Sei sulla pagina 1di 31

Supply

Sl No Description Actual
Qty UOM
Qty
Lab piping netwotk from compressor,receiver, air dryer and labs room etc.
1 supply of 200nb(8") MS "C" class-bend -heavy 4 4 EA
2 supply of 200nb(8")Ms flange 33 0 EA
3 u clamps for 8" pipe 25 25 EA
4 supply of 150nb(6") MS pipe "C" class-make-Tata/jindal 200 138 M
5 supply of 150nb(6") MS "C" class-bend -heavy 25 27 EA
6 supply of150nb(6") MS flange 130 134 EA
7 supply of 150nb(6") Butterfltyvalve 2 3 EA
8 u clamp for 6" pipe 60 60 EA
9 supply of 80mm c class pipe-jindal/tata 30 30 M
10 supply of 80mm elbow 6 6 EA
11 SUPPLY OF 50MM c class pipe 30 30 M
12 supply of 50mmelbow 6 6 EA
13 supply of hardwaresm12x80mm 500 500 EA
14 supply of hardwaresm12x100mm 172 172 EA
15 supply of "channel " supports 850 850 KG
16 15mm ball valves 5 5 EA
17 HOT Air pipe with insulation
Supply of Dia 6" MS "C"Class Jindal Make Pipe 46 30 Rmt

18 Dia 6" ASA 150 Flange - Heavy Duty 20 16 Nos


19 Dia 6 butterfly valve 4 3 Nos
20 Dia 6" MS Elbows "C" Class - Heavy Duty 8 6 Nos
21 GI "U" Clamp Set - Heavy Duty 6" 10 10 EA
22 GI Bolt Nut Double Washer 80 80 Nos
Rock Wool Insulation with Aluminium Cladding - 50mm Thick & 60 60 Mtrs
23 accessories for Dia 6" Pipe
Rock Wool Insulation with Aluminium Cladding - 50mm Thick & 30 30 Nos
24 accessories for Dia 6" Flange
Rock Wool Insulation with Aluminium Cladding - 50mm Thick & 4 4 Nos
25 accessories for Dia 6" Ball Valve
Rock Wool Insulation with Aluminium Cladding - 50mm Thick & 4 4 Nos
26 accessories for Dia 6" Elbow
Rock Wool Insulation with Aluminium Cladding - 50mm Thick & 2 2 Nos
27 accessories for Dia 6" Tee Joint

Sub Total - Supply

Erection
Actual
Qty
qty
Sl No Description UOM
1 Errection of 200nb(8") MS pipe "C" class-make-Tata/jindal 126 96 M
2 Errection of 200nb(8") MS "C" class-bend -heavy 8 10 EA
3 Errection of 200nb(8")Ms flange 40 30 EA
4 Errection of 200nb(8")Butterflty valve- 5 2 EA
5 Errection of 150nb(6") MS pipe "C" class-make-Tata/jindal 250 265 M
6 Errection of 150nb(6") ) MS "C" class-bend -heavy 25 24 EA
7 Errection of 150nb(6") MS flange 140 108 EA
8 Errection of 80mm c class pipe-jindal/tata 30 21 M
9 Errection of 80mm elbow 6 11 EA
10 Errection of 80mm flanges 10 26 EA
11 Errection OF 50MM c class pipe 30 14 M
12 Errection of 50mmelbow 6 10 EA
13 Errection of 50mm flange 12 22 EA
14 supply&painting for pipe enamuel paint skyblue
15 two coat paint over a one coat of primer 450 450 M
errection of 25mm pipes 18 0 M
16 errection of 15mm MS pipe 18 0 M
17 transportation charges and crane charges 1 1 EA
18 scuffholding errection charges 1 1 EA
HOT AIR errection
19 Errection of Dia 6" MS "C"Class Jindal Make Pipe 46 0 Rmt
20 Dia 6" ASA 150 Flange - Heavy Duty 20 0 Nos
21 Dia 6 butterfly valve 4 4 Nos
22 Dia 6" MS Elbows "C" Class - Heavy Duty 8 6 Nos
simplair pipe.
23 Simplair pipe installation with accesories etc in new lab. 1 1 EA

