Sei sulla pagina 1di 1

CONSTRUCTION CHECK SHEET E-019A

ELECTRICAL
Inverter
PROJECT
DESCRIPTION
n-BUTYL LITHIUM DILUTION FACILITY PROJECT No. 44-NC-2900

SYSTEM
DESCRIPTION
INVERTOR SYSTEM No. 010

SERVICE
TAG No.
DESCRIPTION

A. LOCATION ..........................................................................................................................

SYSTEM ..............................DUTY..................................................

MANUFACTURER............................................TYPE / MODEL...................................................

B. INSPECTION:

Item Description of check Results


01 Check all equipment is suitable for area

02 Verify equipment is suitable for IP rating & is supplied as per the data sheet

03 Verify name plate details against data sheet

04 Visually inspect equipment for external damage

05 Check equipment fixings and mountings are secure

06 Check inside of the equipment is clean, dry and silica gel etc. has been removed

07 Check all doors can be opened and are not obstructed

08 Internally inspect the Inverter for damage

09 Check outgoing distribution is complete and correctly identified

10 Ensure outgoing isolators / MCB s are isolated

11 Confirm main isolator is lockable

12 Check all equipment carries the correct circuit identification

13 On completion of all cable glanding confirm spare entries are correctly plugged

14 Check gaskets and seals are not damaged

15 Check all bolts are correct and none are missing

C. REMARKS / OBSERVATIONS:

COMPLETED BY CONTRACTOR APPROVED BY JACOBS ACCEPTED BY CHEMETALL


NAME NAME NAME
COMPANY COMPANY REF. IND.
SIGN & DATE SIGN & DATE SIGN & DATE

Sheet 1 of 1

Potrebbero piacerti anche