 c
2 | Ensure that the penstock and its associated operating equipment have been
correctly installed and fixed in position
|
a | Ydjust the moving parts of the penstock through a complete open and shut
cycle to ensure proper operation before achieving leakage test

3 | se the manual gear box and the stem to ensure full shut down before the test

4 | Ydjust the wedges to ensure positive seal

5 | heck if there is leakage between the penstock frame and the structure which
will not affect the test result

6 | easure the liquid loss through seals over 30 minutes

7 | alculate the leakage rate per one miter of preference per min and compare it
with the allowable leakage rate at the same head