24 Dismantling work-Lab-basement-1
complete dismantling of MS 2000mm pipe with necessary
bend,flanges,valves etc with approprite tools and tackle with
safely landing on the floor with help of scuffholding etc.
near Air Receiver tank area.
inside the lab two line 200mm MS pipe which is coming from
compressorroom to receiver completely dismantling with
necessary valves flanges etc with help of gas cutting etc.
dismantling of all 125mm ms pipes with valves in basement two
different rooms.
dismantling of skid stand seperately with automatic valves
flanges beds and pipes with approprite tools etc.
compressor interconnecting MS piping between
through two air compressor,two dryer with air filters with necessary
bends,flanges bypass arrangements ,valves,and drain piping etc
completely dismantling with necessary tools and tackles. 1 1 Lumps
Sub Total - Erection

Total - Supply & Erection

Water lines material supplied to complete the project.


1 supply of 25mm GI pipe heavy c class 48 M 346.5
2 supply of 25mm GI bend heavy 12 EA 159.5
3 supply of 25mm GI union 14 EA 159.5
4 supply of 25mm GI barrel nipple 5 EA 55
5 supply of 25mm hydraulic clamp 22 EA 99
6 supply of 80mm universal clamp 25 EA 38.5
7 supply of 125mm butterfly valve 1 EA 2915
8 supply of 50mm MS collar 5 EA 159.5
9 supply of ring gasket for simplair piping 20 EA 16.5

Total

Errection for water lines with accossories


1 Errection 25mm GI pipe with necessary fittings 72 M 231
2 transportation charges 1 EA 2750
3 extra painting finishing work 1 EA 9350
Total
Supply Unit
Total Actual amount
Rate- InR
Remarks from IR
1564.2 6256.8 6256.8 OK
1305.7 43088.1 0 Qty shall be zero
73.7 1842.5 1842.5 OK
1504.8 300960 207662.4 OK
766.7 19167.5 20700.9 Ok
605 78650 81070 Ok
7590 15180 22770 OK
62.7 3762 3762 OK
858 25740 25740 OK
275 1650 1650 OK
463.1 13893 13893 OK
104.5 627 627 OK
46.2 23100 23100 OK
60.5 10406 10406 OK
107.8 91630 91630 OK
770 3850 3850 OK
0 0
1,504.80 69,220.80 Qty shall be 30 and same shall be
45144 reduced from line item 4.
605.00 12,100.00 9680 OK
7,590.00 30,360.00 22770 OK
766.70 6,133.60 4600.2 OK
62.70 627.00 627 OK
46.20 3,696.00 3696 OK
1,017.50 61,050.00
61050 To Be executed and measured for billing
756.80 22,704.00
22704 To Be executed and measured for billing
1,430.00 5,720.00
5720 To Be executed and measured for billing
1,136.30 4,545.20
4545.2 To Be executed and measured for billing
770.00 1,540.00
1540 To Be executed and measured for billing
0 0
0 0
0 0
857499.5 697037
Erection Unit
Rate -InR Total Actual amount
1210 152460 116160 OK
418 3344 4180 OK
220 8800 6600 OK
313.5 1567.5 627 Ok
1045 261250 276925 OK
330 8250 7920 OK
330 46200 35640 OK
638 19140 13398 OK
165 990 1815 OK
165 1650 4290 OK
489.5 14685 6853 OK
110 660 1100 OK
110 1320 2420 OK
0 0
66 29700 29700 OK
247.5 4455 0 OK
198 3564 0 OK
19250 19250 19250 OK
22000 22000 22000 OK
0 0
1045 48,070.00 0 OK
330 6,600.00 0 OK
220 880.00 880 OK
330 2,640.00 1980 OK
0 0
25025 25025 25025 OK
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
181500 181500 181500 OK
0
0
0
864000.5 758263

1721500 1455300

16632 Plumbing
1914 Pneumatic
2233 Pneumatic
275 Plumbing
2178 Plumbing
962.5 ??
2915 Additional Pneumatic
797.5 Additional Pneumatic
330 ??

