318.05
Z (m) 21.021
1/2Mmax(kN.m) 1259.33
S (kN) 199.34
Z (m) 6.319
Z (m) δx(mm) M (kN.m) S (kN)
0.000 2.804 2518.65 199.34
0.500 3.577 2418.99 199.34
1.000 4.276 2319.33 199.34
1.500 4.900 2219.68 199.34
2.000 5.450 2120.02 199.34
5.000 7.329 1522.10 199.34
8.000 7.298 924.28 199.34
10.138 6.520 498.46 199.34
11.000 6.101 338.85 172.36
14.000 4.454 61.03 93.68
17.000 2.856 249.91 39.61
20.000 1.561 314.58 7.48
22.102 0.886 314.95 5.87
23.000 0.657 308.54 8.82
24.129 0.418 297.19 11.46
26.000 0.138 250.11 34.92
26.765 0.061 221.87 38.45
29.000 0.071 135.40 37.21
30.415 0.100 85.75 32.72
31.327 0.104 57.44 29.33
32.000 0.100 39.39 24.37
35.000 0.057 5.29 6.99
38.000 0.018 12.53 0.72
38.526 0.013 11.99 1.29
41.000 0.001 7.86 1.81
44.000 0.006 3.12 1.25
45.318 0.006 1.69 0.92
47.000 0.004 0.45 0.56
47.650 0.004 0.13 0.45
50.000 0.002 0.52 0.14
50.793 0.002 0.60 0.07
53.000 0.000 0.57 0.07
56.000 0.000 0.29 0.09
58.397 0.000 0.10 0.06
59.000 0.000 0.07 0.05
62.000 0.000 0.02 0.01
64.885 0.000 0.02 0.01
65.000 0.000 0.02 0.01
66.913 0.000 0.00 0.00

*Mmax:Maximum moment of underground part, 1/2Mmax = 1/2・max(Mmax,Mt), Mt:Moment at pile head


- 15 -
4) EXETREME(1.00) ( 1, 3)pile

Pile-head rigid connection


Acting force at pile head X direction Y direction
H (kN) -11.91 -212.81
M (kN.m) 143.28 2644.50
Perpendicular direction X direction Y direction
spring constant
at pile head
K1(kN/m) 10759 10759
K2(kN/rad) 100663 100663
K3(kN.m/m) 100663 100663
K4(kN.m/rad) 1328367 1328367
Mt (kN.m) 2648.37
Mmax (kN.m) 355.49
Z (m) 20.553
1/2Mmax(kN.m) 1324.19
S (kN) 213.14
Z (m) 6.213
Z (m) δx(mm) M (kN.m) S (kN)
0.000 3.978 2648.37 213.14
0.500 4.778 2541.80 213.14
1.000 5.488 2435.23 213.14
1.500 6.113 2328.66 213.14
2.000 6.657 2222.09 213.14
5.000 8.408 1582.67 213.14
8.000 8.157 943.25 213.14
10.139 7.202 487.33 213.14
11.000 6.713 316.79 183.42
14.000 4.840 97.46 97.34
17.000 3.068 295.04 38.84
20.000 1.655 354.35 4.24
22.103 0.927 347.94 9.06
23.000 0.682 338.30 12.29
24.131 0.428 322.69 15.10
26.000 0.133 268.20 38.87
26.767 0.052 236.92 42.18
29.000 0.082 143.07 40.09
30.417 0.111 89.68 35.01
31.330 0.114 59.43 31.27
32.000 0.109 40.29 25.87
35.000 0.060 6.60 7.18
38.000 0.018 13.69 0.91
38.528 0.013 13.05 1.50
41.000 0.002 8.41 1.99
44.000 0.006 3.26 1.35
45.322 0.006 1.73 0.98
47.000 0.005 0.42 0.59
47.654 0.004 0.07 0.47
50.000 0.002 0.59 0.13
50.797 0.002 0.67 0.07
53.000 0.000 0.62 0.08
56.000 0.000 0.31 0.10
58.401 0.000 0.11 0.07
59.000 0.000 0.07 0.06
62.000 0.000 0.02 0.01
64.890 0.000 0.02 0.01
65.000 0.000 0.02 0.01
66.918 0.000 0.00 0.00

*Mmax:Maximum moment of underground part, 1/2Mmax = 1/2・max(Mmax,Mt), Mt:Moment at pile head


- 16 -
5) EXETREME(1.00) ( 5, 3)pile

Pile-head rigid connection


Acting force at pile head X direction Y direction
H (kN) -11.91 -205.83
M (kN.m) 143.28 2579.16
Perpendicular direction X direction Y direction
spring constant
at pile head
K1(kN/m) 10759 10759
K2(kN/rad) 100663 100663
K3(kN.m/m) 100663 100663
K4(kN.m/rad) 1328367 1328367
Mt (kN.m) 2583.13
Mmax (kN.m) 336.20
Z (m) 20.792
1/2Mmax(kN.m) 1291.57
S (kN) 206.17
Z (m) 6.265
Z (m) δx(mm) M (kN.m) S (kN)
0.000 3.331 2583.13 206.17
0.500 4.132 2480.05 206.17
1.000 4.846 2376.96 206.17
1.500 5.476 2273.88 206.17
2.000 6.026 2170.79 206.17
5.000 7.855 1552.29 206.17
8.000 7.719 933.79 206.17
10.139 6.855 492.80 206.17
11.000 6.402 327.64 177.85
14.000 4.645 76.04 95.50
17.000 2.961 271.70 39.22
20.000 1.608 334.03 5.73
22.103 0.906 331.16 7.23
23.000 0.669 323.19 10.40
24.131 0.423 309.75 13.16
26.000 0.136 259.07 36.85
26.767 0.057 229.30 40.29
29.000 0.076 139.22 38.63
30.417 0.106 87.69 33.85
31.330 0.109 58.42 30.29
32.000 0.104 39.86 25.12
35.000 0.059 5.91 7.09
38.000 0.018 13.10 0.81
38.528 0.013 12.51 1.39
41.000 0.001 8.13 1.90
44.000 0.006 3.19 1.30
45.322 0.006 1.71 0.95
47.000 0.005 0.43 0.58
47.654 0.004 0.10 0.46
50.000 0.002 0.56 0.14
50.797 0.002 0.64 0.07
53.000 0.000 0.60 0.08
56.000 0.000 0.30 0.10
58.401 0.000 0.10 0.07
59.000 0.000 0.07 0.05
62.000 0.000 0.02 0.01
64.890 0.000 0.02 0.01
65.000 0.000 0.02 0.01
66.918 0.000 0.00 0.00

*Mmax:Maximum moment of underground part, 1/2Mmax = 1/2・max(Mmax,Mt), Mt:Moment at pile head


- 17 -
6) EXETREME(1.00) ( 2, 4)pile

Pile-head rigid connection


Acting force at pile head X direction Y direction
H (kN) -23.80 -203.38
M (kN.m) 254.50 2556.22
Perpendicular direction X direction Y direction
spring constant
at pile head
K1(kN/m) 10760 10760
K2(kN/rad) 100669 100669
K3(kN.m/m) 100669 100669
K4(kN.m/rad) 1328403 1328403
Mt (kN.m) 2568.85
Mmax (kN.m) 333.20
Z (m) 20.788
1/2Mmax(kN.m) 1284.43
S (kN) 204.77
Z (m) 6.275
Z (m) δx(mm) M (kN.m) S (kN)
0.000 3.405 2568.85 204.77
0.500 4.158 2466.49 204.77
1.000 4.841 2364.12 204.77
1.500 5.451 2261.76 204.77
2.000 5.987 2159.40 204.77
5.000 7.782 1545.28 204.77
8.000 7.650 931.40 204.77
10.138 6.796 494.48 204.77
11.000 6.348 331.21 176.68
14.000 4.608 82.07 95.07
17.000 2.940 269.37 39.33
20.000 1.598 331.00 6.80
22.102 0.902 328.33 7.63
23.000 0.666 320.52 10.57
24.129 0.422 307.38 13.19
26.000 0.137 257.23 36.54
26.765 0.058 227.80 39.95
29.000 0.075 138.36 38.35
30.415 0.105 87.28 33.63
31.327 0.108 58.21 30.10
32.000 0.104 39.72 24.95
35.000 0.058 5.89 7.06
38.000 0.018 13.00 0.81
38.526 0.013 12.42 1.38
41.000 0.001 8.07 1.88
44.000 0.006 3.17 1.29
45.318 0.006 1.70 0.95
47.000 0.005 0.44 0.57
47.650 0.004 0.12 0.45
50.000 0.002 0.55 0.14
50.793 0.002 0.63 0.07
53.000 0.000 0.59 0.08
56.000 0.000 0.30 0.10
58.397 0.000 0.10 0.07
59.000 0.000 0.07 0.05
62.000 0.000 0.02 0.01
64.885 0.000 0.02 0.01
65.000 0.000 0.02 0.01
66.913 0.000 0.00 0.00

*Mmax:Maximum moment of underground part, 1/2Mmax = 1/2・max(Mmax,Mt), Mt:Moment at pile head


- 18 -
7) EXETREME(1.00) ( 4, 4)pile

Pile-head rigid connection


Acting force at pile head X direction Y direction
H (kN) -5.79 -197.56
M (kN.m) 86.01 2501.81
Perpendicular direction X direction Y direction
spring constant
at pile head
K1(kN/m) 10760 10760
K2(kN/rad) 100669 100669
K3(kN.m/m) 100669 100669
K4(kN.m/rad) 1328403 1328403
Mt (kN.m) 2503.28
Mmax (kN.m) 313.23
Z (m) 21.116
1/2Mmax(kN.m) 1251.64
S (kN) 197.65
Z (m) 6.333
Z (m) δx(mm) M (kN.m) S (kN)
0.000 2.556 2503.28 197.65
0.500 3.353 2404.46 197.65
1.000 4.068 2305.64 197.65
1.500 4.703 2206.82 197.65
2.000 5.261 2108.00 197.65
5.000 7.179 1515.07 197.65
8.000 7.184 922.16 197.65
10.138 6.431 499.60 197.65
11.000 6.022 340.96 171.02
14.000 4.405 50.82 93.26
17.000 2.830 243.29 39.69
20.000 1.550 309.23 7.59
22.102 0.881 310.67 5.05
23.000 0.654 304.74 8.12
24.129 0.417 293.98 10.81
26.000 0.139 247.89 34.40
26.765 0.062 220.03 37.97
29.000 0.069 134.48 36.85
30.415 0.099 85.29 32.44
31.327 0.103 57.20 29.10
32.000 0.099 39.29 24.19
35.000 0.056 5.08 6.97
38.000 0.017 12.38 0.68
38.526 0.013 11.86 1.26
41.000 0.001 7.79 1.79
44.000 0.006 3.10 1.24
45.318 0.005 1.68 0.91
47.000 0.004 0.45 0.56
47.650 0.004 0.13 0.44
50.000 0.002 0.51 0.14
50.793 0.002 0.60 0.07
53.000 0.000 0.57 0.07
56.000 0.000 0.29 0.09
58.397 0.000 0.10 0.06
59.000 0.000 0.07 0.05
62.000 0.000 0.02 0.01
64.885 0.000 0.02 0.01
65.000 0.000 0.02 0.01
66.913 0.000 0.00 0.00

*Mmax:Maximum moment of underground part, 1/2Mmax = 1/2・max(Mmax,Mt), Mt:Moment at pile head


- 19 -
8) EXETREME(1.00) ( 3, 5)pile

Pile-head rigid connection


Acting force at pile head X direction Y direction
H (kN) -16.23 -191.60
M (kN.m) 183.70 2446.07
Perpendicular direction X direction Y direction
spring constant
at pile head
K1(kN/m) 10759 10759
K2(kN/rad) 100663 100663
K3(kN.m/m) 100663 100663
K4(kN.m/rad) 1328367 1328367
Mt (kN.m) 2452.96
Mmax (kN.m) 299.31
Z (m) 21.353
1/2Mmax(kN.m) 1226.48
S (kN) 192.29
Z (m) 6.379
Z (m) δx(mm) M (kN.m) S (kN)
0.000 2.124 2452.96 192.29
0.500 2.901 2356.82 192.29
1.000 3.607 2260.68 192.29
1.500 4.239 2164.54 192.29
2.000 4.798 2068.40 192.29
5.000 6.764 1491.60 192.29
8.000 6.852 914.85 192.29
10.139 6.168 503.79 192.29
11.000 5.786 349.57 166.75
14.000 4.256 38.91 91.85
17.000 2.749 225.90 39.99
20.000 1.514 293.86 8.83
22.103 0.865 297.88 3.97
23.000 0.644 293.20 6.84
24.131 0.413 284.05 9.44
26.000 0.141 240.90 32.85
26.767 0.065 214.13 36.52
29.000 0.064 131.56 35.73
30.417 0.094 83.71 31.54
31.330 0.099 56.38 28.33
32.000 0.096 38.98 23.62
35.000 0.055 4.57 6.90
38.000 0.017 11.93 0.61
38.528 0.013 11.45 1.18
41.000 0.001 7.57 1.72
44.000 0.005 3.05 1.20
45.322 0.005 1.66 0.89
47.000 0.004 0.47 0.55
47.654 0.004 0.15 0.44
50.000 0.002 0.49 0.14
50.797 0.001 0.57 0.07
53.000 0.000 0.55 0.07
56.000 0.000 0.28 0.09
58.401 0.000 0.10 0.06
59.000 0.000 0.07 0.05
62.000 0.000 0.02 0.01
64.890 0.000 0.02 0.01
65.000 0.000 0.02 0.01
66.918 0.000 0.00 0.00

*Mmax:Maximum moment of underground part, 1/2Mmax = 1/2・max(Mmax,Mt), Mt:Moment at pile head


- 20 -
9) EXETREME(1.35) ( 3, 1)pile

Pile-head rigid connection


Acting force at pile head X direction Y direction
H (kN) -238.35 -23.72
M (kN.m) 2954.49 278.71
Perpendicular direction X direction Y direction
spring constant
at pile head
K1(kN/m) 10759 10759
K2(kN/rad) 100663 100663
K3(kN.m/m) 100663 100663
K4(kN.m/rad) 1328367 1328367
Mt (kN.m) 2967.60
Mmax (kN.m) 402.71
Z (m) 20.472
1/2Mmax(kN.m) 1483.80
S (kN) 239.52
Z (m) 6.195
Z (m) δx(mm) M (kN.m) S (kN)
0.000 4.691 2967.60 239.52
0.500 5.576 2847.84 239.52
1.000 6.362 2728.08 239.52
1.500 7.053 2608.32 239.52
2.000 7.652 2488.56 239.52
5.000 9.563 1770.01 239.52
8.000 9.236 1051.48 239.52
10.139 8.139 539.23 239.52
11.000 7.580 347.75 205.95
14.000 5.454 117.53 108.84
17.000 3.450 337.20 42.99
20.000 1.857 401.77 4.25
22.103 1.037 393.20 10.84
23.000 0.763 381.81 14.45
24.131 0.478 363.59 17.58
26.000 0.147 301.53 43.99
26.767 0.057 266.19 47.61
29.000 0.094 160.44 45.11
30.417 0.126 100.40 39.35
31.330 0.128 66.42 35.13
32.000 0.123 44.93 29.04
35.000 0.068 7.61 8.01
38.000 0.020 15.45 1.05
38.528 0.014 14.71 1.71
41.000 0.002 9.46 2.25
44.000 0.007 3.65 1.51
45.322 0.007 1.93 1.10
47.000 0.005 0.46 0.66
47.654 0.005 0.07 0.52
50.000 0.002 0.67 0.15
50.797 0.002 0.76 0.07
53.000 0.001 0.70 0.09
56.000 0.000 0.35 0.11
58.401 0.000 0.12 0.08
59.000 0.000 0.08 0.06
62.000 0.000 0.03 0.01
64.890 0.000 0.02 0.01
65.000 0.000 0.02 0.01
66.918 0.000 0.00 0.00

*Mmax:Maximum moment of underground part, 1/2Mmax = 1/2・max(Mmax,Mt), Mt:Moment at pile head


- 21 -
10) EXETREME(1.35) ( 2, 2)pile

Pile-head rigid connection


Acting force at pile head X direction Y direction
H (kN) -229.18 -17.71
M (kN.m) 2868.65 222.45
Perpendicular direction X direction Y direction
spring constant
at pile head
K1(kN/m) 10760 10760
K2(kN/rad) 100669 100669
K3(kN.m/m) 100669 100669
K4(kN.m/rad) 1328403 1328403
Mt (kN.m) 2877.26
Mmax (kN.m) 375.73
Z (m) 20.761
1/2Mmax(kN.m) 1438.63
S (kN) 229.86
Z (m) 6.259
Z (m) δx(mm) M (kN.m) S (kN)
0.000 3.773 2877.26 229.86
0.500 4.664 2762.33 229.86
1.000 5.457 2647.40 229.86
1.500 6.157 2532.47 229.86
2.000 6.767 2417.54 229.86
5.000 8.790 1727.96 229.86
8.000 8.626 1038.38 229.86
10.138 7.656 546.86 229.86
11.000 7.148 362.59 198.21
14.000 5.182 86.83 106.30
17.000 3.302 304.54 43.52
20.000 1.791 373.45 6.17
22.102 1.009 369.87 8.22
23.000 0.745 360.81 11.76
24.129 0.471 345.67 14.83
26.000 0.151 288.85 41.19
26.765 0.062 255.68 44.98
29.000 0.085 155.07 43.09
30.415 0.118 97.69 37.75
31.327 0.121 65.05 33.78
32.000 0.117 44.29 27.98
35.000 0.065 6.65 7.88
38.000 0.020 14.62 0.91
38.526 0.014 13.97 1.55
41.000 0.002 9.07 2.12
44.000 0.007 3.55 1.45
45.318 0.006 1.90 1.06
47.000 0.005 0.48 0.64
47.650 0.004 0.11 0.51
50.000 0.002 0.62 0.15
50.793 0.002 0.71 0.08
53.000 0.001 0.67 0.09
56.000 0.000 0.34 0.11
58.397 0.000 0.12 0.07
59.000 0.000 0.08 0.06
62.000 0.000 0.02 0.01
64.885 0.000 0.02 0.01
65.000 0.000 0.02 0.01
66.913 0.000 0.00 0.00

*Mmax:Maximum moment of underground part, 1/2Mmax = 1/2・max(Mmax,Mt), Mt:Moment at pile head


