ORC APV SAN JOSE SNIP - 173284

División de Obras

INFORME TECNICO MENSUAL


Jan-13

MEJORAMIENTO
MEJORAMIENTODE DEPISTAS
PISTASYY""
VEREDAS
VEREDASDE DELA
LACALLE
CALLES/NS/NDE
DELA
LA
APV. SAN JOSE , DISTRITO DE SAN
APV. SAN JOSE, DISTRITO DE SAN
"SEBASTIAN - CUSCO - CUSCO
"SEBASTIAN - CUSCO - CUSCO

Residente de Obra : ING. ISAAC CARAZAS PEZO


Supervisor de Obra :

AF - 2012
CONTENIDO
ORC APV SAN JOSE SNIP - 173284

INFORME TECNICO MENSUAL


Jan-13

No DESCRIPCION FORMATO CONTROL

1 Contenido F-1 P 1
2 Información General F-2 P 1
3 Meta Anual F-3 P 1
4 Resumen Ejecutivo
4.1 Recursos Utilizados F-4 P 1
4.2 Ejecución Física F-5 P 1
4.3 Ejecución Financiera F-6 P 1
5 Grafico de Avances F-7 P 1
6 Grafico de Avance de Obra F-8 N
7 Avance Físico
7.1 Metrado y Porcentaje de Avance por Partidas F-9 P 1
7.2 Metrados Diarios F-10 P 1
7.3 Sustento de Metrados F-11 N
8 Avance de Obra Valorizado
8.1 Resumen de Avance de Obra F-12 P 1
8.2 Obra Principal F-13 P 2
8.3 Modificaciones y adicionales F-13A N
8.4 Desagregado F-15 P 2
9 Avance Financiero
9.1 Resumen del Estado Financiero F-16 P 1
9.2 Resumen Gasto Mensual (c/Manifiesto de Gastos) F-17 P 1
10 Mano de Obra
10.1 Planilla de Tareo Valorizado del Personal F-18 P 1
11 Materiales
11.1 Resumen Mensual de Movimiento de Almacén F-19 N
11.2 Movimiento Mensual de Almacen de Obra F-20 P 1
11.3 Movimiento Diario de Almacen de Obra F-21 P 1
12 Equipos
12.1 Resumen Mensual de Movimiento de Equipo Mecanico F-22 N
12.2 Movimiento Mensual de Equipo Mecánico F-23 N
12.3 Control Diario de Equipo Mecánico F-24 N
13 Aportes
13.1 Resumen Mensual de Aportes de Beneficiarios F-25 N
13.2 Aporte de Beneficiarios F-26 N
14 Control de Calidad
14.1 Control de los Gastos Clasificados y Precios Unitarios F-27 N
14.2 Control del Analisis de Agua F-28 N
14.3 Control de Compactación F-29 N
15 Panel Fotografico F-30 P 3
16 Anexos
Copia de los Certificados de Control de Calidad N
Segunda Copia Original del Cuaderno de Obra P
Copia original de las Notas de Entrada de Almacén P
Copia original de las Notas de Salida de Almacén P
Copia de los Partes Diario de Maquinaria N
Otros N
P : Presento N : No Presento X : No Corresponde TOTAL

F-1
INFORMACION GENERAL

A.1 RESIDENTE : ING. ISAAC CARAZAS PEZO


Especialidad : INGENIERO CIVIL
Colegiatura : 113601

A.2 FECHA REPORTADA : Jan-13

A.3 DATOS DEL PROYECTO


Coódigo SNIP : 173284
Unidad Ejecutora : MUNICIPALIDAD DISTRITAL DE SAN SEBASTIAN
Función : 16 TRANSPORTE
Programa : 052 TRANSPORTE TERRESTRE
Sub Programa : 0157 VIAS URBANAS
Actividad :
Sec. Funcional :
Obra :
"MEJORAMIENTO DE PISTAS Y VEREDAS DE LA CALLE S/N DE LA APV. SAN JOSE, DISTRITO DE SAN
SEBASTIAN - CUSCO - CUSCO"

Fuente de Financiamiento : CANON Y SOBRECANON


Modalidad de Ejecución de Obra : ORC
Ejecución Presupuestaria : DIRECTA
Presupuesto de Obra Base : S/. 141,473.63

A.4 DOCUMENTACION ADMINISTRATIVA

DESCRIPCION DOCUMENTO NUMERO FECHA

Aprobación Expediente RESOLUCION 195-88 GG -


Asignación Presupuestal
Inicio y Ejec de Obra y Desig. Residente
Ejecución de Obra
Prorroga en el Plazo de Ejecución
Aprobación Adicionales
Cuaderno de Obra Vol. I Legalizacion Hoja Foliada N°001 1/15/2013
Entrega de Terreno ACTA S/N
Inicio/Reinicio de Obra ACTA (CUADERNO DE OBRA) Asiento N° 001 1/15/2013
Paralización/Corte
Conclusión de Obra

A.5 AVANCE DE OBRA ANUAL

PERIODOS DE GESTION
PPTO. BASE TOTAL SALDO
AF-2011 AF - 2012 AF - 2013

141,473.63 45,334.57 45,334.57 96,139.06

A.6 AVANCE FINANCIERO ANUAL

PERIODOS DE GESTION
PPTO. BASE TOTAL SALDO
AF-2011 AF - 2012 AF - 2013

141,473.63 25,146.09 25,146.09 116,327.54

F-2
META ANUAL AF-2,013

B.1 INFORMACION FINANCIERA

INVERSION

Expediente Técnico : S/. 3,250.98


Presupuesto de Obra : S/. 115,036.51 |
Gastos Generales : S/. 16,533.85
Supervisión de Obra : S/. 5,902.29
Liquidación de Obra : S/. 750.00
TOTAL S/. 141,473.63

PRESUPUESTO DE OBRA
Mano de Obra : S/. 19,338.24
Materiales : S/. 64,995.28
Equipos y Herramientas : S/. 25,989.08
TOTAL S/. 110,322.60

PRESUPUESTO ASIGNADO
Municipalidad:
AF-2013 : S/. 141,473.63
Saldo Presupuestal : S/. -
Saldo Materiales : S/. -
Transferencias : S/. -
Convenio : S/. -
Beneficiarios : S/. -
TOTAL S/. 141,473.63

B.2 DESCRIPCION DE LA META ANUAL

OBRAS PRELIMINARES: Se elaborara el cartel de obra y la habilitacion de un •


.local para almacen
TRABAJOS PRELIMINARES: Se hara la limpieza y habilitacion del terreno para •
realizar el replanteo respectivo. El replanteo debera ser de acuerdo a los
planos donde se verifica la ubicacion de las diferentes obras que se plantean,
los BMs que se tienen en las esquinas de las veredas en la Prolongacion Av. de
.La Cultura seran el punto de partida para el replanteo
CANAL: Se proyecta la construccion de un canal de concreto armado f'c=210 •
.kg/cm2, que servira para conducir las aguas pluviales en forma segura
AREAS VERDES: Se ha proyectado la implementacion de areas verdes •
.(sembrado de cesped) y colocacion de plantones en los bordes del canal
CAPACITACION SOCIAL: Se realizaran talleres de capacitacion a la poblacion •
involucrada en el proyecto con la finalidad de informar y sensibilizar a los
.pobladores respecto al adecuado uso de la infraestructura a construir
Colocacion de 12 und. (60 ml.) de gavion tipo caja de 5.00x1.00x1.00 m. •
sobre cabecera de muro existente como proteccion de la base de las obras a
.ejecutar

F-3
CAPACITACION SOCIAL: Se realizaran talleres de capacitacion a la poblacion •
involucrada en el proyecto con la finalidad de informar y sensibilizar a los
.pobladores respecto al adecuado uso de la infraestructura a construir
Colocacion de 12 und. (60 ml.) de gavion tipo caja de 5.00x1.00x1.00 m. •
sobre cabecera de muro existente como proteccion de la base de las obras a
.ejecutar

F-3
RESUMEN EJECUTIVO

C.1 RECURSOS UTILIZADOS

C.1.1 PERSONAL DE OBRA

CANTIDAD
PERSONAL DE OBRA
CATEGORIA ENE FEB MAR ABR MAY

PROFESIONAL:
Ingº Inspector de obra 1
Ingº Residente de obra 1
TECNICO:
Asistente Técnico 1
Maestro de Obra 1
Técnico de Suelos
Topografo
ADMINISTRATIVO:
Asistente Administrativo
Almacenero de Obra 1
Guardián
OBRERO:
Capataz
Operario 1
Oficial 1
Peón 2

C.1.2 EQUIPO MECANICO

UNIDAD HORAS/MAQUINA
DESCRIPCION MAR ABR MAY JUN JUL AGO SEP OCT NOV DIC ENE FEB

MAQUINARIA PESADA
Tractor sobre orugas
CARGADOR FRONTAL 01
CARGADOR FRONTAL 02
Retroexcavadora
Motoniveladora
Rodillo Liso Vib. Autoport.
Compresora Neumática
VEHICULOS
CAMION VOLQUETE 15M3
CAMION VOLQUETE 15M3
CAMION VOLQUETE 15M3
CAMION VOLQUETE 08 M3
CAMION VOLQUETE 6M3
CAMION VOLQUETE 15M3
Camión Cisterna
Camioneta Pick up
MAQUINARIA LIVIANA
Mezcladora
Vibradora
Cortadora de Concretto
Motobomba
EQUIPO DE TOPOGRAFIA
Teodolito
Nivel Topográfico
Estación Total

F-4
RESUMEN EJECUTIVO

Mira Topográfica
Jalones

F-4
C.2 EJECUCION FISICA

C.2.1 AVANCE DE OBRA MENSUAL VALORIZADO

AVANCE AVANCE
MES SALDO
PROGRAMADO EJECUTADO
NOVIEMBRE
DICIEMBRE
ENERO 38,068.92 26.91%
FEBRERO 7,265.65 5.14%
MARZO
ABRIL
MAYO
JUNIO
JULIO
AGOSTO
SEPTIEMBRE
OCTUBRE
TOTAL S/. 141,473.63 100.00% S/. 45,334.57 32.04% 67.96%
NOTA: El valor del avance fisico del mes de Enero incluye la valorizacion de mayores metrados Y partidas adicionales puesto
que no hay ejecucion de ellos en obra

C.2.2 DESAGREGADO DEL AVANCE DE OBRA VALORIZADO

DEL MES ACUMULADO


ITEMS PPTO. BASE
PROGRAM EJECUTADO PROGRAM EJECUTADO
Mano de Obra 19,338.24 0.00 212.15 0.00 6,596.98
Materiales y Herramientas 64,995.28 0.00 1,437.88 0.00 1,437.88
Equipo 25,989.08 0.00 242.26 0.00 1,601.74
0.00 1,892.30 0.00 9,636.60
TOTAL 110,322.60
0.00% 1.72% 0.00% 8.73%
NOTA: El acumulado resulta de la suma de lo realizado este mes mas el desagregado de Gasto por Expediente Tecnico de
acuerdo al Presupuesto Analitico del Expediente Tecnico

C.2.3 MEMORIA RESUMEN DE AVANCE DE OBRA (partidas genericas)

01.01 CARTEL DE OBRA


01.02 SEÑALES PREVENTIVAS DURANTE EL PROCESO DE EJECUCION
02.02 TRAZO, NIVELES Y REPLANTEO PRELIMINAR
03.01 CORTE DE MATERIAL NO CLASIFICADO

RESUMEN DE PORCENTAJE DE AVANCE FISICO DE OBRA

Avance ejecutado en el mes 1.72%


Avance ejecutado acumulado en el mes 8.73%
Avance programado acumulado en el mes 0.00%

F-5
EJECUCION FINANCIERA

C.3 EJECUCION FINANCIERA

C.3.1 AVANCE FINANCIERO

GASTO GASTO
MES SALDO
PROGRAMADO EJECUTADO
NOVIEMBRE
DICIEMBRE
ENERO
FEBRERO
MARZO 133,456.25 16.84% 25,146.09 3.17% 96.83%
ABRIL 179,455.75 22.65% 0.00 0.00% 96.83%
MAYO 168,378.56 21.25% 0.00 0.00% 96.83%
JUNIO 173,045.23 21.84% 0.00 0.00% 96.83%
JULIO 138,012.19 17.42% 0.00 0.00% 96.83%
AGOSTO
SEPTIEMBRE
OCTUBRE
TOTAL 792,347.98 100.00% 25,146.09 3.17% 484.13%

C.3.2 GASTOS CLASIFICADOS

DEL MES ACUMULADO


ITEMS PPTO. BASE
PROGRAM EJECUTADO PROGRAM EJECUTADO
Mano de Obra 19,338.24 23,393.29 13,371.09 23,393.29 13,371.09
Materiales y Herramientas 64,995.28 78,624.20 11,775.00 78,624.20 11,775.00
Equipo 25,989.08 31,438.75 0.00 31,438.75 0.00
133,456.25 25,146.09 133,456.25 25,146.09
TOTAL 110,322.60
120.97% 22.79% 120.97% 22.79%

C.4 AVANCE DEL PLAZO DE EJECUCION

PLAZO INICIO CONCLUSION EJECUTADO PARALIZADO AMPLIACION


13 0 0
120 3/19/2012
10.83% 0.00% 0.00%
COMENTARIOS:

C.5 EVALUACIÓN TECNICA FINANCIERA

C.6 LIMITACIONES Y RECOMENDACIONES

F-6
CONTROL
COSTO-TIEMPO-AVANCE
OBRA : "CONSTRUCCION DE CANAL PARA EVACUACION DE AGUAS PLUVIALES DE LA QUEBRADA KULLCHIHUAYCO TRAMO
COMPRENDIDO ENTRE LA PROLONGACION AV. LA CULTURA Y LA APV. FRANCISCO BOLOGNESI, DISTRITO DE SAN SEBASTIAN
- CUSCO - CUSCO"
"MEJORAMIENTO CALLE CANADA EN LA URB. NACIONES UNIDAS, DISTRITO DE SAN SEBASTIAN - CUSCO - CUSCO"

RESIDENTE: ING. ISAAC CARAZAS PEZO


SUPERVISOR: 0
FECHA Jan-13
INFORME TECNICO MENSUAL FEBRERO - 2013
MILES DE NUEVO SOLES

3,500...
PR OG R AMAD O EJ EC U TAD O IN VER SION

EJ EC U TAD O PR OG R AM FIN AN C IER O

3,000...

2,500...

2,000...

1,500...

1,000...

500

AF-2012
MES ENE FEB MAR ABR MAY JUN JUL AGO SET OCT NOV DIC

P A P A P A P A P A P A P A P A P A P A P A P A
PROGRAM
AVANCE FISICO

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
EJECUTADO

38,068.92
38,068.92

45,334.57

45,334.57
7,265.65

0.00
FINANCIERO
AVANCE

25,146.09
25,146.09
0.00
0.00
0.00
0.00

VARIACION DEL AVANCE DE OBRA VAO 0.00


INDICE DE DESEMPEÑO DEL AVANCE DE OBRA IDAO #DIV/0!
VARIACION DEL GASTO VC -25,146.09
INDICE DE DESEMPEÑO DEL GASTO IDC 0.00

F-7
P = PARCIAL A = ACUMULADO

F-7
CONTROL DE AVANCE DE OBRA

OBRA : MEJORAMIENTO DE LOS SERVICIOS SOCIALES COMUNITARIOS EN PERSONAS DE LA TERCERA EDAD RESIDENTE :ARQ. REINALDO HUAMAN P.
SUPERVISOR
INFORME TECNICO MENSUAL FEBRERO - 2013 FECHA Jan-13
2008 2009
ITEMS DESCRIPCION PARTIDAS NOV DIC ENE FEB MARZO ABRIL MAYO JUNIO JULIO AGOSTO SEPT OCT

30 31 31 28 31 30 31 30 31 31 30 31

P 0%
1 OBRAS PRELIMINARES
E 5%
P 0%
2 OBRAS PRELIMINARES
E 55%
P 0%
3 MOVIMIENTO DE TIERRAS
E 20%
P 0%
4 OBRAS DE CONCRETO SIMPLE
E 30%
P 0%
5 VIGAS DE CONEXION
E 60%
P
6 COLUMNAS
E

P
7 VIGAS
E

P
8 LOSAS ALIGERADAS
E

P
9 ESCALERAS
E

P
COLUMNETAS DE AMARRE DE
10 MUROS
E

P
11 RAMPA DE CONCRETO ARMADO
E

P
12 CISTERNA DE CONCRETO ARMADO
E

P
13ESTRUCTURAS DE MADERA Y COBERTURAS
E

AVANCE PROGRAMADO 0.00 0.00 0.00


% 0.00% 0.00% 0.00%
AVANCE EJECUTADO 0.00 0.00 38,068.92
% 0.00% 0.00% 26.91%

F-8
CONTROL DE AVANCE DE OBRA

OBRA : MEJORAMIENTO DE LOS SERVICIOS SOCIALES COMUNITARIOS EN PERSONAS DE LA TERCERA EDAD RESIDENTE :ARQ. REINALDO HUAMAN P.
SUPERVISOR
INFORME TECNICO MENSUAL FEBRERO - 2013 FECHA Jan-13
2008 2009
ITEMS DESCRIPCION PARTIDAS NOV DIC ENE FEB MARZO ABRIL MAYO JUNIO JULIO AGOSTO SEPT OCT

30 31 31 28 31 30 31 30 31 31 30 31

P
130 LIMPIEZA FINAL
E

F-8
CONTROL DE AVANCE DE OBRA

OBRA : RESIDENTE : ING° EDWIN J. CRUZ CURO


SUPERVISOR
INFORME TECNICO MENSUAL FEBRERO - 2013 FECHA Jan-13
2008 2009
ITEMS DESCRIPCION PARTIDAS JUN JUL AGO SET OCT NOV DIC ENE FEB MAR ABR MAY

