3 AAAC 2.50 mm for cut point jumpering 0 Mtr. 21.291 Mtr. 0.00
4 AAAC 3.15 mm for cut point jumpering 0 Mtr. 24.776 Mtr. 0.00
Sub-Total 25470.00
Contingencies 1 % 254.70
Sub-Total 25724.70
6 Replacing the exg. Worn out stay without stay pit 18 set 200.00 set 3600.00
11 Replacing the worn out Jumpers in LT Cut points 0 Loc 80.00 Loc 0.00
12 Replacing the worn out Jumpers in HT Cut points 0 Loc 300.00 Loc 0.00
Sub-Total 37724.70
Estt. & Supervision charges 15 % 5658.71
Gross amount 43383.41
7
6
5
4
3
2
1
10
S.No
TOTAL
Name of the DT
7.5 M /
2
2
8.0 M
9M/
Pin point
0
9.14 M
7.5 M /
0
8.0 M
9M/
Cut Point
Re alighining of Leaned Pole
0
9.14 M
Up to
7/3.35
1.8
1.8
mm
LT in KM
Above
0
7/3.35
mm
Up to
0
7/3.35
mm
Resagging of low sag Line
HT in kM
Above
0
7/3.35
NATTAM SS IV 100 KVA(SOZHAKATTU)
mm
No of "LI" Jumpers
101
101
provided in LT line
6
6
SC
S.ph
provided
Sc
DC & RC of
95
95
service wires
3.Ph
in "LI" Jumpers
arrangement including
jumpering