- 22 -
11) EXETREME(1.35) ( 4, 2)pile

Pile-head rigid connection


Acting force at pile head X direction Y direction
H (kN) -230.74 -31.18
M (kN.m) 2883.30 348.50
Perpendicular direction X direction Y direction
spring constant
at pile head
K1(kN/m) 10760 10760
K2(kN/rad) 100669 100669
K3(kN.m/m) 100669 100669
K4(kN.m/rad) 1328403 1328403
Mt (kN.m) 2904.28
Mmax (kN.m) 384.62
Z (m) 20.640
1/2Mmax(kN.m) 1452.14
S (kN) 232.84
Z (m) 6.238
Z (m) δx(mm) M (kN.m) S (kN)
0.000 4.195 2904.28 232.84
0.500 5.053 2787.87 232.84
1.000 5.824 2671.47 232.84
1.500 6.506 2555.06 232.84
2.000 7.103 2438.66 232.84
5.000 9.057 1740.27 232.84
8.000 8.828 1042.07 232.84
10.138 7.813 544.91 232.84
11.000 7.287 359.10 200.57
14.000 5.268 103.09 107.04
17.000 3.348 316.33 43.38
20.000 1.811 382.97 6.27
22.102 1.018 377.47 9.55
23.000 0.750 367.57 12.97
24.129 0.473 351.36 15.98
26.000 0.150 292.77 42.12
26.765 0.061 258.93 45.83
29.000 0.088 156.68 43.72
30.415 0.121 98.51 38.25
31.327 0.124 65.46 34.19
32.000 0.119 44.46 28.30
35.000 0.066 7.03 7.92
38.000 0.020 14.89 0.97
38.526 0.014 14.20 1.61
41.000 0.002 9.19 2.16
44.000 0.007 3.58 1.47
45.318 0.007 1.91 1.07
47.000 0.005 0.47 0.65
47.650 0.005 0.11 0.51
50.000 0.002 0.64 0.15
50.793 0.002 0.73 0.08
53.000 0.001 0.68 0.09
56.000 0.000 0.34 0.11
58.397 0.000 0.12 0.08
59.000 0.000 0.08 0.06
62.000 0.000 0.02 0.01
64.885 0.000 0.02 0.01
65.000 0.000 0.02 0.01
66.913 0.000 0.00 0.00

*Mmax:Maximum moment of underground part, 1/2Mmax = 1/2・max(Mmax,Mt), Mt:Moment at pile head


- 23 -
12) EXETREME(1.35) ( 1, 3)pile

Pile-head rigid connection


Acting force at pile head X direction Y direction
H (kN) -223.45 -29.75
M (kN.m) 2815.08 335.18
Perpendicular direction X direction Y direction
spring constant
at pile head
K1(kN/m) 10759 10759
K2(kN/rad) 100663 100663
K3(kN.m/m) 100663 100663
K4(kN.m/rad) 1328367 1328367
Mt (kN.m) 2834.97
Mmax (kN.m) 364.25
Z (m) 20.879
1/2Mmax(kN.m) 1417.48
S (kN) 225.42
Z (m) 6.289
Z (m) δx(mm) M (kN.m) S (kN)
0.000 3.519 2834.97 225.42
0.500 4.371 2722.27 225.42
1.000 5.142 2609.57 225.42
1.500 5.829 2496.87 225.42
2.000 6.432 2384.18 225.42
5.000 8.468 1708.05 225.42
8.000 8.362 1032.09 225.42
10.139 7.444 550.57 225.42
11.000 6.957 370.53 194.66
14.000 5.061 81.36 105.11
17.000 3.235 291.47 43.78
20.000 1.762 361.32 7.65
22.103 0.995 359.59 7.68
23.000 0.737 351.48 10.99
24.131 0.467 337.55 13.93
26.000 0.152 283.09 39.95
26.767 0.066 250.77 43.81
29.000 0.082 152.63 42.17
30.417 0.115 96.35 37.00
31.330 0.118 64.34 33.14
32.000 0.114 44.03 27.51
35.000 0.064 6.29 7.82
38.000 0.020 14.26 0.86
38.528 0.014 13.63 1.49
41.000 0.002 8.89 2.06
44.000 0.007 3.51 1.42
45.322 0.006 1.88 1.04
47.000 0.005 0.49 0.63
47.654 0.004 0.13 0.50
50.000 0.002 0.60 0.15
50.797 0.002 0.69 0.08
53.000 0.001 0.65 0.08
56.000 0.000 0.33 0.11
58.401 0.000 0.11 0.07
59.000 0.000 0.08 0.06
62.000 0.000 0.02 0.01
64.890 0.000 0.02 0.01
65.000 0.000 0.02 0.01
66.918 0.000 0.00 0.00

*Mmax:Maximum moment of underground part, 1/2Mmax = 1/2・max(Mmax,Mt), Mt:Moment at pile head


- 24 -
13) EXETREME(1.35) ( 5, 3)pile

Pile-head rigid connection


Acting force at pile head X direction Y direction
H (kN) -223.45 -20.57
M (kN.m) 2815.08 249.25
Perpendicular direction X direction Y direction
spring constant
at pile head
K1(kN/m) 10759 10759
K2(kN/rad) 100663 100663
K3(kN.m/m) 100663 100663
K4(kN.m/rad) 1328367 1328367
Mt (kN.m) 2826.09
Mmax (kN.m) 360.90
Z (m) 20.943
1/2Mmax(kN.m) 1413.05
S (kN) 224.39
Z (m) 6.297
Z (m) δx(mm) M (kN.m) S (kN)
0.000 3.277 2826.09 224.39
0.500 4.165 2713.90 224.39
1.000 4.959 2601.70 224.39
1.500 5.662 2489.51 224.39
2.000 6.278 2377.31 224.39
5.000 8.359 1704.15 224.39
8.000 8.284 1030.99 224.39
10.139 7.385 551.05 224.39
11.000 6.906 371.19 193.86
14.000 5.030 70.53 104.87
17.000 3.219 286.37 43.82
20.000 1.755 357.59 7.37
22.103 0.993 356.73 6.84
23.000 0.735 348.99 10.31
24.131 0.467 335.50 13.34
26.000 0.153 281.72 39.60
26.767 0.066 249.66 43.49
29.000 0.081 152.10 41.94
30.417 0.114 96.08 36.83
31.330 0.117 64.21 33.00
32.000 0.113 43.98 27.40
35.000 0.064 6.11 7.81
38.000 0.020 14.16 0.83
38.528 0.014 13.55 1.47
41.000 0.001 8.85 2.05
44.000 0.006 3.50 1.41
45.322 0.006 1.88 1.04
47.000 0.005 0.49 0.63
47.654 0.004 0.13 0.50
50.000 0.002 0.59 0.15
50.797 0.002 0.68 0.08
53.000 0.001 0.65 0.08
56.000 0.000 0.33 0.11
58.401 0.000 0.11 0.07
59.000 0.000 0.08 0.06
62.000 0.000 0.02 0.01
64.890 0.000 0.02 0.01
65.000 0.000 0.02 0.01
66.918 0.000 0.00 0.00

*Mmax:Maximum moment of underground part, 1/2Mmax = 1/2・max(Mmax,Mt), Mt:Moment at pile head


- 25 -
14) EXETREME(1.35) ( 2, 4)pile

Pile-head rigid connection


Acting force at pile head X direction Y direction
H (kN) -237.24 -37.67
M (kN.m) 2944.05 409.25
Perpendicular direction X direction Y direction
spring constant
at pile head
K1(kN/m) 10760 10760
K2(kN/rad) 100669 100669
K3(kN.m/m) 100669 100669
K4(kN.m/rad) 1328403 1328403
Mt (kN.m) 2972.35
Mmax (kN.m) 405.94
Z (m) 20.413
1/2Mmax(kN.m) 1486.18
S (kN) 240.21
Z (m) 6.189
Z (m) δx(mm) M (kN.m) S (kN)
0.000 4.989 2972.35 240.21
0.500 5.827 2852.27 240.21
1.000 6.580 2732.19 240.21
1.500 7.247 2612.12 240.21
2.000 7.827 2492.04 240.21
5.000 9.671 1771.69 240.21
8.000 9.306 1051.70 240.21
10.138 8.188 539.56 240.21
11.000 7.622 348.92 206.43
14.000 5.477 130.39 108.93
17.000 3.461 342.66 43.00
20.000 1.860 405.24 5.79
22.102 1.039 395.63 11.85
23.000 0.763 383.83 15.28
24.129 0.478 365.18 18.29
26.000 0.147 302.44 44.31
26.765 0.058 266.98 47.87
29.000 0.095 160.70 45.27
30.415 0.127 100.58 39.47
31.327 0.129 66.51 35.23
32.000 0.123 44.91 29.09
35.000 0.068 7.83 8.01
38.000 0.020 15.52 1.09
38.526 0.014 14.78 1.73
41.000 0.002 9.48 2.26
44.000 0.007 3.66 1.52
45.318 0.007 1.93 1.11
47.000 0.005 0.46 0.66
47.650 0.005 0.10 0.52
50.000 0.002 0.68 0.15
50.793 0.002 0.76 0.07
53.000 0.001 0.70 0.10
56.000 0.000 0.35 0.12
58.397 0.000 0.12 0.08
59.000 0.000 0.08 0.06
62.000 0.000 0.03 0.01
64.885 0.000 0.02 0.01
65.000 0.000 0.02 0.01
66.913 0.000 0.00 0.00

*Mmax:Maximum moment of underground part, 1/2Mmax = 1/2・max(Mmax,Mt), Mt:Moment at pile head


- 26 -
15) EXETREME(1.35) ( 4, 4)pile

Pile-head rigid connection


Acting force at pile head X direction Y direction
H (kN) -235.67 -11.21
M (kN.m) 2929.40 161.70
Perpendicular direction X direction Y direction
spring constant
at pile head
K1(kN/m) 10760 10760
K2(kN/rad) 100669 100669
K3(kN.m/m) 100669 100669
K4(kN.m/rad) 1328403 1328403
Mt (kN.m) 2933.86
Mmax (kN.m) 392.75
Z (m) 20.562
1/2Mmax(kN.m) 1466.93
S (kN) 235.94
Z (m) 6.218
Z (m) δx(mm) M (kN.m) S (kN)
0.000 4.380 2933.86 235.94
0.500 5.260 2815.90 235.94
1.000 6.044 2697.93 235.94
1.500 6.735 2579.97 235.94
2.000 7.337 2462.00 235.94
5.000 9.282 1754.23 235.94
8.000 9.012 1046.51 235.94
10.138 7.961 542.22 235.94
11.000 7.421 353.49 203.06
14.000 5.353 107.58 107.88
17.000 3.395 325.43 43.19
20.000 1.832 391.42 5.14
22.102 1.027 384.63 9.97
23.000 0.756 374.07 13.53
24.129 0.475 356.99 16.61
26.000 0.149 296.81 42.97
26.765 0.059 262.32 46.65
29.000 0.091 158.41 44.36
30.415 0.123 99.42 38.76
31.327 0.126 65.93 34.63
32.000 0.120 44.67 28.64
35.000 0.067 7.28 7.96
38.000 0.020 15.14 1.00
38.526 0.014 14.44 1.65
41.000 0.002 9.31 2.20
44.000 0.007 3.61 1.49
45.318 0.007 1.92 1.09
47.000 0.005 0.47 0.66
47.650 0.005 0.09 0.52
50.000 0.002 0.65 0.15
50.793 0.002 0.74 0.08
53.000 0.001 0.69 0.09
56.000 0.000 0.35 0.11
58.397 0.000 0.12 0.08
59.000 0.000 0.08 0.06
62.000 0.000 0.02 0.01
64.885 0.000 0.02 0.01
65.000 0.000 0.02 0.01
66.913 0.000 0.00 0.00

*Mmax:Maximum moment of underground part, 1/2Mmax = 1/2・max(Mmax,Mt), Mt:Moment at pile head


- 27 -
16) EXETREME(1.35) ( 3, 5)pile

Pile-head rigid connection


Acting force at pile head X direction Y direction
H (kN) -247.53 -23.72
M (kN.m) 3040.42 278.71
Perpendicular direction X direction Y direction
spring constant
at pile head
K1(kN/m) 10759 10759
K2(kN/rad) 100663 100663
K3(kN.m/m) 100663 100663
K4(kN.m/rad) 1328367 1328367
Mt (kN.m) 3053.17
Mmax (kN.m) 428.63
Z (m) 20.232
1/2Mmax(kN.m) 1526.58
S (kN) 248.67
Z (m) 6.139
Z (m) δx(mm) M (kN.m) S (kN)
0.000 5.534 3053.17 248.67
0.500 6.419 2928.84 248.67
1.000 7.201 2804.51 248.67
1.500 7.886 2680.17 248.67
2.000 8.476 2555.84 248.67
5.000 10.288 1809.86 248.67
8.000 9.810 1063.89 248.67
10.139 8.593 532.06 248.67
11.000 7.987 333.49 213.25
14.000 5.710 145.38 111.24
17.000 3.590 367.74 42.49
20.000 1.918 428.39 2.34
22.103 1.064 415.19 13.22
23.000 0.779 401.61 16.92
24.131 0.485 380.55 20.11
26.000 0.144 313.50 46.64
26.767 0.051 276.18 50.10
29.000 0.102 165.48 47.02
30.417 0.133 103.02 40.86
31.330 0.135 67.75 36.42
32.000 0.128 45.50 30.03
35.000 0.070 8.51 8.14
38.000 0.020 16.22 1.19
38.528 0.015 15.41 1.85
41.000 0.002 9.83 2.37
44.000 0.008 3.75 1.58
45.322 0.007 1.95 1.14
47.000 0.006 0.44 0.68
47.654 0.005 0.04 0.54
50.000 0.003 0.72 0.15
50.797 0.002 0.80 0.07
53.000 0.001 0.73 0.10
56.000 0.000 0.36 0.12
58.401 0.000 0.12 0.08
59.000 0.000 0.08 0.07
62.000 0.000 0.03 0.01
64.890 0.000 0.02 0.01
65.000 0.000 0.02 0.01
66.918 0.000 0.00 0.00

*Mmax:Maximum moment of underground part, 1/2Mmax = 1/2・max(Mmax,Mt), Mt:Moment at pile head


- 28 -
17) EXETREME(0.90) ( 3, 1)pile

Pile-head rigid connection


Acting force at pile head X direction Y direction
H (kN) -239.64 -23.72
M (kN.m) 2966.56 278.71
Perpendicular direction X direction Y direction
spring constant
at pile head
K1(kN/m) 10759 10759
K2(kN/rad) 100663 100663
K3(kN.m/m) 100663 100663
K4(kN.m/rad) 1328367 1328367
Mt (kN.m) 2979.62
Mmax (kN.m) 406.32
Z (m) 20.436
1/2Mmax(kN.m) 1489.81
S (kN) 240.81
Z (m) 6.187
Z (m) δx(mm) M (kN.m) S (kN)
0.000 4.809 2979.62 240.81
0.500 5.694 2859.22 240.81
1.000 6.480 2738.82 240.81
1.500 7.170 2618.41 240.81
2.000 7.768 2498.01 240.81
5.000 9.665 1775.61 240.81
8.000 9.317 1053.23 240.81
10.139 8.202 538.23 240.81
11.000 7.637 345.75 206.97
14.000 5.490 121.43 109.18
17.000 3.470 341.49 42.92
20.000 1.865 405.51 3.98
22.103 1.041 396.29 11.18
23.000 0.765 384.59 14.80
24.131 0.479 365.97 17.93
26.000 0.147 303.21 44.36
26.767 0.056 267.59 47.96
29.000 0.095 161.15 45.38
30.417 0.127 100.77 39.56
31.330 0.129 66.61 35.31
32.000 0.124 45.01 29.18
35.000 0.068 7.74 8.03
38.000 0.020 15.56 1.07
38.528 0.014 14.81 1.73
41.000 0.002 9.51 2.26
44.000 0.007 3.67 1.52
45.322 0.007 1.93 1.11
47.000 0.005 0.45 0.67
47.654 0.005 0.07 0.52
50.000 0.002 0.68 0.15
50.797 0.002 0.76 0.07
53.000 0.001 0.71 0.10
56.000 0.000 0.35 0.12
58.401 0.000 0.12 0.08
59.000 0.000 0.08 0.06
62.000 0.000 0.03 0.01
64.890 0.000 0.02 0.01
65.000 0.000 0.02 0.01
66.918 0.000 0.00 0.00

*Mmax:Maximum moment of underground part, 1/2Mmax = 1/2・max(Mmax,Mt), Mt:Moment at pile head


- 29 -
18) EXETREME(0.90) ( 2, 2)pile

Pile-head rigid connection


Acting force at pile head X direction Y direction
H (kN) -230.09 -16.79
M (kN.m) 2877.18 213.92
Perpendicular direction X direction Y direction
spring constant
at pile head
K1(kN/m) 10760 10760
K2(kN/rad) 100669 100669
K3(kN.m/m) 100669 100669
K4(kN.m/rad) 1328403 1328403
Mt (kN.m) 2885.13
Mmax (kN.m) 378.04
Z (m) 20.732
1/2Mmax(kN.m) 1442.56
S (kN) 230.70
Z (m) 6.253
Z (m) δx(mm) M (kN.m) S (kN)
0.000 3.853 2885.13 230.70
0.500 4.743 2769.77 230.70
1.000 5.535 2654.42 230.70
1.500 6.234 2539.07 230.70
2.000 6.844 2423.72 230.70
5.000 8.857 1731.62 230.70
8.000 8.679 1039.52 230.70
10.138 7.698 546.21 230.70
11.000 7.185 361.29 198.88
14.000 5.206 89.50 106.52
17.000 3.315 307.38 43.47
20.000 1.797 375.91 6.00
22.102 1.012 371.90 8.45
23.000 0.747 362.64 11.99
24.129 0.472 347.23 15.07
26.000 0.150 289.96 41.43
26.765 0.062 256.60 45.21
29.000 0.086 155.54 43.26
30.415 0.119 97.93 37.89
31.327 0.122 65.17 33.89
32.000 0.117 44.34 28.07
35.000 0.066 6.74 7.89
38.000 0.020 14.70 0.92
38.526 0.014 14.03 1.57
41.000 0.002 9.10 2.13
44.000 0.007 3.56 1.45
45.318 0.006 1.90 1.07
47.000 0.005 0.48 0.64
47.650 0.005 0.10 0.51
50.000 0.002 0.63 0.15
50.793 0.002 0.72 0.08
53.000 0.001 0.67 0.09
56.000 0.000 0.34 0.11
58.397 0.000 0.12 0.07
59.000 0.000 0.08 0.06
62.000 0.000 0.02 0.01
64.885 0.000 0.02 0.01
65.000 0.000 0.02 0.01
66.913 0.000 0.00 0.00

*Mmax:Maximum moment of underground part, 1/2Mmax = 1/2・max(Mmax,Mt), Mt:Moment at pile head