30 31 31 30 31 30 31 31 28 31 30 31

P
10 PLANEAMIENTO
E

P
20 COMPATIBILIDAD
E

P
30 LOGISTICA
E

P
01 OBRAS PRELIMINARES
E

MOVILIZACION Y P
02.01 DESMOVILIZACION DE
EQUIPOS E 25.32%
P 12.50%
MOVIMIENTO DE
60

AMPLIACION DE 25 DIAS CALENDARIOS


TIERRAS
E 15.20% 8.50%
P
70 BASE
E

P
80 SARDINEL
E

P
90 LOSA DE CONCRETO
E

P
100 VEREDAS
E

P
EVACUACION DE AGUAS
110 PUVIALES
E

P
120 SEÑALIZACION
E

F-8
CONTROL DE AVANCE DE OBRA

OBRA : RESIDENTE : ING° EDWIN J. CRUZ CURO


SUPERVISOR
INFORME TECNICO MENSUAL FEBRERO - 2013 FECHA Jan-13
2008 2009
ITEMS DESCRIPCION PARTIDAS JUN JUL AGO SET OCT NOV DIC ENE FEB MAR ABR MAY

30 31 31 30 31 30 31 31 28 31 30 31

P
130 LIMPIEZA FINAL

F-8
CONTROL DE AVANCE DE OBRA

OBRA : RESIDENTE : ING° EDWIN J. CRUZ CURO


SUPERVISOR
INFORME TECNICO MENSUAL FEBRERO - 2013 FECHA Jan-13
2008 2009
ITEMS DESCRIPCION PARTIDAS JUN JUL AGO SET OCT NOV DIC ENE FEB MAR ABR MAY

30 31 31 30 31 30 31 31 28 31 30 31
130 LIMPIEZA FINAL
E

AVANCE PROGRAMADO

%
AVANCE EJECUTADO

F-8
METRADO Y PORCENTAJE DE AVANCE POR PARTIDAS
OBRA : RESIDENTE: ING. ISAAC CARAZAS PEZO
"MEJORAMIENTO DE PISTAS Y VEREDAS DE LA CALLE S/N DE LA APV. SAN JOSE, DISTRITO DE SAN SEBASTIAN - CUSCO - CUSCO"
PERVISOR: 0
INFORME TECNICO MENSUAL FEBRERO - 2013 FECHA: Jan-13

PRESUPUESTO BASE METRADOS MES ANTERIOR EN EL MES ACUMULADO SALDO

ITEMS DESCRIPCION PARTIDA U.M. CANT CANT % CANT % CANT % CANT %

01 OBRASPRELIMINARES
01.01 CARTEL
DE OBRA UND 1.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 100.00
01.02 SEÑALES PREVENTIVAS DURANTE EL PROCESO DE EJECUCION UND 3.00 0.00 0.00 0.00 0.00 0.00 0.00 3.00 100.00
01.03 ALQUILER DE ALMACEN Y OFICINAS 0 0.00
02 TRABAJOS PRELIMINARES
02.01 MOVILIZACION Y DESMOVILIZACION DE EQUIPOS GLB 1.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 100.00
02.02 TRAZO, NIVELES Y REPLANTEO PRELIMINAR M2 432.00 15.30 3.54 0.00 0.00 15.30 3.54 416.70 96.46
02.03 REPARACION Y/O ENCIMADO DE BUZONES, INCLUYE TAPA UND 1.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 100.00
03 MOVIMIENTO DE TIERRAS
03.01 CORTE DE MATERIAL NO CLASIFICADO M3 303.19 303.19 100.00 0.00 0.00 303.19 100.00 0.00 0.00
03.02 ELIMINACION DE MATERIAL EXCEDENTE M3 364.07 364.07 100.00 0.00 0.00 364.07 100.00 0.00 0.00
03.03 PERFILADO Y COMPACTADO DE SUB RAZANTE M2 432.00 0.00 0.00 0.00 0.00 0.00 0.00 432.00 100.00
04 BASES PARA PAVIMENTO DE 0.40M DE ESPESOR
04.01 EXTRACCION Y PREPARACION DE MATERIAL DE CANTERA PARA BASE
04.02 CARGUIO Y TRANSPORTE DE MAT. DE CANTERA PARA BASE M3 228.39 0.00 0.00 0.00 0.00 0.00 0.00 228.39 100.00
04.03 EXTENDIDO RIEGO Y COMPACTADO DE BASE M2 432.00 0.00 0.00 0.00 0.00 0.00 0.00 432.00 100.00
05 PAVIMENTO
05.01 LOSA DE CONCRETO
05.01.01 TRAZO, NIVELES Y REPLANTEO DURANTE EL PROCESO DE CONSTRUCCION M2 432.00 0.00 0.00 0.00 0.00 0.00 0.00 432.00 100.00
05.01.02 ENCOFRADO Y DESENCOFRADO DE LOSAS M3 16.00 0.00 0.00 0.00 0.00 0.00 0.00 16.00 100.00
05.01.03 CONCRETO F´C=210 KG/CM2 KG 99.36 0.00 0.00 0.00 0.00 0.00 0.00 99.36 100.00
05.01.04 ACERO CORRUGADO D=1/4" MALLA DE TEMPERATURA KG 945.00 0.00 0.00 0.00 0.00 0.00 0.00 945.00 100.00
05.01.05 ACERO CORRUGADO D=5/8" JUNTA LONGITUDINAL KG 215.11 0.00 0.00 0.00 0.00 0.00 0.00 215.11 100.00
05.01.06 ACERO LISO D=3/4", JUNTA DE CONTRACCION KG 281.61 0.00 0.00 0.00 0.00 0.00 0.00 281.61 100.00
05.01.07 ACERO LISO D=3/4", JUNTA DE DILATACION KG 112.54 0.00 0.00 0.00 0.00 0.00 0.00 112.54 100.00
05.01.08 SELLADO DE JUNTAS M 240.00 0.00 0.00 0.00 0.00 0.00 0.00 240.00 100.00
05.01.09 CURADO DE CONCRETO M2 432.00 0.00 0.00 0.00 0.00 0.00 0.00 432.00 100.00
06 VEREDAS DE CONCRETO
06.01 TRAZO, NIVELES Y REPLANTEO PARA VEREDAS M2 224.00 170.20 75.98 0.00 0.00 170.20 75.98 53.80 24.02
06.02 DEMOLICION DE VEREDAS M2 9.20 9.20 100.00 0.00 0.00 9.20 100.00 0.00 0.00
06.03 CORTE DE MATERIAL NO CLASIFICADO MANUAL M3 11.20 11.20 100.00 0.00 0.00 11.20 100.00 0.00 0.00
06.04 ACARREO DE MATERIAL EXCEDENTE D=30M M3 11.20 11.20 100.00 0.00 0.00 11.20 100.00 0.00 0.00
06.05 ELIMINACION DE MATERIAL EXCEDENTE M3 11.20 12.38 110.51 5.74 51.28 18.12 161.78 -6.92 -61.78
06.06 NIVELACION Y COMPACTADO MANUAL M2 224.00 0.00 0.00 87.90 39.24 87.90 39.24 136.10 60.76
06.07 EMPEDRADO PARA VEREDA DE 6" M2 224.00 0.00 0.00 83.65 37.34 83.65 37.34 140.35 62.66
06.08 ENCOFRADO Y DESENCOFRADO DE VEREDAS M2 64.00 0.00 0.00 15.05 23.52 15.05 23.52 48.95 76.48
06.09 CONCRETO F´C=175 KG/CM2 M3 19.20 0.00 0.00 0.24 1.25 0.24 1.25 18.96 98.75
06.10 SELLADO DE JUNTAS M 74.67 0.00 0.00 0.00 0.00 0.00 0.00 74.67 100.00
06.11 CURADO DE CONCRETO M2 224.00 0.00 0.00 0.00 0.00 0.00 0.00 224.00 100.00
07 SARDINELES
METRADO Y PORCENTAJE DE AVANCE POR PARTIDAS
OBRA : RESIDENTE: ING. ISAAC CARAZAS PEZO
"MEJORAMIENTO DE PISTAS Y VEREDAS DE LA CALLE S/N DE LA APV. SAN JOSE, DISTRITO DE SAN SEBASTIAN - CUSCO - CUSCO"
PERVISOR: 0
INFORME TECNICO MENSUAL FEBRERO - 2013 FECHA: Jan-13

PRESUPUESTO BASE METRADOS MES ANTERIOR EN EL MES ACUMULADO SALDO

ITEMS DESCRIPCION PARTIDA U.M. CANT CANT % CANT % CANT % CANT %

07.01 TRAZO, NIVELES Y REPLANTEO PARA SARDINELES M2 24.00 17.25 71.88 0.00 0.00 17.25 71.88 6.75 28.13
07.02 EXCAVACION MANUAL EN TERRENO NATURAL M3 4.80 4.48 93.33 0.00 0.00 4.48 93.33 0.32 6.67
07.03 ELIMINACION DE MATERIAL EXCEDENTE M3 6.00 6.00 100.00 0.00 0.00 6.00 100.00 0.00 0.00
07.04 ENCOFRADO Y DESENCOFRADO EN SARDINELES M2 128.00 0.00 0.00 22.00 17.19 22.00 17.19 106.00 82.81
07.05 CONCRETO F´C=175 KG/CM2 M3 12.00 0.00 0.00 0.21 1.75 0.21 1.75 11.79 98.25
07.06 SELLADO DE JUNTAS M 13.60 0.00 0.00 0.00 0.00 0.00 0.00 13.60 100.00
07.07 CURADO DE CONCRETO M2 88.00 0.00 0.00 0.00 0.00 0.00 0.00 88.00 100.00
08 MURO DE CONCRETO CICLOPEO
08.01 TRAZO, NIVELES Y REPLANTEO DE MURO DE CONTENCION M2 8.31 0.00 0.00 8.31 100.00 8.31 100.00 0.00 0.00
08.02 EXCAVACION MANUAL DE ZANJAS M3 15.78 15.78 100.00 0.00 0.00 15.78 100.00 0.00 0.00
08.03 ACARREO DE MATERIAL EXCEDENTE D=30M M3 15.78 0.00 0.00 0.00 0.00 0.00 0.00 15.78 100.00
08.04 ELIMINACION DE MATERIAL EXCEDENTE M3 19.72 0.00 0.00 0.00 0.00 0.00 0.00 19.72 100.00
08.05 ENCOFRADO Y DESENCOFRADO PARA MURO M2 26.43 0.00 0.00 0.00 0.00 0.00 0.00 26.43 100.00
08.06 CONCRETO F´C=175 KG/CM2 M3 7.85 0.00 0.00 4.09 52.13 4.09 52.13 3.76 47.87
08.07 COLOCACION DE TUBERIA PVC SAP DE 2" M 4.40 0.00 0.00 0.00 0.00 0.00 0.00 4.40 100.00
08.08 CURADO DE CONCRETO M2 8.31 0.00 0.00 0.00 0.00 0.00 0.00 8.31 100.00
09 ESCALINATAS
09.01 TRAZO, NIVELES Y REPLANTEO PARA ESCALINATAS M2 2.20 0.00 0.00 0.00 0.00 0.00 0.00 2.20 100.00
09.02 CORTE DE MATERIAL NO CLASIFICADO MANUAL M3 0.92 0.00 0.00 0.00 0.00 0.00 0.00 0.92 100.00
09.03 ACARREO DE MATERIAL EXCEDENTE D=30M M3 0.92 0.00 0.00 0.00 0.00 0.00 0.00 0.92 100.00
09.04 ELIMINACION DE MATERIAL EXCEDENTE M3 1.16 0.00 0.00 0.00 0.00 0.00 0.00 1.16 100.00
09.05 EMPEDRADO DE P.G. DE 8" M2 0.44 0.00 0.00 0.00 0.00 0.00 0.00 0.44 100.00
09.06 ENCOFRADO Y DESENCOFRADO PARA ESCALINATAS M2 1.76 0.00 0.00 0.00 0.00 0.00 0.00 1.76 100.00
09.07 CONCRETO F´C=210 KG/CM2 M3 0.46 0.00 0.00 0.00 0.00 0.00 0.00 0.46 100.00
09.08 CURADO DE CONCRETO M2 3.08 0.00 0.00 0.00 0.00 0.00 0.00 3.08 100.00
10 SEÑALIZACION
10.01 PINTADO Y DEMARCACION DE PAVIMENTOS M2 70.80 0.00 0.00 0.00 0.00 0.00 0.00 70.80 100.00
11 TRATAMIENTO DE AREAS VERDES
11.01 MEJORAMIENTO CON TERRENO AGRICOLA M3 22.40 0.00 0.00 0.00 0.00 0.00 0.00 22.40 100.00
11.02 COLOCACION DE PLANTONES UND 60.00 0.00 0.00 0.00 0.00 0.00 0.00 60.00 100.00
12 CONTROL DE CALIDAD
12.01 DENSIDAD DE CAMPO UND 2.00 0.00 0.00 0.00 0.00 0.00 0.00 2.00 100.00
12.02 DISEÑO DE NEZCLADO DE CONCRETOO UND 2.00 0.00 0.00 0.00 0.00 0.00 0.00 2.00 100.00
12.03 ROTURA DE BRIQUETAS UND 10.00 0.00 0.00 0.00 0.00 0.00 0.00 10.00 100.00
12.04 ESTUDIO DE CANTERAS PARA BASE UND 1.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 100.00
13 PLACA RECORDATORIA
13.01 PLACA RECORDATORIA UND 1.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 100.00
OBRA : RESIDENTE ING. ISAAC CARAZAS PEZO
"MEJORAMIENTO DE PISTAS Y VEREDAS DE LA CALLE S/N DE LA APV. SAN JOSE, DISTRITO DE SAN SEBASTIAN - CUSCO - CUSCO"
SUPERVISOR 0
INFORME TECNICO MENSUAL FEBRERO - 2013 FECHA Jan-13

PRESUPUESTO BASE FECHA 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28


TOTAL
ITEMS DESCRIPCION PARTIDA DIA V S D L M MI J V S D L M MI J V S D L M MI J V S D L M MI J

01 OBRAS PRELIMINARES
01.01 CARTEL DE OBRA UND --
01.02 SEÑALES PREVENTIVAS DURANTE EL PROCESO DE EJECUCION UND --
01.03 ALQUILER DE ALMACEN Y OFICINAS MES
02 TRABAJOS PRELIMINARES --
02.01 MOVILIZACION Y DESMOVILIZACION DE EQUIPOS GLB --
02.02 LIMPIEZA MANUAL DEL TERRENO
02.03 TRAZO, NIVELES Y REPLANTEO PRELIMINAR M2 --
02.04 REPARACION Y/O ENCIMADO DE BUZONES, INCLUYE TAPA UND --
03 MOVIMIENTO DE TIERRAS --
03.01 CORTE DE MATERIAL NO CLASIFICADO M3 --
03.02 ELIMINACION DE MATERIAL EXCEDENTE M3 --
03.03 PERFILADO Y COMPACTADO DE SUB RAZANTE M2 --
04 BASES PARA PAVIMENTO DE 0.40M DE ESPESOR --
04.01 EXTRACCION Y PREPARACION DE MATERIAL DE CANTERA PARA BASE M3 --
04.02 CARGUIO Y TRANSPORTE DE MAT. DE CANTERA PARA BASE M3 --
04.03 EXTENDIDO RIEGO Y COMPACTADO DE BASE M2 --
05 PAVIMENTO --
05.01 LOSA DE CONCRETO M2 --
05.01.01 TRAZO, NIVELES Y REPLANTEO DURANTE EL PROCESO DE CONSTRUCCION M2 --
05.01.02 ENCOFRADO Y DESENCOFRADO DE LOSAS M3 --
05.01.03 CONCRETO F´C=210 KG/CM2 KG --
05.01.04 ACERO CORRUGADO D=1/4" MALLA DE TEMPERATURA KG --
05.01.05 ACERO CORRUGADO D=5/8" JUNTA LONGITUDINAL KG --
05.01.06 ACERO LISO D=3/4", JUNTA DE CONTRACCION KG --
05.01.07 ACERO LISO D=3/4", JUNTA DE DILATACION KG --
05.01.08 SELLADO DE JUNTAS M --
05.01.09 CURADO DE CONCRETO M2 --
06 VEREDAS DE CONCRETO --
06.01 TRAZO, NIVELES Y REPLANTEO PARA VEREDAS M2 --
06.02 DEMOLICION DE VEREDAS M2 31.50 13.90 2.00 47.40
06.03 CORTE DE MATERIAL NO CLASIFICADO MANUAL M3 --
06.04 ACARREO DE MATERIAL EXCEDENTE D=30M M3 5.74 5.74
06.05 ELIMINACION DE MATERIAL EXCEDENTE M3 3.98 1.76 5.74
06.06 NIVELACION Y COMPACTADO MANUAL M2 12.00 16.80 19.50 6.00 18.00 6.00 9.60 87.90
06.07 EMPEDRADO PARA VEREDA DE 6" M2 24.20 17.25 23.00 19.20 83.65
06.08 ENCOFRADO Y DESENCOFRADO DE VEREDAS M2 4.00 6.00 5.05 15.05
06.09 CONCRETO F´C=175 KG/CM2 M3 0.24 0.24
06.10 SELLADO DE JUNTAS M --
06.11 CURADO DE CONCRETO M2 --
07 SARDINELES --
07.01 TRAZO, NIVELES Y REPLANTEO PARA SARDINELES M2 --
07.02 EXCAVACION MANUAL EN TERRENO NATURAL M3 2.25 0.45 2.70
07.03 ELIMINACION DE MATERIAL EXCEDENTE M3 2.70 0.23 2.93
07.04 ENCOFRADO Y DESENCOFRADO EN SARDINELES M2 2.00 12.00 8.00 22.00
07.05 CONCRETO F´C=175 KG/CM2 M3 0.21 0.21
07.06 SELLADO DE JUNTAS M --
07.07 CURADO DE CONCRETO M2 --
08 MURO DE CONCRETO CICLOPEO --
08.01 TRAZO, NIVELES Y REPLANTEO DE MURO DE CONTENCION M2 8.31 8.31
08.02 EXCAVACION MANUAL DE ZANJAS M3 --
08.03 ACARREO DE MATERIAL EXCEDENTE D=30M M3 --
08.04 ELIMINACION DE MATERIAL EXCEDENTE M3 --
08.05 ENCOFRADO Y DESENCOFRADO PARA MURO M2 --
08.06 CONCRETO F´C=175 KG/CM2 M3 0.81 3.29 4.09
08.07 COLOCACION DE TUBERIA PVC SAP DE 2" M --
08.08 CURADO DE CONCRETO M2 --
09 ESCALINATAS --
09.01 TRAZO, NIVELES Y REPLANTEO PARA ESCALINATAS M2 --
09.02 CORTE DE MATERIAL NO CLASIFICADO MANUAL M3 --
09.03 ACARREO DE MATERIAL EXCEDENTE D=30M M3 --
09.04 ELIMINACION DE MATERIAL EXCEDENTE M3 --
09.05 EMPEDRADO DE P.G. DE 8" M2 --
09.06 ENCOFRADO Y DESENCOFRADO PARA ESCALINATAS M2 --
09.07 CONCRETO F´C=210 KG/CM2 M3 --

