Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
Page :
1 OF 32
Digitally signed by
roger.tan2
DN: CN=roger.tan2
Reason: I am
roger.tan2
approving this
document
Date: 2020.05.13
16:57:43+08'00'
REVISION
DESCRIPTION DATE ORIGINATOR REVIEWER APPROVER
NO.
1A ISSUED FOR COMMENT 26-Sep-19 VV LHK RT
REVISION
SHEET DESCRIPTION TOTAL PAGE
O1 F1 F2
1 COVER SHEET 1 PAGE X X X
2 REVISION CONTROL PAGE 1 PAGE X X X
3 INDEX SHEET 1 PAGE X X X
4 NOTES SHEET 1 1 PAGE X X X
5 NOTES SHEET 2 1 PAGE X X X
6 NOTES SHEET 3 1 PAGE X X X
7 27PIA-503-TX 1 PAGE X X
8 27PIA-510-TX 1 PAGE X X
9 27PICA-508-TX 1 PAGE X X
10 27PI-509-TX 1 PAGE X X X
11 27PICA-514-TX 1 PAGE X X
12 27PI-520-TX 1 PAGE X X
13 27PIA-521-TX 1 PAGE X X
14 27PI-524-TX 1 PAGE X X
15 27PICA-531-TX 1 PAGE X X
16 27PSA-534-TX 1 PAGE X X X
17 27PZA-532-TX 1 PAGE X X X
18 83PICA-038-TX 1 PAGE X X
19 27PI-553-TX 1 PAGE X X
20 27PIA-554-TX 1 PAGE X X
21 27PIA-526-TX 1 PAGE X
22 27PIA-527-TX 1 PAGE X
23 27PZA-538-TX 1 PAGE X
24 27PZA-539-TX 1 PAGE X
25 27PZA-540-TX 1 PAGE X
26 27PZA-541-TX 1 PAGE X
27 27PZA-542-TX 1 PAGE X
28 27PZA-543-TX 1 PAGE X
29 SUPPLIER DOCUMENTATION REQUIREMENT 1 1 PAGE X X X
30 SUPPLIER DOCUMENTATION REQUIREMENT 2 1 PAGE X X X
31 DEVIATION LIST 1 PAGE X X X
32 ATTACHMENT 1: PRESSURE TRANSMITTER 1 PAGE X X X
PROCESS SPECIFICATION, Rev.F1
Page 3 of 32
DATA SHEET NO.:
DATE
CLIENT: SHELL EASTERN PETROLEUM PTE LTD. SITE: PULAU BUKOM, SINGAPORE 0591-8550-DS-03-0011
Page 4 of 32
DATA SHEET NO.:
DATE
CLIENT: SHELL EASTERN PETROLEUM PTE LTD. SITE: PULAU BUKOM, SINGAPORE 0591-8550-DS-03-0011
Model no. specified for item 26 are indicative, vendor to verify wetted part material is suitable for process conditions.
HOLDS
Page 5 of 32
DATA SHEET NO.:
DATE
CLIENT: SHELL EASTERN PETROLEUM PTE LTD. SITE: PULAU BUKOM, SINGAPORE0591-8550-DS-03-0011
1 ISBL PEFS:
Wood Dwg No Shell PEFS No.: Rev.
0591-8110-25-0014 T-1.477.150 R2
0591-8110-25-0016 B-4.042.891 R2
0591-8110-25-0017 B-4.042.892 R2
0591-8110-25-0018 B-4.042.893 R2
0591-8110-25-0019 B-4.042.894 R2
0591-8110-25-0034 B-4.042.921 R2
0591-8140-25-0001 B-4.042.951 S2
2 APPLICABLE DEPS:
DEP No Ver. Description
32.31.00.32 Feb.2018 INSTRUMENTS FOR MEASUREMENT AND CONTROL
62.10.08.11 Feb.2018 INSPECTION AND FUNCTIONAL TESTING OF INSTRUMENTS
37.001 B INSTRUMENT IMPULSE LINES
Page 6 of 32
DATA SHEET FOR PRESSURE TRANSMITTERS contr.job no:1-PD-0591E
Rev Units Units
1 GENERAL: --- 60 GENERAL
2 Tag number --- 27PIA-503-TX 61 Plant '--- LPG 4
62
3 Service --- LEAN ADIP Location/Unit '--- H2S EXTRACT/2750
4 P.E.F.S darws. Number --- 0591-8110-25-0016 63 Zone '--- ZONE 2
5 64 Gas group '--- IIA/IIB
6 Intermediate revison - 65 Temp category '--- T3
7 66
8 BODY: 67 ELECTRONICS:
9 Meter type --- C/W REMOTE MANIFOLD 68 Type '--- INTEGRATED
10 Measuring function --- GAUGE 69 Transmission type '--- 2-WIRE
11 Measuring method --- CAPACITANCE 70 Supply VDC 24
12 Body material --- AL W/ LOW CU CONTENT 71 Output Signal mA 4-20, HART
EPOXY COATED
ALUMINIUM
72
POLYURETHANE
13 Fill fluid --- SILICONE Housing material --- COATED
14 Diaphragm material --- HASTELLOY C276 73 Electrical connections --- SCREW TERMINALS
15 Gasket material --- GLASS-FILLED PTFE 74 Cable entry '--- M20 x 1.5
16 Gold coating --- N/A 75 Explosion prot. Cert.transmitter '--- Ex d IIC, T5/T6
17 Bolt --- 316 SST 76 Weather protection '--- IP66
18 Nuts --- 316 SST 77 Mounting brackets '--- YES
19 Over pressure 78
20 Range limits 79
21 80
22 81
23 82 RANGE