28237

16632 TBD
2750 Plumbing
9350 ??
28732
514,960.60
115555 605

313.5 313.5
270864 6061
9240 -1320
33000 2640
11484 1914

2860 -440
Supply
Sl No Description Actual
Qty UOM
Qty
Lab piping netwotk from compressor,receiver, air dryer and labs room etc.
1 supply of 200nb(8") MS "C" class-bend -heavy 4 4 EA
2 supply of 200nb(8")Ms flange 33 0 EA
3 u clamps for 8" pipe 25 25 EA
4 supply of 150nb(6") MS pipe "C" class-make-Tata/jindal 200 138 M
5 supply of 150nb(6") MS "C" class-bend -heavy 25 27 EA
6 supply of150nb(6") MS flange 130 134 EA
7 supply of 150nb(6") Butterfltyvalve 2 3 EA
8 u clamp for 6" pipe 60 60 EA
9 supply of 80mm c class pipe-jindal/tata 30 30 M
10 supply of 80mm elbow 6 6 EA
11 SUPPLY OF 50MM c class pipe 30 30 M
12 supply of 50mmelbow 6 6 EA
13 supply of hardwaresm12x80mm 500 500 EA
14 supply of hardwaresm12x100mm 172 172 EA
15 supply of "channel " supports 850 850 KG
16 15mm ball valves 5 5 EA
Sub Total - Supply

Erection
Actual
Qty
qty
Sl No Description UOM
1 Errection of 200nb(8") MS pipe "C" class-make-Tata/jindal 126 96 M
2 Errection of 200nb(8") MS "C" class-bend -heavy 8 10 EA
3 Errection of 200nb(8")Ms flange 40 30 EA
4 Errection of 200nb(8")Butterflty valve- 5 2 EA
5 Errection of 150nb(6") MS pipe "C" class-make-Tata/jindal 250 235 M
6 Errection of 150nb(6") ) MS "C" class-bend -heavy 25 24 EA
7 Errection of 150nb(6") MS flange 140 92 EA
8 Errection of 80mm c class pipe-jindal/tata 30 21 M
9 Errection of 80mm elbow 6 11 EA
10 Errection of 80mm flanges 10 26 EA
11 Errection OF 50MM c class pipe 30 14 M
12 Errection of 50mmelbow 6 10 EA
13 Errection of 50mm flange 12 22 EA
14 supply&painting for pipe enamuel paint skyblue
15 two coat paint over a one coat of primer 450 450 M
errection of 25mm pipes 18 0M
16 errection of 15mm MS pipe 18 0M
17 transportation charges and crane charges 1 1 EA
18 scuffholding errection charges 1 1 EA
19 Dia 6 butterfly valve 0 1 Nos
23 Simplair pipe installation with accesories etc in new lab. 1 1 EA

24 Dismantling work-Lab-basement-1
complete dismantling of MS 2000mm pipe with necessary
bend,flanges,valves etc with approprite tools and tackle with
safely landing on the floor with help of scuffholding etc.
near Air Receiver tank area.
inside the lab two line 200mm MS pipe which is coming from
compressorroom to receiver completely dismantling with
necessary valves flanges etc with help of gas cutting etc.
dismantling of all 125mm ms pipes with valves in basement two
different rooms.
dismantling of skid stand seperately with automatic valves
flanges beds and pipes with approprite tools etc.
compressor interconnecting MS piping between
through two air compressor,two dryer with air filters with necessary
bends,flanges bypass arrangements ,valves,and drain piping etc
completely dismantling with necessary tools and tackles. 1 1 Lumps

Sub Total - Erection


Total - Supply & Erection

Water lines material supplied to complete the project.