- 30 -
19) EXETREME(0.90) ( 4, 2)pile

Pile-head rigid connection


Acting force at pile head X direction Y direction
H (kN) -231.66 -32.09
M (kN.m) 2891.83 357.04
Perpendicular direction X direction Y direction
spring constant
at pile head
K1(kN/m) 10760 10760
K2(kN/rad) 100669 100669
K3(kN.m/m) 100669 100669
K4(kN.m/rad) 1328403 1328403
Mt (kN.m) 2913.79
Mmax (kN.m) 387.56
Z (m) 20.611
1/2Mmax(kN.m) 1456.89
S (kN) 233.87
Z (m) 6.231
Z (m) δx(mm) M (kN.m) S (kN)
0.000 4.305 2913.79 233.87
0.500 5.160 2796.87 233.87
1.000 5.928 2679.95 233.87
1.500 6.609 2563.03 233.87
2.000 7.203 2446.11 233.87
5.000 9.142 1744.66 233.87
8.000 8.895 1043.42 233.87
10.138 7.865 544.16 233.87
11.000 7.334 357.65 201.38
14.000 5.297 106.89 107.31
17.000 3.364 319.98 43.33
20.000 1.818 386.06 6.17
22.102 1.021 380.00 9.87
23.000 0.752 369.83 13.29
24.129 0.474 353.28 16.30
26.000 0.149 294.12 42.42
26.765 0.061 260.06 46.11
29.000 0.089 157.24 43.94
30.415 0.121 98.80 38.42
31.327 0.124 65.60 34.34
32.000 0.119 44.53 28.41
35.000 0.066 7.14 7.93
38.000 0.020 14.98 0.98
38.526 0.014 14.28 1.63
41.000 0.002 9.23 2.17
44.000 0.007 3.59 1.48
45.318 0.007 1.91 1.08
47.000 0.005 0.47 0.65
47.650 0.005 0.11 0.51
50.000 0.002 0.64 0.15
50.793 0.002 0.73 0.08
53.000 0.001 0.68 0.09
56.000 0.000 0.34 0.11
58.397 0.000 0.12 0.08
59.000 0.000 0.08 0.06
62.000 0.000 0.02 0.01
64.885 0.000 0.02 0.01
65.000 0.000 0.02 0.01
66.913 0.000 0.00 0.00

*Mmax:Maximum moment of underground part, 1/2Mmax = 1/2・max(Mmax,Mt), Mt:Moment at pile head


- 31 -
20) EXETREME(0.90) ( 1, 3)pile

Pile-head rigid connection


Acting force at pile head X direction Y direction
H (kN) -223.45 -28.46
M (kN.m) 2815.08 323.11
Perpendicular direction X direction Y direction
spring constant
at pile head
K1(kN/m) 10759 10759
K2(kN/rad) 100663 100663
K3(kN.m/m) 100663 100663
K4(kN.m/rad) 1328367 1328367
Mt (kN.m) 2833.56
Mmax (kN.m) 363.68
Z (m) 20.883
1/2Mmax(kN.m) 1416.78
S (kN) 225.25
Z (m) 6.291
Z (m) δx(mm) M (kN.m) S (kN)
0.000 3.473 2833.56 225.25
0.500 4.333 2720.95 225.25
1.000 5.108 2608.33 225.25
1.500 5.799 2495.71 225.25
2.000 6.404 2383.10 225.25
5.000 8.449 1707.45 225.25
8.000 8.349 1031.93 225.25
10.139 7.434 550.63 225.25
11.000 6.949 370.59 194.54
14.000 5.055 79.32 105.07
17.000 3.232 290.57 43.79
20.000 1.760 360.68 7.58
22.103 0.995 359.10 7.53
23.000 0.737 351.06 10.86
24.131 0.467 337.21 13.82
26.000 0.153 282.87 39.89
26.767 0.066 250.59 43.75
29.000 0.082 152.55 42.13
30.417 0.114 96.31 36.98
31.330 0.118 64.32 33.12
32.000 0.114 44.03 27.49
35.000 0.064 6.25 7.82
38.000 0.020 14.24 0.85
38.528 0.014 13.62 1.49
41.000 0.001 8.88 2.06
44.000 0.007 3.50 1.42
45.322 0.006 1.88 1.04
47.000 0.005 0.49 0.63
47.654 0.004 0.13 0.50
50.000 0.002 0.60 0.15
50.797 0.002 0.69 0.08
53.000 0.001 0.65 0.08
56.000 0.000 0.33 0.11
58.401 0.000 0.11 0.07
59.000 0.000 0.08 0.06
62.000 0.000 0.02 0.01
64.890 0.000 0.02 0.01
65.000 0.000 0.02 0.01
66.918 0.000 0.00 0.00

*Mmax:Maximum moment of underground part, 1/2Mmax = 1/2・max(Mmax,Mt), Mt:Moment at pile head


- 32 -
21) EXETREME(0.90) ( 5, 3)pile

Pile-head rigid connection


Acting force at pile head X direction Y direction
H (kN) -223.45 -21.86
M (kN.m) 2815.08 261.32
Perpendicular direction X direction Y direction
spring constant
at pile head
K1(kN/m) 10759 10759
K2(kN/rad) 100663 100663
K3(kN.m/m) 100663 100663
K4(kN.m/rad) 1328367 1328367
Mt (kN.m) 2827.18
Mmax (kN.m) 361.27
Z (m) 20.940
1/2Mmax(kN.m) 1413.59
S (kN) 224.51
Z (m) 6.296
Z (m) δx(mm) M (kN.m) S (kN)
0.000 3.299 2827.18 224.51
0.500 4.184 2714.93 224.51
1.000 4.977 2602.67 224.51
1.500 5.678 2490.42 224.51
2.000 6.293 2378.16 224.51
5.000 8.370 1704.64 224.51
8.000 8.293 1031.14 224.51
10.139 7.392 550.98 224.51
11.000 6.911 371.06 193.96
14.000 5.033 71.48 104.90
17.000 3.221 286.89 43.81
20.000 1.756 357.99 7.38
22.103 0.993 357.05 6.92
23.000 0.735 349.27 10.37
24.131 0.467 335.74 13.40
26.000 0.153 281.89 39.64
26.767 0.066 249.79 43.53
29.000 0.081 152.16 41.97
30.417 0.114 96.12 36.85
31.330 0.117 64.23 33.01
32.000 0.113 43.99 27.41
35.000 0.064 6.12 7.81
38.000 0.020 14.17 0.83
38.528 0.014 13.56 1.47
41.000 0.001 8.85 2.05
44.000 0.006 3.50 1.41
45.322 0.006 1.88 1.04
47.000 0.005 0.49 0.63
47.654 0.004 0.13 0.50
50.000 0.002 0.60 0.15
50.797 0.002 0.69 0.08
53.000 0.001 0.65 0.08
56.000 0.000 0.33 0.11
58.401 0.000 0.11 0.07
59.000 0.000 0.08 0.06
62.000 0.000 0.02 0.01
64.890 0.000 0.02 0.01
65.000 0.000 0.02 0.01
66.918 0.000 0.00 0.00

*Mmax:Maximum moment of underground part, 1/2Mmax = 1/2・max(Mmax,Mt), Mt:Moment at pile head


- 33 -
22) EXETREME(0.90) ( 2, 4)pile

Pile-head rigid connection


Acting force at pile head X direction Y direction
H (kN) -236.32 -36.76
M (kN.m) 2935.51 400.72
Perpendicular direction X direction Y direction
spring constant
at pile head
K1(kN/m) 10760 10760
K2(kN/rad) 100669 100669
K3(kN.m/m) 100669 100669
K4(kN.m/rad) 1328403 1328403
Mt (kN.m) 2962.74
Mmax (kN.m) 402.89
Z (m) 20.440
1/2Mmax(kN.m) 1481.37
S (kN) 239.17
Z (m) 6.196
Z (m) δx(mm) M (kN.m) S (kN)
0.000 4.876 2962.74 239.17
0.500 5.717 2843.18 239.17
1.000 6.473 2723.62 239.17
1.500 7.141 2604.06 239.17
2.000 7.724 2484.50 239.17
5.000 9.583 1767.25 239.17
8.000 9.238 1050.34 239.17
10.138 8.135 540.31 239.17
11.000 7.575 350.33 205.60
14.000 5.448 126.53 108.67
17.000 3.445 338.92 43.06
20.000 1.853 402.08 5.82
22.102 1.036 393.06 11.52
23.000 0.761 381.52 14.95
24.129 0.478 363.23 17.96
26.000 0.148 301.07 44.00
26.765 0.058 265.84 47.58
29.000 0.094 160.14 45.05
30.415 0.126 100.29 39.30
31.327 0.128 66.36 35.08
32.000 0.123 44.84 28.98
35.000 0.068 7.72 8.00
38.000 0.020 15.43 1.07
38.526 0.014 14.70 1.71
41.000 0.002 9.44 2.24
44.000 0.007 3.65 1.51
45.318 0.007 1.93 1.10
47.000 0.005 0.46 0.66
47.650 0.005 0.10 0.52
50.000 0.002 0.67 0.15
50.793 0.002 0.76 0.08
53.000 0.001 0.70 0.09
56.000 0.000 0.35 0.11
58.397 0.000 0.12 0.08
59.000 0.000 0.08 0.06
62.000 0.000 0.03 0.01
64.885 0.000 0.02 0.01
65.000 0.000 0.02 0.01
66.913 0.000 0.00 0.00

*Mmax:Maximum moment of underground part, 1/2Mmax = 1/2・max(Mmax,Mt), Mt:Moment at pile head


- 34 -
23) EXETREME(0.90) ( 4, 4)pile

Pile-head rigid connection


Acting force at pile head X direction Y direction
H (kN) -234.76 -12.12
M (kN.m) 2920.87 170.23
Perpendicular direction X direction Y direction
spring constant
at pile head
K1(kN/m) 10760 10760
K2(kN/rad) 100669 100669
K3(kN.m/m) 100669 100669
K4(kN.m/rad) 1328403 1328403
Mt (kN.m) 2925.83
Mmax (kN.m) 390.28
Z (m) 20.589
1/2Mmax(kN.m) 1462.91
S (kN) 235.07
Z (m) 6.224
Z (m) δx(mm) M (kN.m) S (kN)
0.000 4.290 2925.83 235.07
0.500 5.172 2808.29 235.07
1.000 5.958 2690.76 235.07
1.500 6.651 2573.23 235.07
2.000 7.254 2455.69 235.07
5.000 9.211 1750.51 235.07
8.000 8.957 1045.36 235.07
10.138 7.917 542.87 235.07
11.000 7.381 354.74 202.37
14.000 5.329 104.45 107.66
17.000 3.382 322.41 43.24
20.000 1.826 388.83 5.25
22.102 1.024 382.52 9.71
23.000 0.754 372.18 13.27
24.129 0.475 355.38 16.35
26.000 0.149 295.68 42.71
26.765 0.059 261.38 46.41
29.000 0.090 157.94 44.18
30.415 0.122 99.17 38.62
31.327 0.125 65.80 34.51
32.000 0.120 44.61 28.55
35.000 0.067 7.19 7.95
38.000 0.020 15.07 0.99
38.526 0.014 14.37 1.64
41.000 0.002 9.28 2.19
44.000 0.007 3.61 1.48
45.318 0.007 1.92 1.08
47.000 0.005 0.47 0.65
47.650 0.005 0.09 0.52
50.000 0.002 0.65 0.15
50.793 0.002 0.74 0.08
53.000 0.001 0.69 0.09
56.000 0.000 0.35 0.11
58.397 0.000 0.12 0.08
59.000 0.000 0.08 0.06
62.000 0.000 0.02 0.01
64.885 0.000 0.02 0.01
65.000 0.000 0.02 0.01
66.913 0.000 0.00 0.00

*Mmax:Maximum moment of underground part, 1/2Mmax = 1/2・max(Mmax,Mt), Mt:Moment at pile head


- 35 -
24) EXETREME(0.90) ( 3, 5)pile

Pile-head rigid connection


Acting force at pile head X direction Y direction
H (kN) -246.24 -23.72
M (kN.m) 3028.35 278.71
Perpendicular direction X direction Y direction
spring constant
at pile head
K1(kN/m) 10759 10759
K2(kN/rad) 100663 100663
K3(kN.m/m) 100663 100663
K4(kN.m/rad) 1328367 1328367
Mt (kN.m) 3041.15
Mmax (kN.m) 424.96
Z (m) 20.264
1/2Mmax(kN.m) 1520.57
S (kN) 247.38
Z (m) 6.147
Z (m) δx(mm) M (kN.m) S (kN)
0.000 5.415 3041.15 247.38
0.500 6.300 2917.46 247.38
1.000 7.083 2793.77 247.38
1.500 7.769 2670.08 247.38
2.000 8.360 2546.39 247.38
5.000 10.186 1804.26 247.38
8.000 9.730 1062.15 247.38
10.139 8.529 533.07 247.38
11.000 7.930 335.49 212.22
14.000 5.674 141.45 110.91
17.000 3.571 363.45 42.56
20.000 1.910 424.65 2.61
22.103 1.061 412.11 12.88
23.000 0.777 398.83 16.58
24.131 0.484 378.16 19.76
26.000 0.145 311.82 46.26
26.767 0.052 274.78 49.75
29.000 0.100 164.77 46.76
30.417 0.132 102.65 40.65
31.330 0.134 67.57 36.23
32.000 0.128 45.42 29.89
35.000 0.070 8.39 8.12
38.000 0.020 16.12 1.17
38.528 0.015 15.31 1.83
41.000 0.002 9.77 2.35
44.000 0.008 3.73 1.57
45.322 0.007 1.95 1.14
47.000 0.006 0.44 0.68
47.654 0.005 0.05 0.53
50.000 0.002 0.71 0.15
50.797 0.002 0.80 0.07
53.000 0.001 0.73 0.10
56.000 0.000 0.36 0.12
58.401 0.000 0.12 0.08
59.000 0.000 0.08 0.07
62.000 0.000 0.03 0.01
64.890 0.000 0.02 0.01
65.000 0.000 0.02 0.01
66.918 0.000 0.00 0.00

*Mmax:Maximum moment of underground part, 1/2Mmax = 1/2・max(Mmax,Mt), Mt:Moment at pile head


- 36 -
25) QUASI ( 3, 1)pile

Pile-head rigid connection


Acting force at pile head X direction Y direction
H (kN) -137.06 0.00
M (kN.m) 1694.49 0.00
Perpendicular direction X direction Y direction
spring constant
at pile head
K1(kN/m) 10759 10759
K2(kN/rad) 100663 100663
K3(kN.m/m) 100663 100663
K4(kN.m/rad) 1328367 1328367
Mt (kN.m) 1694.49
Mmax (kN.m) 231.74
Z (m) 20.414
1/2Mmax(kN.m) 847.25
S (kN) 137.06
Z (m) 6.182
Z (m) δx(mm) M (kN.m) S (kN)
0.000 2.762 1694.49 137.06
0.500 3.266 1625.96 137.06
1.000 3.712 1557.44 137.06
1.500 4.104 1488.91 137.06
2.000 4.444 1420.38 137.06
5.000 5.517 1009.21 137.06
8.000 5.313 598.05 137.06
10.139 4.675 304.88 137.06
11.000 4.352 195.28 117.77
14.000 3.127 69.88 62.05
17.000 1.975 195.14 24.32
20.000 1.061 231.32 2.07
22.103 0.592 225.88 6.43
23.000 0.435 219.14 8.50
24.131 0.272 208.44 10.28
26.000 0.083 172.60 25.29
26.767 0.031 152.29 27.33
29.000 0.054 91.66 25.84
30.417 0.072 57.29 22.52
31.330 0.074 37.85 20.09
32.000 0.070 25.56 16.60
35.000 0.039 4.43 4.56
38.000 0.011 8.86 0.61
38.528 0.008 8.44 0.99
41.000 0.001 5.41 1.29
44.000 0.004 2.08 0.87
45.322 0.004 1.10 0.63
47.000 0.003 0.26 0.38
47.654 0.003 0.04 0.30
50.000 0.001 0.39 0.08
50.797 0.001 0.44 0.04
53.000 0.000 0.40 0.05
56.000 0.000 0.20 0.07
58.401 0.000 0.07 0.04
59.000 0.000 0.04 0.04
62.000 0.000 0.01 0.01
64.890 0.000 0.01 0.01
65.000 0.000 0.01 0.01
66.918 0.000 0.00 0.00

*Mmax:Maximum moment of underground part, 1/2Mmax = 1/2・max(Mmax,Mt), Mt:Moment at pile head


- 37 -
26) QUASI ( 2, 2)pile

Pile-head rigid connection


Acting force at pile head X direction Y direction
H (kN) -132.36 3.68
M (kN.m) 1650.52 -34.45
Perpendicular direction X direction Y direction
spring constant
at pile head
K1(kN/m) 10760 10760
K2(kN/rad) 100669 100669
K3(kN.m/m) 100669 100669
K4(kN.m/rad) 1328403 1328403
Mt (kN.m) 1650.88
Mmax (kN.m) 218.82
Z (m) 20.653
1/2Mmax(kN.m) 825.44
S (kN) 132.41
Z (m) 6.234
Z (m) δx(mm) M (kN.m) S (kN)
0.000 2.350 1650.88 132.41
0.500 2.850 1584.68 132.41
1.000 3.296 1518.47 132.41
1.500 3.689 1452.27 132.41
2.000 4.032 1386.07 132.41
5.000 5.151 988.85 132.41
8.000 5.023 591.67 132.41
10.138 4.445 308.64 132.41
11.000 4.146 202.65 114.04
14.000 2.997 56.53 60.82
17.000 1.904 179.81 24.57
20.000 1.030 217.87 3.18
22.102 0.578 214.75 5.27
23.000 0.426 209.10 7.28
24.129 0.269 199.86 9.02
26.000 0.085 166.50 23.96
26.765 0.034 147.25 26.07
29.000 0.050 89.07 24.87
30.415 0.069 55.99 21.75
31.327 0.070 37.19 19.44
32.000 0.067 25.25 16.09
35.000 0.038 3.99 4.50
38.000 0.011 8.47 0.55
38.526 0.008 8.08 0.91
41.000 0.001 5.22 1.23
44.000 0.004 2.04 0.84
45.318 0.004 1.08 0.61
47.000 0.003 0.27 0.37
47.650 0.003 0.06 0.29
50.000 0.001 0.36 0.09
50.793 0.001 0.41 0.04
53.000 0.000 0.39 0.05
56.000 0.000 0.19 0.06
58.397 0.000 0.07 0.04
59.000 0.000 0.04 0.03
62.000 0.000 0.01 0.01
64.885 0.000 0.01 0.00
65.000 0.000 0.01 0.01
66.913 0.000 0.00 0.00