F-10
OBRA : RESIDENTE ING. ISAAC CARAZAS PEZO
"MEJORAMIENTO DE PISTAS Y VEREDAS DE LA CALLE S/N DE LA APV. SAN JOSE, DISTRITO DE SAN SEBASTIAN - CUSCO - CUSCO"
SUPERVISOR 0
INFORME TECNICO MENSUAL FEBRERO - 2013 FECHA Jan-13

PRESUPUESTO BASE FECHA 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28


TOTAL
ITEMS DESCRIPCION PARTIDA DIA V S D L M MI J V S D L M MI J V S D L M MI J V S D L M MI J

09.08 CURADO DE CONCRETO M2 --


10 SEÑALIZACION --
10.01 PINTADO Y DEMARCACION DE PAVIMENTOS M2 --
11 TRATAMIENTO DE AREAS VERDES --
11.01 MEJORAMIENTO CON TERRENO AGRICOLA M3 --
11.02 COLOCACION DE PLANTONES UND --
12 CONTROL DE CALIDAD --
12.01 DENSIDAD DE CAMPO UND --
12.02 DISEÑO DE NEZCLADO DE CONCRETOO UND --
12.03 ROTURA DE BRIQUETAS UND --
12.04 ESTUDIO DE CANTERAS PARA BASE UND --
13 PLACA RECORDATORIA --
13.01 PLACA RECORDATORIA UND --

F-10
SUSTENTO DE METRADOS

OBRA: MEJORAMIENTO DEL SISTEMA DE RIEGO EN LA ZONA DE TANKARPATA


RESIDENTE ING. ISAAC CARAZAS PEZO
INFORME TECNICO MENSUAL MARZO 2010 SUPERVISOR
FECHA 3/29/2010
ITEMS 02 PESOS NOMINALES
PARTIDA TRABAJOS PRELIMINARES 0.222 0.994 2.237 3.978
TRABAJOS PRELIMINARES ENCOFRADO F. CORRUG F. LISO
PROG DIMENSIONES DIMENSIONES AREA LONGITUD
AREA VOL
largo ancho altura CANT LON ANCHO altura TOTAL 1/4" 1/2" 3/4" 1"
00+000 al 880.00
00+088
880.00 0.00
TOTAL

M KG KG KG KG
METRADO BASE
METRADO EJECUTADO ACUMULADO
METRADO EJECUTADO EN EL MES 880.00

SUSTENTO DE METRADOS

OBRA: MEJORAMIENTO DEL SISTEMA DE RIEGO EN LA ZONA DE TANKARPATA


RESIDENTE ING. ISAAC CARAZAS PEZO
INFORME TECNICO MENSUAL MARZO 2010 SUPERVISOR
FECHA 2/2/2010
ITEMS 02 PESOS NOMINALES
PARTIDA TRABAJOS PRELIMINARES 0.222 0.994 2.237 3.978
TRABAJOS PRELIMINARES ENCOFRADO F. CORRUG F. LISO
PROG DIMENSIONES DIMENSIONES AREA LONGITUD
AREA VOL
largo ancho altura CANT LON ANCHO altura TOTAL 1/4" 1/2" 3/4" 1"
00+088 al 1,260.00
02+140
1,260.00 0.00
TOTAL

M KG KG KG KG
METRADO BASE
METRADO EJECUTADO ACUMULADO

METRADO EJECUTADO EN EL MES 1,260.00

SUSTENTO DE METRADOS

OBRA: MEJORAMIENTO DEL SISTEMA DE RIEGO EN LA ZONA DE TANKARPATA


RESIDENTE ING. ISAAC CARAZAS PEZO
INFORME TECNICO MENSUAL MARZO 2010 SUPERVISOR
FECHA 2/2/2010
ITEMS Err:509 PESOS NOMINALES
PARTIDA Err:509 0.222 0.994 2.237 3.978
Err:509 ENCOFRADO F. CORRUG F. LISO
PROG DIMENSIONES DIMENSIONES AREA LONGITUD
AREA VOL
largo ancho altura CANT LON ANCHO altura TOTAL 1/4" 1/2" 3/4" 1"
00+000 al 300.00
00+117.18
300.00 0.00
TOTAL

M KG KG KG KG
METRADO BASE
METRADO EJECUTADO ACUMULADO
METRADO EJECUTADO EN EL MES 300.00
SUSTENTO DE METRADOS

OBRA :
INFORME TECNICO MENSUAL FEBRERO - 2013
PLANILLA DE METRADOS ACERO

Clasificacion (m) Peso Peso


Nº Nº Piezas Longitud Longitud
Partida Descripción Diseño Ø Elemento por por Pieza Parcial
Iguales Elemento (m) (m) 1/4" 3/8" 1/2" 5/8" 3/4" 1" parcial Total

0.248 0.55 1 1.6 2.25 3.97 kg kg


04.00.00 m 1.70-2.05SIMPLE
CONCRETO
04.05 ACERO fy=4200 kg/cm2 GRADO 60 EN SOBRECIMIENTOS ARMADOS 94.67
ARRANQUES SOBRECIMIENTO
3/8" 1 153 1.13 172.13 0.00 172.13 0.00 0.00 0.00 0.00 94.67 94.67
05.01.00 VIGAS DE CIMENTACION
05.01.03 Acero Grado 60 en Vigas de Conexión 6,716.07
Bloque A
VIGA EJE 5,6,7
1" 3 4 4.50 54.00 0.00 0.00 0.00 0.00 0.00 54.00 214.38
1" 3 4 9.00 108.00 0.00 0.00 0.00 0.00 0.00 108.00 428.76
3/4" 3 7 3.20 67.20 0.00 0.00 0.00 0.00 67.20 0.00 151.20
3/4" 3 7 7.10 149.10 0.00 0.00 0.00 0.00 149.10 0.00 335.48
1/2" 3 6 4.50 81.00 0.00 0.00 81.00 0.00 0.00 0.00 81.00
1/2" 3 6 5.75 103.50 0.00 0.00 103.50 0.00 0.00 0.00 103.50
3/8" 3 6 5.00 90.00 0.00 90.00 0.00 0.00 0.00 0.00 49.50
3/8" 3 6 4.50 81.00 0.00 81.00 0.00 0.00 0.00 0.00 44.55
3/8" 3 54 3.20 518.40 0.00 518.40 0.00 0.00 0.00 0.00 285.12
3/8" 3 198 1.80 1069.20 0.00 1069.20 0.00 0.00 0.00 0.00 588.06 2,281.55
VIGA 1,2,3,4
1" 4 3 9.00 108.00 0.00 0.00 0.00 0.00 0.00 108.00 428.76
1" 4 3 9.00 108.00 0.00 0.00 0.00 0.00 0.00 108.00 428.76
5/8" 4 8 9.00 288.00 0.00 0.00 0.00 288.00 0.00 0.00 460.80
5/8" 4 14 2.80 156.80 0.00 0.00 0.00 156.80 0.00 0.00 250.88
5/8" 4 7 2.40 67.20 0.00 0.00 0.00 67.20 0.00 0.00 107.52
1/2" 4 2 4.50 36.00 0.00 0.00 36.00 0.00 0.00 0.00 36.00
1/2" 4 2 9.00 72.00 0.00 0.00 72.00 0.00 0.00 0.00 72.00
3/8" 4 6 4.50 108.00 0.00 108.00 0.00 0.00 0.00 0.00 59.40
3/8" 4 6 5.00 120.00 0.00 120.00 0.00 0.00 0.00 0.00 66.00
3/8" 4 6 3.50 84.00 0.00 84.00 0.00 0.00 0.00 0.00 46.20
3/8" 4 84 2.50 840.00 0.00 840.00 0.00 0.00 0.00 0.00 462.00
3/8" 4 88 1.70 598.40 0.00 598.40 0.00 0.00 0.00 0.00 329.12 2,747.44
VIGA EJE A,B
3/4" 2 3 9.00 54.00 0.00 0.00 0.00 0.00 54.00 0.00 121.50
FALTA 6 FIERROS L=9M 3/4" 3/4" 2 3 9.00 54.00 0.00 0.00 0.00 0.00 54.00 0.00 121.50
3/4" 2 3 3.00 18.00 0.00 0.00 0.00 0.00 18.00 0.00 40.50
5/8" 2 4 9.00 72.00 0.00 0.00 0.00 72.00 0.00 0.00 115.20
FALTA 8FIERROS DR 5/8" L=9M(02/02/09) 5/8" 2 4 9.00 72.00 0.00 0.00 0.00 72.00 0.00 0.00 115.20
5/8" 2 4 2.00 16.00 0.00 0.00 0.00 16.00 0.00 0.00 25.60
1/2" 2 2 9.00 36.00 0.00 0.00 36.00 0.00 0.00 0.00 36.00
1/2" 2 2 9.00 36.00 0.00 0.00 36.00 0.00 0.00 0.00 36.00
1/2" 2 2 9.00 36.00 0.00 0.00 36.00 0.00 0.00 0.00 36.00
1/2" 2 2 1.00 4.00 0.00 0.00 4.00 0.00 0.00 0.00 4.00
3/8" 1 172 1.80 309.60 0.00 309.60 0.00 0.00 0.00 0.00 170.28 821.78

VIGA EJE C
3/4" 1 3 9.00 27.00 0.00 0.00 0.00 0.00 27.00 0.00 60.75
FALTA 3 FIERROS LONGITUD 9M 3/4" 3/4" 1 3 9.00 27.00 0.00 0.00 0.00 0.00 27.00 0.00 60.75
3/4" 1 3 3.00 9.00 0.00 0.00 0.00 0.00 9.00 0.00 20.25
3/4" 1 3 9.00 27.00 0.00 0.00 0.00 0.00 27.00 0.00 60.75
3/4" 1 3 9.00 27.00 0.00 0.00 0.00 0.00 27.00 0.00 60.75
3/4" 1 3 9.00 27.00 0.00 0.00 0.00 0.00 27.00 0.00 60.75
1/2" 1 3 9.00 27.00 0.00 0.00 27.00 0.00 0.00 0.00 27.00
1/2" 1 3 9.00 27.00 0.00 0.00 27.00 0.00 0.00 0.00 27.00
1/2" 1 3 9.00 27.00 0.00 0.00 27.00 0.00 0.00 0.00 27.00
1/2" 1 3 1.00 3.00 0.00 0.00 3.00 0.00 0.00 0.00 3.00
3/4" 1 3 2.25 6.75 0.00 0.00 0.00 0.00 6.75 0.00 15.19
3/8" 1 172 1.80 309.60 0.00 309.60 0.00 0.00 0.00 0.00 170.28 593.47

F-11
SUSTENTO DE METRADOS

OBRA :
INFORME TECNICO MENSUAL FEBRERO - 2013
PLANILLA DE METRADOS ACERO

Clasificacion (m) Peso Peso


Nº Nº Piezas Longitud Longitud
Partida Descripción Diseño Ø Elemento por por Pieza Parcial
Iguales Elemento (m) (m) 1/4" 3/8" 1/2" 5/8" 3/4" 1" parcial Total

0.248 0.55 1 1.6 2.25 3.97 kg kg

VIGA EJE D
3/4" 1 3 6.50 19.50 0.00 0.00 0.00 0.00 19.50 0.00 43.88
3/4" 1 3 6.00 18.00 0.00 0.00 0.00 0.00 18.00 0.00 40.50
5/8" 1 4 3.00 12.00 0.00 0.00 0.00 12.00 0.00 0.00 19.20
5/8" 1 4 3.00 12.00 0.00 0.00 0.00 12.00 0.00 0.00 19.20
5/8" 1 4 8.00 32.00 0.00 0.00 0.00 32.00 0.00 0.00 51.20
1/2" 1 2 4.50 9.00 0.00 0.00 9.00 0.00 0.00 0.00 9.00
1/2" 1 2 3.00 6.00 0.00 0.00 6.00 0.00 0.00 0.00 6.00
1/2" 1 2 4.50 9.00 0.00 0.00 9.00 0.00 0.00 0.00 9.00
3/8" 1 79 1.70 134.30 0.00 134.30 0.00 0.00 0.00 0.00 73.87 271.84

05.02. PLACAS Y COLUMNAS


05.02.03 Acero Grado 60 en Columnas 2,719.68
1/2" 16 2 9.00 288.00 0.00 0.00 288.00 0.00 0.00 0.00 288.00
c1,c2,c3,c4,c5,c6,c7,c8,c9,c10,c12,c13,c15,c16,c21,c23 5/8" 16 4 9.00 576.00 0.00 0.00 0.00 576.00 0.00 0.00 921.60
3/8" 16 33 1.08 570.24 0.00 570.24 0.00 0.00 0.00 0.00 313.63
1/2" 4 2 9.00 72.00 0.00 0.00 72.00 0.00 0.00 0.00 72.00
c17,c18,c19,c20 5/8" 4 4 9.00 144.00 0.00 0.00 0.00 144.00 0.00 0.00 230.40
3/8" 4 40 1.18 188.80 0.00 188.80 0.00 0.00 0.00 0.00 103.84
1/2" 1 2 9.00 18.00 0.00 0.00 18.00 0.00 0.00 0.00 18.00
c14 5/8" 1 4 9.00 36.00 0.00 0.00 0.00 36.00 0.00 0.00 57.60
3/8" 1 50 1.28 64.00 0.00 64.00 0.00 0.00 0.00 0.00 35.20
5/8" 1 8 9.00 72.00 0.00 0.00 0.00 72.00 0.00 0.00 115.20
c11(circular)
3/8" 1 30 0.90 27.00 0.00 27.00 0.00 0.00 0.00 0.00 14.85
3/4" 3 8 9.00 216.00 0.00 0.00 0.00 0.00 216.00 0.00 486.00
c22,c24,c25(circular)
3/8" 3 32 1.20 115.20 0.00 115.20 0.00 0.00 0.00 0.00 63.36 2,719.68
ºº

F-11
RESUMEN AVANCE MENSUAL VALORIZADO

OBRA : "CONSTRUCCION DE CANAL PARA EVACUACION DE AGUAS PLUVIALES DE LA QUEBRADA KULLCHIHUAYCO, RESIDENTE ING. ISAAC CARAZAS PEZO
DISTRITO DE SAN SEBASTIAN - CUSCO - CUSCO" SUPERVISOR 0
INFORME TECNICO MENSUAL FEBRERO - 2013 FECHA Jan-13

OBRA PRINCIPAL MODIFICACIONES TOTAL GENERAL


MES
PROGRAM ACUM. ANTER EN EL MES ACUMUL MES ANTER EN EL MES ACUMUL MES ANTER EN EL MES ACUMUL

MAR - 2012 S/. 133,456.25 S/. 19,143.22 S/. 5,395.28 S/. 24,538.50 S/. - S/. - S/. - S/. 19,143.22 S/. 5,395.28 S/. 24,538.50

ABR - 2012 S/. 179,455.75

MAY - 2012 S/. 168,378.56

JUN - 2012 S/. 173,045.23


JUL - 2012 S/. 138,012.19

TOTAL S/. 792,347.98 % AVANCE 2.42% 0.68% 3.10%

F-12
OBRA PRINCIPAL
AVANCE DE OBRA VALORIZADO
OBRA : RESIDENTE ING. ISAAC CARAZAS PEZO
"MEJORAMIENTO DE PISTAS Y VEREDAS DE LA CALLE S/N DE LA APV. SAN JOSE, DISTRITO DE SAN SEBASTIAN - CUSCO - CUSCO"
SUPERVISOR 0
INFORME TECNICO MENSUAL FEBRERO - 2013 FECHA Jan-13

PRESUPUESTO BASE AVANCE


METRADO COSTOS
MES ANTERIOR EN EL MES ACUMULADO SALDO
ITEMS DESCRIPCION PARTIDA METRADO / METRADO / METRADO / METRADO /
U.M. CANT UNIT PARCIAL VALORIZ VALORIZ VALORIZ VALORIZ
% % % %