1 supply of 25mm GI pipe heavy c class 48 M 346.5
2 supply of 25mm GI bend heavy 12 EA 159.5
3 supply of 25mm GI union 14 EA 159.5
4 supply of 25mm GI barrel nipple 5 EA 55
5 supply of 25mm hydraulic clamp 22 EA 99
6 supply of 80mm universal clamp 25 EA 38.5
7 supply of 125mm butterfly valve 1 EA 2915
8 supply of 50mm MS collar 5 EA 159.5
9 supply of ring gasket for simplair piping 20 EA 16.5

Total

Errection for water lines with accossories


1 Errection 25mm GI pipe with necessary fittings 72 M 231
2 transportation charges 1 EA 2750
3 extra painting finishing work 1 EA 9350
Total
Supply Unit
Total Actual amount
Rate- InR
Remarks from IR
1564.2 6256.8 6256.8 OK
1305.7 43088.1 0 Qty shall be zero
73.7 1842.5 1842.5 OK
1504.8 300960 207662.4 OK
766.7 19167.5 20700.9 Ok
605 78650 81070 Ok
7590 15180 22770 OK
62.7 3762 3762 OK
858 25740 25740 OK
275 1650 1650 OK
463.1 13893 13893 OK
104.5 627 627 OK
46.2 23100 23100 OK
60.5 10406 10406 OK
107.8 91630 91630 OK
770 3850 3850 OK
639802.9 514960.6

Erection Unit
Rate -InR Total Actual amount
1210 152460 116160 OK
418 3344 4180 OK
220 8800 6600 OK
313.5 1567.5 627 Ok
1045 261250 245575 OK
330 8250 7920 OK
330 46200 30360 OK
638 19140 13398 OK
165 990 1815 OK
165 1650 4290 OK
489.5 14685 6853 OK
110 660 1100 OK
110 1320 2420 OK
0 0
66 29700 29700 OK
247.5 4455 0 OK
198 3564 0 OK
19250 19250 19250 OK
22000 22000 22000 OK
220 - 220 OK
25025 25025 25025
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 181500 OK
181500 181500 0
0
0
718993
805810.5
1445613.4 1233953.6 221346

16632 Plumbing
1914 Pneumatic & Plumbing
2233 Pneumatic
275 Plumbing
2178 Plumbing
962.5 ??
2915 Additional Pneumatic
797.5 Additional Pneumatic
330 ??

28237

16632 TBD
2750 Plumbing
9350 ??
28732
30m of 6inch pipe us supplied for hot air piping
qty 2 is added , for hot airpiping instead of 8, we have used only 6, so 2 are added here
4 is added , for hot air piping we have used 16 instead of 20, for extra 4 items suhail will not take back, so same is added he
1ty is added, for hot airpiping we have used 3 instead of 4, so extra 1item is added here
Released PO:1213388

20565
HOT Air pipe with insulation
Supply of Dia 6" MS "C"Class Jindal 46 30 Rmt 1,504.80
17 Make Pipe
Dia 6" ASA 150 Flange - Heavy Duty 20 16 Nos 605.00
18
19 Dia 6 butterfly valve 4 3 Nos 7,590.00
Dia 6" MS Elbows "C" Class - Heavy 8 6 Nos 766.70
20 Duty
GI "U" Clamp Set - Heavy Duty 6" 10 10 EA 62.70
21
22 GI Bolt Nut Double Washer 80 80 Nos 46.20
Rock Wool Insulation with
Aluminium Cladding - 50mm Thick & 60 60 Mtrs 1,017.50
23 accessories for Dia 6" Pipe
Rock Wool Insulation with
Aluminium Cladding - 50mm Thick & 30 30 Nos 756.80
24 accessories for Dia 6" Flange
Rock Wool Insulation with
Aluminium Cladding - 50mm Thick & 4 4 Nos 1,430.00
accessories for Dia 6" Ball Valve
25
Rock Wool Insulation with
Aluminium Cladding - 50mm Thick & 4 4 Nos 1,136.30
26 accessories for Dia 6" Elbow
Rock Wool Insulation with
Aluminium Cladding - 50mm Thick & 2 2 Nos 770.00
27 accessories for Dia 6" Tee Joint
Sub Total - Supply

Erection
Errection of Dia 6" MS "C"Class
46 30 Rmt
19 Jindal Make Pipe 1045

Dia 6" ASA 150 Flange - Heavy Duty 20 16 Nos


20 330
21 Dia 6 butterfly valve 4 3 Nos 220
Dia 6" MS Elbows "C" Class - Heavy
8 6 Nos
22 Duty 330

Sub Total - Erection

Total - Supply & Erection

Water lines material supplied to complete the project.