*Mmax:Maximum moment of underground part, 1/2Mmax = 1/2・max(Mmax,Mt), Mt:Moment at pile head


- 38 -
27) QUASI ( 1, 3)pile

Pile-head rigid connection


Acting force at pile head X direction Y direction
H (kN) -128.82 -2.83
M (kN.m) 1617.40 26.44
Perpendicular direction X direction Y direction
spring constant
at pile head
K1(kN/m) 10759 10759
K2(kN/rad) 100663 100663
K3(kN.m/m) 100663 100663
K4(kN.m/rad) 1328367 1328367
Mt (kN.m) 1617.61
Mmax (kN.m) 209.00
Z (m) 20.851
1/2Mmax(kN.m) 808.81
S (kN) 128.85
Z (m) 6.277
Z (m) δx(mm) M (kN.m) S (kN)
0.000 2.013 1617.61 128.85
0.500 2.515 1553.19 128.85
1.000 2.963 1488.77 128.85
1.500 3.360 1424.35 128.85
2.000 3.707 1359.92 128.85
5.000 4.868 973.40 128.85
8.000 4.799 586.88 128.85
10.139 4.267 311.34 128.85
11.000 3.987 208.15 111.21
14.000 2.897 45.30 59.89
17.000 1.850 167.80 24.77
20.000 1.006 207.45 3.88
22.103 0.568 206.15 4.33
23.000 0.420 201.37 6.30
24.131 0.266 193.22 8.02
26.000 0.086 161.85 22.92
26.767 0.036 143.32 25.10
29.000 0.047 87.13 24.12
30.417 0.066 54.94 21.15
31.330 0.068 36.65 18.94
32.000 0.065 25.04 15.71
35.000 0.037 3.62 4.45
38.000 0.011 8.17 0.49
38.528 0.008 7.80 0.86
41.000 0.001 5.08 1.18
44.000 0.004 2.00 0.81
45.322 0.004 1.07 0.60
47.000 0.003 0.28 0.36
47.654 0.003 0.07 0.29
50.000 0.001 0.35 0.09
50.797 0.001 0.40 0.04
53.000 0.000 0.37 0.05
56.000 0.000 0.19 0.06
58.401 0.000 0.07 0.04
59.000 0.000 0.04 0.03
62.000 0.000 0.01 0.01
64.890 0.000 0.01 0.00
65.000 0.000 0.01 0.00
66.918 0.000 0.00 0.00

*Mmax:Maximum moment of underground part, 1/2Mmax = 1/2・max(Mmax,Mt), Mt:Moment at pile head


- 39 -
28) QUASI ( 2, 4)pile

Pile-head rigid connection


Acting force at pile head X direction Y direction
H (kN) -136.36 -7.68
M (kN.m) 1687.91 71.83
Perpendicular direction X direction Y direction
spring constant
at pile head
K1(kN/m) 10760 10760
K2(kN/rad) 100669 100669
K3(kN.m/m) 100669 100669
K4(kN.m/rad) 1328403 1328403
Mt (kN.m) 1689.44
Mmax (kN.m) 230.76
Z (m) 20.407
1/2Mmax(kN.m) 844.72
S (kN) 136.57
Z (m) 6.186
Z (m) δx(mm) M (kN.m) S (kN)
0.000 2.789 1689.44 136.57
0.500 3.278 1621.16 136.57
1.000 3.715 1552.88 136.57
1.500 4.100 1484.60 136.57
2.000 4.434 1416.32 136.57
5.000 5.495 1006.69 136.57
8.000 5.290 597.16 136.57
10.138 4.656 305.55 136.57
11.000 4.334 196.71 117.36
14.000 3.114 71.73 61.90
17.000 1.968 194.48 24.36
20.000 1.058 230.35 2.76
22.102 0.590 224.95 6.55
23.000 0.434 218.25 8.56
24.129 0.272 207.65 10.30
26.000 0.083 171.96 25.19
26.765 0.032 151.79 27.22
29.000 0.054 91.35 25.74
30.415 0.072 57.16 22.44
31.327 0.073 37.78 20.03
32.000 0.070 25.50 16.54
35.000 0.039 4.43 4.55
38.000 0.011 8.83 0.61
38.526 0.008 8.40 0.98
41.000 0.001 5.39 1.28
44.000 0.004 2.08 0.86
45.318 0.004 1.10 0.63
47.000 0.003 0.26 0.38
47.650 0.003 0.05 0.30
50.000 0.001 0.38 0.08
50.793 0.001 0.43 0.04
53.000 0.000 0.40 0.05
56.000 0.000 0.20 0.07
58.397 0.000 0.07 0.04
59.000 0.000 0.04 0.04
62.000 0.000 0.01 0.01
64.885 0.000 0.01 0.01
65.000 0.000 0.01 0.01
66.913 0.000 0.00 0.00

*Mmax:Maximum moment of underground part, 1/2Mmax = 1/2・max(Mmax,Mt), Mt:Moment at pile head


- 40 -
29) QUASI ( 3, 5)pile

Pile-head rigid connection


Acting force at pile head X direction Y direction
H (kN) -142.71 0.00
M (kN.m) 1747.38 0.00
Perpendicular direction X direction Y direction
spring constant
at pile head
K1(kN/m) 10759 10759
K2(kN/rad) 100663 100663
K3(kN.m/m) 100663 100663
K4(kN.m/rad) 1328367 1328367
Mt (kN.m) 1747.38
Mmax (kN.m) 247.87
Z (m) 20.162
1/2Mmax(kN.m) 873.69
S (kN) 142.71
Z (m) 6.122
Z (m) δx(mm) M (kN.m) S (kN)
0.000 3.287 1747.38 142.71
0.500 3.790 1676.03 142.71
1.000 4.234 1604.67 142.71
1.500 4.622 1533.32 142.71
2.000 4.955 1461.96 142.71
5.000 5.966 1033.84 142.71
8.000 5.668 605.71 142.71
10.139 4.956 300.45 142.71
11.000 4.604 186.48 122.29
14.000 3.286 87.32 63.54
17.000 2.062 214.08 24.01
20.000 1.099 247.80 0.86
22.103 0.609 239.49 7.91
23.000 0.445 231.39 10.04
24.131 0.276 218.93 11.86
26.000 0.081 180.00 26.93
26.767 0.028 158.47 28.87
29.000 0.059 94.78 27.02
30.417 0.077 58.91 23.45
31.330 0.078 38.67 20.89
32.000 0.074 25.91 17.21
35.000 0.040 4.99 4.64
38.000 0.012 9.34 0.70
38.528 0.008 8.87 1.07
41.000 0.001 5.64 1.36
44.000 0.004 2.14 0.91
45.322 0.004 1.11 0.66
47.000 0.003 0.24 0.39
47.654 0.003 0.02 0.31
50.000 0.001 0.41 0.08
50.797 0.001 0.46 0.04
53.000 0.000 0.42 0.06
56.000 0.000 0.21 0.07
58.401 0.000 0.07 0.05
59.000 0.000 0.04 0.04
62.000 0.000 0.02 0.01
64.890 0.000 0.01 0.01
65.000 0.000 0.01 0.01
66.918 0.000 0.00 0.00

*Mmax:Maximum moment of underground part, 1/2Mmax = 1/2・max(Mmax,Mt), Mt:Moment at pile head


- 41 -
30) FATIGUE ( 3, 1)pile

Pile-head rigid connection


Acting force at pile head X direction Y direction
H (kN) -65.72 -6.95
M (kN.m) 819.56 80.76
Perpendicular direction X direction Y direction
spring constant
at pile head
K1(kN/m) 10759 10759
K2(kN/rad) 100663 100663
K3(kN.m/m) 100663 100663
K4(kN.m/rad) 1328367 1328367
Mt (kN.m) 823.53
Mmax (kN.m) 109.36
Z (m) 20.621
1/2Mmax(kN.m) 411.76
S (kN) 66.08
Z (m) 6.231
Z (m) δx(mm) M (kN.m) S (kN)
0.000 1.183 823.53 66.08
0.500 1.432 790.49 66.08
1.000 1.654 757.45 66.08
1.500 1.850 724.41 66.08
2.000 2.020 691.37 66.08
5.000 2.577 493.13 66.08
8.000 2.510 294.90 66.08
10.139 2.221 153.60 66.08
11.000 2.071 100.76 56.92
14.000 1.496 28.58 30.33
17.000 0.951 90.01 12.23
20.000 0.514 108.91 1.56
22.103 0.288 107.28 2.67
23.000 0.213 104.44 3.67
24.131 0.134 99.78 4.53
26.000 0.042 83.11 11.97
26.767 0.017 73.47 13.02
29.000 0.025 44.45 12.41
30.417 0.034 27.91 10.85
31.330 0.035 18.53 9.70
32.000 0.034 12.59 8.03
35.000 0.019 2.00 2.24
38.000 0.006 4.23 0.27
38.528 0.004 4.03 0.46
41.000 0.001 2.61 0.61
44.000 0.002 1.02 0.42
45.322 0.002 0.54 0.30
47.000 0.001 0.13 0.18
47.654 0.001 0.03 0.15
50.000 0.001 0.18 0.04
50.797 0.000 0.21 0.02
53.000 0.000 0.19 0.03
56.000 0.000 0.10 0.03
58.401 0.000 0.03 0.02
59.000 0.000 0.02 0.02
62.000 0.000 0.01 0.00
64.890 0.000 0.01 0.00
65.000 0.000 0.01 0.00
66.918 0.000 0.00 0.00

*Mmax:Maximum moment of underground part, 1/2Mmax = 1/2・max(Mmax,Mt), Mt:Moment at pile head


- 42 -
31) FATIGUE ( 2, 2)pile

Pile-head rigid connection


Acting force at pile head X direction Y direction
H (kN) -63.59 -6.34
M (kN.m) 799.61 75.10
Perpendicular direction X direction Y direction
spring constant
at pile head
K1(kN/m) 10760 10760
K2(kN/rad) 100669 100669
K3(kN.m/m) 100669 100669
K4(kN.m/rad) 1328403 1328403
Mt (kN.m) 803.13
Mmax (kN.m) 103.34
Z (m) 20.884
1/2Mmax(kN.m) 401.56
S (kN) 63.90
Z (m) 6.284
Z (m) δx(mm) M (kN.m) S (kN)
0.000 0.977 803.13 63.90
0.500 1.227 771.18 63.90
1.000 1.450 739.23 63.90
1.500 1.648 707.28 63.90
2.000 1.821 675.33 63.90
5.000 2.402 483.63 63.90
8.000 2.372 291.94 63.90
10.138 2.112 155.33 63.90
11.000 1.973 104.11 55.17
14.000 1.435 21.73 29.76
17.000 0.917 82.64 12.35
20.000 0.499 102.51 1.99
22.102 0.282 102.01 2.08
23.000 0.209 99.70 3.06
24.129 0.132 95.74 3.92
26.000 0.043 80.25 11.34
26.765 0.018 71.10 12.43
29.000 0.023 43.24 11.96
30.415 0.032 27.30 10.49
31.327 0.034 18.22 9.40
32.000 0.032 12.45 7.79
35.000 0.018 1.78 2.21
38.000 0.006 4.04 0.24
38.526 0.004 3.87 0.42
41.000 0.000 2.52 0.59
44.000 0.002 0.99 0.40
45.318 0.002 0.53 0.30
47.000 0.001 0.14 0.18
47.650 0.001 0.03 0.14
50.000 0.001 0.17 0.04
50.793 0.000 0.20 0.02
53.000 0.000 0.18 0.02
56.000 0.000 0.09 0.03
58.397 0.000 0.03 0.02
59.000 0.000 0.02 0.02
62.000 0.000 0.01 0.00
64.885 0.000 0.01 0.00
65.000 0.000 0.01 0.00
66.913 0.000 0.00 0.00

*Mmax:Maximum moment of underground part, 1/2Mmax = 1/2・max(Mmax,Mt), Mt:Moment at pile head


- 43 -
32) FATIGUE ( 4, 2)pile

Pile-head rigid connection


Acting force at pile head X direction Y direction
H (kN) -64.02 -7.95
M (kN.m) 803.67 90.13
Perpendicular direction X direction Y direction
spring constant
at pile head
K1(kN/m) 10760 10760
K2(kN/rad) 100669 100669
K3(kN.m/m) 100669 100669
K4(kN.m/rad) 1328403 1328403
Mt (kN.m) 808.70
Mmax (kN.m) 105.10
Z (m) 20.802
1/2Mmax(kN.m) 404.35
S (kN) 64.51
Z (m) 6.269
Z (m) δx(mm) M (kN.m) S (kN)
0.000 1.057 808.70 64.51
0.500 1.302 776.45 64.51
1.000 1.521 744.20 64.51
1.500 1.716 711.95 64.51
2.000 1.886 679.69 64.51
5.000 2.455 486.19 64.51
8.000 2.413 292.72 64.51
10.138 2.143 154.91 64.51
11.000 2.002 103.33 55.65
14.000 1.452 24.80 29.91
17.000 0.926 84.97 12.32
20.000 0.503 104.42 1.96
22.102 0.284 103.55 2.33
23.000 0.210 101.06 3.29
24.129 0.133 96.89 4.14
26.000 0.043 81.05 11.52
26.765 0.018 71.77 12.60
29.000 0.024 43.57 12.09
30.415 0.033 27.47 10.59
31.327 0.034 18.31 9.48
32.000 0.033 12.48 7.86
35.000 0.018 1.85 2.22
38.000 0.006 4.10 0.25
38.526 0.004 3.91 0.43
41.000 0.000 2.54 0.59
44.000 0.002 1.00 0.41
45.318 0.002 0.54 0.30
47.000 0.001 0.14 0.18
47.650 0.001 0.03 0.14
50.000 0.001 0.17 0.04
50.793 0.000 0.20 0.02
53.000 0.000 0.19 0.02
56.000 0.000 0.09 0.03
58.397 0.000 0.03 0.02
59.000 0.000 0.02 0.02
62.000 0.000 0.01 0.00
64.885 0.000 0.01 0.00
65.000 0.000 0.01 0.00
66.913 0.000 0.00 0.00

*Mmax:Maximum moment of underground part, 1/2Mmax = 1/2・max(Mmax,Mt), Mt:Moment at pile head


- 44 -
33) FATIGUE ( 1, 3)pile

Pile-head rigid connection


Acting force at pile head X direction Y direction
H (kN) -63.06 -10.20
M (kN.m) 794.72 111.16
Perpendicular direction X direction Y direction
spring constant
at pile head
K1(kN/m) 10759 10759
K2(kN/rad) 100663 100663
K3(kN.m/m) 100663 100663
K4(kN.m/rad) 1328367 1328367
Mt (kN.m) 802.46
Mmax (kN.m) 103.68
Z (m) 20.813
1/2Mmax(kN.m) 401.23
S (kN) 63.88
Z (m) 6.284
Z (m) δx(mm) M (kN.m) S (kN)
0.000 1.069 802.46 63.88
0.500 1.297 770.53 63.88
1.000 1.506 738.59 63.88
1.500 1.694 706.66 63.88
2.000 1.860 674.73 63.88
5.000 2.419 483.17 63.88
8.000 2.380 291.73 63.88
10.139 2.116 155.53 63.88
11.000 1.977 104.77 55.15
14.000 1.436 26.35 29.73
17.000 0.917 83.68 12.37
20.000 0.499 102.96 2.32
22.103 0.282 102.22 2.43
23.000 0.208 99.83 3.31
24.131 0.132 95.78 4.11
26.000 0.043 80.24 11.37
26.767 0.019 71.06 12.44
29.000 0.023 43.22 11.96
30.417 0.033 27.26 10.49
31.330 0.034 18.20 9.39
32.000 0.032 12.45 7.79
35.000 0.018 1.83 2.21
38.000 0.006 4.05 0.25
38.528 0.004 3.87 0.43
41.000 0.000 2.52 0.59
44.000 0.002 0.99 0.40
45.322 0.002 0.53 0.30
47.000 0.001 0.14 0.18
47.654 0.001 0.04 0.14
50.000 0.001 0.17 0.04
50.797 0.000 0.20 0.02
53.000 0.000 0.18 0.02
56.000 0.000 0.09 0.03
58.401 0.000 0.03 0.02
59.000 0.000 0.02 0.02
62.000 0.000 0.01 0.00
64.890 0.000 0.01 0.00
65.000 0.000 0.01 0.00
66.918 0.000 0.00 0.00

*Mmax:Maximum moment of underground part, 1/2Mmax = 1/2・max(Mmax,Mt), Mt:Moment at pile head


- 45 -
34) FATIGUE ( 5, 3)pile

Pile-head rigid connection


Acting force at pile head X direction Y direction
H (kN) -63.06 -4.49
M (kN.m) 794.72 57.75
Perpendicular direction X direction Y direction
spring constant
at pile head
K1(kN/m) 10759 10759
K2(kN/rad) 100663 100663
K3(kN.m/m) 100663 100663
K4(kN.m/rad) 1328367 1328367
Mt (kN.m) 796.82
Mmax (kN.m) 101.48
Z (m) 20.963
1/2Mmax(kN.m) 398.41
S (kN) 63.22
Z (m) 6.302
Z (m) δx(mm) M (kN.m) S (kN)
0.000 0.907 796.82 63.22
0.500 1.159 765.21 63.22
1.000 1.383 733.60 63.22
1.500 1.583 701.99 63.22
2.000 1.757 670.38 63.22
5.000 2.347 480.71 63.22
8.000 2.329 291.05 63.22
10.139 2.078 155.82 63.22
11.000 1.943 105.13 54.63
14.000 1.416 19.26 29.58
17.000 0.907 80.29 12.39
20.000 0.495 100.50 2.11
22.103 0.280 100.36 1.88
23.000 0.207 98.21 2.86
24.131 0.132 94.46 3.72
26.000 0.043 79.37 11.14
26.767 0.019 70.34 12.24
29.000 0.023 42.88 11.81
30.417 0.032 27.10 10.38
31.330 0.033 18.12 9.30
32.000 0.032 12.42 7.72
35.000 0.018 1.71 2.20
38.000 0.006 3.99 0.23
38.528 0.004 3.81 0.41
41.000 0.000 2.49 0.58
44.000 0.002 0.99 0.40
45.322 0.002 0.53 0.29
47.000 0.001 0.14 0.18
47.654 0.001 0.04 0.14
50.000 0.001 0.17 0.04
50.797 0.000 0.19 0.02
53.000 0.000 0.18 0.02
56.000 0.000 0.09 0.03
58.401 0.000 0.03 0.02
59.000 0.000 0.02 0.02
62.000 0.000 0.01 0.00
64.890 0.000 0.01 0.00
65.000 0.000 0.01 0.00
66.918 0.000 0.00 0.00