01 OBRAS PRELIMINARES 1,565.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 100.00% 1,565.00
01.01 CARTEL DE OBRA UND 1.00 500.00 500.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 500.00
01.02 SEÑALES PREVENTIVAS DURANTE EL PROCESO DE EJECUCION UND 3.00 55.00 165.00 0.00 0.00 0.00 0.00 0.00 0.00 3.00 165.00
01.03 ALQUILER DE ALMACEN Y OFICINAS MES 2.00 450.00 900.00 0.00 0.00 0.00 0.00 0.00 0.00 2.00 900.00
02 TRABAJOS PRELIMINARES 3,206.67 0.60% 19.28 0.00% 0.00 0.60% 19.28 99.40% 3,187.39
02.01 MOVILIZACION Y DESMOVILIZACION DE EQUIPOS GLB 1.00 2000.00 2,000.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 2000.00
02.02 TRAZO, NIVELES Y REPLANTEO PRELIMINAR M2 432.00 1.26 544.32 15.30 19.28 0.00 0.00 15.30 19.28 416.70 525.04
02.03 REPARACION Y/O ENCIMADO DE BUZONES, INCLUYE TAPA UND 1.00 662.35 662.35 0.00 0.00 0.00 0.00 0.00 0.00 1.00 662.35
03 MOVIMIENTO DE TIERRAS 12,375.36 87.50% 10,828.80 0.00% 0.00 87.50% 10,828.80 12.50% 1,546.56
03.01 CORTE DE MATERIAL NO CLASIFICADO M3 303.19 8.29 2,513.45 303.19 2513.45 0.00 0.00 303.19 2513.45 0.00 0.00
03.02 ELIMINACION DE MATERIAL EXCEDENTE M3 364.07 22.84 8,315.36 364.07 8315.36 0.00 0.00 364.07 8315.36 0.00 0.00
03.03 PERFILADO Y COMPACTADO DE SUB RAZANTE M2 432.00 3.58 1,546.56 0.00 0.00 0.00 0.00 0.00 0.00 432.00 1546.56
04 BASES PARA PAVIMENTO DE 0.40M DE ESPESOR 20,156.55 0.00% 0.00 0.00% 0.00 0.00% 0.00 100.00% 20,156.55
04.01 EXTRACCION Y PREPARACION DE MATERIAL DE CANTERA PARA BASE M3 228.39 17.65 10,078.28 0.00 0.00 0.00 0.00 0.00 0.00 228.39 10,078.28
04.02 CARGUIO Y TRANSPORTE DE MAT. DE CANTERA PARA BASE M3 228.39 30.66 7,002.44 0.00 0.00 0.00 0.00 0.00 0.00 228.39 7002.44
04.03 EXTENDIDO RIEGO Y COMPACTADO DE BASE M2 432.00 7.12 3,075.84 0.00 0.00 0.00 0.00 0.00 0.00 432.00 3075.84
05 PAVIMENTO 49,457.04 0.00% 0.00 0.00% 0.00 0.00% 0.00 100.00% 49,457.04
05.01 LOSA DE CONCRETO

05.01.01 TRAZO, NIVELES Y REPLANTEO DURANTE EL PROCESO DE CONSTRUCCION M2 432.00 1.26 544.32 0.00 0.00 0.00 0.00 0.00 0.00 432.00 544.32

05.01.02 ENCOFRADO Y DESENCOFRADO DE LOSAS M3 16.00 29.39 470.24 0.00 0.00 0.00 0.00 0.00 0.00 16.00 470.24
05.01.03 CONCRETO F´C=210 KG/CM2 KG 99.36 401.63 39,905.96 0.00 0.00 0.00 0.00 0.00 0.00 99.36 39905.96
05.01.04 ACERO CORRUGADO D=1/4" MALLA DE TEMPERATURA KG 945.00 4.11 3,883.95 0.00 0.00 0.00 0.00 0.00 0.00 945.00 3883.95
05.01.05 ACERO CORRUGADO D=5/8" JUNTA LONGITUDINAL KG 215.11 3.88 834.63 0.00 0.00 0.00 0.00 0.00 0.00 215.11 834.63
05.01.06 ACERO LISO D=3/4", JUNTA DE CONTRACCION KG 281.61 3.88 1,092.65 0.00 0.00 0.00 0.00 0.00 0.00 281.61 1092.65
05.01.07 ACERO LISO D=3/4", JUNTA DE DILATACION KG 112.54 3.88 436.66 0.00 0.00 0.00 0.00 0.00 0.00 112.54 436.66
05.01.08 SELLADO DE JUNTAS M 240 8.87 2,128.80 0.00 0.00 0.00 0.00 0.00 0.00 240.00 2128.80
05.01.09 CURADO DE CONCRETO M2 432.00 0.37 159.84 0.00 0.00 0.00 0.00 0.00 0.00 432.00 159.84
06 VEREDAS DE CONCRETO 13,951.98 6.16% 859.60 16.37% 2,284.09 22.53% 3,143.70 77.47% 10,808.28
06.01 TRAZO, NIVELES Y REPLANTEO PARA VEREDAS M2 224.00 1.17 262.08 170.20 199.13 0.00 0.00 170.20 199.13 53.80 62.95
06.02 DEMOLICION DE VEREDAS M2 9.20 2.18 20.06 9.20 20.06 0.00 0.00 9.20 20.06 0.00 0.00
06.03 CORTE DE MATERIAL NO CLASIFICADO MANUAL M3 11.20 17.75 198.80 11.20 198.80 0.00 0.00 11.20 198.80 0.00 0.00
06.04 ACARREO DE MATERIAL EXCEDENTE D=30M M3 11.20 14.19 158.93 11.20 158.93 0.00 0.00 11.20 158.93 0.00 0.00
06.05 ELIMINACION DE MATERIAL EXCEDENTE M3 11.20 22.84 255.81 12.38 282.69 5.74 131.17 18.12 413.86 -6.92 -158.05
06.06 NIVELACION Y COMPACTADO MANUAL M2 224.00 2.93 656.32 0.00 0.00 87.90 257.55 87.90 257.55 136.10 398.77
06.07 EMPEDRADO PARA VEREDA DE 6" M2 224.00 17.85 3,998.40 0.00 0.00 83.65 1493.15 83.65 1493.15 140.35 2505.25
06.08 ENCOFRADO Y DESENCOFRADO DE VEREDAS M2 64.00 21.51 1,376.64 0.00 0.00 15.05 323.73 15.05 323.73 48.95 1052.91
06.09 CONCRETO F´C=175 KG/CM2 M3 19.20 327.07 6,279.74 0.00 0.00 0.24 78.50 0.24 78.50 18.96 6201.25
06.10 SELLADO DE JUNTAS M 74.67 8.87 662.32 0.00 0.00 0.00 0.00 0.00 0.00 74.67 662.32
06.11 CURADO DE CONCRETO M2 224.00 0.37 82.88 0.00 0.00 0.00 0.00 0.00 0.00 224.00 82.88
07 SARDINELES 7,071.79 3.21% 227.10 7.66% 541.90 10.87% 769.00 89.13% 6,302.79

F-13
AVANCE DE OBRA VALORIZADO
OBRA : RESIDENTE ING. ISAAC CARAZAS PEZO
"MEJORAMIENTO DE PISTAS Y VEREDAS DE LA CALLE S/N DE LA APV. SAN JOSE, DISTRITO DE SAN SEBASTIAN - CUSCO - CUSCO"
SUPERVISOR 0
INFORME TECNICO MENSUAL FEBRERO - 2013 FECHA Jan-13

PRESUPUESTO BASE AVANCE


METRADO COSTOS
MES ANTERIOR EN EL MES ACUMULADO SALDO
ITEMS DESCRIPCION PARTIDA METRADO / METRADO / METRADO / METRADO /
U.M. CANT UNIT PARCIAL VALORIZ VALORIZ VALORIZ VALORIZ
% % % %

07.01 TRAZO, NIVELES Y REPLANTEO PARA SARDINELES M2 24.00 1.26 30.24 17.25 21.74 0.00 0.00 17.25 21.74 6.75 8.51
07.02 EXCAVACION MANUAL EN TERRENO NATURAL M3 4.80 15.25 73.20 4.48 68.32 0.00 0.00 4.48 68.32 0.32 4.88
07.03 ELIMINACION DE MATERIAL EXCEDENTE M3 6.00 22.84 137.04 6.00 137.04 0.00 0.00 6.00 137.04 0.00 0.00
07.04 ENCOFRADO Y DESENCOFRADO EN SARDINELES M2 128.00 21.51 2,753.28 0.00 0.00 22.00 473.22 22.00 473.22 106.00 2280.06
07.05 CONCRETO F´C=175 KG/CM2 M3 12.00 327.07 3,924.84 0.00 0.00 0.21 68.68 0.21 68.68 11.79 3856.16
07.06 SELLADO DE JUNTAS M 13.60 8.87 120.63 0.00 0.00 0.00 0.00 0.00 0.00 13.60 120.63
07.07 CURADO DE CONCRETO M2 88.00 0.37 32.56 0.00 0.00 0.00 0.00 0.00 0.00 88.00 32.56
08 MURO DE CONCRETO CICLOPEO 4,163.72 0.00% 280.10 31.72% 1,320.85 38.45% 1,600.94 61.55% 2,562.78
08.01 TRAZO, NIVELES Y REPLANTEO DE MURO DE CONTENCION M2 8.31 1.26 10.47 0.00 0.00 8.31 10.47 8.31 10.47 0.00 0.00
08.02 EXCAVACION MANUAL DE ZANJAS M3 15.78 17.75 280.10 15.78 280.10 0.00 0.00 15.78 280.10 0.00 0.00
08.03 ACARREO DE MATERIAL EXCEDENTE D=30M M3 15.78 14.19 223.92 0.00 0.00 0.00 0.00 0.00 0.00 15.78 223.92
08.04 ELIMINACION DE MATERIAL EXCEDENTE M3 19.72 22.84 450.40 0.00 0.00 0.00 0.00 0.00 0.00 19.72 450.40
08.05 ENCOFRADO Y DESENCOFRADO PARA MURO M2 26.43 21.51 568.51 0.00 0.00 0.00 0.00 0.00 0.00 26.43 568.51
08.06 CONCRETO F´C=175 KG/CM2 M3 7.85 320.22 2,513.73 0.00 0.00 4.09 1310.38 4.09 1310.38 3.76 1203.35
08.07 COLOCACION DE TUBERIA PVC SAP DE 2" M 4.40 25.80 113.52 0.00 0.00 0.00 0.00 0.00 0.00 4.40 113.52
08.08 CURADO DE CONCRETO M2 8.31 0.37 3.07 0.00 0.00 0.00 0.00 0.00 0.00 8.31 3.07
09 ESCALINATAS 257.49 0.00% 0.00 0.00% 0.00 0.00% 0.00 100.00% 257.49
09.01 TRAZO, NIVELES Y REPLANTEO PARA ESCALINATAS M2 2.20 1.26 2.77 0.00 0.00 0.00 0.00 0.00 0.00 2.20 2.77
09.02 CORTE DE MATERIAL NO CLASIFICADO MANUAL M3 0.92 17.75 16.33 0.00 0.00 0.00 0.00 0.00 0.00 0.92 16.33
09.03 ACARREO DE MATERIAL EXCEDENTE D=30M M3 0.92 14.19 13.05 0.00 0.00 0.00 0.00 0.00 0.00 0.92 13.05
09.04 ELIMINACION DE MATERIAL EXCEDENTE M3 1.16 22.84 26.49 0.00 0.00 0.00 0.00 0.00 0.00 1.16 26.49
09.05 EMPEDRADO DE P.G. DE 8" M2 0.44 21.35 9.39 0.00 0.00 0.00 0.00 0.00 0.00 0.44 9.39
09.06 ENCOFRADO Y DESENCOFRADO PARA ESCALINATAS M2 1.76 21.51 37.86 0.00 0.00 0.00 0.00 0.00 0.00 1.76 37.86
09.07 CONCRETO F´C=210 KG/CM2 M3 0.46 327.07 150.45 0.00 0.00 0.00 0.00 0.00 0.00 0.46 150.45
09.08 CURADO DE CONCRETO M2 3.08 0.37 1.14 0.00 0.00 0.00 0.00 0.00 0.00 3.08 1.14
10 SEÑALIZACION 3,131.48 0.00% 0.00 0.00% 0.00 0.00% 0.00 100.00% 3,131.48
10.01 PINTADO Y DEMARCACION DE PAVIMENTOS M2 70.80 3.91 276.83 0.00 0.00 0.00 0.00 0.00 0.00 70.80 276.83
11 TRATAMIENTO DE AREAS VERDES 1,427.33 0.00% 0.00 0.00% 0.00 0.00% 0.00 100.00% 1,427.33
11.01 MEJORAMIENTO CON TERRENO AGRICOLA M3 22.40 50.97 1,141.73 0.00 0.00 0.00 0.00 0.00 0.00 22.40 1141.73
11.02 COLOCACION DE PLANTONES UND 60.00 4.76 285.60 0.00 0.00 0.00 0.00 0.00 0.00 60.00 285.60
12 CONTROL DE CALIDAD 1,710.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 100.00% 1,710.00
12.01 DENSIDAD DE CAMPO UND 2.00 30.00 60.00 0.00 0.00 0.00 0.00 0.00 0.00 2.00 60.00
12.02 DISEÑO DE NEZCLADO DE CONCRETOO UND 2.00 450.00 900.00 0.00 0.00 0.00 0.00 0.00 0.00 2.00 900.00
12.03 ROTURA DE BRIQUETAS UND 10.00 30.00 300.00 0.00 0.00 0.00 0.00 0.00 0.00 10.00 300.00
12.04 ESTUDIO DE CANTERAS PARA BASE UND 1.00 450.00 450.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 450.00
13 PLACA RECORDATORIA 750.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 100.00% 750.00
13.01 PLACA RECORDATORIA UND 1.00 750.00 750.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 750.00
COSTOS DIRECTOS S/. 115,036.51 10.62% 12,214.88 3.60% 4,146.85 14.22% 16,361.72 88.18% 101,435.37
GASTOS GENERALES (10.00%) S/. 16,533.85 10.62% 1,755.61 3.60% 596.01 14.22% 2,351.62 88.18% 14,579.00
GASTOS DE SUPERVISION (2.62%) S/. 18,098.58 10.62% 1,921.75 3.60% 652.42 14.22% 2,574.17 88.18% 15,958.73
GASTOS DE EXPEDIENTE TECNICO (1.12%) S/. 3,250.98 100.00% 3,250.98 0.00% 0.00 100.00% 3,250.98 0.00% 0.00
GASTOS DE LIQUIDACION (0.77%) S/. 750.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 100.00% 750.00
TOTAL VALORIZADO S/. 141,473.63 13.53% 19,143.22 3.81% 5,395.28 17.34% 24,538.50 93.81% 132,723.10

F-13
OBRA PRINCIP
AVANCE DE OBRA VALORIZADO DE MAYRORES METRADO
OBRA : RESIDENTE ING. ISAAC CARAZAS PEZO
"MEJORAMIENTO DE PISTAS Y VEREDAS DE LA CALLE S/N DE LA APV. SAN JOSE, DISTRITO DE SAN SEBASTIAN - CUSCO - CUSCO"
SUPERVISOR 0
INFORME TECNICO MENSUAL FEBRERO - 2013 FECHA Jan-13

PRESUPUESTO BASE AVANCE


METRADO COSTOS
MES ANTERIOR EN EL MES ACUMULADO SALDO
ITEMS DESCRIPCION PARTIDA METRADO / METRADO / METRADO / METRADO /
U.M. CANT UNIT PARCIAL VALORIZ VALORIZ VALORIZ
% % % %

03 MOVIMIENTO DE TIERRAS 20,241.63 92.36% 18,695.07 0.00% 0.00 92.36% 18,695.07 7.64%
03.01 CORTE DE MATERIAL NO CLASIFICADO M3 496.29 8.29 4,114.24 496.29 4114.24 0.00 0.00 496.29 4114.24 0.00
03.02 ELIMINACION DE MATERIAL EXCEDENTE M3 638.39 22.84 14,580.83 638.39 14580.83 0.00 0.00 638.39 14580.83 0.00
06 VEREDAS DE CONCRETO 16,165.11 16.51% 2,668.17 15.27% 2,468.92 31.78% 5,137.09 68.22%
06.01 TRAZO, NIVELES Y REPLANTEO PARA VEREDAS M2 170.20 1.17 199.13 170.20 199.13 0.00 0.00 170.20 199.13 0.00
06.02 DEMOLICION DE VEREDAS M2 348.20 2.18 759.08 300.80 655.74 47.40 103.33 348.20 759.08 0.00
06.03 CORTE DE MATERIAL NO CLASIFICADO MANUAL M3 50.05 17.75 888.39 50.05 888.39 0.00 0.00 50.05 888.39 0.00
06.04 ACARREO DE MATERIAL EXCEDENTE D=30M M3 70.92 14.19 1,006.40 65.18 924.90 5.74 81.49 70.92 1006.40 0.00
07 SARDINELES 7,842.98 11.14% 873.44 8.29% 649.89 19.42% 1,523.33 80.58%
07.02 EXCAVACION MANUAL EN TERRENO NATURAL M3 24.00 15.25 366.00 21.30 324.83 2.70 41.18 24.00 366.00 0.00
07.03 ELIMINACION DE MATERIAL EXCEDENTE M3 26.95 22.84 615.42 24.02 548.62 2.93 66.81 26.95 615.42 0.00
COSTOS DIRECTOS S/. 128,647.68 17.28% 22,236.68 2.42% 3,118.81 20.74% 26,676.34 79.26%

F-13
OBRA PRINCIPAL
AVANCE DE OBRA VALORIZADO DE MAYRORES METRADOS

AVANCE
SALDO

VALORIZ

1,546.56
0.00
0.00
11,028.02
0.00
0.00
0.00
0.00
6,319.65
0.00
0.00
101,971.34

F-13
SOBRE METRADOS
AVANCE DE OBRA VALORIZADO
OBRA : RESIDENTE ING. ISAAC CARAZAS PEZO
SUPERVISOR 0

INFORME TECNICO MENSUAL FEBRERO - 2013 FECHA Jan-13

PRESUPUESTO BASE AVANCE


METRADO COSTOS
MES ANTERIOR EN EL MES ACUMULADO SALDO
ITEMS DESCRIPCION PARTIDA
U.M. CANT UNIT PARCIAL METRADO VALORIZ METRADO VALORIZ METRADO VALORIZ METRADO VALORIZ
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509 M3 Err:509 Err:509 Err:509 0.00 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
COSTOS DIRECTOS S/. Err:509 Err:509 Err:509 Err:509 Err:509
TOTAL VALORIZADO S/. Err:509 Err:509 Err:509 Err:509 Err:509
PARTIDAS ADICIONALES
AVANCE DE OBRA VALORIZADO
OBRA : RESIDENTE ING. ISAAC CARAZAS PEZO
SUPERVISOR 0