1 supply of 25mm GI pipe heavy c clas 48 M 346.5 16632
2 supply of 25mm GI bend heavy 12 EA 159.5 1914
3 supply of 25mm GI union 14 EA 159.5 2233
4 supply of 25mm GI barrel nipple 5 EA 55 275
5 supply of 25mm hydraulic clamp 22 EA 99 2178
6 supply of 80mm universal clamp 25 EA 38.5 962.5
7 supply of 125mm butterfly valve 1 EA 2915 2915
8 supply of 50mm MS collar 5 EA 159.5 797.5
9 supply of ring gasket for simplair pip 20 EA 16.5 330

Total 28237

Errection for water lines with accossories


1 Errection 25mm GI pipe with necessar 72 M 231 16632
2 transportation charges 1 EA 2750 2750
3 extra painting finishing work 1 EA 9350 9350
Total 28732
tion
69,220.80 Qty shall be 46 and same shall be
45144 reduced from line item 4.
12,100.00
9680 OK
30,360.00 22770 OK
6,133.60
4600.2 OK
627.00
627 OK
3,696.00 3696 OK

61,050.00
61050 To Be executed and measured for billing

22,704.00
22704 To Be executed and measured for billing

5,720.00
5720 To Be executed and measured for billing

4,545.20
4545.2 To Be executed and measured for billing

1,540.00
1540 To Be executed and measured for billing

217,696.60 182,076.40

48,070.00
31350 OK

6,600.00
5280 OK
880.00 660 OK

2,640.00
1980 OK
0
58190 39270

275886.6 221346.4 54540.2

Plumbing
Pneumatic & Plumbing
Pneumatic
Plumbing
Plumbing
??
Additional Pneumatic
Additional Pneumatic
??

TBD
Plumbing
??
Supply
Var
Sl No Description Qty UOM
Qty
Lab piping netwotk from compressor,receiver, air dryer and labs room etc.
1 supply of 200nb(8") MS "C" class-bend -heavy 4 4 EA
2 supply of 200nb(8")Ms flange 33 33 EA
3 u clamps for 8" pipe 25 25 EA
4 supply of 150nb(6") MS pipe "C" class-make-Tata/jindal 200 168 M
5 supply of 150nb(6") MS "C" class-bend -heavy 25 25 EA
6 supply of150nb(6") MS flange 130 130 EA
7 supply of 150nb(6") Butterfltyvalve 2 2 EA
8 u clamp for 6" pipe 60 60 EA
9 supply of 80mm c class pipe-jindal/tata 30 30 M
10 supply of 80mm elbow 6 6 EA
11 SUPPLY OF 50MM c class pipe 30 30 M
12 supply of 50mmelbow 6 6 EA
13 supply of hardwaresm12x80mm 500 500 EA
14 supply of hardwaresm12x100mm 172 172 EA
15 supply of "channel " supports 850 850 KG
16 15mm ball valves 5 5 EA
17 HOT Air pipe with insulation
Supply of Dia 6" MS "C"Class Jindal Make Pipe 46 0 Rmt
18 Dia 6" ASA 150 Flange - Heavy Duty 20 20 Nos
19 Dia 6 butterfly valve 4 4 Nos
20 Dia 6" MS Elbows "C" Class - Heavy Duty 8 8 Nos
21 GI "U" Clamp Set - Heavy Duty 6" 10 10 EA
22 GI Bolt Nut Double Washer 80 80 Nos
Rock Wool Insulation with Aluminium Cladding - 50mm Thick & 60 60 Mtrs
23 accessories for Dia 6" Pipe
Rock Wool Insulation with Aluminium Cladding - 50mm Thick & 30 30 Nos
24 accessories for Dia 6" Flange
Rock Wool Insulation with Aluminium Cladding - 50mm Thick & 4 4 Nos
25 accessories for Dia 6" Ball Valve
Rock Wool Insulation with Aluminium Cladding - 50mm Thick & 4 4 Nos
26 accessories for Dia 6" Elbow
Rock Wool Insulation with Aluminium Cladding - 50mm Thick & 2 2 Nos
27 accessories for Dia 6" Tee Joint