*Mmax:Maximum moment of underground part, 1/2Mmax = 1/2・max(Mmax,Mt), Mt:Moment at pile head


- 46 -
35) FATIGUE ( 2, 4)pile

Pile-head rigid connection


Acting force at pile head X direction Y direction
H (kN) -68.05 -11.99
M (kN.m) 841.42 127.88
Perpendicular direction X direction Y direction
spring constant
at pile head
K1(kN/m) 10760 10760
K2(kN/rad) 100669 100669
K3(kN.m/m) 100669 100669
K4(kN.m/rad) 1328403 1328403
Mt (kN.m) 851.09
Mmax (kN.m) 118.41
Z (m) 20.252
1/2Mmax(kN.m) 425.54
S (kN) 69.10
Z (m) 6.162
Z (m) δx(mm) M (kN.m) S (kN)
0.000 1.554 851.09 69.10
0.500 1.786 816.54 69.10
1.000 1.995 782.00 69.10
1.500 2.179 747.46 69.10
2.000 2.339 712.93 69.10
5.000 2.839 505.73 69.10
8.000 2.711 298.70 69.10
10.138 2.377 151.60 69.10
11.000 2.211 97.05 59.30
14.000 1.583 41.87 31.09
17.000 0.997 101.42 12.09
20.000 0.534 118.32 1.71
22.102 0.297 114.88 3.77
23.000 0.218 111.21 4.74
24.129 0.136 105.51 5.58
26.000 0.041 87.07 12.90
26.765 0.016 76.78 13.87
29.000 0.028 46.07 13.05
30.415 0.037 28.76 11.36
31.327 0.037 18.96 10.13
32.000 0.036 12.76 8.35
35.000 0.020 2.36 2.28
38.000 0.006 4.49 0.33
38.526 0.004 4.27 0.51
41.000 0.001 2.73 0.66
44.000 0.002 1.05 0.44
45.318 0.002 0.55 0.32
47.000 0.002 0.13 0.19
47.650 0.001 0.03 0.15
50.000 0.001 0.20 0.04
50.793 0.001 0.22 0.02
53.000 0.000 0.20 0.03
56.000 0.000 0.10 0.03
58.397 0.000 0.03 0.02
59.000 0.000 0.02 0.02
62.000 0.000 0.01 0.00
64.885 0.000 0.01 0.00
65.000 0.000 0.01 0.00
66.913 0.000 0.00 0.00

*Mmax:Maximum moment of underground part, 1/2Mmax = 1/2・max(Mmax,Mt), Mt:Moment at pile head


- 47 -
36) FATIGUE ( 4, 4)pile

Pile-head rigid connection


Acting force at pile head X direction Y direction
H (kN) -67.62 -2.31
M (kN.m) 837.36 37.34
Perpendicular direction X direction Y direction
spring constant
at pile head
K1(kN/m) 10760 10760
K2(kN/rad) 100669 100669
K3(kN.m/m) 100669 100669
K4(kN.m/rad) 1328403 1328403
Mt (kN.m) 838.20
Mmax (kN.m) 113.82
Z (m) 20.458
1/2Mmax(kN.m) 419.10
S (kN) 67.66
Z (m) 6.195
Z (m) δx(mm) M (kN.m) S (kN)
0.000 1.340 838.20 67.66
0.500 1.587 804.37 67.66
1.000 1.807 770.54 67.66
1.500 2.000 736.71 67.66
2.000 2.168 702.88 67.66
5.000 2.704 499.92 67.66
8.000 2.610 297.00 67.66
10.138 2.300 152.44 67.66
11.000 2.142 98.41 58.17
14.000 1.541 33.92 30.74
17.000 0.975 95.43 12.15
20.000 0.524 113.57 1.33
22.102 0.293 111.11 3.11
23.000 0.215 107.88 4.12
24.129 0.135 102.73 5.00
26.000 0.042 85.17 12.44
26.765 0.016 75.21 13.45
29.000 0.027 45.30 12.74
30.415 0.036 28.37 11.12
31.327 0.036 18.77 9.93
32.000 0.035 12.68 8.20
35.000 0.019 2.16 2.26
38.000 0.006 4.36 0.30
38.526 0.004 4.16 0.48
41.000 0.001 2.67 0.63
44.000 0.002 1.03 0.43
45.318 0.002 0.54 0.31
47.000 0.002 0.13 0.19
47.650 0.001 0.02 0.15
50.000 0.001 0.19 0.04
50.793 0.001 0.21 0.02
53.000 0.000 0.20 0.03
56.000 0.000 0.10 0.03
58.397 0.000 0.03 0.02
59.000 0.000 0.02 0.02
62.000 0.000 0.01 0.00
64.885 0.000 0.01 0.00
65.000 0.000 0.01 0.00
66.913 0.000 0.00 0.00

*Mmax:Maximum moment of underground part, 1/2Mmax = 1/2・max(Mmax,Mt), Mt:Moment at pile head


- 48 -
37) FATIGUE ( 3, 5)pile

Pile-head rigid connection


Acting force at pile head X direction Y direction
H (kN) -71.42 -6.95
M (kN.m) 872.97 80.76
Perpendicular direction X direction Y direction
spring constant
at pile head
K1(kN/m) 10759 10759
K2(kN/rad) 100663 100663
K3(kN.m/m) 100663 100663
K4(kN.m/rad) 1328367 1328367
Mt (kN.m) 876.69
Mmax (kN.m) 125.45
Z (m) 20.105
1/2Mmax(kN.m) 438.35
S (kN) 71.76
Z (m) 6.108
Z (m) δx(mm) M (kN.m) S (kN)
0.000 1.704 876.69 71.76
0.500 1.954 840.81 71.76
1.000 2.174 804.93 71.76
1.500 2.366 769.05 71.76
2.000 2.532 733.17 71.76
5.000 3.027 517.89 71.76
8.000 2.867 302.62 71.76
10.139 2.503 149.14 71.76
11.000 2.324 91.89 61.45
14.000 1.656 45.76 31.82
17.000 1.037 108.96 11.92
20.000 0.552 125.43 0.42
22.103 0.305 120.94 4.13
23.000 0.223 116.74 5.19
24.131 0.138 110.31 6.10
26.000 0.040 90.54 13.61
26.767 0.014 79.68 14.57
29.000 0.030 47.58 13.60
30.417 0.039 29.53 11.80
31.330 0.039 19.36 10.50
32.000 0.037 12.95 8.65
35.000 0.020 2.56 2.32
38.000 0.006 4.71 0.36
38.528 0.004 4.47 0.55
41.000 0.001 2.84 0.69
44.000 0.002 1.07 0.46
45.322 0.002 0.56 0.33
47.000 0.002 0.12 0.20
47.654 0.001 0.01 0.15
50.000 0.001 0.21 0.04
50.797 0.001 0.23 0.02
53.000 0.000 0.21 0.03
56.000 0.000 0.10 0.03
58.401 0.000 0.03 0.02
59.000 0.000 0.02 0.02
62.000 0.000 0.01 0.00
64.890 0.000 0.01 0.00
65.000 0.000 0.01 0.00
66.918 0.000 0.00 0.00

*Mmax:Maximum moment of underground part, 1/2Mmax = 1/2・max(Mmax,Mt), Mt:Moment at pile head


- 49 -
3.2 Section force chart
1) EXETREME(1.00) ( 3, 1)pile
Pile diameter D = 1600.0 (mm)
Pile length L = 66.00 (m)
【Pile-head rigid connection】
Hx = -9.24 (kN) Hy = -191.60 (kN)
My = 118.36 (kN.m) Mx = 2446.07 (kN.m)

Bending
(m) moment diagram(rigid connection)(kN.m) (m) Bending moment fogure(hinge)(kN.m)
0 0

10 10

20 20
297.89

30 30

40 40

50 50

60 60

-2448.93 -1225 1225 2448.93


Mt=2448.93, 1/2Mmax=1224.46, L1/2=6.383 Mt=***, 1/2Mmax=***, L1/2=***

(m) Displacement diagram(mm) (m) Shear force figure(kN)


0 0

10 10

20 20

30 30

40 40

50 50

60 60

-6.96 -3.48 3.48 6.96 -191.82 -96 96 191.82


- 50 -
2) EXETREME(1.00) ( 2, 2)pile
Pile diameter D = 1600.0 (mm)
Pile length L = 66.00 (m)
【Pile-head rigid connection】
Hx = -0.85 (kN) Hy = -202.50 (kN)
My = 39.82 (kN.m) Mx = 2548.00 (kN.m)

Bending
(m) moment diagram(rigid connection)(kN.m) (m) Bending moment fogure(hinge)(kN.m)
0 0

10 10

20 326.55 20

30 30

40 40

50 50

60 60

-2548.31 -1275 1275 2548.31


Mt=2548.31, 1/2Mmax=1274.15, L1/2=6.293 Mt=***, 1/2Mmax=***, L1/2=***

(m) Displacement diagram(mm) (m) Shear force figure(kN)


0 0

10 10

20 20

30 30

40 40

50 50

60 60

-7.74 -3.87 3.87 7.74 -202.50 -102 102 202.50


- 51 -
3) EXETREME(1.00) ( 4, 2)pile
Pile diameter D = 1600.0 (mm)
Pile length L = 66.00 (m)
【Pile-head rigid connection】
Hx = -18.86 (kN) Hy = -198.44 (kN)
My = 208.31 (kN.m) Mx = 2510.03 (kN.m)

Bending
(m) moment diagram(rigid connection)(kN.m) (m) Bending moment fogure(hinge)(kN.m)
0 0

10 10

20 318.05 20

30 30

40 40

50 50

60 60

-2518.65 -1260 1260 2518.65


Mt=2518.65, 1/2Mmax=1259.33, L1/2=6.319 Mt=***, 1/2Mmax=***, L1/2=***

(m) Displacement diagram(mm) (m) Shear force figure(kN)


0 0

10 10

20 20

30 30

40 40

50 50

60 60

-7.51 -3.75 3.75 7.51 -199.34 -100 100 199.34


- 52 -
4) EXETREME(1.00) ( 1, 3)pile
Pile diameter D = 1600.0 (mm)
Pile length L = 66.00 (m)
【Pile-head rigid connection】
Hx = -11.91 (kN) Hy = -212.81 (kN)
My = 143.28 (kN.m) Mx = 2644.50 (kN.m)

Bending
(m) moment diagram(rigid connection)(kN.m) (m) Bending moment fogure(hinge)(kN.m)
0 0

10 10

20 355.49 20

30 30

40 40

50 50

60 60

-2648.37 -1325 1325 2648.37


Mt=2648.37, 1/2Mmax=1324.19, L1/2=6.213 Mt=***, 1/2Mmax=***, L1/2=***

(m) Displacement diagram(mm) (m) Shear force figure(kN)


0 0

10 10

20 20

30 30

40 40

50 50

60 60

-8.51 -4.25 4.25 8.51 -213.14 -107 107 213.14


- 53 -
5) EXETREME(1.00) ( 5, 3)pile
Pile diameter D = 1600.0 (mm)
Pile length L = 66.00 (m)
【Pile-head rigid connection】
Hx = -11.91 (kN) Hy = -205.83 (kN)
My = 143.28 (kN.m) Mx = 2579.16 (kN.m)

Bending
(m) moment diagram(rigid connection)(kN.m) (m) Bending moment fogure(hinge)(kN.m)
0 0

10 10

20 336.20 20

30 30

40 40

50 50

60 60

-2583.13 -1292 1292 2583.13


Mt=2583.13, 1/2Mmax=1291.57, L1/2=6.265 Mt=***, 1/2Mmax=***, L1/2=***

(m) Displacement diagram(mm) (m) Shear force figure(kN)


0 0

10 10

20 20

30 30

40 40

50 50

60 60

-7.99 -4.00 4.00 7.99 -206.17 -104 104 206.17


- 54 -
6) EXETREME(1.00) ( 2, 4)pile
Pile diameter D = 1600.0 (mm)
Pile length L = 66.00 (m)
【Pile-head rigid connection】
Hx = -23.80 (kN) Hy = -203.38 (kN)
My = 254.50 (kN.m) Mx = 2556.22 (kN.m)

Bending
(m) moment diagram(rigid connection)(kN.m) (m) Bending moment fogure(hinge)(kN.m)
0 0

10 10

20 333.20 20

30 30

40 40

50 50

60 60

-2568.85 -1285 1285 2568.85


Mt=2568.85, 1/2Mmax=1284.43, L1/2=6.275 Mt=***, 1/2Mmax=***, L1/2=***

(m) Displacement diagram(mm) (m) Shear force figure(kN)


0 0

10 10

20 20

30 30

40 40

50 50

60 60

-7.92 -3.96 3.96 7.92 -204.77 -103 103 204.77


- 55 -
7) EXETREME(1.00) ( 4, 4)pile
Pile diameter D = 1600.0 (mm)
Pile length L = 66.00 (m)
【Pile-head rigid connection】
Hx = -5.79 (kN) Hy = -197.56 (kN)
My = 86.01 (kN.m) Mx = 2501.81 (kN.m)

Bending
(m) moment diagram(rigid connection)(kN.m) (m) Bending moment fogure(hinge)(kN.m)
0 0

10 10

20 313.23 20

30 30

40 40

50 50

60 60

-2503.28 -1252 1252 2503.28


Mt=2503.28, 1/2Mmax=1251.64, L1/2=6.333 Mt=***, 1/2Mmax=***, L1/2=***

(m) Displacement diagram(mm) (m) Shear force figure(kN)


0 0

10 10

20 20

30 30

40 40

50 50

60 60

-7.37 -3.69 3.69 7.37 -197.65 -99 99 197.65


- 56 -
8) EXETREME(1.00) ( 3, 5)pile
Pile diameter D = 1600.0 (mm)
Pile length L = 66.00 (m)
【Pile-head rigid connection】
Hx = -16.23 (kN) Hy = -191.60 (kN)
My = 183.70 (kN.m) Mx = 2446.07 (kN.m)

Bending
(m) moment diagram(rigid connection)(kN.m) (m) Bending moment fogure(hinge)(kN.m)
0 0

10 10

20 20
299.31

30 30

40 40

50 50

60 60

-2452.96 -1227 1227 2452.96


Mt=2452.96, 1/2Mmax=1226.48, L1/2=6.379 Mt=***, 1/2Mmax=***, L1/2=***

(m) Displacement diagram(mm) (m) Shear force figure(kN)


0 0

10 10

20 20

30 30

40 40

50 50

60 60

-7.00 -3.50 3.50 7.00 -192.29 -97 97 192.29


- 57 -
9) EXETREME(1.35) ( 3, 1)pile
Pile diameter D = 1600.0 (mm)
Pile length L = 66.00 (m)
【Pile-head rigid connection】
Hx = -238.35 (kN) Hy = -23.72 (kN)
My = 2954.49 (kN.m) Mx = 278.71 (kN.m)

Bending
(m) moment diagram(rigid connection)(kN.m) (m) Bending moment fogure(hinge)(kN.m)
0 0

10 10

20 402.71 20

30 30

40 40

50 50

60 60

-2967.60 -1484 1484 2967.60


Mt=2967.60, 1/2Mmax=1483.80, L1/2=6.195 Mt=***, 1/2Mmax=***, L1/2=***

(m) Displacement diagram(mm) (m) Shear force figure(kN)


0 0

10 10

20 20

30 30

40 40

50 50

60 60

-9.66 -4.83 4.83 9.66 -239.52 -120 120 239.52


- 58 -
10) EXETREME(1.35) ( 2, 2)pile
Pile diameter D = 1600.0 (mm)
Pile length L = 66.00 (m)
【Pile-head rigid connection】
Hx = -229.18 (kN) Hy = -17.71 (kN)
My = 2868.65 (kN.m) Mx = 222.45 (kN.m)

Bending
(m) moment diagram(rigid connection)(kN.m) (m) Bending moment fogure(hinge)(kN.m)
0 0

10 10

20 375.73 20

30 30

40 40

50 50

60 60

-2877.26 -1439 1439 2877.26


Mt=2877.26, 1/2Mmax=1438.63, L1/2=6.259 Mt=***, 1/2Mmax=***, L1/2=***

(m) Displacement diagram(mm) (m) Shear force figure(kN)


0 0

10 10

20 20

30 30

40 40

50 50

60 60

-8.94 -4.47 4.47 8.94 -229.86 -115 115 229.86


- 59 -
11) EXETREME(1.35) ( 4, 2)pile
Pile diameter D = 1600.0 (mm)
Pile length L = 66.00 (m)
【Pile-head rigid connection】
Hx = -230.74 (kN) Hy = -31.18 (kN)
My = 2883.30 (kN.m) Mx = 348.50 (kN.m)

Bending
(m) moment diagram(rigid connection)(kN.m) (m) Bending moment fogure(hinge)(kN.m)
0 0

10 10

20 384.62 20

30 30

40 40

50 50

60 60

-2904.28 -1453 1453 2904.28


Mt=2904.28, 1/2Mmax=1452.14, L1/2=6.238 Mt=***, 1/2Mmax=***, L1/2=***

(m) Displacement diagram(mm) (m) Shear force figure(kN)


0 0

10 10

20 20

30 30

40 40

50 50

60 60

-9.18 -4.59 4.59 9.18 -232.84 -117 117 232.84


- 60 -
12) EXETREME(1.35) ( 1, 3)pile
Pile diameter D = 1600.0 (mm)
Pile length L = 66.00 (m)
【Pile-head rigid connection】
Hx = -223.45 (kN) Hy = -29.75 (kN)
My = 2815.08 (kN.m) Mx = 335.18 (kN.m)

Bending
(m) moment diagram(rigid connection)(kN.m) (m) Bending moment fogure(hinge)(kN.m)
0 0

10 10

20 364.25 20

30 30

40 40

50 50

60 60

-2834.97 -1418 1418 2834.97


Mt=2834.97, 1/2Mmax=1417.48, L1/2=6.289 Mt=***, 1/2Mmax=***, L1/2=***

(m) Displacement diagram(mm) (m) Shear force figure(kN)


0 0

10 10

20 20

30 30

40 40

50 50

60 60

-8.64 -4.32 4.32 8.64 -225.42 -113 113 225.42


- 61 -
13) EXETREME(1.35) ( 5, 3)pile
Pile diameter D = 1600.0 (mm)
Pile length L = 66.00 (m)
【Pile-head rigid connection】
Hx = -223.45 (kN) Hy = -20.57 (kN)
My = 2815.08 (kN.m) Mx = 249.25 (kN.m)

Bending
(m) moment diagram(rigid connection)(kN.m) (m) Bending moment fogure(hinge)(kN.m)
0 0