INFORME TECNICO MENSUAL FEBRERO - 2013 FECHA Jan-13

PRESUPUESTO BASE AVANCE


METRADO COSTOS
MES ANTERIOR EN EL MES ACUMULADO SALDO
ITEMS DESCRIPCION PARTIDA
U.M. CANT UNIT PARCIAL METRADO VALORIZ METRADO VALORIZ METRADO VALORIZ METRADO VALORIZ
0 0
0 0 M3 0.00 0.54 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0 0
0 0 M2 62.75 #VALUE! 0.00 0.00 #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0 0 M3 287.54 #VALUE! 0.00 0.00 #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0 0 M3 0.00 417.68 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
COSTOS DIRECTOS S/. #VALUE! 0.00 #VALUE! #VALUE! #VALUE!
TOTAL VALORIZADO S/. #VALUE! 0.00 #VALUE! #VALUE! #VALUE!
% QUE REPRESENTA DEL PRESUPUESTO TOTAL: 0.00% #VALUE! #VALUE!
AVANCE DE OBRA VALORIZADO
DESAGREGADO
OBRA : RESIDENTE ING. ISAAC CARAZAS PEZO
SUPERVISOR 0
INFORME TECNICO MENSUAL FEBRERO - 2013 FECHA Jan-13

AVANCE DEL MES


ITEMS DESCRIPCION PARTIDAS U.M. DESAGREGADO
MET TOTAL
PU. M.OBRA P.U. MAT. P.U. EQUIPO

01 OBRAS PRELIMINARES
01.01 CARTEL DE OBRA UND 1.00 68.44 68.44 740.00 740.00 2.05 2.05 810.49
01.02 SEÑALES PREVENTIVAS DURANTE EL PROCESO DE EJECUCION UND 3.00 - 0.00 250.00 750.00 - 0.00 750.00
02 TRABAJOS PRELIMINARES
02.01 MOVILIZACION Y DESMOVILIZACION DE EQUIPOS GLB 1.00 0.37 0.37 0.29 0.29 0.32 0.32 0.98
02.02 TRAZO, NIVELES Y REPLANTEO PRELIMINAR M2 432.00 0.24 103.68 - 0.00 0.01 4.32 108.00
02.03 REPARACION Y/O ENCIMADO DE BUZONES, INCLUYE TAPA UND 1.00 - 0.00 - 0.00 2,223.20 2223.20 2,223.20
Err:509 Err:509 Err:509 Err:509 - Err:509 1,000.00 Err:509 - Err:509 Err:509
03 MOVIMIENTO DE TIERRAS
03.01 CORTE DE MATERIAL NO CLASIFICADO M3 303.19 0.74 224.36 - 0.00 15.65 4744.92 4,969.28
03.02 ELIMINACION DE MATERIAL EXCEDENTE M3 364.07 14.20 5169.79 1.75 637.12 9.92 3611.57 9,418.49
03.03 PERFILADO Y COMPACTADO DE SUB RAZANTE M2 432.00 25.40 10972.80 - 0.00 1.27 548.64 11,521.44
Err:509 Err:509 Err:509 Err:509 0.28 Err:509 - Err:509 17.13 Err:509 Err:509
04 BASES PARA PAVIMENTO DE 0.40M DE ESPESOR
04.01 EXTRACCION Y PREPARACION DE MATERIAL DE CANTERA PARA BASE
04.02 CARGUIO Y TRANSPORTE DE MAT. DE CANTERA PARA BASE M3 228.39 24.27 5543.03 - 0.00 1.21 276.35 5,819.38
04.03 EXTENDIDO RIEGO Y COMPACTADO DE BASE M2 432.00 27.30 11793.60 - 0.00 1.37 591.84 12,385.44
Err:509 Err:509 Err:509 Err:509 0.53 Err:509 - Err:509 0.03 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 0.05 Err:509 - Err:509 - Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 0.03 Err:509 - Err:509 - Err:509 Err:509
05 PAVIMENTO
05.01 LOSA DE CONCRETO - 0.00 0.44 0.00 0.14 0.00 0.26 0.00 -
05.01.01 TRAZO, NIVELES Y REPLANTEO DURANTE EL PROCESO DE CONSTRUCCION M2 432.00 2.06 889.92 - 0.00 0.06 25.92 915.84
05.01.02 ENCOFRADO Y DESENCOFRADO DE LOSAS M3 16.00 9.86 157.76 15.00 240.00 0.30 4.80 402.56
05.01.03 CONCRETO F´C=210 KG/CM2 KG 99.36 2.53 251.38 14.50 1440.72 0.48 47.69 1,739.79
05.01.04 ACERO CORRUGADO D=1/4" MALLA DE TEMPERATURA KG 945.00 10.75 10158.75 8.04 7597.80 0.32 302.40 18,058.95
05.01.05 ACERO CORRUGADO D=5/8" JUNTA LONGITUDINAL KG 215.11 0.60 129.07 4.77 1026.07 0.02 4.30 1,159.44
05.01.06 ACERO LISO D=3/4", JUNTA DE CONTRACCION KG 281.61 85.20 23993.17 312.55 88017.21 18.40 5181.62 117,192.00
05.01.07 ACERO LISO D=3/4", JUNTA DE DILATACION KG 112.54 0.52 58.52 0.24 27.01 0.02 2.25 87.78
05.01.08 SELLADO DE JUNTAS M 240.00 1.32 316.80 2.00 480.00 0.04 9.60 806.40
05.01.09 CURADO DE CONCRETO M2 432.00 3.41 1473.12 36.99 15979.68 0.17 73.44 17,526.24
06 VEREDAS DE CONCRETO
06.01 TRAZO, NIVELES Y REPLANTEO PARA VEREDAS M2 224.00 0.44 98.56 0.14 31.36 0.26 58.24 188.16
06.02 DEMOLICION DE VEREDAS M2 9.20 25.40 233.68 - 0.00 1.27 11.68 245.36

F-15
AVANCE DE OBRA VALORIZADO
DESAGREGADO
OBRA : RESIDENTE ING. ISAAC CARAZAS PEZO
SUPERVISOR 0
INFORME TECNICO MENSUAL FEBRERO - 2013 FECHA Jan-13

AVANCE DEL MES


ITEMS DESCRIPCION PARTIDAS U.M. DESAGREGADO
MET TOTAL
PU. M.OBRA P.U. MAT. P.U. EQUIPO
06.03 CORTE DE MATERIAL NO CLASIFICADO MANUAL M3 11.20 1.50 16.80 2.00 22.40 0.05 0.56 39.76
06.04 ACARREO DE MATERIAL EXCEDENTE D=30M M3 11.20 0.40 4.48 0.95 10.64 0.01 0.11 15.23
06.05 ELIMINACION DE MATERIAL EXCEDENTE M3 11.20 4.82 53.98 12.00 134.40 0.14 1.57 189.95
06.06 NIVELACION Y COMPACTADO MANUAL M2 224.00 0.10 22.40 0.20 44.80 0.71 159.04 226.24
07 SARDINELES
07.01 TRAZO, NIVELES Y REPLANTEO PARA SARDINELES M2 24.00 - 0.00 250.00 6000.00 - 0.00 6,000.00
07.02 EXCAVACION MANUAL EN TERRENO NATURAL M3 4.80 - 0.00 30.00 144.00 - 0.00 144.00
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 0.41 Err:509 - Err:509 0.01 Err:509 Err:509
COSTO DIRECTO Err:509 Err:509 Err:509 Err:509
COSTO INDIRECTO Err:509 Err:509 Err:509 Err:509
COSTO TOTAL Err:509 Err:509 Err:509 Err:509

F-15
AVANCE DE OBRA VALORIZADO
DESAGREGADO
OBRA : RESIDENTE ING. ISAAC CARAZAS PEZO
"MEJORAMIENTO DE PISTAS Y VEREDAS DE LA CALLE S/N DE LA APV. SAN JOSE, DISTRITO DE SAN SEBASTIAN -
CUSCO - CUSCO" SUPERVISOR 0
INFORME TECNICO MENSUAL FEBRERO - 2013 FECHA Jan-13

AVANCE DEL MES


ITEMS DESCRIPCION PARTIDAS U.M. DESAGREGADO
MET TOTAL
PU. M.OBRA P.U. MAT. P.U. EQUIPO

01 OBRAS PRELIMINARES
01.01 CARTEL DE OBRA UND 0.00 68.44 0.00 740.00 0.00 2.05 0.00 -
01.02 SEÑALES PREVENTIVAS DURANTE EL PROCESO DE EJECUCION UND 0.00 - 0.00 250.00 0.00 - 0.00 -
01.03 ALQUILER DE ALMACEN Y OFICINAS MES 0.00 1.00 0.00 251.00 0.00 1.00 0.00 -
02 TRABAJOS PRELIMINARES
02.01 MOVILIZACION Y DESMOVILIZACION DE EQUIPOS GLB 0.00 0.37 0.00 0.29 0.00 0.32 0.00 -
02.02 TRAZO, NIVELES Y REPLANTEO PRELIMINAR M2 0.00 0.24 0.00 - 0.00 0.01 0.00 -
02.03 REPARACION Y/O ENCIMADO DE BUZONES, INCLUYE TAPA UND 0.00 - 0.00 - 0.00 2,223.20 0.00 -
03 MOVIMIENTO DE TIERRAS
03.01 CORTE DE MATERIAL NO CLASIFICADO M3 0.00 0.74 0.00 - 0.00 15.65 0.00 -
03.02 ELIMINACION DE MATERIAL EXCEDENTE M3 0.00 14.20 0.00 1.75 0.00 9.92 0.00 -
03.03 PERFILADO Y COMPACTADO DE SUB RAZANTE M2 0.00 25.40 0.00 - 0.00 1.27 0.00 -
04 BASES PARA PAVIMENTO DE 0.40M DE ESPESOR
04.01 EXTRACCION Y PREPARACION DE MATERIAL DE CANTERA PARA BASE
04.02 CARGUIO Y TRANSPORTE DE MAT. DE CANTERA PARA BASE M3 0.00 24.27 0.00 - 0.00 1.21 0.00 -
04.03 EXTENDIDO RIEGO Y COMPACTADO DE BASE M2 0.00 27.30 0.00 - 0.00 1.37 0.00 -
05 PAVIMENTO
05.01 LOSA DE CONCRETO - 0.44 0.14 0.26
05.01.01 TRAZO, NIVELES Y REPLANTEO DURANTE EL PROCESO DE CONSTRUCCION M2 0.00 2.06 0.00 - 0.00 0.06 0.00 -
05.01.02 ENCOFRADO Y DESENCOFRADO DE LOSAS M3 0.00 9.86 0.00 15.00 0.00 0.30 0.00 -
05.01.03 CONCRETO F´C=210 KG/CM2 KG 0.00 2.53 0.00 14.50 0.00 0.48 0.00 -
05.01.04 ACERO CORRUGADO D=1/4" MALLA DE TEMPERATURA KG 0.00 10.75 0.00 8.04 0.00 0.32 0.00 -
05.01.05 ACERO CORRUGADO D=5/8" JUNTA LONGITUDINAL KG 0.00 0.60 0.00 4.77 0.00 0.02 0.00 -
05.01.06 ACERO LISO D=3/4", JUNTA DE CONTRACCION KG 0.00 85.20 0.00 312.55 0.00 18.40 0.00 -
05.01.07 ACERO LISO D=3/4", JUNTA DE DILATACION KG 0.00 0.52 0.00 0.24 0.00 0.02 0.00 -
05.01.08 SELLADO DE JUNTAS M 0.00 1.32 0.00 2.00 0.00 0.04 0.00 -
05.01.09 CURADO DE CONCRETO M2 0.00 3.41 0.00 36.99 0.00 0.17 0.00 -
06 VEREDAS DE CONCRETO
06.01 TRAZO, NIVELES Y REPLANTEO PARA VEREDAS M2 0.00 0.44 0.00 0.14 0.00 0.26 0.00 -
06.02 DEMOLICION DE VEREDAS M2 0.00 25.40 0.00 - 0.00 1.27 0.00 -
06.03 CORTE DE MATERIAL NO CLASIFICADO MANUAL M3 0.00 1.50 0.00 2.00 0.00 0.05 0.00 -
06.04 ACARREO DE MATERIAL EXCEDENTE D=30M M3 0.00 0.40 0.00 0.95 0.00 0.01 0.00 -

F-15
AVANCE DE OBRA VALORIZADO
DESAGREGADO
OBRA : RESIDENTE ING. ISAAC CARAZAS PEZO
"MEJORAMIENTO DE PISTAS Y VEREDAS DE LA CALLE S/N DE LA APV. SAN JOSE, DISTRITO DE SAN SEBASTIAN -
CUSCO - CUSCO" SUPERVISOR 0
INFORME TECNICO MENSUAL FEBRERO - 2013 FECHA Jan-13

AVANCE DEL MES


ITEMS DESCRIPCION PARTIDAS U.M. DESAGREGADO
MET TOTAL
PU. M.OBRA P.U. MAT. P.U. EQUIPO
06.05 ELIMINACION DE MATERIAL EXCEDENTE M3 5.74 4.82 27.68 12.00 68.92 0.14 0.80 97.40
06.06 NIVELACION Y COMPACTADO MANUAL M2 87.90 0.10 8.79 0.20 17.58 0.71 62.41 88.78
07 SARDINELES
07.01 TRAZO, NIVELES Y REPLANTEO PARA SARDINELES M2 0.00 0.10 0.00 250.00 0.00 - 0.00 -
07.02 EXCAVACION MANUAL EN TERRENO NATURAL M3 0.00 0.10 0.00 30.00 0.00 - 0.00 -
07.03 ELIMINACION DE MATERIAL EXCEDENTE M3 0.00 1.00 0.00 31.00 0.00 1.00 0.00 -
07.04 ENCOFRADO Y DESENCOFRADO EN SARDINELES M2 22.00 2.00 44.00 32.00 704.00 2.00 44.00 792.00
07.05 CONCRETO F´C=175 KG/CM2 M3 0.21 3.00 0.63 33.00 6.93 3.00 0.63 8.19
07.06 SELLADO DE JUNTAS M 0.00 4.00 0.00 34.00 0.00 4.00 0.00 -
07.07 CURADO DE CONCRETO M2 0.00 5.00 0.00 35.00 0.00 5.00 0.00 -
08 MURO DE CONCRETO CICLOPEO
08.01 TRAZO, NIVELES Y REPLANTEO DE MURO DE CONTENCION M2 8.31 7.00 58.17 37.00 307.47 7.00 58.17 423.81
08.02 EXCAVACION MANUAL DE ZANJAS M3 0.00 8.00 0.00 38.00 0.00 8.00 0.00 -
08.03 ACARREO DE MATERIAL EXCEDENTE D=30M M3 0.00 9.00 0.00 39.00 0.00 9.00 0.00 -
08.04 ELIMINACION DE MATERIAL EXCEDENTE M3 0.00 10.00 0.00 40.00 0.00 10.00 0.00 -
08.05 ENCOFRADO Y DESENCOFRADO PARA MURO M2 0.00 11.00 0.00 41.00 0.00 11.00 0.00 -
08.06 CONCRETO F´C=175 KG/CM2 M3 4.09 12.00 49.11 42.00 171.87 12.00 49.11 270.08
08.07 COLOCACION DE TUBERIA PVC SAP DE 2" M 0.00 13.00 0.00 43.00 0.00 13.00 0.00 -
08.08 CURADO DE CONCRETO M2 0.00 14.00 0.00 44.00 0.00 14.00 0.00 -
09 ESCALINATAS
09.01 TRAZO, NIVELES Y REPLANTEO PARA ESCALINATAS M2 0.00 16.00 0.00 46.00 0.00 16.00 0.00 -
09.02 CORTE DE MATERIAL NO CLASIFICADO MANUAL M3 0.00 17.00 0.00 47.00 0.00 17.00 0.00 -
09.03 ACARREO DE MATERIAL EXCEDENTE D=30M M3 0.00 18.00 0.00 48.00 0.00 18.00 0.00 -
09.04 ELIMINACION DE MATERIAL EXCEDENTE M3 0.00 19.00 0.00 49.00 0.00 19.00 0.00 -
09.05 EMPEDRADO DE P.G. DE 8" M2 0.00 20.00 0.00 50.00 0.00 20.00 0.00 -
09.06 ENCOFRADO Y DESENCOFRADO PARA ESCALINATAS M2 0.00 21.00 0.00 51.00 0.00 21.00 0.00 -
09.07 CONCRETO F´C=210 KG/CM2 M3 0.00 22.00 0.00 52.00 0.00 22.00 0.00 -
09.08 CURADO DE CONCRETO M2 0.00 23.00 0.00 53.00 0.00 23.00 0.00 -
10 SEÑALIZACION
10.01 PINTADO Y DEMARCACION DE PAVIMENTOS M2 0.00 25.00 0.00 55.00 0.00 25.00 0.00 -
11 TRATAMIENTO DE AREAS VERDES
11.01 MEJORAMIENTO CON TERRENO AGRICOLA M3 0.00 27.00 0.00 57.00 0.00 27.00 0.00 -
11.02 COLOCACION DE PLANTONES UND 0.00 28.00 0.00 58.00 0.00 28.00 0.00 -
12 CONTROL DE CALIDAD
12.01 DENSIDAD DE CAMPO UND 0.00 30.00 0.00 60.00 0.00 30.00 0.00 -
12.02 DISEÑO DE NEZCLADO DE CONCRETOO UND 0.00 31.00 0.00 61.00 0.00 31.00 0.00 -
12.03 ROTURA DE BRIQUETAS UND 0.00 32.00 0.00 62.00 0.00 32.00 0.00 -
12.04 ESTUDIO DE CANTERAS PARA BASE UND 0.00 33.00 0.00 63.00 0.00 33.00 0.00 -
13 PLACA RECORDATORIA
13.01 PLACA RECORDATORIA UND 0.00 35.00 0.00 65.00 0.00 35.00 0.00 -
COSTO DIRECTO 188.38 1,276.77 215.12 1,680.26
COSTO INDIRECTO 23.77 161.12 27.15 212.04
COSTO TOTAL 212.15 1,437.88 242.26 1,892.30

F-15
RESUMEN FINANCIERO
PROYECTO:
MEJORAMIENTO CALLE CANADA EN LA URB. NACIONES UNIDAS, DISTRITO DE SAN SEBASTIAN
- CUSCO - CUSCO

