Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
N/A
Overlap Shiplap Fixed Opening No Solid Sheet T&G Floor Solid Sheet T&G Roof
Cladding Cladding Windows Windows Windows Floor Roof
BUILDING A BASE
8x6 Overlap Reverse Apex Single Door Fixed Window When thinking about where the building and base is going to be constructed:
Ensure that there will be access to all sides for maintenance work and annual
For Assistance Please
treatment. Contact Customer Care on
Ensure the base is level and is built on firm ground, to prevent distortion. Refer
01636 880514
to diagrams for the base dimensions, The base should be slightly smaller than
01OSBRA0806SDFW-V1 the external measurement of the building, i.e. The cladding should overlap the
base, creating a run off for water. It is also recommended that the floor be at
8x6 Shiplap Reverse Apex Single Door Fixed Window least 25mm above the surrounding ground level to avoid flooding.
Mercia Garden Products Limited, Sutton On Trent, Newark, Nottinghamshire, NG23 6QN
www.merciagardenproducts.co.uk
Before assembly
please make sure you have a
suitable base ready to erect your
building
Building content
3
1 2 4 6
5
20mm Screw x 12 5
Pad Bolt
13 Qty 1 30mm Black Screw x 2
30mm Screw x 68
Finial x2 18
Felt 40mm Screw x 36
50mm Screw x 26
P2
Please retain product label and instructions for future reference
Step 1 Step 3
Place the floor on a firm and level base, Fix the corners with 50mm 3
ensure the base has suitable drainage free screws as shown in diagram.
from areas where standing water can collect. 9x50mm Screws
1
See the front page for base requirments.
Pre drill
hole
4
50mm
screw
Step 2
Fix the corners with 50mm screws
as shown in diagram.
2 3
Do not secure the building to the
floor until the roof is fitted. Step 4
Place the ridge bar in between the two
Position the panels so there is equal spacing gables. Ensure the top corners of the
between the floor and cladding on all 4 sides
ridge bar sit flush with the top points of
3x50mm Screws
the gable. Fix the ridge bar to the gable
using one L bracket for each end.
Fix with 4x20mm screws each
Pre drill
hole
8x20mm Screws
Pre drill
hole
50mm
screw 20mm
screw
8
16
P3
Please retain product label and instructions for future reference
Step 5 Step 7 18
Fix two eaves frames to each roof sheet
using 3x30mm screws per eave.
Cut the felt into two 1894mm long sheets
Fix the roof sheets to the roof ensuring
and lay onto roof as shown in diagram
they come together at the top using ensuring there is overhang around the
40mm screws directly through the roof sides.
sheet at the top. Make sure to attach the
roofs to the ridge bar.
10 Felt
30mm tacks
screw 10 18 18 63x Tacks
Pre drill
hole
Step 6
b Once the roof is fixed 1
attach the building to 2
the floor with 50 mm
screws.
4 HANDLE
Pre drill
hole WITH CARE
50mm
screw
P4
Please retain product label and instructions for future reference
10x30mm Screws
14
12
11
Step 9 30mm
screw Pre drill
30mm
screw
16x40mm Screws
40mm
screw
Pre drill
hole
P5
Please retain product label and instructions for future reference
Step 11
Fix the pad bolt with 6x30mm
screws to the horizontal brace
on the door. Then fix the pad
bolt retainer to the door panel
framing using 4x30mm screws.
30mm
screw
15
30mm
screw
17
P6