10 10

20 360.90 20

30 30

40 40

50 50

60 60

-2826.09 -1414 1414 2826.09


Mt=2826.09, 1/2Mmax=1413.05, L1/2=6.297 Mt=***, 1/2Mmax=***, L1/2=***

(m) Displacement diagram(mm) (m) Shear force figure(kN)


0 0

10 10

20 20

30 30

40 40

50 50

60 60

-8.54 -4.27 4.27 8.54 -224.39 -113 113 224.39


- 62 -
14) EXETREME(1.35) ( 2, 4)pile
Pile diameter D = 1600.0 (mm)
Pile length L = 66.00 (m)
【Pile-head rigid connection】
Hx = -237.24 (kN) Hy = -37.67 (kN)
My = 2944.05 (kN.m) Mx = 409.25 (kN.m)

Bending
(m) moment diagram(rigid connection)(kN.m) (m) Bending moment fogure(hinge)(kN.m)
0 0

10 10

20 405.94 20

30 30

40 40

50 50

60 60

-2972.35 -1487 1487 2972.35


Mt=2972.35, 1/2Mmax=1486.18, L1/2=6.189 Mt=***, 1/2Mmax=***, L1/2=***

(m) Displacement diagram(mm) (m) Shear force figure(kN)


0 0

10 10

20 20

30 30

40 40

50 50

60 60

-9.75 -4.88 4.88 9.75 -240.21 -121 121 240.21


- 63 -
15) EXETREME(1.35) ( 4, 4)pile
Pile diameter D = 1600.0 (mm)
Pile length L = 66.00 (m)
【Pile-head rigid connection】
Hx = -235.67 (kN) Hy = -11.21 (kN)
My = 2929.40 (kN.m) Mx = 161.70 (kN.m)

Bending
(m) moment diagram(rigid connection)(kN.m) (m) Bending moment fogure(hinge)(kN.m)
0 0

10 10

20 392.75 20

30 30

40 40

50 50

60 60

-2933.86 -1467 1467 2933.86


Mt=2933.86, 1/2Mmax=1466.93, L1/2=6.218 Mt=***, 1/2Mmax=***, L1/2=***

(m) Displacement diagram(mm) (m) Shear force figure(kN)


0 0

10 10

20 20

30 30

40 40

50 50

60 60

-9.39 -4.70 4.70 9.39 -235.94 -118 118 235.94


- 64 -
16) EXETREME(1.35) ( 3, 5)pile
Pile diameter D = 1600.0 (mm)
Pile length L = 66.00 (m)
【Pile-head rigid connection】
Hx = -247.53 (kN) Hy = -23.72 (kN)
My = 3040.42 (kN.m) Mx = 278.71 (kN.m)

Bending
(m) moment diagram(rigid connection)(kN.m) (m) Bending moment fogure(hinge)(kN.m)
0 0

10 10

20 428.63 20

30 30

40 40

50 50

60 60

-3053.17 -1527 1527 3053.17


Mt=3053.17, 1/2Mmax=1526.58, L1/2=6.139 Mt=***, 1/2Mmax=***, L1/2=***

(m) Displacement diagram(mm) (m) Shear force figure(kN)


0 0

10 10

20 20

30 30

40 40

50 50

60 60

-10.35 -6 6 10.35 -248.67 -125 125 248.67


- 65 -
17) EXETREME(0.90) ( 3, 1)pile
Pile diameter D = 1600.0 (mm)
Pile length L = 66.00 (m)
【Pile-head rigid connection】
Hx = -239.64 (kN) Hy = -23.72 (kN)
My = 2966.56 (kN.m) Mx = 278.71 (kN.m)

Bending
(m) moment diagram(rigid connection)(kN.m) (m) Bending moment fogure(hinge)(kN.m)
0 0

10 10

20 406.32 20

30 30

40 40

50 50

60 60

-2979.62 -1490 1490 2979.62


Mt=2979.62, 1/2Mmax=1489.81, L1/2=6.187 Mt=***, 1/2Mmax=***, L1/2=***

(m) Displacement diagram(mm) (m) Shear force figure(kN)


0 0

10 10

20 20

30 30

40 40

50 50

60 60

-9.75 -4.88 4.88 9.75 -240.81 -121 121 240.81


- 66 -
18) EXETREME(0.90) ( 2, 2)pile
Pile diameter D = 1600.0 (mm)
Pile length L = 66.00 (m)
【Pile-head rigid connection】
Hx = -230.09 (kN) Hy = -16.79 (kN)
My = 2877.18 (kN.m) Mx = 213.92 (kN.m)

Bending
(m) moment diagram(rigid connection)(kN.m) (m) Bending moment fogure(hinge)(kN.m)
0 0

10 10

20 378.04 20

30 30

40 40

50 50

60 60

-2885.13 -1443 1443 2885.13


Mt=2885.13, 1/2Mmax=1442.56, L1/2=6.253 Mt=***, 1/2Mmax=***, L1/2=***

(m) Displacement diagram(mm) (m) Shear force figure(kN)


0 0

10 10

20 20

30 30

40 40

50 50

60 60

-9.00 -4.50 4.50 9.00 -230.70 -116 116 230.70


- 67 -
19) EXETREME(0.90) ( 4, 2)pile
Pile diameter D = 1600.0 (mm)
Pile length L = 66.00 (m)
【Pile-head rigid connection】
Hx = -231.66 (kN) Hy = -32.09 (kN)
My = 2891.83 (kN.m) Mx = 357.04 (kN.m)

Bending
(m) moment diagram(rigid connection)(kN.m) (m) Bending moment fogure(hinge)(kN.m)
0 0

10 10

20 387.56 20

30 30

40 40

50 50

60 60

-2913.79 -1457 1457 2913.79


Mt=2913.79, 1/2Mmax=1456.89, L1/2=6.231 Mt=***, 1/2Mmax=***, L1/2=***

(m) Displacement diagram(mm) (m) Shear force figure(kN)


0 0

10 10

20 20

30 30

40 40

50 50

60 60

-9.26 -4.63 4.63 9.26 -233.87 -117 117 233.87


- 68 -
20) EXETREME(0.90) ( 1, 3)pile
Pile diameter D = 1600.0 (mm)
Pile length L = 66.00 (m)
【Pile-head rigid connection】
Hx = -223.45 (kN) Hy = -28.46 (kN)
My = 2815.08 (kN.m) Mx = 323.11 (kN.m)

Bending
(m) moment diagram(rigid connection)(kN.m) (m) Bending moment fogure(hinge)(kN.m)
0 0

10 10

20 363.68 20

30 30

40 40

50 50

60 60

-2833.56 -1417 1417 2833.56


Mt=2833.56, 1/2Mmax=1416.78, L1/2=6.291 Mt=***, 1/2Mmax=***, L1/2=***

(m) Displacement diagram(mm) (m) Shear force figure(kN)


0 0

10 10

20 20

30 30

40 40

50 50

60 60

-8.62 -4.31 4.31 8.62 -225.25 -113 113 225.25


- 69 -
21) EXETREME(0.90) ( 5, 3)pile
Pile diameter D = 1600.0 (mm)
Pile length L = 66.00 (m)
【Pile-head rigid connection】
Hx = -223.45 (kN) Hy = -21.86 (kN)
My = 2815.08 (kN.m) Mx = 261.32 (kN.m)

Bending
(m) moment diagram(rigid connection)(kN.m) (m) Bending moment fogure(hinge)(kN.m)
0 0

10 10

20 361.27 20

30 30

40 40

50 50

60 60

-2827.18 -1414 1414 2827.18


Mt=2827.18, 1/2Mmax=1413.59, L1/2=6.296 Mt=***, 1/2Mmax=***, L1/2=***

(m) Displacement diagram(mm) (m) Shear force figure(kN)


0 0

10 10

20 20

30 30

40 40

50 50

60 60

-8.55 -4.28 4.28 8.55 -224.51 -113 113 224.51


- 70 -
22) EXETREME(0.90) ( 2, 4)pile
Pile diameter D = 1600.0 (mm)
Pile length L = 66.00 (m)
【Pile-head rigid connection】
Hx = -236.32 (kN) Hy = -36.76 (kN)
My = 2935.51 (kN.m) Mx = 400.72 (kN.m)

Bending
(m) moment diagram(rigid connection)(kN.m) (m) Bending moment fogure(hinge)(kN.m)
0 0

10 10

20 402.89 20

30 30

40 40

50 50

60 60

-2962.74 -1482 1482 2962.74


Mt=2962.74, 1/2Mmax=1481.37, L1/2=6.196 Mt=***, 1/2Mmax=***, L1/2=***

(m) Displacement diagram(mm) (m) Shear force figure(kN)


0 0

10 10

20 20

30 30

40 40

50 50

60 60

-9.67 -4.84 4.84 9.67 -239.17 -120 120 239.17


- 71 -
23) EXETREME(0.90) ( 4, 4)pile
Pile diameter D = 1600.0 (mm)
Pile length L = 66.00 (m)
【Pile-head rigid connection】
Hx = -234.76 (kN) Hy = -12.12 (kN)
My = 2920.87 (kN.m) Mx = 170.23 (kN.m)

Bending
(m) moment diagram(rigid connection)(kN.m) (m) Bending moment fogure(hinge)(kN.m)
0 0

10 10

20 390.28 20

30 30

40 40

50 50

60 60

-2925.83 -1463 1463 2925.83


Mt=2925.83, 1/2Mmax=1462.91, L1/2=6.224 Mt=***, 1/2Mmax=***, L1/2=***

(m) Displacement diagram(mm) (m) Shear force figure(kN)


0 0

10 10

20 20

30 30

40 40

50 50

60 60

-9.33 -4.66 4.66 9.33 -235.07 -118 118 235.07


- 72 -
24) EXETREME(0.90) ( 3, 5)pile
Pile diameter D = 1600.0 (mm)
Pile length L = 66.00 (m)
【Pile-head rigid connection】
Hx = -246.24 (kN) Hy = -23.72 (kN)
My = 3028.35 (kN.m) Mx = 278.71 (kN.m)

Bending
(m) moment diagram(rigid connection)(kN.m) (m) Bending moment fogure(hinge)(kN.m)
0 0

10 10

20 424.96 20

30 30

40 40

50 50

60 60

-3041.15 -1521 1521 3041.15


Mt=3041.15, 1/2Mmax=1520.57, L1/2=6.147 Mt=***, 1/2Mmax=***, L1/2=***

(m) Displacement diagram(mm) (m) Shear force figure(kN)


0 0

10 10

20 20

30 30

40 40

50 50

60 60

-10.25 -6 6 10.25 -247.38 -124 124 247.38


- 73 -
25) QUASI ( 3, 1)pile
Pile diameter D = 1600.0 (mm)
Pile length L = 66.00 (m)
【Pile-head rigid connection】
Hx = -137.06 (kN) Hy = 0.00 (kN)
My = 1694.49 (kN.m) Mx = 0.00 (kN.m)

Bending
(m) moment diagram(rigid connection)(kN.m) (m) Bending moment fogure(hinge)(kN.m)
0 0

10 10

20 231.74 20

30 30

40 40

50 50

60 60

-1694.49 -848 848 1694.49


Mt=1694.49, 1/2Mmax=847.25, L1/2=6.182 Mt=***, 1/2Mmax=***, L1/2=***

(m) Displacement diagram(mm) (m) Shear force figure(kN)


0 0

10 10

20 20

30 30

40 40

50 50

60 60

-5.57 -2.78 2.78 5.57 -137.06 -69 69 137.06


- 74 -
26) QUASI ( 2, 2)pile
Pile diameter D = 1600.0 (mm)
Pile length L = 66.00 (m)
【Pile-head rigid connection】
Hx = -132.36 (kN) Hy = 3.68 (kN)
My = 1650.52 (kN.m) Mx = -34.45 (kN.m)

Bending
(m) moment diagram(rigid connection)(kN.m) (m) Bending moment fogure(hinge)(kN.m)
0 0

10 10

20 218.82 20

30 30

40 40

50 50

60 60

-1650.88 -826 826 1650.88


Mt=1650.88, 1/2Mmax=825.44, L1/2=6.234 Mt=***, 1/2Mmax=***, L1/2=***

(m) Displacement diagram(mm) (m) Shear force figure(kN)


0 0

10 10

20 20

30 30

40 40

50 50

60 60

-5.22 -2.61 2.61 5.22 -132.41 -67 67 132.41


- 75 -
27) QUASI ( 1, 3)pile
Pile diameter D = 1600.0 (mm)
Pile length L = 66.00 (m)
【Pile-head rigid connection】
Hx = -128.82 (kN) Hy = -2.83 (kN)
My = 1617.40 (kN.m) Mx = 26.44 (kN.m)

Bending
(m) moment diagram(rigid connection)(kN.m) (m) Bending moment fogure(hinge)(kN.m)
0 0

10 10

20 209.00 20

30 30

40 40

50 50

60 60

-1617.61 -809 809 1617.61


Mt=1617.61, 1/2Mmax=808.81, L1/2=6.277 Mt=***, 1/2Mmax=***, L1/2=***

(m) Displacement diagram(mm) (m) Shear force figure(kN)


0 0

10 10

20 20

30 30

40 40

50 50

60 60

-4.96 -2.48 2.48 4.96 -128.85 -65 65 128.85


- 76 -
28) QUASI ( 2, 4)pile
Pile diameter D = 1600.0 (mm)
Pile length L = 66.00 (m)
【Pile-head rigid connection】
Hx = -136.36 (kN) Hy = -7.68 (kN)
My = 1687.91 (kN.m) Mx = 71.83 (kN.m)

Bending
(m) moment diagram(rigid connection)(kN.m) (m) Bending moment fogure(hinge)(kN.m)
0 0

10 10

20 230.76 20

30 30

40 40

50 50

60 60

-1689.44 -845 845 1689.44


Mt=1689.44, 1/2Mmax=844.72, L1/2=6.186 Mt=***, 1/2Mmax=***, L1/2=***

(m) Displacement diagram(mm) (m) Shear force figure(kN)


0 0

10 10

20 20

30 30

40 40

50 50

60 60

-5.54 -2.77 2.77 5.54 -136.57 -69 69 136.57


- 77 -
29) QUASI ( 3, 5)pile
Pile diameter D = 1600.0 (mm)
Pile length L = 66.00 (m)
【Pile-head rigid connection】
Hx = -142.71 (kN) Hy = 0.00 (kN)
My = 1747.38 (kN.m) Mx = 0.00 (kN.m)

Bending
(m) moment diagram(rigid connection)(kN.m) (m) Bending moment fogure(hinge)(kN.m)
0 0

10 10

20 247.87 20

30 30

40 40

50 50

60 60

-1747.38 -874 874 1747.38


Mt=1747.38, 1/2Mmax=873.69, L1/2=6.122 Mt=***, 1/2Mmax=***, L1/2=***

(m) Displacement diagram(mm) (m) Shear force figure(kN)


0 0

10 10

20 20

30 30

40 40

50 50

60 60

-5.99 -3.00 3.00 5.99 -142.71 -72 72 142.71


- 78 -
30) FATIGUE ( 3, 1)pile
Pile diameter D = 1600.0 (mm)
Pile length L = 66.00 (m)
【Pile-head rigid connection】
Hx = -65.72 (kN) Hy = -6.95 (kN)
My = 819.56 (kN.m) Mx = 80.76 (kN.m)

Bending
(m) moment diagram(rigid connection)(kN.m) (m) Bending moment fogure(hinge)(kN.m)
0 0

10 10

20 109.36 20

30 30

40 40

50 50

60 60

-823.53 -412 412 823.53


Mt=823.53, 1/2Mmax=411.76, L1/2=6.231 Mt=***, 1/2Mmax=***, L1/2=***

(m) Displacement diagram(mm) (m) Shear force figure(kN)


0 0

10 10

20 20

30 30

40 40

50 50

60 60

-2.61 -1.31 1.31 2.61 -66.08 -34 34 66.08


- 79 -
31) FATIGUE ( 2, 2)pile
Pile diameter D = 1600.0 (mm)
Pile length L = 66.00 (m)
【Pile-head rigid connection】
Hx = -63.59 (kN) Hy = -6.34 (kN)
My = 799.61 (kN.m) Mx = 75.10 (kN.m)

Bending
(m) moment diagram(rigid connection)(kN.m) (m) Bending moment fogure(hinge)(kN.m)
0 0

10 10

20 103.34 20

30 30

40 40

50 50

60 60

-803.13 -402 402 803.13


Mt=803.13, 1/2Mmax=401.56, L1/2=6.284 Mt=***, 1/2Mmax=***, L1/2=***

(m) Displacement diagram(mm) (m) Shear force figure(kN)


0 0

10 10

20 20

30 30

40 40

50 50

60 60

-2.45 -1.23 1.23 2.45 -63.90 -32 32 63.90


- 80 -
32) FATIGUE ( 4, 2)pile
Pile diameter D = 1600.0 (mm)
Pile length L = 66.00 (m)
【Pile-head rigid connection】
Hx = -64.02 (kN) Hy = -7.95 (kN)
My = 803.67 (kN.m) Mx = 90.13 (kN.m)

Bending
(m) moment diagram(rigid connection)(kN.m) (m) Bending moment fogure(hinge)(kN.m)
0 0

10 10

20 105.10 20

30 30

40 40

50 50

60 60

-808.70 -405 405 808.70


Mt=808.70, 1/2Mmax=404.35, L1/2=6.269 Mt=***, 1/2Mmax=***, L1/2=***

(m) Displacement diagram(mm) (m) Shear force figure(kN)


0 0

10 10

20 20

30 30

40 40

50 50

60 60

-2.50 -1.25 1.25 2.50 -64.51 -33 33 64.51


- 81 -
33) FATIGUE ( 1, 3)pile
Pile diameter D = 1600.0 (mm)
Pile length L = 66.00 (m)
【Pile-head rigid connection】
Hx = -63.06 (kN) Hy = -10.20 (kN)
My = 794.72 (kN.m) Mx = 111.16 (kN.m)

Bending
(m) moment diagram(rigid connection)(kN.m) (m) Bending moment fogure(hinge)(kN.m)
0 0

10 10

20 103.68 20

30 30

40 40

50 50

60 60

-802.46 -402 402 802.46


Mt=802.46, 1/2Mmax=401.23, L1/2=6.284 Mt=***, 1/2Mmax=***, L1/2=***

(m) Displacement diagram(mm) (m) Shear force figure(kN)


0 0

10 10

20 20

30 30

40 40

50 50

60 60

-2.46 -1.23 1.23 2.46 -63.88 -32 32 63.88


- 82 -
34) FATIGUE ( 5, 3)pile
Pile diameter D = 1600.0 (mm)
Pile length L = 66.00 (m)
【Pile-head rigid connection】
Hx = -63.06 (kN) Hy = -4.49 (kN)
My = 794.72 (kN.m) Mx = 57.75 (kN.m)