24 83 Calibrated range barg 0 / 16
25 84 Output form LINEAR
BETTER THAN 0.25%
85
26 Accuracy % OF ADJUSTED SPAN
27 86 Burnout value min/max mA NOTE 1
28 87 Saturation value min/max mA NOTE 1
29 88
30 PROCES DATA 89 SPECIAL REQUIREMENTS
31 Medium/Phase '--- LEAN ADIP / LIQUID 90
32 91 Test requirements
33 Operating conditions Min Norm Max 92 Validation '---
34 pressure barg - 5.8 11 93 MAC- value '---
35 Temperature °C - 45 - 94 Advise chemical requirements '---
36 95 NACE requirements '---
37 96 Material certificate '--- N/A EN 10204-3.1B
38 Corrosive '--- 97 Mati. Cert. file no. '---
39 Toxic '--- 98 Oxyen service '---
40 Pulsation '--- 99
41 100
42 Design pressure barg 15.1 (G.NOTE3) 101
43 Design Temperature min/ max °C 80 (G.NOTE3) 102
44 103
45 104
46 105
47 106 NON-VENDOR RELATED INFO
48 107
49 108 Winterizing heating
50 109 Grid position '---
51 110 Design code '---
52 111 Shell registration no. '---
53 112 Mesc number '---
54 PURCHASE DATA 113 REMARKS
55 Manufacturer '--- EMERSON 114 1. Burnout and Saturation Value as per NAMUR NE 43
56 Supplier '--- EMERSON 115 2. 2-Way valve manifold, G1/4 with 3/8" tube fitting
3051CG4A03A1BH2SJE7Y2L4M
116
57 Model number '--- 5Q4D4T1C4P1DO ½" NPT Female x 3/8" NPT, provide
58 Serial number '--- N/A 117 necessary adaptor compression fitting (if required) to
59 Item number '--- 1 118 connect to 3/8" SS tubing
62
3 Service --- C-2751 Location/Unit '--- H2S EXTRACT/2750
4 P.E.F.S darws. Number --- 0591-8110-25-0016 63 Zone '--- ZONE 2
5 64 Gas group '--- IIA/IIB
6 Intermediate revison - 65 Temp category '--- T3
7 66
8 BODY: 67 ELECTRONICS:
9 Meter type --- C/W REMOTE MANIFOLD 68 Type '--- INTEGRATED
10 Measuring function --- GAUGE 69 Transmission type '--- 2-WIRE
11 Measuring method --- CAPACITANCE 70 Supply VDC 24
12 Body material --- AL W/ LOW CU CONTENT 71 Output Signal mA 4-20, HART
ALUMINIUM
72
13 Fill fluid --- SILICONE Housing material --- POLYURETHANE
14 Diaphragm material --- HASTELLOY C276 73 Electrical connections --- SCREW TERMINALS
15 Gasket material --- GLASS-FILLED PTFE 74 Cable entry '--- M20 x 1.5
16 Gold coating --- N/A 75 Explosion prot. Cert.transmitter '--- Ex d IIC, T5/T6
17 Bolt --- 316 SST 76 Weather protection '--- IP66
18 Nuts --- 316 SST 77 Mounting brackets '--- YES
19 Over pressure 78
20 Range limits 79
21 80
22 81
23 82 RANGE
24 83 Calibrated range barg 0 / 25
25 84 Output form LINEAR
BETTER THAN 0.25%
85
26 Accuracy % OF ADJUSTED SPAN
27 86 Burnout value min/max mA NOTE 1
28 87 Saturation value min/max mA NOTE 1
29 88
30 PROCES DATA 89 SPECIAL REQUIREMENTS
31 Medium/Phase '--- LPG / LIQUID 90
32 91 Test requirements
33 Operating conditions Min Norm Max 92 Validation '---
34 pressure barg - 17.8 - 93 MAC- value '---
35 Temperature °C - 43.8 - 94 Advise chemical requirements '---
36 95 NACE requirements '---
37 96 Material certificate '--- N/A EN 10204-3.1B
38 Corrosive '--- 97 Mati. Cert. file no. '---
39 Toxic '--- 98 Oxyen service '---
40 Pulsation '--- 99
41 100
42 Design pressure barg 42 / FV (G.NOTE1) 101
43 Design Temperature min/ max °C -29/120 (G.NOTE1,2) 102
44 103
45 104
46 105
47 106 NON-VENDOR RELATED INFO
48 107
49 108 Winterizing heating
50 109 Grid position '---
51 110 Design code '---
52 111 Shell registration no. '---
53 112 Mesc number '---
54 PURCHASE DATA 113 REMARKS
55 Manufacturer '--- EMERSON 114 1. Burnout and Saturation Value as per NAMUR NE 43
56 Supplier '--- EMERSON 115 2. 2-Way valve manifold, G1/4 with 3/8" tube fitting
