MEO I+II ( E-Tech ) BOE

ELECTRONIC MOTOR / GE
W 23 PLC 1 13 W 2 Motor Failure

C 17 PLC 1 W 4 Induction Motor 1 7 10

W 22 PNP 4 A 3 Induction Motor 1 7 10 13

W 25 NPN 8 A 4 Synchronous Motor & PF Correct

A 17 NPN,PNP 8 C 14 Synchroscope,Meter,Earth Lamp 1 3 8 11 13

W 20 Logical Gate 6 7 W 26 Soft Starter 5 7 11

C 16 Logical Gate 6 7 W 5 Star Delta Starting 3 9 12

C 22 Mosfet,Thyristor 4 A 6 Star Delta Starting 3 9 12

A 19 Thyristor, GTO W 14 Synchronising 3

W 24 IGBT 2 10 12 C 5 Soft Starter

A 20 IGBT 2 10 12 W 30 AC GE Construction 2 4 7 12

A 16 Diode A 8 Alternator

SURVEY C 4 AC GE

W 21 Alternator & Switchboard Survey 2 6 7 10 11 C 25 GE Parallel Run

W 9 UMS 8

W 8 Marine Electrical Machinery 4 5 10 13 W 1 Ward Lenoard System 6

W 13 EP Survey 1 9 A 7 Ward Lenoard & IGBT

C 3 MCB Motor Starter Survey 13 W 7 AVR 6 8 9 12 13

C 11 Emergency Power & Assi Equip 1 9 W 12 Carbon Pile

C 6 Main Switch Board Safety Device 12 W 29 Transformer

TEST BATTERY
W 6 Insulation Test 5 7 9 10 W 10 Battery Charging

W 28 Earth Faults W 11 Battery Charging - Dicharge 3 5 9 11

A 2 IR Teat & Motor Routie Maintance 11 W 3 Battery 1


MEO I+II ( E-Tech ) BOE
CONTROL CALCULATION
W 17 Drag cup, Pneumatic Flapper 4 Chapter
W 27 Close Loop,Cascade Loop 1 1 4 7 9 10

C 8 Close Loop 11 5 3 5 8

W 18 Bimetal 6 6 1 2 11

W 16 Steam Temp Control 7 2 6 13

W 19 LO Temp Control 9 1 2 4 10 11

W 15 Low Voltage 2 4 8 11 3 4 6 8 9 10 12 13

C 21 3 Terms Water Level (Boiler) 12 DC


A 21 Basic Control Transformer 5 7 6 8 12 13

A 22 PID

A 23 Fail Safe 5 8 10

A 24 RTD

A 25 4-20A , AD Converter

A 18 Op-amp

A 11 OC Trip

A 14 NF

A 5 6 Steps 2