Bending
(m) moment diagram(rigid connection)(kN.m) (m) Bending moment fogure(hinge)(kN.m)
0 0

10 10

20 101.48 20

30 30

40 40

50 50

60 60

-796.82 -399 399 796.82


Mt=796.82, 1/2Mmax=398.41, L1/2=6.302 Mt=***, 1/2Mmax=***, L1/2=***

(m) Displacement diagram(mm) (m) Shear force figure(kN)


0 0

10 10

20 20

30 30

40 40

50 50

60 60

-2.40 -1.20 1.20 2.40 -63.22 -32 32 63.22


- 83 -
35) FATIGUE ( 2, 4)pile
Pile diameter D = 1600.0 (mm)
Pile length L = 66.00 (m)
【Pile-head rigid connection】
Hx = -68.05 (kN) Hy = -11.99 (kN)
My = 841.42 (kN.m) Mx = 127.88 (kN.m)

Bending
(m) moment diagram(rigid connection)(kN.m) (m) Bending moment fogure(hinge)(kN.m)
0 0

10 10

20 118.41 20

30 30

40 40

50 50

60 60

-851.09 -426 426 851.09


Mt=851.09, 1/2Mmax=425.54, L1/2=6.162 Mt=***, 1/2Mmax=***, L1/2=***

(m) Displacement diagram(mm) (m) Shear force figure(kN)


0 0

10 10

20 20

30 30

40 40

50 50

60 60

-2.86 -1.43 1.43 2.86 -69.10 -35 35 69.10


- 84 -
36) FATIGUE ( 4, 4)pile
Pile diameter D = 1600.0 (mm)
Pile length L = 66.00 (m)
【Pile-head rigid connection】
Hx = -67.62 (kN) Hy = -2.31 (kN)
My = 837.36 (kN.m) Mx = 37.34 (kN.m)

Bending
(m) moment diagram(rigid connection)(kN.m) (m) Bending moment fogure(hinge)(kN.m)
0 0

10 10

20 113.82 20

30 30

40 40

50 50

60 60

-838.20 -420 420 838.20


Mt=838.20, 1/2Mmax=419.10, L1/2=6.195 Mt=***, 1/2Mmax=***, L1/2=***

(m) Displacement diagram(mm) (m) Shear force figure(kN)


0 0

10 10

20 20

30 30

40 40

50 50

60 60

-2.73 -1.37 1.37 2.73 -67.66 -34 34 67.66


- 85 -
37) FATIGUE ( 3, 5)pile
Pile diameter D = 1600.0 (mm)
Pile length L = 66.00 (m)
【Pile-head rigid connection】
Hx = -71.42 (kN) Hy = -6.95 (kN)
My = 872.97 (kN.m) Mx = 80.76 (kN.m)

Bending
(m) moment diagram(rigid connection)(kN.m) (m) Bending moment fogure(hinge)(kN.m)
0 0

10 10

20 125.45 20

30 30

40 40

50 50

60 60

-876.69 -439 439 876.69


Mt=876.69, 1/2Mmax=438.35, L1/2=6.108 Mt=***, 1/2Mmax=***, L1/2=***

(m) Displacement diagram(mm) (m) Shear force figure(kN)


0 0

10 10

20 20

30 30

40 40

50 50

60 60

-3.04 -1.52 1.52 3.04 -71.76 -36 36 71.76


- 86 -
3.3 Pile body stress
Steel pile pile
・( 1, 3)pile
1th cross section
Material:SKK490
Pile outer diameter D = 1600.0(mm) Plate thickness t = 25.0(mm)
Outer rust thickness = 1.2(mm) Inner rust thickness = 0.6(mm)
Cross sectional area A = 1147.50 ×102(mm2)
Moment of inertia of area I = 3556210.22 ×104(mm4)
Ys = 798.8(mm)
N M
σ = ± ・Ys
A I
S
τ =
A
Stress
Load name M N σc,σca σt,σta S τ,τa Mr(kN.m)
No
abbreviation (kN.m) (kN) (N/mm2) (N/mm2) (kN) (N/mm2) Mr_L(m)

1 EXETREME 2648.37 5239.96 -105.15 13.82 213.14 1.857 10712.97


-286.30 283.60 157.000 ------
-76.59 50.77 1.964 12171.21
2 EXETREME 2834.97 1481.29 225.42
-286.30 283.60 157.000 ------

3 EXETREME 2833.56 1158.03 -73.74 53.56 225.25 1.963 12296.63


-286.30 283.60 157.000 ------
-42.51 30.16 1.123 12471.12
4 QUASI 1617.61 708.26 128.85
-286.30 283.60 157.000 ------

5 FATIGUE 802.46 804.27 -25.03 11.02 63.88 0.557 12433.87


-286.30 283.60 157.000 ------

MrLis the depth of crossing point of Mr and real moment.


2th cross section
Material:SKK400
Pile outer diameter D = 1600.0(mm) Plate thickness t = 18.0(mm)
Outer rust thickness = 1.2(mm) Inner rust thickness = 0.6(mm)
Cross sectional area A = 804.83 ×102(mm2)
Moment of inertia of area I = 2516203.11 ×104(mm4)
Ys = 798.8(mm)
Stress
No Load name M N σc,σca σt,σta S τ,τa Mr(kN.m)
abbreviation (kN.m) (kN) (N/mm2) (N/mm2) (kN) (N/mm2) Mr_L(m)
-67.95 -62.26 0.435 4564.13
1 EXETREME 89.68 5239.96 35.01
-210.00 210.00 120.000 ------

2 EXETREME 96.35 1481.29 -21.46 -15.35 37.00 0.460 6035.20


-210.00 210.00 120.000 ------
-17.45 -11.33 0.459 6161.72
3 EXETREME 96.31 1158.03 36.98
-210.00 210.00 120.000 ------

4 QUASI 54.94 708.26 -10.54 -7.06 21.15 0.263 6337.76


-210.00 210.00 120.000 ------
-10.86 -9.13 0.130 6300.18
5 FATIGUE 27.26 804.27 10.49
-210.00 210.00 120.000 ------

MrLis the depth of crossing point of Mr and real moment.


- 87 -
・( 2, 2)pile
1th cross section
Material:SKK490
Pile outer diameter D = 1600.0(mm) Plate thickness t = 25.0(mm)
Outer rust thickness = 1.2(mm) Inner rust thickness = 0.6(mm)
Cross sectional area A = 1147.50 ×102(mm2)
Moment of inertia of area I = 3556210.22 ×104(mm4)
Ys = 798.8(mm)
N M
σ = ± ・Ys
A I
S
τ =
A
Stress
Load name M N σc,σca σt,σta S τ,τa Mr(kN.m)
No
abbreviation (kN.m) (kN) (N/mm2) (N/mm2) (kN) (N/mm2) Mr_L(m)

1 EXETREME 2548.31 3824.02 -90.57 23.92 202.50 1.765 11262.31


-286.30 283.60 157.000 ------
-47.34 81.92 2.003 11855.89
2 EXETREME 2877.26 -1984.22 229.86
-286.30 283.60 157.000 ------

3 EXETREME 2885.13 -2307.50 -44.70 84.91 230.70 2.010 11730.47


-286.30 283.60 157.000 ------
-26.62 47.54 1.154 12160.12
4 QUASI 1650.88 -1200.06 132.41
-286.30 283.60 157.000 ------

5 FATIGUE 803.13 -174.00 -16.52 19.56 63.90 0.557 12558.20


-286.30 283.60 157.000 ------

MrLis the depth of crossing point of Mr and real moment.


2th cross section
Material:SKK400
Pile outer diameter D = 1600.0(mm) Plate thickness t = 18.0(mm)
Outer rust thickness = 1.2(mm) Inner rust thickness = 0.6(mm)
Cross sectional area A = 804.83 ×102(mm2)
Moment of inertia of area I = 2516203.11 ×104(mm4)
Ys = 798.8(mm)
Stress
No Load name M N σc,σca σt,σta S τ,τa Mr(kN.m)
abbreviation (kN.m) (kN) (N/mm2) (N/mm2) (kN) (N/mm2) Mr_L(m)
-50.26 -44.76 0.413 5118.30
1 EXETREME 86.66 3824.02 33.25
-210.00 210.00 120.000 ------

2 EXETREME 97.69 -1984.22 21.55 27.75 37.75 0.469 5838.37


-210.00 210.00 120.000 ------
25.56 31.78 0.471 5711.84
3 EXETREME 97.93 -2307.50 37.89
-210.00 210.00 120.000 ------

4 QUASI 55.99 -1200.06 13.13 16.69 21.75 0.270 6145.27


-210.00 210.00 120.000 ------
1.30 3.03 0.130 6546.85
5 FATIGUE 27.30 -174.00 10.49
-210.00 210.00 120.000 ------

MrLis the depth of crossing point of Mr and real moment.


- 88 -
・( 2, 4)pile
1th cross section
Material:SKK490
Pile outer diameter D = 1600.0(mm) Plate thickness t = 25.0(mm)
Outer rust thickness = 1.2(mm) Inner rust thickness = 0.6(mm)
Cross sectional area A = 1147.50 ×102(mm2)
Moment of inertia of area I = 3556210.22 ×104(mm4)
Ys = 798.8(mm)
N M
σ = ± ・Ys
A I
S
τ =
A
Stress
Load name M N σc,σca σt,σta S τ,τa Mr(kN.m)
No
abbreviation (kN.m) (kN) (N/mm2) (N/mm2) (kN) (N/mm2) Mr_L(m)

1 EXETREME 2568.85 4100.18 -93.43 21.97 204.77 1.784 11155.17


-286.30 283.60 157.000 ------
-108.19 25.34 2.093 10901.70
2 EXETREME 2972.35 4753.48 240.21
-286.30 283.60 157.000 ------

3 EXETREME 2962.74 4430.20 -105.16 27.94 239.17 2.084 11027.13


-286.30 283.60 157.000 ------
-60.75 15.14 1.190 11730.72
4 QUASI 1689.44 2616.68 136.57
-286.30 283.60 157.000 ------

5 FATIGUE 851.09 1730.53 -34.20 4.04 69.10 0.602 12074.52


-286.30 283.60 157.000 ------

MrLis the depth of crossing point of Mr and real moment.


2th cross section
Material:SKK400
Pile outer diameter D = 1600.0(mm) Plate thickness t = 18.0(mm)
Outer rust thickness = 1.2(mm) Inner rust thickness = 0.6(mm)
Cross sectional area A = 804.83 ×102(mm2)
Moment of inertia of area I = 2516203.11 ×104(mm4)
Ys = 798.8(mm)
Stress
No Load name M N σc,σca σt,σta S τ,τa Mr(kN.m)
abbreviation (kN.m) (kN) (N/mm2) (N/mm2) (kN) (N/mm2) Mr_L(m)
-53.72 -48.17 0.418 5010.22
1 EXETREME 87.28 4100.18 33.63
-210.00 210.00 120.000 ------

2 EXETREME 100.58 4753.48 -62.25 -55.87 39.47 0.490 4754.53


-210.00 210.00 120.000 ------
-58.23 -51.86 0.488 4881.05
3 EXETREME 100.29 4430.20 39.30
-210.00 210.00 120.000 ------

4 QUASI 57.16 2616.68 -34.33 -30.70 22.44 0.279 5590.83


-210.00 210.00 120.000 ------
-22.41 -20.59 0.141 5937.66
5 FATIGUE 28.76 1730.53 11.36
-210.00 210.00 120.000 ------

MrLis the depth of crossing point of Mr and real moment.


- 89 -
・( 3, 1)pile
1th cross section
Material:SKK490
Pile outer diameter D = 1600.0(mm) Plate thickness t = 25.0(mm)
Outer rust thickness = 1.2(mm) Inner rust thickness = 0.6(mm)
Cross sectional area A = 1147.50 ×102(mm2)
Moment of inertia of area I = 3556210.22 ×104(mm4)
Ys = 798.8(mm)
N M
σ = ± ・Ys
A I
S
τ =
A
Stress
Load name M N σc,σca σt,σta S τ,τa Mr(kN.m)
No
abbreviation (kN.m) (kN) (N/mm2) (N/mm2) (kN) (N/mm2) Mr_L(m)

1 EXETREME 2448.93 679.79 -60.93 49.08 191.82 1.672 12482.17


-286.30 283.60 157.000 ------
-35.18 98.14 2.087 11224.13
2 EXETREME 2967.60 -3612.61 239.52
-286.30 283.60 157.000 ------

3 EXETREME 2979.62 -3935.87 -32.63 101.23 240.81 2.099 11098.71


-286.30 283.60 157.000 ------
-20.72 55.40 1.194 11853.61
4 QUASI 1694.49 -1990.09 137.06
-286.30 283.60 157.000 ------

5 FATIGUE 823.53 -631.22 -13.00 24.00 66.08 0.576 12380.81


-286.30 283.60 157.000 ------

MrLis the depth of crossing point of Mr and real moment.


2th cross section
Material:SKK400
Pile outer diameter D = 1600.0(mm) Plate thickness t = 18.0(mm)
Outer rust thickness = 1.2(mm) Inner rust thickness = 0.6(mm)
Cross sectional area A = 804.83 ×102(mm2)
Moment of inertia of area I = 2516203.11 ×104(mm4)
Ys = 798.8(mm)
Stress
No Load name M N σc,σca σt,σta S τ,τa Mr(kN.m)
abbreviation (kN.m) (kN) (N/mm2) (N/mm2) (kN) (N/mm2) Mr_L(m)
-11.10 -5.79 0.391 6348.90
1 EXETREME 83.59 679.79 31.47
-210.00 210.00 120.000 ------

2 EXETREME 100.40 -3612.61 41.70 48.07 39.35 0.489 5201.04


-210.00 210.00 120.000 ------
45.70 52.10 0.492 5074.53
3 EXETREME 100.77 -3935.87 39.56
-210.00 210.00 120.000 ------

4 QUASI 57.29 -1990.09 22.91 26.55 22.52 0.280 5836.07


-210.00 210.00 120.000 ------
6.96 8.73 0.135 6367.91
5 FATIGUE 27.91 -631.22 10.85
-210.00 210.00 120.000 ------

MrLis the depth of crossing point of Mr and real moment.


- 90 -
・( 3, 5)pile
1th cross section
Material:SKK490
Pile outer diameter D = 1600.0(mm) Plate thickness t = 25.0(mm)
Outer rust thickness = 1.2(mm) Inner rust thickness = 0.6(mm)
Cross sectional area A = 1147.50 ×102(mm2)
Moment of inertia of area I = 3556210.22 ×104(mm4)
Ys = 798.8(mm)
N M
σ = ± ・Ys
A I
S
τ =
A
Stress
Load name M N σc,σca σt,σta S τ,τa Mr(kN.m)
No
abbreviation (kN.m) (kN) (N/mm2) (N/mm2) (kN) (N/mm2) Mr_L(m)

1 EXETREME 2452.96 1070.26 -64.43 45.77 192.29 1.676 12330.68


-286.30 283.60 157.000 ------
-120.12 17.04 2.167 10451.37
2 EXETREME 3053.17 5914.22 248.67
-286.30 283.60 157.000 ------

3 EXETREME 3041.15 5590.96 -117.03 19.59 247.38 2.156 10576.79


-286.30 283.60 157.000 ------
-68.94 9.56 1.244 11424.25
4 QUASI 1747.38 3406.61 142.71
-286.30 283.60 157.000 ------

5 FATIGUE 876.69 2061.70 -37.66 1.73 71.76 0.625 11946.03


-286.30 283.60 157.000 ------

MrLis the depth of crossing point of Mr and real moment.


2th cross section
Material:SKK400
Pile outer diameter D = 1600.0(mm) Plate thickness t = 18.0(mm)
Outer rust thickness = 1.2(mm) Inner rust thickness = 0.6(mm)
Cross sectional area A = 804.83 ×102(mm2)
Moment of inertia of area I = 2516203.11 ×104(mm4)
Ys = 798.8(mm)
Stress
No Load name M N σc,σca σt,σta S τ,τa Mr(kN.m)
abbreviation (kN.m) (kN) (N/mm2) (N/mm2) (kN) (N/mm2) Mr_L(m)
-15.96 -10.64 0.392 6196.08
1 EXETREME 83.71 1070.26 31.54
-210.00 210.00 120.000 ------

2 EXETREME 103.02 5914.22 -76.75 -70.21 40.86 0.508 4300.24


-210.00 210.00 120.000 ------
-72.73 -66.21 0.505 4426.75
3 EXETREME 102.65 5590.96 40.65
-210.00 210.00 120.000 ------

4 QUASI 58.91 3406.61 -44.20 -40.46 23.45 0.291 5281.67


-210.00 210.00 120.000 ------
-26.55 -24.68 0.147 5808.04
5 FATIGUE 29.53 2061.70 11.80
-210.00 210.00 120.000 ------

MrLis the depth of crossing point of Mr and real moment.


- 91 -
・( 4, 2)pile
1th cross section
Material:SKK490
Pile outer diameter D = 1600.0(mm) Plate thickness t = 25.0(mm)
Outer rust thickness = 1.2(mm) Inner rust thickness = 0.6(mm)
Cross sectional area A = 1147.50 ×102(mm2)
Moment of inertia of area I = 3556210.22 ×104(mm4)
Ys = 798.8(mm)
N M
σ = ± ・Ys
A I
S
τ =
A
Stress
Load name M N σc,σca σt,σta S τ,τa Mr(kN.m)
No
abbreviation (kN.m) (kN) (N/mm2) (N/mm2) (kN) (N/mm2) Mr_L(m)

1 EXETREME 2518.65 -2350.00 -36.09 77.05 199.34 1.737 11713.98


-286.30 283.60 157.000 ------
-43.87 86.60 2.029 11674.52
2 EXETREME 2904.28 -2451.71 232.84
-286.30 283.60 157.000 ------

3 EXETREME 2913.79 -2774.99 -41.27 89.63 233.87 2.038 11549.09


-286.30 283.60 157.000 ------
-26.62 47.54 1.154 12160.12
4 QUASI 1650.88 -1200.06 132.41
-286.30 283.60 157.000 ------

5 FATIGUE 808.70 -299.95 -15.55 20.78 64.51 0.562 12509.33


-286.30 283.60 157.000 ------

MrLis the depth of crossing point of Mr and real moment.