MES ANTERIOR EN EL MES ACUMULADO SALDO


CODIGO ESPECIFICA DE GASTOS APROBADO

EJECUT % EJECUT % EJECUT % EJECUT %

COSTO DIRECTO 189,468.56 0.00 0.00% #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
2.6.23.24 PERSONAL
RETRIBUCIONES COMPLEMENTARIAS 18,012.38 0.00
OBLIGACIONES DEL EMPLEADOR 2,144.08 0.00
GASTOS VARIABLES Y OCASIONALES 1,391.49 0.00 #NAME? #NAME? #NAME?
ESCOLARIDAD, AGUINALDOS Y GRATIFICACIONES 916.88 0.00
VIATICOS Y ASIGNACIONES 0.00 0.00
2.6.23.25 BIENES
VESTUARIO 0.00 0.00 0.00 0.00 0.00
COMBUSTIBLES Y LUBRICANTES 530.37 0.00 12,333.79 12,333.79 -11,803.42
ALIMENTOS 0.00 0.00 0.00 0.00 0.00
PROPINAS 0.00 0.00 0.00 0.00 0.00
MATERIALES DE CONSTRUCCION 111,894.28 0.00 2,857.30 2,857.30 109,036.98
BIENES DE CONSUMO 3,893.55 0.00 #NAME? #NAME? #NAME?
2.6.23.26 OTROS
TARIFAS DE SERVICIOS BASICOS 0.00 0.00 0.00 0.00 0.00
SEGUROS 0.00 0.00 0.00 0.00 0.00
OTROS SERVICIOS DE TERCEROS 13,530.00 0.00 6,540.00 6,540.00 6,990.00
MATERIALES DE ESCRITORIO 0.00 0.00 0.00 0.00 0.00
EQUIPAMIENTO Y BIENES DURADEROS 1,590.95 0.00 #NAME? #NAME? #NAME?
ALQUILER DE BIENES MUEBLES 35,564.58 0.00 0.00 0.00 35,564.58
ALQUILER DE BIENES INMUEBLES 0.00 0.00 0.00 0.00 0.00
GASTOS GENERALES 22,605.32 0.00 0.00% #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
2.6.23.24 PERSONAL
RETRIBUCIONES COMPLEMENTARIAS 13,849.39 0.00
OBLIGACIONES DEL EMPLEADOR 1,612.73 0.00
GASTOS VARIABLES Y OCASIONALES 1,065.85 0.00 #NAME? #NAME? #NAME?
ESCOLARIDAD, AGUINALDOS Y GRATIFICACIONES 393.80 0.00
VIATICOS Y ASIGNACIONES 400.00 0.00
2.6.23.26 OTROS
OTROS SERVICIOS DE TERCEROS 4,685.56 0.00 0.00 0.00 4,685.56
MATERIALES DE ESCRITORIO 98.00 0.00 0.00 0.00 98.00
EQUIPAMIENTO Y BIENES DURADEROS 500.00 0.00 0.00 0.00 500.00
RESUMEN FINANCIERO
PROYECTO:
MEJORAMIENTO CALLE CANADA EN LA URB. NACIONES UNIDAS, DISTRITO DE SAN SEBASTIAN
- CUSCO - CUSCO

MES ANTERIOR EN EL MES ACUMULADO SALDO


CODIGO ESPECIFICA DE GASTOS APROBADO

EJECUT % EJECUT % EJECUT % EJECUT %

GASTOS DE SUPERVISION 9,519.85 0.00 0.00% #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
2.6.23.24 PERSONAL
RETRIBUCIONES COMPLEMENTARIAS 7,764.80 0.00 #NAME? #NAME?
OBLIGACIONES DEL EMPLEADOR 895.90 0.00 0.00 895.90
#NAME?
GASTOS VARIABLES Y OCASIONALES 597.30 0.00 0.00 597.30
ESCOLARIDAD, AGUINALDOS Y GRATIFICACIONES 145.85 0.00 0.00 145.85
2.6.23.25 BIENES
COMBUSTIBLES Y LUBRICANTES 60.00 0.00 0.00 0.00 60.00
2.6.23.26 OTROS
MATERIALES DE ESCRITORIO 56.00 0.00 0.00 0.00 56.00
GASTOS DE EXPEDIENTE TECNICO 8,548.19 8,548.19 100.00% 0.00 0.00% 8,548.19 100.00% 0.00 0.00%
2.6.23.24 PERSONAL
RETRIBUCIONES COMPLEMENTARIAS 5,895.50 5,895.50 0.00 5,895.50 0.00
OBLIGACIONES DEL EMPLEADOR 581.92 581.92 0.00 581.92 0.00
GASTOS VARIABLES Y OCASIONALES 453.50 453.50 0.00 453.50 0.00
ESCOLARIDAD, AGUINALDOS Y GRATIFICACIONES 116.68 116.68 0.00 116.68 0.00
2.6.23.26 OTROS
OTROS SERVICIOS DE TERCEROS 1,360.00 1,360.00 0.00 1,360.00 0.00
EQUIPAMIENTO Y BIENES DURADEROS 140.59 140.59 0.00 140.59 0.00
GASTOS DE LIQUIDACION DE OBRA 3,400.00 0.00 0.00% 0.00 0.00% 0.00 0.00% 3,400.00 100.00%
2.6.23.26 OTROS
OTROS SERVICIOS DE TERCEROS 3,400.00 0.00 0.00 0.00 3,400.00
TOTAL S/. 233,541.92 8,548.19 #NAME? #NAME? #NAME?
% 3.66% #NAME? #NAME? #NAME?
RESUMEN FINANCIERO
PROYECTO:
MEJORAMIENTO CALLE CANADA EN LA URB. NACIONES UNIDAS, DISTRITO DE SAN SEBASTIAN
- CUSCO - CUSCO

MES ANTERIOR EN EL MES ACUMULADO SALDO


CODIGO ESPECIFICA DE GASTOS APROBADO

EJECUT EJECUT EJECUT EJECUT

2.6.23.99.3 COSTO DE CONSTRUCCION POR ADMINISTRACION DIRECTA - PERSONAL 19,338.24 0.00 13,371.09 13,371.09 5,967.15
2.6.23.99.4 COSTO DE CONSTRUCCION POR ADMINISTRACION DIRECTA - BIENES 64,995.28 0.00 11,775.00 11,775.00 53,220.28
2.6.23.99.5 COSTO DE CONSTRUCCION POR ADMINISTRACION DIRECTA - SERVICIOS 16,498.00 0.00 0.00 0.00 16,498.00
2.6.8.1.4.3 GASTO POR LA CONSTRATACION DE SERVICIOS 25,989.08 0.00 0.00 0.00 25,989.08
TOTAL S/. 126,820.60 S/. - S/. 25,146.09 S/. 25,146.09 S/. 101,674.51
% 0.00% 19.83% 19.83% 80.17%
NOTA: ESTE CUADRO ESTA DE ACUERDO A LA EJECUCIN PRESUPUESTAL DEL AREA DE PRESUPUESTO DE LA MUNICICPALIDAD A LA FECHA 04/04/2012
MANIFIESTO DE GASTOS

Correspondiente al mes de ENERO

OBRA "MEJORAMIENTO CALLE CANADA EN LA URB. NACIONES UNIDAS, DISTRITO DE SAN SEBASTIAN - CUSCO - CUSCO"

RUBRO

No. de DOCUMENTO DETALLE


OBSERVAC
Precio IMPORTE S/.
Orden Fecha Clase No. Razón Social o Nombre Cantidad Und. Concepto IONES
Unit.
292 24-mar-12 FACTURA 001-292 FERRETERIA Y CONSULTORIA EMPRESA I. 70 PAR S/. 26.00 BOTAS DE JEBE S/. 1,820.00 MAT
40 UND S/. 9.00 CASCOS COLOR NARANJA S/. 360.00 MAT
2 RLL S/. 57.00 CINTA DE SEGURIDAD AMARILLO S/. 114.00 MAT
2 RLL S/. 57.00 CINTA DE SEGURIDAD ANARANJADO S/. 114.00 MAT
50 PAR S/. 9.00 GUANTES DE JEBE S/. 450.00 MAT
50 PAR S/. 9.00 GUANTES DE CUERO S/. 450.00 MAT
50 PAR S/. 9.80 GUANTES DE NITRILO S/. 490.00 MAT
2 RLL S/. 67.00 MALLA DE SEGURIDAD AMARILLO S/. 134.00 MAT
2 RLL S/. 67.00 MALLA DE SEGURIDAD NARANJA S/. 134.00 MAT
2 RLL S/. 67.00 MALLA DE SEGURIDAD ROJO S/. 134.00 MAT

290 29-mar-12 FACTURA 001-00290 CALLAPIÑA CCAMA MARILUZ 60 PLN S/. 109.00 TRIPLAY DE 18 mm., 1.22m. x 2.44m. S/. 6,540.00 MAT

"TECNCOMP" - TECNOLOGIA DE ZAPATOS DE CUERO PUNTA DE


341 29-mar-12 FACTURA 000429 2 PAR S/. 360.00 S/. 720.00 MAT
COMPUTADORAS ACERO
29-mar-12 PLANILLA PLANILLA NETO MARZO PLANILLA PERSONAL DE OBRA S/. 10,513.79 MO
29-mar-12 PLANILLA PLANILLA PDT MARZO PLANILLA PDT PERSONAL DE OBRA S/. 1,945.31 MO
30-mar-12 PLANILLA PLANILLA AFP MARZO PLANILLA AFP PERSONAL DE OBRA S/. 911.99 MO
INFORME CAJA CHICA
19-mar-12 FACTURA 000178 MEGAELECTRIC "LA SOLUCION" 6 UND S/. 30.00 LLANTA Y CAMARA PARA BUGUI S/. 180.00 MAT
19-mar-12 FACTURA 00678 LIBRERÍA TAURO 1 UND S/. 20.00 CUADERNO DE OBRA X 50 H. S/. 20.00 MAT
LEGALIZACION DE CUADERNO DE
20-mar-12 FACTURA 57498 NOTARIA GAONA 1 UND S/. 30.00 S/. 30.00 SERV.
OBRA
23-mar-12 FACTURA 002247 EL OFERTON, PAPELERIA Y SUMINISTROS 1 UND S/. 35.00 CUADERNO DE OBRA X 100 H. S/. 35.00 MAT
LEGALIZACION DE CUADERNO DE
27-mar-12 FACTURA 57597 NOTARIA GAONA 1 UND S/. 50.00 S/. 50.00 SERV.
OBRA

T O T A L : S/. 25,146.09
RESUMEN DE ESTADO FINANCIERO

OBRA : RESIDENTE ING. ISAAC CARAZAS PEZO


SUPERVISOR
INFORME TECNICO MENSUAL FEBRERO - 2013 FECHA Jan-13

MES ANTERIOR EN EL MES ACUMULADO


ESPEC
APLIC
GEN
CAT

DESCRIPCION APROBADO
PROGRAM EJECUT SALDO PROGRAM EJECUT SALDO PROGRAM EJECUT SALDO

6 GASTOS DE CAPITAL
5 INVERSIONES
11 APLICACIONES DIRECTAS
10 Retribuciones y Complementos 171,768.66 49,971.63 #VALUE! 0.00
11 Obligaciones del Empleador 17,961.57 2,338.41 1,756.41 0.00
18 Escolaridad, Aginaldos y Gratificaciones 7,955.11 0.00 0.00 0.00
20 Viáticos 2,640.00
23 Combustibles y Lubricantes 4,565.10 1,256.54 0.00 1,256.54
29 Materiales de Construcción 574,379.21 116,858.11 11,775.00 105,083.11
30 Bienes de Consumo 1,102.28
39 Otros Servicios de Terceros 2,570.00
49 Materiales de Escritorio 755.00
51 Equip.y Materiales Duraderos 4,690.48
52 Alquiler Bienes Inmuebles 37504.79

TOTAL 825,892.20 0.00 0.00 0.00 170,424.70 #VALUE! 106,339.66 0.00 0.00 0.00

F-16
RESUMEN GASTO MENSUAL

OBRA : RESIDENTE ING. ISAAC CARAZAS PEZO


SUPERVISOR 0
INFORME TECNICO MENSUAL FEBRERO - 2013 FECHA Jan-13

APORTES
SALDO
ANTERIOR ACTUAL ACUMULADO 
ITEM

DESCRIPCION DEL GASTO APROBADO Valorizado % Valorizado % Valorizado % Valorizado %

1 PLANILLA DE TAREO VALORIZADO 19,338.24 0.00 0.00% 22,220.22 114.90% 22,220.22 114.90% -2,881.98 -14.90%
2 MOVIMIENTO DE ALMACEN 64,995.28 0.00 0.00% 5,266.45 8.10% 5,266.45 8.10% 59,728.84 91.90%
3 VALORIZACION MAQUINARIA 25,989.08 0.00 0.00% 7,242.65 27.87% 7,242.65 27.87% 18,746.43 72.13%
5 SERVICIOS DE TERCEROS Err:509 0.00 0.00% 0.00 0.00% 0.00 0.00% 0.00 0.00%
6
7

TOTAL GASTO Err:509 0.00 Err:509 34,729.32 Err:509 34,729.32 Err:509 75,593.29 Err:509

NOTA: Se debe aclarar que este monto es de acuerdo a lo ejecutado en obra, y no refleja el avance financiero real de la obra. Dicho
avance financiero se deduce de los gastos realizados durante el mes lo cual se encuentra de acuerdo al manifiesto de gastos de la obra,
lo cual tambien se adjunta en este informe.

F-17
PLANILLA DE TAREO VALORIZADO DEL PERSONAL
FEBRERO 2012

OBRA : RESIDENTE: ING. ISAAC CARAZAS PEZO


SUPERVISOR: 0
INFORME TECNICO MENSUAL FEBRERO - 2013 FECHA: Jan-13

ABRIL 2010
ITEM

CARGO MI J V S D L M MI J V S D L M MI J V S D L M MI J V S D L M MI TOTAL COSTO


1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 DIAS S/.
COSTO INDIRECTO
01 ARAOZ SILVA AXEL INSPECTOR DE OBRA X X X X X X X X X X X X X X X X X X X X X X X X X X X X X 29 3,757.86 *
02 PILCO ROSAS FLAVIO ENRIQUE ASIST. TECNICO X X X X X X X X X X X X X X X X X X X X X X X X X X X X X 29 1,458.34 *
03 BENTANCOURT FERNANDEZ VICTOR MAESTRO DE OBRA X X X X X X X X X X X X X X X X X X X X X X X X X X X X X 29 1,768.61 *
COSTO DIRECTO
04 RAMOS SOTELO FELIX DAVID OPERARIO X X X X X X X X X X X X X X X X X X X X X X X X X X X X X 29 1,426.41 **
06 TORRES TAIPIA RICARDO OPERARIO X X X X X X X X X X X X X X X X X X X X X X X X X X X X X 29 1,426.41 **
05 CRUZ CONDORI ALFREDO OFICIAL X X X X X X X X X X X X X X X X X X X X X X X X X X X X X 29 1,312.35 **
07 CHULLO SALLO VICENTE OFICIAL X X X X X X X X X X X X X X X X X X X X X X X X X X X X X 29 1,312.35 **
08 ENCISO ZAMORA LEONCIO PEON X X X X X X X X X X X X X X X X X X X X X X X X X X X X X 29 1,084.21 **
09 GONZALES DELGADO ALFONSO EDUARDO PEON X X X X X X X X X X X X X X X X X X X X X X X X X X X X X 29 1,084.21 **
10 HUILLCA HUAMAN FLORENTINO RAYMUNDO PEON X X X X X X X X X X X X X X X X X X X X X X X X X X X X X 29 1,084.21 **
11 BRAVO PEÑA DANY PEON X X X X X X X X X X X X X X X X X X X X X X X X X X X X X 29 1,084.21 **
12 OBLITAS SERRANO MAURICIO PEON X X X X X X X X X X X X X X X X X X X X X X X X X X X X X 29 1,084.21 **
CUBA QUIROGA JHON PEON X X X X X X X X X X X X X X X X X X X X X X X X X X X X X 29 1,084.21 **
13 HUALLPA CASTILLO MERCEDES PEON X X X X X X X X X X X X X X X X X X X X X X X X X X X X X 29 1,084.21 **
14 ORMACHEA MANSILLA RAYMUNDA PEON X X X X X X X X X X X X X X X X X X X X X X X X X X X X X 29 1,084.21 **
15 MAMANI QUISPE MARIA PEON X X X X X X X X X X X X X X X X X X X X X X X X X X X X X 29 1,084.21 **
TOTAL S/. 22,220.22
* GASTOS GENERALES Y GASTOS DE SUPERVISION
** COSTO DIRECTO

F-18
MUNICIPALIDAD DISTRITAL DE SAN SEBASTIAN
"UNIDOS SI PODEMOS"

RESIDENTE: ING. ISAAC CARAZAS PEZO


ALMACENERO:
PERIODO: : DEL 1 AL 29 DE FEBRERO DE 2012

OBRA :

