The engine room is a potential hazards space, it contains fuel line and high-
temperature heating and exhaust line. Even a small human mistake or
mechanical failure may lead to a disastrous situation. That’s why ER is being
provided with xed re ghting system to be used as a last resource for
extinguishing a re. But there are other tools to extinguish a re at a very early
stage, e.g. portable and semi-portable re ghting extinguisher, local
re ghting system(like puri er room system), high-pressure water mist system.
Although high-pressure water mist system (hyper mist system) is a xed re
ghting system, it is often called as local re ghting system because of it’s
installation and extinguishing mechanism.
Before hyper mist system halon local xed re ghting system was in Browse By Content
commonly used. After Montreal protocol, it was declared as ozone depletion
potential (ODP) and must not be speci ed for use in xed re ghting Motor
installations. As an alternative to above system high-pressure water mist Auxiliary Machineries
system was developed. In this blog, I have explained regulations and
Electrical
Privacy - Terms
https://www.marinerdesk.com/hyper-mist-regulations-maintenance/ 1/8
6/2/2020 Hyper Mist System: Regulations, Working and Maintenance
We can use at a ected area only. Like in case of co2 we have to ood
in the whole engine room but here we can use separately.
Use water economically and water is easily available and cheap.
Send
Working of the Hyper mist System
The main component of the system is-
Motor Study
Cylinder
lubrication
developments and
Lubricants drain
analysis
December 16, 2018 Anurag
Singh 0
https://www.marinerdesk.com/hyper-mist-regulations-maintenance/ 3/8
6/2/2020 Hyper Mist System: Regulations, Working and Maintenance
November
Here in the system nozzle having special design having the ne hole, the water 28, 2018
with high pressure of about 4 to 10 MPa passes through the nozzle get 0
converted into ne particles of size about 50 to 200 µm. The di user action in
nozzle drop in pressure at nozzle throat breaks the liquid particles into a ne
mist. These ne particles are excellent re extinguisher as it provides large
ARTICOLE POPULARE
surface area for cooling and of its characteristic.
1. Automatic starting
Hyper mist system is provided with detectors as composed of minimum two
detectors in each protected area. When perceiving a re via one detector in any
protected area, the pre-warning alarm will start. Activation of the other
detector in the same protected area, it will automatically result in the release of
the hyper mist system by opening the suction valve and start the pump. If the
solenoid valve is not open, it can be opened by using override.
Valentina Sampaio:
2. Manual Starting Victoria’s Secret hires its
For the manual release push button is provided on the local control panel at first transgender top model!
each section and on the main control panel at the re control station. When Cooked for you, with love
the manual release push button is pressed, the re alarm, as well as the
system, will be activated in the designated area.
Why we can’t use sprinkler instead of Will you be the last one
standing in this new battle
hyper mist? royale?
Cuisine Royale
To avoid boilover e ect in case of oil re we can’t use the sprinkler. What is a
boilover e ect? An e ect of the explosion, which is an extremely hazardous
situation when we attempt to extinguish the semi-enclosed oil-fueled re with
water.
Privacy - Terms
https://www.marinerdesk.com/hyper-mist-regulations-maintenance/ 4/8
6/2/2020 Hyper Mist System: Regulations, Working and Maintenance
Search Keywords
1. Operation test (pump running test and raft MEO Class II MEO Class IV money
MT Marine
veri cation of discharge pressure) montereal Protocol
https://www.marinerdesk.com/hyper-mist-regulations-maintenance/ 5/8
6/2/2020 Hyper Mist System: Regulations, Working and Maintenance
Daily
• Control panel to be checked for any abnormal indication.
• The alarm monitoring system to be checked for any abnormal
indication.
Monthly
• Pump operation to be checked. Running condition, water pressure,
any abnormal noise or vibration.
• Wire disconnection check and lamp tests to be carried out.
Every 6 month
• Various alarm to be checked
• If possible check the interlocks
Every year
• Check the clogging of the nozzle. We can do it by air blowing.
• Overhaul the pump unit, section valve, lter etc.
Note – If having any problem with the nozzle, don’t disassemble it and send it
to the manufacturer.
by BidVertiser
Privacy - Terms
https://www.marinerdesk.com/hyper-mist-regulations-maintenance/ 6/8
6/2/2020 Hyper Mist System: Regulations, Working and Maintenance
Abhay Kumar
He is working as engineer in Shipping Corporation Of India,
member of Nielsons Educational Forum. He is alumni of Marine
Engineering & Research Institute(MERI) Mumbai. He loves
driving and writing blog in his free time. Specialty : Tanker ship
Leave a reply
Default Comments (0) Facebook Comments
Leave a Reply
CONNECT WITH:
I agree to my personal data being stored and used as per Privacy Policy
Privacy - Terms
https://www.marinerdesk.com/hyper-mist-regulations-maintenance/ 7/8
6/2/2020 Hyper Mist System: Regulations, Working and Maintenance
maintenance work on hyper mist system. Before explaining that let’s read Ship Construction
regulation for xed re ghting system in engine room.
Naval Architech
system SOLAS
https://www.marinerdesk.com/hyper-mist-regulations-maintenance/ 2/8
6/2/2020 Hyper Mist System: Regulations, Working and Maintenance
Miscellaneous
Privacy - Terms
https://www.marinerdesk.com/hyper-mist-regulations-maintenance/ 8/8