2th cross section
Material:SKK400
Pile outer diameter D = 1600.0(mm) Plate thickness t = 18.0(mm)
Outer rust thickness = 1.2(mm) Inner rust thickness = 0.6(mm)
Cross sectional area A = 804.83 ×102(mm2)
Moment of inertia of area I = 2516203.11 ×104(mm4)
Ys = 798.8(mm)
Stress
No Load name M N σc,σca σt,σta S τ,τa Mr(kN.m)
abbreviation (kN.m) (kN) (N/mm2) (N/mm2) (kN) (N/mm2) Mr_L(m)
26.48 31.92 0.407 5695.21
1 EXETREME 85.75 -2350.00 32.72
-210.00 210.00 120.000 ------

2 EXETREME 98.51 -2451.71 27.34 33.59 38.25 0.475 5655.40


-210.00 210.00 120.000 ------
31.34 37.62 0.477 5528.87
3 EXETREME 98.80 -2774.99 38.42
-210.00 210.00 120.000 ------

4 QUASI 55.99 -1200.06 13.13 16.69 21.75 0.270 6145.27


-210.00 210.00 120.000 ------
2.85 4.60 0.132 6497.56
5 FATIGUE 27.47 -299.95 10.59
-210.00 210.00 120.000 ------

MrLis the depth of crossing point of Mr and real moment.


- 92 -
・( 4, 4)pile
1th cross section
Material:SKK490
Pile outer diameter D = 1600.0(mm) Plate thickness t = 25.0(mm)
Outer rust thickness = 1.2(mm) Inner rust thickness = 0.6(mm)
Cross sectional area A = 1147.50 ×102(mm2)
Moment of inertia of area I = 3556210.22 ×104(mm4)
Ys = 798.8(mm)
N M
σ = ± ・Ys
A I
S
τ =
A
Stress
Load name M N σc,σca σt,σta S τ,τa Mr(kN.m)
No
abbreviation (kN.m) (kN) (N/mm2) (N/mm2) (kN) (N/mm2) Mr_L(m)

1 EXETREME 2503.28 -2073.84 -38.16 74.30 197.65 1.722 11821.12


-286.30 283.60 157.000 ------
-103.25 28.55 2.056 11083.08
2 EXETREME 2933.86 4285.99 235.94
-286.30 283.60 157.000 ------

3 EXETREME 2925.83 3962.71 -100.25 31.19 235.07 2.049 11208.50


-286.30 283.60 157.000 ------
-60.75 15.14 1.190 11730.72
4 QUASI 1689.44 2616.68 136.57
-286.30 283.60 157.000 ------

5 FATIGUE 838.20 1604.58 -32.81 4.84 67.66 0.590 12123.38


-286.30 283.60 157.000 ------

MrLis the depth of crossing point of Mr and real moment.


2th cross section
Material:SKK400
Pile outer diameter D = 1600.0(mm) Plate thickness t = 18.0(mm)
Outer rust thickness = 1.2(mm) Inner rust thickness = 0.6(mm)
Cross sectional area A = 804.83 ×102(mm2)
Moment of inertia of area I = 2516203.11 ×104(mm4)
Ys = 798.8(mm)
Stress
No Load name M N σc,σca σt,σta S τ,τa Mr(kN.m)
abbreviation (kN.m) (kN) (N/mm2) (N/mm2) (kN) (N/mm2) Mr_L(m)
23.06 28.47 0.403 5803.29
1 EXETREME 85.29 -2073.84 32.44
-210.00 210.00 120.000 ------

2 EXETREME 99.42 4285.99 -56.41 -50.10 38.76 0.482 4937.49


-210.00 210.00 120.000 ------
-52.38 -46.09 0.480 5064.02
3 EXETREME 99.17 3962.71 38.62
-210.00 210.00 120.000 ------

4 QUASI 57.16 2616.68 -34.33 -30.70 22.44 0.279 5590.83


-210.00 210.00 120.000 ------
-20.84 -19.04 0.138 5986.95
5 FATIGUE 28.37 1604.58 11.12
-210.00 210.00 120.000 ------

MrLis the depth of crossing point of Mr and real moment.


- 93 -
・( 5, 3)pile
1th cross section
Material:SKK490
Pile outer diameter D = 1600.0(mm) Plate thickness t = 25.0(mm)
Outer rust thickness = 1.2(mm) Inner rust thickness = 0.6(mm)
Cross sectional area A = 1147.50 ×102(mm2)
Moment of inertia of area I = 3556210.22 ×104(mm4)
Ys = 798.8(mm)
N M
σ = ± ・Ys
A I
S
τ =
A
Stress
Load name M N σc,σca σt,σta S τ,τa Mr(kN.m)
No
abbreviation (kN.m) (kN) (N/mm2) (N/mm2) (kN) (N/mm2) Mr_L(m)

1 EXETREME 2583.13 -3489.91 -27.61 88.44 206.17 1.797 11271.73


-286.30 283.60 157.000 ------
-70.63 56.33 1.955 12427.65
2 EXETREME 2826.09 820.32 224.39
-286.30 283.60 157.000 ------

3 EXETREME 2827.18 497.06 -67.84 59.17 224.51 1.957 12553.06


-286.30 283.60 157.000 ------
-42.51 30.16 1.123 12471.12
4 QUASI 1617.61 708.26 128.85
-286.30 283.60 157.000 ------

5 FATIGUE 796.82 626.20 -23.36 12.44 63.22 0.551 12502.96


-286.30 283.60 157.000 ------

MrLis the depth of crossing point of Mr and real moment.


2th cross section
Material:SKK400
Pile outer diameter D = 1600.0(mm) Plate thickness t = 18.0(mm)
Outer rust thickness = 1.2(mm) Inner rust thickness = 0.6(mm)
Cross sectional area A = 804.83 ×102(mm2)
Moment of inertia of area I = 2516203.11 ×104(mm4)
Ys = 798.8(mm)
Stress
No Load name M N σc,σca σt,σta S τ,τa Mr(kN.m)
abbreviation (kN.m) (kN) (N/mm2) (N/mm2) (kN) (N/mm2) Mr_L(m)
40.58 46.15 0.421 5249.07
1 EXETREME 87.69 -3489.91 33.85
-210.00 210.00 120.000 ------

2 EXETREME 96.08 820.32 -13.24 -7.14 36.83 0.458 6293.90


-210.00 210.00 120.000 ------
-9.23 -3.12 0.458 6420.42
3 EXETREME 96.12 497.06 36.85
-210.00 210.00 120.000 ------

4 QUASI 54.94 708.26 -10.54 -7.06 21.15 0.263 6337.76


-210.00 210.00 120.000 ------
-8.64 -6.92 0.129 6369.87
5 FATIGUE 27.10 626.20 10.38
-210.00 210.00 120.000 ------

MrLis the depth of crossing point of Mr and real moment.


- 94 -
4 Fundamental pile calculation result list
Load case No. abbreviation
1 2 3 4
Acting force at origin EXETREME EXETREME EXETREME QUASI

Vo kN 6909.3 9086.9 6534.4 5592.5


Hxo kN 31.0 1292.0 1292.0 714.0
Myo kN.m 5850.0 136986.3 136986.3 77791.0
Hyo kN 1289.0 24.0 24.0 0.0
Mxo kN.m 124400.0 10208.0 10208.0 0.0
Displacement at origin
δz mm 1.97 2.59 1.86 1.59
δx mm -0.34 -3.23 -3.23 -2.00
αy rad 0.00008247 0.00187425 0.00187425 0.00106632
δy mm -1.99 -0.83 -0.83 0.00
αx rad 0.00169042 0.00014693 0.00014693 0.00000000
δf, δa mm 3.98 <= 15.00 5.53 <= 15.00 5.42 <= 15.00 3.29 ------
Virtical reaction
PNmax, Ra kN 5239.96<=16180.00 5914.22<=16180.00 5590.96<=16180.00 3406.61 ------
PNmin, Pa kN -3489.91=>-6756.00 -3612.61=>-6756.00 -3935.87=>-6756.00 -1990.09 ------
Horizontal reaction
PH kN 213.14 248.67 247.38 142.71
Pile acting moment
Pile head Mt kN.m 2648.37 3053.17 3041.15 1747.38
Underground Mm kN.m 355.49 428.63 424.96 247.87
Pile body stress
1 σc,σca N/mm2 -105.15=> -286.30 -120.12=> -286.30 -117.03=> -286.30 -68.94=> -286.30
Cross σt,σta N/mm2 88.44<= 283.60 98.14<= 283.60 101.23<= 283.60 55.40<= 283.60
section τ, τa N/mm2 1.857<= 157.000 2.167<= 157.000 2.156<= 157.000 1.244<= 157.000
Judge OK OK OK OK
- 95 -
Load case No. abbreviation 5
FATIGUE
Acting force at origin
Vo kN 5647.6
Hxo kN 366.0
Myo kN.m 38713.0
Hyo kN 2.0
Mxo kN.m 2798.0
Displacement at origin
δz mm 1.61
δx mm -0.91
αy rad 0.00052958
δy mm -0.26
αx rad 0.00004073
δf, δa mm 1.70 ------
Virtical reaction
PNmax, Ra kN 2061.70 ------
PNmin, Pa kN -631.22 ------
Horizontal reaction
PH kN 71.76
Pile acting moment
Pile head Mt kN.m 876.69
Underground Mm kN.m 125.45
Pile body stress
1 σc,σca N/mm2 -37.66=> -286.30
Cross σt,σta N/mm2 24.00<= 283.60
section τ, τa N/mm2 0.625<= 157.000
Judge OK
- 96 -
5 Preparative calculation
5.1 Horizontal directional soil reaction coefficient
Pile outer diameter D = 1.6000 (m)
Young modulus of pile body E = 20.00 × 107 (kN/m2)
Moment of inertia of area of pile body I = 0.035562072 (m4)
Characteristic value of pile(Calculation of equivalent load width) Normal time β = 0.114910 (m-1)
Earthquake time β = 0.114910 (m-1)
Regarding horizontal resistance Normal time 1/β = 8.7025 (m)
Soil depth Earthquake time 1/β = 8.7025 (m)

Σ(α・Eoi・Li)
1 2
Average of range α・Eo = = 6160.0 (kN/m ) (Normal time)
β 1/β
= 6160.0 (kN/m2) (Earthquake time)
D
Equivalent load width of pile BH = = 3.7315 (m) (Normal time)
β
= 3.7315 (m) (Earthquake time)
1 3
kHo = ・α・Eo = 20533.3 (kN/m ) (Normal time)
0.3
= 20533.3 (kN/m3) (Earthquake time)
3
-
BH
( )
4

kH = kHo・
0.3

4 kH・D -1 -1
β = = 0.114910 (m ) (Normal time), 0.114910 (m ) (Earthquake time)
4・E・I

*α・Eo for earthquake timeBH: Normal time


Layer thickness(m) α・Eo (kN/m2) kH (kN/m3)
LayerNo
Normal Earthquake Normal Earthquake Normal Earthquake
1 10.000 10.000 0 0 0 0
2 11.800 11.800 6160 12320 3100 6200
3 2.000 2.000 5600 11200 2818 5637
4 2.600 2.600 58800 117600 29593 59186
5 3.600 3.600 44800 89600 22547 45094
5' 0.900 0.900 44800 89600 22547 45094
6 7.100 7.100 89600 179200 45094 90188
7 6.700 6.700 54600 109200 27479 54958
8 2.300 2.300 53200 106400 26774 53549
9 3.100 3.100 56000 112000 28184 56367
10 7.500 7.500 86800 173600 43685 87369
11 6.400 6.400 127400 254800 64118 128236
12 2.000 2.000 140000 280000 70459 140918

*' shows layer divided by cross section transition point.


- 97 -
5.2 Pile axis directional vertical spring constant
Ap・Ep
Kv = a・
L

Pile type :Steel pile pile


Construction method:Hammering pile hammering const. method
a = 0.014・(L'/D) + 0.72 = 1.2975
Ap : Net cross sectional area of pile = 0.11475 (m2)
Ep : Young modulus of pile body = 20.00 × 107 (kN/m2)
L : Pile length = 66.000 (m)
L' : Pile length (for adjustment factor) = 66.000 (m)
D : Pile diameter = 1.6000 (m)
Kv = 451176 (kN/m)
- 98 -
5.3 Maximum side friction force
Maximum side friction acting on pile circumference is shown below.
1)How to assume maximum side friction
Sandy soil Cohesive soil
Construction method of hammering pile 2N (≦100) 10N (≦150)

*N is N value for each layer.


*Maximum side friction is 0, of weak soil with N value less than 2.
2)Maximum side friction
Layer Elevation Thickness Average Cohesive C fi
Soil type
No (m) (m) N value (kN/m2) (kN/m2)
1 0.000 10.000 Viscosity 0.0 0.0 0.0
-10.000
2 -10.000 11.800 Viscosity 2.2 9.8 22.0
-21.800
3 -21.800 2.000 Viscosity 2.0 9.8 0.0
-23.800
4 -23.800 2.600 Viscosity 21.0 28.4 150.0
-26.400
5 -26.400 4.500 Sandy 16.0 20.5 32.0
-30.900
6 -30.900 7.100 Sandy 32.0 10.7 64.0
-38.000
7 -38.000 6.700 Viscosity 19.5 43.1 150.0
-44.700
8 -44.700 2.300 Viscosity 19.0 26.4 150.0
-47.000
9 -47.000 3.100 Viscosity 20.0 50.0 150.0
-50.100
10 -50.100 7.500 Viscosity 31.0 27.4 150.0
-57.600
11 -57.600 6.400 Viscosity 45.5 26.9 150.0
-64.000
12 -64.000 5.000 Sandy 50.0 20.6 100.0
-69.000

*Maximum side friction of all layers from current earth sureface


- 99 -
5.4 Calculation of bearing capacity, pull‐out force
1)Pile dimension
Pile type :Steel pile pile φ1600.0 (mm)
Construction method :Hammering pile(hammering)
Design pile length :L = 66.000 (m)
Protrusion pile length :Lo = 0.000 (m) (signifies above corrent earth surface)
Pile type :Bearing pile
2)Calculation of load bearing capacity.
γ
Ra = ・Ru
n
Ru = qd・Ap + U・Σ(Li・fi) (Normal), (Earthquake(No liq))
Ru = qd・Ap + U・Σ(Li・fi・DEi) (Earthquake(liq.))
Ra:Axis-direction push-in bearing capacity at pile-head(kN)
n :Safety factor 1.5 (Normal time)
1.1 (Earthquake time)
γ:Adjustment factor of safety factor = 1.0
Ru:Ultimate load bearing capacity of pile determined by soil (kN)
qd:Ultimate load bearing capacity per cross sectional area carried by pile-end (kN/m2)
Equivalent embedment length to support layer
diameter = 2.00
Pile
Design N value = 30.0
qd
= 120.0
N
qd = 120.0 ・ 30.0 = 3600 (kN/m2)
Ap:Area of pile end(m2)
π 2 2
Ap = ・1.6000 = 2.011 (m )
4
U :Pile circumference(m)
U = π・1.6000 = 5.027 (m)
Li:Layer thickness(m)
fi:Maximum side friction of layer(kN/m2)
DEi:Reduction factor of soil quality coefficient(Earthquake time only)
Maximum side friction
・Normal
Layer Soil quality Average Cohesion Layer thick fi Li・fi
No N value (kN/m2) Li(m) (kN/m2) (kN/m)
1 Viscosity 0.0 0.0 10.000 0.0 0.0
2 Viscosity 2.2 9.8 11.800 22.0 259.6
3 Viscosity 2.0 9.8 2.000 0.0 0.0
4 Viscosity 21.0 28.4 2.600 150.0 390.0
5 Sandy 16.0 20.5 3.600 32.0 115.2
5 Sandy 16.0 20.5 0.900 32.0 28.8
6 Sandy 32.0 10.7 7.100 64.0 454.4
7 Viscosity 19.5 43.1 6.700 150.0 1005.0
8 Viscosity 19.0 26.4 2.300 150.0 345.0
9 Viscosity 20.0 50.0 3.100 150.0 465.0
10 Viscosity 31.0 27.4 7.500 150.0 1125.0
11 Viscosity 45.5 26.9 6.400 150.0 960.0
12 Sandy 50.0 20.6 2.000 100.0 200.0
Total 66.000 5348.0
- 100 -
・Earthquake(No liq)
Layer Average Cohesion Layer thick fi Li・fi
Soil quality
No N value (kN/m2) Li(m) (kN/m2) (kN/m)
1 Viscosity 0.0 0.0 10.000 0.0 0.0
2 Viscosity 2.2 9.8 11.800 22.0 259.6
3 Viscosity 2.0 9.8 2.000 0.0 0.0
4 Viscosity 21.0 28.4 2.600 150.0 390.0
5 Sandy 16.0 20.5 3.600 32.0 115.2
5 Sandy 16.0 20.5 0.900 32.0 28.8
6 Sandy 32.0 10.7 7.100 64.0 454.4
7 Viscosity 19.5 43.1 6.700 150.0 1005.0
8 Viscosity 19.0 26.4 2.300 150.0 345.0
9 Viscosity 20.0 50.0 3.100 150.0 465.0
10 Viscosity 31.0 27.4 7.500 150.0 1125.0
11 Viscosity 45.5 26.9 6.400 150.0 960.0
12 Sandy 50.0 20.6 2.000 100.0 200.0
Total 66.000 5348.0

Ultimate load bearing capacity determined by soil


Normal time
Ru = qd・Ap + U・Σ(Li・fi)
= 3600・ 2.011+ 5.027・ 5348.0 = 34120 (kN)
Earthquake time(No liquefaction)
Ru = qd・Ap + U・Σ(Li・fi)
= 3600・ 2.011+ 5.027・ 5348.0 = 34120 (kN)
Load bearing cap.
1.0
Normal Ra = ・ 34120 = 22747 (kN)
1.5
1.0
Earthquake(No liq) Ra = ・ 34120 = 31018 (kN)
1.1

3)Calculation of allowable pull-out force


1
Pa = *Pu
n
Pu = U*Σ(Li*fi) (Normal time), (Earthquake time(No liquefaction))
Pu = U*Σ(Li*fi*DEi) (Earthquake time(liquefaction))
Pa:Allowable pile axis direction pull-out force at pile-head(kN)
n :Safety factor 3.0 (Normal time)
1.1 (Earthquake time)
Pu:Ultimate pull-out force of pile determined by soil (kN)
Pu = 5.027・ 5348.0 = 26882 (kN) (Normal)
Pu = 5.027・ 5348.0 = 26882 (kN) (Earthquake(No liq))
Allowable pull-out force
1
Normal Pa = ・ 26882 = 8961 (kN)
3.0
1
Earthquake(No liq) Pa = ・ 26882 = 24438 (kN)
1.1
- 101 -
4)Calculation result list
(kN/unit)
Normal 22747
Allowable bearing capacity
Earthquake(No liq) 31018
Normal 8961
Allowable pull-out force
Earthquake(No liq) 24438