Sub Total - Supply


Erection
Var
Qty
qty
Sl No Description UOM
1 Errection of 200nb(8") MS pipe "C" class-make-Tata/jindal 126 95.5 M
2 Errection of 200nb(8") MS "C" class-bend -heavy 8 10 EA
3 Errection of 200nb(8")Ms flange 40 30 EA
4 Errection of 200nb(8")Butterflty valve- 5 1 EA
5 Errection of 150nb(6") MS pipe "C" class-make-Tata/jindal 250 259 M
6 Errection of 150nb(6") ) MS "C" class-bend -heavy 25 28 EA
7 Errection of 150nb(6") MS flange 140 100 EA
8 Errection of 80mm c class pipe-jindal/tata 30 18 M
9 Errection of 80mm elbow 6 11 EA
10 Errection of 80mm flanges 10 26 EA
11 Errection OF 50MM c class pipe 30 14 M
12 Errection of 50mmelbow 6 10 EA
13 Errection of 50mm flange 12 26 EA
14 supply&painting for pipe enamuel paint skyblue
15 two coat paint over a one coat of primer 450 450 M
errection of 25mm pipes 18 0 M
16 errection of 15mm MS pipe 18 0 M
17 transportation charges and crane charges 1 1 EA
18 scuffholding errection charges 1 1 EA
HOT AIR errection
19 Errection of Dia 6" MS "C"Class Jindal Make Pipe 46 0 Rmt
20 Dia 6" ASA 150 Flange - Heavy Duty 20 0 Nos
21 Dia 6 butterfly valve 4 4 Nos
22 Dia 6" MS Elbows "C" Class - Heavy Duty 8 8 Nos
simplair pipe.
23 Simplair pipe installation with accesories etc in new lab. 1 1 EA

24 Dismantling work-Lab-basement-1
complete dismantling of MS 2000mm pipe with necessary
bend,flanges,valves etc with approprite tools and tackle with
safely landing on the floor with help of scuffholding etc.
near Air Receiver tank area.
inside the lab two line 200mm MS pipe which is coming from
compressorroom to receiver completely dismantling with
necessary valves flanges etc with help of gas cutting etc.
dismantling of all 125mm ms pipes with valves in basement two
different rooms.
dismantling of skid stand seperately with automatic valves
flanges beds and pipes with approprite tools etc.
compressor interconnecting MS piping between
through two air compressor,two dryer with air filters with necessary
bends,flanges bypass arrangements ,valves,and drain piping etc
completely dismantling with necessary tools and tackles. 1 1 Lumps

Sub Total - Erection

Total - Supply & Erection


Supply Unit Approx Actual
Total
Rate- InR amount

1564.2 6256.8 6256.8


1305.7 43088.1 43088.1
73.7 1842.5 1842.5
1504.8 300960 252806.4
766.7 19167.5 19167.5
605 78650 78650
7590 15180 15180
62.7 3762 3762
858 25740 25740
275 1650 1650
463.1 13893 13893
104.5 627 627
46.2 23100 23100
60.5 10406 10406
107.8 91630 91630
770 3850 3850
0 0
1,504.80 69,220.80 0
605.00 12,100.00 12100
7,590.00 30,360.00 30360
766.70 6,133.60 6133.6
62.70 627.00 627
46.20 3,696.00 3696
1,017.50 61,050.00
61050
756.80 22,704.00
22704
1,430.00 5,720.00
5720
1,136.30 4,545.20
4545.2
770.00 1,540.00
1540
0 0
0 0
0 0
857499.5 740125.1
Erection Unit Approx actual
Rate -InR Total amount
1210 152460 115555
418 3344 4180
220 8800 6600
313.5 1567.5 313.5
1045 261250 270864
330 8250 9240
330 46200 33000
638 19140 11484
165 990 1815
165 1650 4290
489.5 14685 6853
110 660 1100
110 1320 2860
0 0
66 29700 29700
247.5 4455 0
198 3564 0
19250 19250 19250
22000 22000 22000
0 0
1045 48,070.00 0
330 6,600.00 0
220 880.00 880
330 2,640.00 2640
0 0
25025 25025 25025
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
181500 181500 181500
0
0
0
864000.5 749149.5

1721500 1489274.6

Potrebbero piacerti anche