Sei sulla pagina 1di 1

konseptual

cost center accounting

Konfigurasi Metode SAP Migration


Profitability Analysis

sistematika penelitian

Strategic Planning resource


Discovery
Application Value and Scoping oros activity

Prototype Prepare Pemodelan cost object


Tools
Activate Solution Legacy System Migration Workbench (LSMW)

Fit/Gap Analysis Explore


SAP Activate
metodologi
ANALISIS PERANCANGAN ACTUAL COST SAP S/4HANA Migration Cockpit

Master Data Planning


ALLOCATION ACTIVITY PADA MODULE Bahasa

Configuration
CONTROLLING PROFITABILITY ANALYSIS UNTUK
Master Data Configuration Realize
PROSES MIGRASI DATA DARI APLIKASI OROS KE sub-module Activity Based Costing (CO-OM-
ABC)

Test Execution
SAP S/4HANA Alokasi biaya
laporan akhir module Profitability Analysis (
CO-PA)

Oros Permasalahan data resource

SAP S/4HANA Aplikasi Migrasi data activity

cost object

Proses Bisnis Alokasi Cost Actual Eksisting


Studi Kasus
Struktur Data pada Aplikasi Oros
PT. Telkom Indonesia

Potrebbero piacerti anche