3051CG5A03A1BH2SJE7Y2L4M
116
57 Model number '--- 5Q4D4T1C4P1DO ½" NPT Female x 3/8" NPT, provide
58 Serial number '--- N/A 117 necessary adaptor compression fitting (if required) to
59 Item number '--- 2 118 connect to 3/8" SS tubing
4 5 6
This Supplier Documentation Requirements is in conjunction with the FW Standard “General Notes for
Requisitions”, document no. 0605-8820-GN-00-0001, defines the scope of documentation for all Supplier Documents
SUPPLIER shall include the supply of all Documentation to define the Equipment supplied for the purposes of:
•Integration into the Plant Design
•Design Code Compliance
•Regulatory Authority Approval
•Installation, Operation and Maintenance
Page 29 of 32
DATA SHEET NO.:
DATE
CLIENT: SHELL EASTERN PETROLEUM PTE LTD. SITE: PULAU BUKOM, SINGAPORE 0591-8550-DS-03-0011
4 5 6
NOTES FOR SUPPLIER DOCUMENT SUBMISSION TABLE
1) Documents for review shall be submitted via e-procurement process. No hard copy is required to be submitted
2) Documents shall be submitted in accordance with a DUE DATE CODE as follows
A2 DOCUMENT TIMING
A2.1.1 WITH QUOTE
Q Documents shall be submitted with the Quotation.
A2.1.2 FOR REVIEW
Documents shall be submitted in accordance with a DUE DATE CODE as follows
An : n weeks after order placement (normally n=3)
Bn=3 : n weeks after receipt of PURCHASER information (normally n=3)
Dn : n weeks after equipment dispatch (normally n=2)
E : As information becomes available
F : 1 month prior to equipment dispatch and one copy with equipment
G : at Final Inspection
A2.1.3 DATA BOOKS
VDB : n weeks after order placement (normally n=3)
Supplier may specifically note that the MR has total 3nos of WBS as listed at below:
WBS01= ISBL
WBS02= OSBL
WBS03= COMMON AREAS
Each WBS represents different unit/sections of the plant.
During document approval process supplier may combine documents of similar category (i.e Sizing
/ GAD /Reports etc), mentioned above, for all WBS (01 to 03) as single set / document
for XXXX/FWAPL approval
Approved documents/Certified Final documents are to be inserted in the Vendor Data Books as per
VDB index. These documents must be stamped and signed by the WOOD responsible engineer as
Code 4 or 5, as defined in the General Notes
Project requires that supplier provides separate VDB & CD for each WBS (01 to 03).
CD shall be structured for easy navigation to all documents listed in VDB index via use of bookmarks
/ links
The data book shall include 4 sets of hardcopy and 2 sets of electronics copy (CD ROM) for each
WBS (01 to 03).
Page 30 of 32
DATA SHEET NO.:
DATE
CLIENT: SHELL EASTERN PETROLEUM PTE LTD. SITE: PULAU BUKOM, SINGAPORE 0591-8550-DS-03-0011
4 5 6
DEVIATIONS LIST
SUPPLIER shall list all deviations to the Material Requisition and reference documents that are included in the
requisition. SUPPLIER’s quotation is deemed to comply with all requirements except those are brought out
in the deviation list
SUPPLIER’s scope of work and supply shall fully comply with the requirements of this requisition except for the
deviations listed in the following table
Note, SUPPLIER shall propose alternatives and/or the impact, cost and delivery, to comply with the
requirements of the material requisition and associated documents for each deviation tabled
Page 31 of 32
DATA SHEET NO.:
DATE
CLIENT: SHELL EASTERN PETROLEUM PTE LTD. SITE: PULAU BUKOM, SINGAPORE 0591-8550-DS-03-0011
4 5 6
ATTACHMENT 1: PRESSURE TRANSMITTER PROCESS SPECIFICATIONS, Rev.F1 (20 PAGES)
Page 32 of 32