WORK BREAK DOWN STRUCTURE

OF
BAHRIA HOUSING PROJECT
Assignment # 1

Submitted To:
Sir Dr. Shahid Iqbal
Submitted By:
MUHAMMAD SHABAN
01-398192-031
MSPM 2-D

Dated: 8 March, 2020


TABLE OF CONTENTS:

Scope
Statement……………………………………………………………………………
…………...3
Hierarchical Structure…...........................................................................................4
Work Breakdown Structure…….
…………………………………………………………………….5
Budgeting……………………………………………………………………………
……………………....6
Work/Cost Breakdown
Structure……………………………………………………………........7
SCOPE STATEMENT:

PROJECT OBJECTIVE:
To construct a House in Bahria Housing Society at a Cost of $220,000, In one Year.
DELIVERABLES:
 A 4500-square-foot, finished house as per design given by the customer.

MILESTONES:
1. Foundation work would start on 1 March 2020.
2. Grey structure Completion on September 15, 2020.
3. House Finishing on December 15, 2020.
4. Test and clean on January 15, 2021.
HIRARCHIAL STRUCTURE

1. Bahria Housing Project


1.1. Foundation
1.1.1. Excavation
1.1.2. Piling
1.1.3. Steel/Iron Frame
1.1.4. Concreting Foundation/Beams
1.1.5. Concreting Water Tank
1.2. House Structure
1.2.1. Install Iron/Steel Frame
1.2.2. Lift Iron/Steel Frame
1.2.3. Strengthening Beams
1.2.4. Concreting Iron/Steel Frame
1.2.5. Stair’s
1.2.6. Floor Slabbing
1.2.7. Internal/External Brick Work
1.3. Pipes/Wiring/Tanks
1.3.1. Install Water/gas Pipes
1.3.2. Over Head Tanks
1.3.3. Rough Plumbing
1.3.4. Set Plumbing Equipment
1.3.5. Install Electrical Wiring
1.3.6. Installing Ventilation System’s
1.3.7. Roofing
1.3.8. Install Roof Drains
1.4. Interior/Exterior Designing
1.4.1. Install Electrical Switches/Fittings
1.4.2. Wood works
1.4.3. Ceiling/Tiles
1.4.4. Paint Walls
1.4.5. Kitchen Accessories
1.4.6. Glass Work
1.4.7. Garage/Garden Finishing
1.4.8. Wall Paintings
1.5. Finishing
1.5.1. Decor
1.5.2. Carpets
1.5.3. Furniture
1.5.4. Test and Clean
1.5.5. Closeout

WORK BREAKDOWN STRUCTURE


Bahria Housing Project
1

Interior/Exterior
Foundation House Structure Pipes/Wiring/Tanks Finishing
Designing
1.1 1.2 1.3 1.5
1.4

Install Iron/Steel Install Water/gas Install Electrical


Excavation Decor
Frame Pipes Switches/Fittings
1.1.1 1.4.1 1.5.1
1.2.1 1.3.1

Lift Iron/Steel
Piling Over Head Tanks Wood Works Carpets
Frame
1.1.2 1.3.2 1.4.2 1.5.2
1.2.2

Strengthening
Steel/Iron Frame Rough Plumbing Ceiling/Tiles Furniture
Beams
1.1.3 1.3.3 1.4.3 1.5.3
1.2.3

Concreting Concreting Set Plumbing


Test and Clean
Foundation/Beams Iron/Steel Frame Equipment Paint Walls
1.5.4
1.1.4 1.2.4 1.3.4 1.4.4

Concreting Water Install Electrical


Stair’s Kitchen Accessories Closeout
Tank Wiring
1.2.5 1.4.5 1.5.5
1.1.5 1.3.5

Installing Garage/Garden
Floor Slabbing
Ventilation System's Finishing
1.2.6 1.4.6
1.3.6

Internal/External Roofing Wall Paintings


Brick Work
1.3.7 1.4.7
1.2.7

Install Roof Drains


1.3.8

Budgeting: Total Contract Cost


$ 219,999
Total Contract Cost Profit/Fee
$ 176,000 $ 43,999

Contract Budget Base


(CBB)
$ 176,000

Performance Management Reserves


Measurement Baseline (MR)
(PMB) $ 17,600 @ 10% (of
$ 158,400 (CCB

Distributed Budgets Undistributed Budget


$ 158,400 $0

Control Accounts
$ 158,400

Work Packages

Planning Packages

Total Cost + Profit/Fee = Total Price


$ 176,000+ $ 43,999 = $ 219,999

WORK COST/BREAKDOWN STRUCTURE


Bahria House
$ 176,000
1

Interior/Exterior
Foundation House Structure Pipes/Wiring/Tanks Finishing
Designing
$ 30,500 $ 45,500 $ 50,000 $ 20,400
$ 29,600
1.1 1.2 1.3 1.5
1.4

Install Electrical
Excavation Install Iron/Steel Frame Install Water/gas Pipes Decor
Switches/Fittings
$ 9,000 $ 14,300 $ 12,000 $ 5,400
$ 7,700
1.1.1 1.2.1 1.3.1 1.5.1
1.4.1

Piling Lift Iron/Steel Frame Over Head Tanks Wood Works Carpets
$ 5,000 $ 3,300 $ 8,000 $ 4,500 $ 4,000
1.1.2 1.2.2 1.3.2 1.4.2 1.5.2

Steel/Iron Frame Strengthening Beams Rough Plumbing Ceiling/Tiles Furniture


$ 8,000 $ 6,000 $ 2,800 $ 8,000 $ 9,300
1.1.3 1.2.3 1.3.3 1.4.3 1.5.3

Concreting Concreting Iron/Steel


Set Plumbing Equipment Test and Clean
Foundation/Beams Frame Paint Walls
$ 7,900 $ 1,700
$ 7,500 $10,500 $ 2,000
1.3.4 1.5.4
1.1.4 1.2.4 1.4.4

Concreting Water Tank Stair’s Install Electrical Wiring Kitchen Accessories Closeout
$ 1,000 $ 2,600 $ 6,200 $ 3,800 $0
1.1.5 1.2.5 1.3.5 1.4.5 1.5.5

Installing Ventilation
Floor Slabbing Garage/Garden Finishing
System's
$ 3,000 $ 2,980
$ 4,200
1.2.6 1.4.6
1.3.6

Internal/External Brick Roofing Wall Paintings


Work
$ 5,000 $ 620
$ 5,600
1.3.7 1.4.7
1.2.7

Install Roof Drains


$ 3,900
1.3.8