SALDO ANTERIOR INGRESO MES EGRESO MES SALDO ACTUAL


Nº DESCRIPCION UNID. P.U
CAN VALOR CAN VALOR CAN VALOR CAN VALOR
1 GASOLINA DE 84 OCTANOS (GRIFO) GLN 12.20 0.00 0.00 40.00 488.00 10.00 122.00 30.00 366.00
2 PETROLEO DISEL (GRIFO) GLN 13.10 0.00 0.00 300.00 3930.00 183.00 2397.30 117.00 1532.70
3 CEMENTO PORTLAND TIPO IP BLS 23.00 0.00 0.00 130.00 2990.00 62.00 1426.00 68.00 1564.00
4 ARENA FINA M3 70.00 0.00 0.00 77.00 5390.00 0.00 0.00 77.00 5390.00
5 ARENA GRUESA 3/8" M3 60.00 0.00 0.00 38.80 2328.00 4.51 270.51 34.29 2057.49
6 PIEDRA CHANCADA DE 3/4" M3 50.00 0.00 0.00 39.60 1980.00 7.71 385.38 31.89 1594.63
7 PIEDRA MEDIANA DE 6" M3 40.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
8 PIEDRA GRANDE DE 8" M3 40.00 0.00 0.00 37.40 1496.00 6.26 250.26 31.14 1245.74
9 CALAMINA N°18 x 1.80 m. UND 14.00 0.00 0.00 50.00 700.00 23.00 322.00 27.00 378.00
10 CLAVO PARA MADERA C/CABEZA DE 5" KG 6.50 0.00 0.00 40.00 260.00 0.00 0.00 40.00 260.00
11 BARRA REDONDE LISA DE 5/8" x 6 m. VAR 31.95 0.00 0.00 15.00 479.25 0.00 0.00 15.00 479.25
12 PLATINA DE 1/2" x 2 1/2" x 6 m. VAR 129.17 0.00 0.00 30.00 3875.10 0.00 0.00 30.00 3875.10
13 TRIPLAY DE 18 mm., 1.22m. x 2.44m. PLN 110.00 0.00 0.00 18.00 1980.00 0.00 0.00 18.00 1980.00
14 TRIPLAY DE 4 mm. PLN 25.00 0.00 0.00 20.00 500.00 0.00 0.00 20.00 500.00
15 TECNOPOR DE 1.20 x 2.40 x 1/2" PLN 11.00 0.00 0.00 5.00 55.00 0.00 0.00 5.00 55.00
16 ROLLIZOS DE EUCALIPTO DE 4" x 3m. UND 13.00 0.00 0.00 30.00 390.00 0.00 0.00 30.00 390.00
17 ROLLIZOS DE EUCALIPTO DE 4" x 6m. UND 24.00 0.00 0.00 20.00 480.00 0.00 0.00 20.00 480.00
18 LISTON DE 2"x3"x10' MADERA CORRIENTE UND 10.00 0.00 0.00 50.00 500.00 0.00 0.00 50.00 500.00
19 TABLA DE 1 1/2"x8"x10' MADERA CORRIENTE UND 18.00 0.00 0.00 60.00 1080.00 0.00 0.00 60.00 1080.00
20 LISTON DE 2"x2"x10' MADERA CORRIENTE UND 7.00 0.00 0.00 30.00 210.00 0.00 0.00 30.00 210.00
21 BOTAS DE JEBE PAR 16.00 0.00 0.00 15.00 240.00 0.00 0.00 15.00 240.00
22 GUANTES DE CUERO PAR 7.80 0.00 0.00 30.00 234.00 0.00 0.00 30.00 234.00
23 GUANTES NITRILO PAR 8.50 0.00 0.00 15.00 127.50 0.00 0.00 15.00 127.50
24 CASCO NACIONAL UND 5.80 0.00 0.00 10.00 58.00 0.00 0.00 10.00 58.00
25 CHALECOS 4 BOLSILLOS UND 17.00 0.00 0.00 12.00 204.00 0.00 0.00 12.00 204.00
26 MASCARILLA AZUL UND 3.50 0.00 0.00 12.00 42.00 0.00 0.00 12.00 42.00
27 ZAPATOS CAT PAR 320.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
28 PICO C/MANGO UND 24.00 0.00 0.00 10.00 240.00 0.00 0.00 10.00 240.00
29 PALA TIPO CUCHARA UND 15.00 0.00 0.00 10.00 150.00 0.00 0.00 10.00 150.00
30 CARRETILLA BUGUI UND 135.00 0.00 0.00 5.00 675.00 0.00 0.00 5.00 675.00
31 MANGUERA DE 3/4" M 1.50 0.00 0.00 100.00 150.00 0.00 0.00 100.00 150.00
32 SOGA DE NYLON 3/4" M 5.00 0.00 0.00 50.00 250.00 0.00 0.00 50.00 250.00
33 PLASTICO GRUESO 4m. DE ANCHO M 4.50 0.00 0.00 100.00 450.00 10.00 45.00 90.00 405.00
34 CINTA DE SEGURIDAD AMARILLA RLL 45.00 0.00 0.00 1.00 45.00 0.00 0.00 1.00 45.00
35 ARPILLERA DE 4m. DE ANCHO M 6.00 0.00 0.00 60.00 360.00 8.00 48.00 52.00 312.00
36 TUBO PVC SAL 2" UND 0.00 0.00 6.00 0.00 0.00 0.00 6.00 0.00
37 GEOCOMPUESTO M 0.00 0.00 8.00 0.00 8.00 0.00 0.00 0.00
38 CLAVO PARA CALAMINA KG 0.00 0.00 1.00 0.00 1.00 0.00 0.00 0.00
MUNICIPALIDAD DISTRITAL DE SAN SEBASTIAN
"UNIDOS SI PODEMOS"

RESIDENTE: ING. ISAAC CARAZAS PEZO


ALMACENERO:
PERIODO: : DEL 1 AL 29 DE FEBRERO DE 2012

OBRA :

SALDO ANTERIOR INGRESO MES EGRESO MES SALDO ACTUAL


Nº DESCRIPCION UNID. P.U
CAN VALOR CAN VALOR CAN VALOR CAN VALOR
TOTAL - 32,336.85 5,266.45 27,070.41
MOVIMIENTO DIARIO DE ALAMACEN

OBRA : RESIDENTE: ING. ISAAC CARAZAS PEZO


INFORME TECNICO MENSUAL FEBRERO - 2013 ALMACENERO
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 TOTAL
Nº DESCRIPCION UNIDAD MOV. CANT
MI J V S D L M MI J V S D L M MI J V S D L M MI J V S D L M MI
ENTRADA 40 40.00
1 GASOLINA DE 84 OCTANOS (GRIFO) GLN
SALIDA 8.5 1 0.5 10.00
ENTRADA 300 300.00
2 PETROLEO DISEL (GRIFO) GLN
SALIDA 50 63 40 30 183.00
ENTRADA 10 120 130.00
3 CEMENTO PORTLAND TIPO IP BLS
SALIDA 5 5 15 29 8 62.00
ENTRADA 37 20 20 77.00
4 ARENA FINA BLS
SALIDA 0.00
ENTRADA 38.8 38.80
5 ARENA GRUESA 3/8" M3
SALIDA 0.29 0.29 1.195 2.228 0.506 4.51
ENTRADA 19.6 20 39.60
6 PIEDRA CHANCADA DE 3/4" M3
SALIDA 0.58 0.58 1.991 3.713 0.844 7.71
ENTRADA 0.00
7 PIEDRA MEDIANA DE 6" M3
SALIDA 0.00
ENTRADA 18.7 18.7 37.40
8 PIEDRA GRANDE DE 8" M3
SALIDA 1.903 3.548 0.806 6.26
ENTRADA 50 50.00
9 CALAMINA N°18 x 1.80 m. PLN
SALIDA 23 23.00
ENTRADA 40 40.00
10 CLAVO PARA MADERA C/CABEZA DE 5" KG
SALIDA 0.00
ENTRADA 15 15.00
11 BARRA REDONDE LISA DE 5/8" x 6 m. VAR
SALIDA 0.00
ENTRADA 30 30.00
12 PLATINA DE 1/2" x 2 1/2" x 6 m. VAR
SALIDA 0.00
ENTRADA 18 18.00
13 TRIPLAY DE 18 mm., 1.22m. x 2.44m. PLN
SALIDA 0.00
ENTRADA 20 20.00
14 TRIPLAY DE 4 mm. PLN
SALIDA 0.00
ENTRADA 5 5.00
15 TECNOPOR DE 1.20 x 2.40 x 1/2" UND
SALIDA 0.00
ENTRADA 30 30.00
16 ROLLIZOS DE EUCALIPTO DE 4" x 3m. UND
SALIDA 0.00
ENTRADA 20 20.00
17 ROLLIZOS DE EUCALIPTO DE 4" x 6m. UND
SALIDA 0.00
ENTRADA 50 50.00
18 LISTON DE 2"x3"x10' MADERA CORRIENTE UND
SALIDA 0.00
TABLA DE 1 1/2"x8"x10' MADERA ENTRADA 60 60.00
19 UND
CORRIENTE SALIDA 0.00
ENTRADA 30 30.00
20 LISTON DE 2"x2"x10' MADERA CORRIENTE UND
SALIDA 0.00
ENTRADA 15 15.00
21 BOTAS DE JEBE PAR
SALIDA 0.00
ENTRADA 30 30.00
22 GUANTES DE CUERO PAR
SALIDA 0.00
ENTRADA 15 15.00
23 GUANTES NITRILO PAR
SALIDA 0.00
ENTRADA 10 10.00
24 CASCO NACIONAL UND
SALIDA 0.00
ENTRADA 12 12.00
25 CHALECOS 4 BOLSILLOS UND
SALIDA 0.00
ENTRADA 12 12.00
26 MASCARILLA AZUL UND
SALIDA 0.00
ENTRADA 0.00
27 ZAPATOS CAT PAR
SALIDA 0.00
MOVIMIENTO DIARIO DE ALAMACEN

OBRA : RESIDENTE: ING. ISAAC CARAZAS PEZO


INFORME TECNICO MENSUAL FEBRERO - 2013 ALMACENERO
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 TOTAL
Nº DESCRIPCION UNIDAD MOV. CANT
MI J V S D L M MI J V S D L M MI J V S D L M MI J V S D L M MI
ENTRADA 10 10.00
28 PICO C/MANGO UND
SALIDA 0.00
ENTRADA 10 10.00
29 PALA TIPO CUCHARA UND
SALIDA 0.00
ENTRADA 5 5.00
30 CARRETILLA BUGUI UND
SALIDA 0.00
ENTRADA 100 100.00
31 MANGUERA DE 3/4" M.
SALIDA 0.00
ENTRADA 50 50.00
32 SOGA DE NYLON 3/4" M.
SALIDA 0.00
ENTRADA 100 100.00
33 PLASTICO GRUESO 4m. DE ANCHO M
SALIDA 10 10.00
ENTRADA 1 1.00
34 CINTA DE SEGURIDAD AMARILLA RLL
SALIDA 0.00
ENTRADA 60 60.00
35 ARPILLERA DE 4m. DE ANCHO M
SALIDA 8 8.00
ENTRADA 6 6.00
36 TUBO PVC SAL 2" UND
SALIDA 0.00
ENTRADA 8 8.00
37 GEOCOMPUESTO M
SALIDA 8 8.00
ENTRADA 1 1.00
38 CLAVO PARA CALAMINA KG
SALIDA 1 1.00
RESUMEN MENSUAL DE MOVIMIENTO DE EQUIPO MECANICO

OBRA : RESIDENTE ING. ISAAC CARAZAS PEZO


SUPERVISOR 0.00%
INFORME TECNICO MENSUAL FEBRERO - 2013 FECHA Jan-13

AVANCES
SALDO
ITEM MOVIMIENTO DE MAQUINARIA APROBADO ANTERIOR ACTUAL ACUMULADO 
Valorizado % Valorizado % Valorizado % Valorizado %

01 MAQUINARIA PESADA 31,182.68 0.00 0.00% 7,071.65 22.68% 7,071.65 22.68% 24,111.03 77.32%

02 MAQUINARIA LIVIANA 3,439.97 0.00 0.00% 121.00 3.52% 121.00 3.52% 3,318.97 96.48%

04 EQUIPO DE TOPOGRAFIA 571.09 0.00 0.00% 50.00 8.76% 50.00 8.76% 521.09 91.24%
TOTAL 35,193.74 0.00 7,242.65 7,242.65 27,951.09
MOVIMIENTO MENSUAL DE EQUIPO MECANICO

OBRA : RESIDENTE ING. ISAAC CARAZAS PEZO


SUPERVISOR 0.00%
INFORME TECNICO MENSUAL FEBRERO - 2013 FECHA Jan-13

COMBUSTIBLE RENDIMIENTO HORAS MAQ.


UNIDAD REG CONDIC ACTIVIDAD REALIZADA
TIPO CANT PU PARCIAL H/T GAL/HR P. U. PARCIAL

CARGADOR FRONTAL ALQUILADO DIESEL 48.00 13.10 628.80 11.17 4.00 165.00 1,843.05 CORTE DE RASANTE Y CARGUIO DE MATERIAL EXCEDENTE
RETROEXCAVADORA ALQUILADO DIESEL 30.00 13.10 393.00 11.17 3.00 140.00 1,563.80 CORTE DE RASANTE Y CARGUIO DE MATERIAL EXCEDENTE
MAQ. PESADA

TRACTOR ORUGA PROPIO DIESEL


MOTONIVELADORA PROPIO DIESEL
RODILLO PROPIO DIESEL

SUB TOTAL 1,021.80 3,406.85

VOLQUETE AZUL 01 ALQUILADO DIESEL 33.00 13.10 432.30 10.84 3.00 120.00 1,300.80 ELIMINACION DE MATERIAL EXCEDENTE A BOTADERO
VOLQUETE ROJO 02 ALQUILADO DIESEL 27.00 13.10 353.70 7.26 3.00 120.00 871.20 ELIMINACION DE MATERIAL EXCEDENTE A BOTADERO
VEHICULOS

VOLQUETE BLANCO 03 ALQUILADO DIESEL 45.00 13.10 589.50 12.44 3.00 120.00 1,492.80 ELIMINACION DE MATERIAL EXCEDENTE A BOTADERO
CISTERNA
CAMION ALQUILADO GAS 8.50 12.20 103.70 TRASLADO DE MATERIALES A OBRA

SUB TOTAL 1,479.20 3,664.80

MEZCLADORA DE CONCRETO PROPIA GAS 1.50 12.20 18.30 11.00 0.17 11.00 121.00 VACIADO DE CONCRETO
MAQ. LIVIANA

CORTADORA DE CONCRETO PROPIA GAS


VIBRADORA DE CONCRETO PROPIA GAS 0.00 12.20 0.00 0.00 0.17 7.00 0.00 VIBRADO DE CONCRETO

SUB TOTAL 18.30 121.00

TEODOLITO PROPIO
NIVEL TOPOGRAFICO PROPIO 5.00 9.00 45.00 TRAZO Y REPLANTEO DE EJE DE CALLE
EQ. TOP.

ESTACION TOTAL PROPIO


MIRA TOPOGRAFICA PROPIO 5.00 1.00 5.00 TRAZO Y REPLANTEO DE EJE DE CALLE
JALONES PROPIO
MOVIMIENTO MENSUAL DE EQUIPO MECANICO

OBRA : RESIDENTE ING. ISAAC CARAZAS PEZO


SUPERVISOR 0.00%
INFORME TECNICO MENSUAL FEBRERO - 2013 FECHA Jan-13
EQ. TOP.

COMBUSTIBLE RENDIMIENTO HORAS MAQ.


UNIDAD REG CONDIC ACTIVIDAD REALIZADA
TIPO CANT PU PARCIAL H/T GAL/HR P. U. PARCIAL

SUB TOTAL 0.00 50.00


CONTROL DIARIO DE MOVIMIENTO DE EQUIPO MECANICO

OBRA : RESIDENTE ING. ISAAC CARAZAS PEZO


SUPERVISOR 0.00%
INFORME TECNICO MENSUAL FEBRERO - 2013 FECHA Jan-13

FECHA 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 TOTAL
UNIDAD REG
DIA MI J V S D L M MI J V S D L M MI J V S D L M MI J V S D L M MI Horas Comb

Combust 14 18.0 16
CARGADOR FRONTAL S2 11.17 48.00
MAQUINARIA PESADA

HM 3.17 4.33 3.67


Combust 12.00 18
RETROEXCAVADORA 11.17 30.00
HM 3 8.17
Combust
TRACTOR ORUGA 0.00 0.00
HM
Combust
MOTONIVELADORA 0.00 0.00
HM
Combust
RODILLO 0.00 0.00
HM

Combust 12 15.0 6
VOLQUETE AZUL #01 10.84 33.00
HM 3.00 5.67 2.17
Combust 12 15
VOLQUETE ROJO #02 7.26 27.00
VEHICULOS

HM 2.73 4.53
Combust 12 15 6 12
VOLQUETE BLANCO #03 12.44 45.00
HM 3.17 5.67 1.73 1.87
Combust
CISTERNA #01 0.00 0.00
HM
Combust 8.5
CAMION 0.00 8.50
HM

Combust 1.00 0.50


MEZCLADORA DE CONCRETO 11.00 1.50
MAQUINARIA

HM 4.00 6.00 1.00


LIVIANA

Combust
CORTADORA DE CONCRETO 0.00 0.00
HM
Combust
VIBRADORA DE CONCRETO 0.00 0.00
HM

TEODOLITO HM 0.00
0.00
NIVEL TOPOGRAFICO HM 5.00 5.00
EQ. TOP.

ESTACION TOTAL HM 0.00


0.00
MIRA TOPOGRAFICA HM 5.00 5.00
JALONES HM 0.00
0.00
HM 0.00
GASTOS CLASIFICADOS Y PRECIOS UNITARIOS

OBRA : RESIDENTE ING. ISAAC CARAZAS PEZO


SUPERVISOR
INFORME TECNICO MENSUAL FEBRERO - 2013 FECHA Jan-13

PRESUPUESTO BASE COSTOS DIRECTOS COSTOS TOTAL GENERAL METRADOS PRECIO UNITARIO

MANO DE EQ / MEC SUB EN EL MES EN EL MES EN EL


ITEMS DESCRIPCION PARTIDA MAT INDIRECT ACUMUL ACUMUL U.M. PROMED APROB
OBRA HERRAM TOTAL MES ANTER MES ANTER MES

ESTRUCTURAS
01.01 CARTEL DE OBRA
01.02 SEÑALES PREVENTIVAS DURANTE EL PROCESO DE EJECUCION Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 #VALUE! Err:509 3.00 #VALUE! #VALUE! UND Err:509 Err:509 55.000
02 TRABAJOS PRELIMINARES #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! 0.000
02.01 MOVILIZACION Y DESMOVILIZACION DE EQUIPOS Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 #VALUE! Err:509 1.00 #VALUE! #VALUE! GLB Err:509 Err:509 2,000.000
02.02 TRAZO, NIVELES Y REPLANTEO PRELIMINAR Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 #VALUE! Err:509 432.00 #VALUE! #VALUE! M2 Err:509 Err:509
02.03 REPARACION Y/O ENCIMADO DE BUZONES, INCLUYE TAPA Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 #VALUE! Err:509 1.00 #VALUE! #VALUE! UND Err:509 Err:509 662.350
Err:508 Err:508 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:508 Err:509 Err:509 Err:508 Err:509 Err:508 Err:509 Err:509 Err:509
03 MOVIMIENTO DE TIERRAS #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! 0.000
03.01 CORTE DE MATERIAL NO CLASIFICADO Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 303.19 303.19 M3 Err:509 Err:509 8.290
03.02 ELIMINACION DE MATERIAL EXCEDENTE Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 #VALUE! Err:509 364.07 #VALUE! #VALUE! M3 Err:509 Err:509
03.03 PERFILADO Y COMPACTADO DE SUB RAZANTE Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 #VALUE! Err:509 432.00 #VALUE! #VALUE! M2 Err:509 Err:509 3.580
Err:508 Err:508 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:508 Err:509 Err:509 Err:508 Err:509 Err:508 Err:509 Err:509 Err:509
04 BASES PARA PAVIMENTO DE 0.40M DE ESPESOR #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! 0.000
04.01 EXTRACCION Y PREPARACION DE MATERIAL DE CANTERA PARA BASE #VALUE! #VALUE! #VALUE! #VALUE! M3 #VALUE! 17.650
04.02 CARGUIO Y TRANSPORTE DE MAT. DE CANTERA PARA BASE Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 228.39 228.39 M3 Err:509 Err:509 30.660
04.03 EXTENDIDO RIEGO Y COMPACTADO DE BASE Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 #VALUE! Err:509 432.00 #VALUE! #VALUE! M2 Err:509 Err:509 7.120
Err:508 Err:508 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:508 Err:509 Err:509 Err:508 Err:509 Err:508 Err:509 Err:509 Err:509
Err:508 Err:508 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:508 Err:509 Err:509 Err:508 Err:509 Err:508 Err:509 Err:509 Err:509
Err:508 Err:508 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:508 Err:509 Err:509 Err:508 Err:509 Err:508 Err:509 Err:509 Err:509
05 PAVIMENTO 0.000
05.01 LOSA DE CONCRETO Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 #VALUE! Err:509 0.00 #VALUE! #VALUE! Err:509 Err:509 0.000
05.01.01 TRAZO, NIVELES Y REPLANTEO DURANTE EL PROCESO DE CONSTRUCCION Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 #VALUE! Err:509 432.00 #VALUE! #VALUE! M2 Err:509 Err:509 1.260
05.01.02 ENCOFRADO Y DESENCOFRADO DE LOSAS Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 #VALUE! Err:509 16.00 #VALUE! #VALUE! M3 Err:509 Err:509
05.01.03 CONCRETO F´C=210 KG/CM2 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 #VALUE! Err:509 99.36 #VALUE! #VALUE! KG Err:509 Err:509 401.630
05.01.04 ACERO CORRUGADO D=1/4" MALLA DE TEMPERATURA Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 #VALUE! Err:509 945.00 #VALUE! #VALUE! KG Err:509 Err:509 4.110
05.01.05 ACERO CORRUGADO D=5/8" JUNTA LONGITUDINAL Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 215.11 215.11 KG Err:509 Err:509 3.880
05.01.06 ACERO LISO D=3/4", JUNTA DE CONTRACCION Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 281.61 281.61 KG Err:509 Err:509 3.880
05.01.07 ACERO LISO D=3/4", JUNTA DE DILATACION Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 #VALUE! Err:509 112.54 #VALUE! #VALUE! KG Err:509 Err:509 3.880
05.01.08 SELLADO DE JUNTAS Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 #VALUE! Err:509 240.00 #VALUE! #VALUE! M Err:509 Err:509
05.01.09 CURADO DE CONCRETO Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 #VALUE! Err:509 432.00 #VALUE! #VALUE! M2 Err:509 Err:509
06 VEREDAS DE CONCRETO 0.000
06.01 TRAZO, NIVELES Y REPLANTEO PARA VEREDAS Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 #VALUE! Err:509 224.00 #VALUE! #VALUE! M2 Err:509 Err:509 1.170
06.02 DEMOLICION DE VEREDAS Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 #VALUE! Err:509 9.20 #VALUE! #VALUE! M2 Err:509 Err:509 2.180
06.03 CORTE DE MATERIAL NO CLASIFICADO MANUAL Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 #VALUE! Err:509 11.20 #VALUE! #VALUE! M3 Err:509 Err:509 17.750
06.04 ACARREO DE MATERIAL EXCEDENTE D=30M Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 11.20 11.20 M3 Err:509 Err:509
06.05 ELIMINACION DE MATERIAL EXCEDENTE Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 #VALUE! Err:509 11.20 #VALUE! #VALUE! M3 Err:509 Err:509 22.840
06.06 NIVELACION Y COMPACTADO MANUAL Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 #VALUE! Err:509 224.00 #VALUE! #VALUE! M2 Err:509 Err:509 2.930
07 SARDINELES #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
07.01 TRAZO, NIVELES Y REPLANTEO PARA SARDINELES
07.02 EXCAVACION MANUAL EN TERRENO NATURAL Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 #VALUE! Err:509 4.80 #VALUE! #VALUE! M3 Err:509 Err:509 15.250
Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508
Err:508 Err:508 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:508 Err:509 Err:509 Err:508 Err:509 Err:508 Err:509 Err:509
Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:509
Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:509
Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508
Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:509
Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:509
Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:509
Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508
Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:509
Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:509
Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508
Err:508 Err:508

F-27
GASTOS CLASIFICADOS Y PRECIOS UNITARIOS

OBRA : RESIDENTE ING. ISAAC CARAZAS PEZO


SUPERVISOR
INFORME TECNICO MENSUAL FEBRERO - 2013 FECHA Jan-13

PRESUPUESTO BASE COSTOS DIRECTOS COSTOS TOTAL GENERAL METRADOS PRECIO UNITARIO

MANO DE EQ / MEC SUB EN EL MES EN EL MES EN EL


ITEMS DESCRIPCION PARTIDA MAT INDIRECT ACUMUL ACUMUL U.M. PROMED APROB
OBRA HERRAM TOTAL MES ANTER MES ANTER MES

ESTRUCTURAS
Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:509
Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:509
Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508
Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:509
Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:509
Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:509
Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508
Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:509
Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:509
Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:509
Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508
Err:508 Err:508 Err:509 Err:508 Err:509 Err:509 Err:509 Err:509 Err:508 Err:509 0.00 Err:508 Err:508 Err:508 Err:509 Err:509 Err:509

TOTAL COSTO DIRECTOS Err:508

TOTAL COSTOS INDIRECTOS Err:509

TOTAL INVERSION Err:508 Err:508 Err:508

F-27
PANEL FOTOGRAFICO

INICIO DE EXCAVACIONES PARA


MICROPILOTES.

EXCAVACION DE ZANJA PARA


MICROPILOTES, SE
REALIZATAMBIEN PARA
VERIFICACION DE RED DE
DESAGUE Y SU CAMBIO.

VISTA DE LA CALLE ANTES DE SU


EXCAVACION, AL COSTADO LA
ZANJA PARA MICROPILOTES.

F-30
PANEL FOTOGRAFICO

VISTA PANORAMICA DE ZONA DE


EXCAVACION PARA MICROPILOTES.

LIMPIEZA DE ZANJA
EXACAVADA QUE DEBIDO
A LLUVIAS SE LLENA DE
AGUA.

MATERIAL EXCEDENTE
DE LA ZANJA PARA
MICROPILOTES.

F-30
PANEL FOTOGRAFICO

EXCAVACION DE ZANJA DE
TUBERIA MATRIZ DE DESAGUE
PARA VERIFICACION DE
PROFUNDIDAD DEUBICACION
(PLAZOLETA DE MANIOBRAS).

BUZON N°03, AL CUAL SEL E LE HIZO


VACIADO DE CONCRETO PARA UN 2DO
CUERPO EL CUAL SE MUESTRA EN LA
IMAGEN.

INICIO DE TRABAJOS DE
EXCAVACION EN LA CALLE CANADA
CON MAQUINARIA PESADA
(CARGADOR FRONTAL).

F-30
PANEL FOTOGRAFICO

DEBIDO AL PASO DE LA
MAQUINARIA SE ROMPIO UNA
TUBERIA QUE ROBRESALIA
DEMASIADO DEL ANCHO DE LA
VEREDA, POR LO QUE SE PROCEDE
A REPARARLA
MOMENTANEAMENTE.

APUNTALAMIENTO DE
ESTRUCTURAS EXISTENTES
(BUZON N°02 Y TAULD DE
EXCAVACION).

CORTE DE RASANTE EN CALLE


CANADA CON CARGADOR FRONTAL

F-30
PANEL FOTOGRAFICO

AGUJEROS EXCAVADOS HASTA EL


NIVEL DE SUB RASANTE Q DEBE
LLEGAR EL CORTE DE MATERIAL
EN LA CALLE CANADA.

VACIADO DE CUERPO DEL BUZON


N°01

EXCAVACION DE ZANJA,
BUSCANDO LA LLAVE PRINCIPAL
PARA EL CIERRE DE PASO DE AGUA
EN LA RED PRICIPAL DE LA CALLE,
PUES LA TUBERIA SE ROMPIO
DEBIDO A LOS TRABAJOS CON LA
MAQUINARIA PESADA.

F-30
PANEL FOTOGRAFICO

EMPOZAMIENTO DE AGUA DEBIDO


A LA ROTURA DE TUBERIA DE AGUA
DE LA RED PRINCIPAL DE LA CALLE
CANADA POR LO QUE SE HIZO
ZANJA PARA EVACUACION DE
AGUAS.

TRABAJOS CON EL
CARGADOR FRONTAL,
CORTE DE RASANTE EN
CALLE CANADA.

TRABAJO DE CORTE CON


MAQUINARIA PESADA DE
ACUERDO A LOS NIVELES
DE LA SUBRASANTE.

F-30
PANEL FOTOGRAFICO

VACIADO DE 1RA ZONA


DE SOLADO DE
CONCRETO DE AREA 5.90
m. x 3 m., Y ESPESOR 0.25
cm., SE OBSERVA QUE SE
DEJA SOLDADOS PARA
UNION CON EL MURO DE
CONTENCION

LIMPIEZA CONSTANTE DE
ZANJA DEBIDO A
LLUVIAS, A INGRESO DE
AGUA DEL RIO POR
AGUJEROS EN EL MURO
DE CANALIZACION DEL
RIO, Y DEBIDO A
MANANTE EN LA PARTE
DEL FONDO DE LA
IMAGEN.

TOMA PANORAMICA DE
LA CALLE CANADA, CON
LA MAQUINARIA PESADA
REALIZANDO EL CORTE
DE LA RASANTE.

F-30
PANEL FOTOGRAFICO

DEBIDO AL PESO DE LA
MAQUINARIA PESADA EL
MATERIAL DEL SUELO
CEDIO DEJANDO AL AIRE
LIBRE LA TUBERIA DE
AGUA DE UNA CONEXIÓN
DOMICILIARIA.

SE OBSERVA QUE EL
MATERIAL DEL LA
SUBRASANTE ES DE
MALA CALIDAD, PUES SE
DEFORMA DEMASIADO
DEBIDO SOLO AL PESO
DE LA MAQUINARIA
PESADA, LA CUAL NO
PUEDE TRABAJAR
COMODAMENTE.

ACARREO DE MATERIAL
EXCEDENTE
PROVENIENTE DE LA
ZANJA PARA EL MURO DE
CONTENCION,
ACUMULADO AL FRENTE
DEL RIO .

F-30
PANEL FOTOGRAFICO

CONTINUA LIMPIEZA DE
ZANJA PARA PODER
VACIAR EL SOLADO EN
ESA ZONA.

TRABAJO DE LA
RETROEXCAVADORA
PARA NIVELAR LA
SUBRASANTE, SE
OBSERVA LA
DEFORMACION DEL
SUELO SOLO POR EL
PASO DE LA
MAQUINARIA.

CORTE Y NIVELACION DE
SUBRASANTE CON LA
RETROEXCAVADORA. SE
VERIFICA
CONSTANTEMENTE LOS
NIVELES DE CORTE.

F-30
PANEL FOTOGRAFICO

CORTE DE TERRENO EN
LOS BORDES DE LA
CALLE. SE OBSERVA EL
TRAZO REALIZADO CON
YESO.

CORTE Y NIVELACION DE
SUBRASANTE CON
RETROEXCAVADORA, SE
OBSERVA QUE EL SUELO
ESTA HUMEDO POR LAS
CONSTANTES LLUVIAS
QUE VIENEN PASANDO
POR LO QUE HACE
DIFICULTOSO EL
TRABAJO CON LA
MAQUINARIA.

COLOCACION DE GEO
COMPUESTO PARA EL
2DO TRAMO DEL SOLADO
PARA EVITAR QUE EL
AGUA DE LA BASE PASE
AL CUERPO DE LA
ESTRUCTURA DE
CONCRETO.

F-30
PANEL FOTOGRAFICO

TENDIDO DE GEO COMPUESTO


SOBRE TUBERIA DE DESAGUE,
PARA EVITAR EL PASO DE AGUA AL
CUERPO DE LA ESTRUCTURA
(SOLADO).

COLOCACION DE PLASTICO
GRUESO SOBRE GEO COMPUESTO
PARA AYUDAR AL CONTROL DE
AGUAS DURANTE Y DESPUES DEL
VACIADO DEL SOLADO DE
CONCRETO.

COLOCACION DE PIEDRA MEDIANA,


COMO PARTE DEL SOLADO DE
CONCRETO, ESTA COLOCADO
SOBRE EL GEO COMPUESTO Y EL
PLASTICO GRUESO.

F-30
PANEL FOTOGRAFICO

VACIADO DE CONCRETO DE LA 2DA


ZONA DEL SOLADO.

TARRAJEO DEL SOLADO

SE CONTINUA CON EL
VACIADO DEL SOLADO
DE CONCRETO.

F-30
SE CONTINUA CON EL
VACIADO DEL SOLADO
DE CONCRETO.

F-30
PANEL FOTOGRAFICO

SE OBSERVA EL SOLADO VACIADO


EN LAS 2 ZONAS, ANTERIOR Y
POSTERIOR, SOLO FALTA 2.50m. DE
LARGO PARA CONCLUIR EL
CUERPO DEL SOLADO.

SE OBSERVA EL
MATERIAL EXCEDENTE
DEL CORTE DE LA
RASANTE DE LA CALLE
CANADA.

VACIADO DEL ULTIMO


TRAMO DE SOLADO DE
CONCRETO.

F-30
PANEL FOTOGRAFICO

TARRAJEO DEL ULTIMO


TRAMO DE SOLADO DE
CONCRETO.

SE LE DA UNA SOLUCION
TEMPORAL A LA ROTURA DE LA
TUBERIA ANTIGUA DE CONCRETO
DE DESAGUE DE UN DOMICILIO,
QUE OCURRIO DEBIDO A LOS
TRABAJOS CON LA MAQUINARIA
PESADA.

SE OBSERVA EL ESTADO
DEL SUELO DE LA
RASANTE DE LA CALLE
CANADA CADA VEZ QUE
LLUEVE, SE VUELVE
INESTABLE POR LO QUE
TENDRA QUE SER
REEMPLAZADO.

F-30
F-30
CONCRETO 210 KG/CM2 417.678
M3/DIA MO 10 EQ 10

DESCRIPCION UM CUADRILLA CANT PRECIO PARCIAL


OPERARIO HH 3 2.4 8.38 20.112
OFICIAL HH 3 2.4 7.74 18.576
PEON HH 9 7.2 6.46 46.512
85.2
ARENA FINA M3 0.42 60 25.2
PIEDRA CHANCADA 3/4" M3 0.85 70 59.5
GASOLINA GLN 0.07 14 0.98
CEMENTO BLS 9.74 23 224.02
AGUA M3 0.185 1.2 0.222
309.922
HERRAMIENTAS MANUALES %MO 3% 2.556
MEZCLADORA HM 1 0.8 15 12.00
VIBRADORA HM 1 0.8 10 8.00
22.56

CONCRETO 100 KG/CM2 62.75


M2/DIA MO 40 EQ 40

DESCRIPCION UM CUADRILLA CANT PRECIO PARCIAL


OPERARIO HH 2 0.4 8.38 3.352
OFICIAL HH 1 0.2 7.74 1.548
PEON HH 9 1.8 6.46 11.628
16.528
ARENA FINA M3 0.0675 60 4.05
PIEDRA CHANCADA 3/4" M3 0.1125 70 7.875
GASOLINA GLN 0.0175 14 0.245
CEMENTO BLS 1 23 23
AGUA M3 0.04625 1.2 0.0555
PIEDRA MEDIANA DE 6" M3 0.1375 40 5.5
40.7255
HERRAMIENTAS MANUALES %MO 3% 0.49584
MEZCLADORA HM 1 0.2 15 3.00
VIBRADORA HM 1 0.2 10 2.00
5.50

CONCRETO 140 KG/CM2 287.539333


M3/DIA MO 15 EQ 15

DESCRIPCION UM CUADRILLA CANT PRECIO PARCIAL


OPERARIO HH 3 1.6 8.38 13.408
OFICIAL HH 3 1.6 7.74 12.384
PEON HH 9 4.8 6.46 31.008
56.8
ARENA FINA M3 0.25 60 15
PIEDRA CHANCADA 3/4" M3 0.65 70 45.5
GASOLINA GLN 0.07 14 0.98
CEMENTO BLS 6 23 138
AGUA M3 0.185 1.2 0.222
PIEDRA MEDIANA 6" M3 0.4 40 16
215.702
HERRAMIENTAS MANUALES %MO 3% 1.704
MEZCLADORA HM 1 0.53333333 15 8.00
VIBRADORA HM 1 0.53333333 10 5.33
15.04
0.68
1.27

1 0.85
0.68 0.578
GERENCIA DE INFRAESTRUCTURA
División de Obras

PANEL
PANELFOTOGRAFICO
FOTOGRAFICO

OBRA:

"CONSTRUCCION DE CANAL PARA EVACUACION DE AGUAS PLUVIALES DE LA QUEBRADA


KULLCHIHUAYCO TRAMO COMPRENDIDO ENTRE LA PROLONGACION AV. LA CULTURA Y LA APV.
FRANCISCO BOLOGNESI, DISTRITO DE SAN SEBASTIAN - CUSCO - CUSCO"

Residente de Obra : ING. PERCY ASCUE HUMPIRI


Supervisor de Obra : ING. KATIUSKA YESSENIA CHAVEZ LETONA

AF - 2012