Authorized By:
Mr. S. Chandramouli
XXX INDIA PRIVATE LIMITED Page : 2 of 9
Quality Procedure Manual Issue : 1
DM/2/FDY/P11 Date : May’17
Effectiveness
Adherence to X Axis -
schedule Product wise / Month Marketing In-
1 Monthly Chart Monthly
(Delivery Marketing Y Axis – DSA Charge
performance) %
X Axis -
Adherence to Product wise /
Month
2 Production PPC In Monthly Chart Monthly PPC In charge
Y Axis – PSA
schedule Charge
%
Efficiency
X Axis -
Foundry
Finished goods Month Marketing In-
1 wise / Monthly Chart Quarterly
inventory Y Axis - No of Charge
Marketing
tons
Customer line Overall / X Axis - Marketing In-
2 Monthly Chart Quarterly
stoppages marketing Month Charge
Authorized By:
Mr. S. Chandramouli
XXX INDIA PRIVATE LIMITED Page : 3 of 9
Quality Procedure Manual Issue : 1
DM/2/FDY/P11 Date : May’17
Y Axis - No of
occurrences
X Axis -
Every Chart PPC / Fettling In
3 WIP inventory Overall / PPC Month Monthly
Month charge
Y Axis - Tons
Authorized By:
Mr. S. Chandramouli
XXX INDIA PRIVATE LIMITED Page : 4 of 9
Quality Procedure Manual Issue : 1
DM/2/FDY/P11 Date : May’17
11.0 Turtle diagram:
Turtle Diagram - Scheduling & Planning process
Ramco ERP system, DWM board, PC Printer.E-Mail Marketing in charge / PPC In charge /
Manufacturing head
Input Output
Support Processes
Authorized By:
Mr. S. Chandramouli
XXX INDIA PRIVATE LIMITED Page : 5 of 9
Quality Procedure Manual Issue : 1
DM/2/FDY/P11 Date : May’17
12.0Process Flow Diagram:
Authorized By:
Mr. S. Chandramouli
XXX INDIA PRIVATE LIMITED Page : 6 of 9
Quality Procedure Manual Issue : 1
DM/2/FDY/P11 Date : May’17
Scheduling & Pla nning process
Reference
Documents /
document /
Input Job Position Activity Records
Details of
generated
activity
Customer
RL Marketing Review of schedules
schedule / order
Customer
schedule,
Previous Convert customer schedule into Despatch
RL Marketing consolidated despatch schedule COD
schedules and schedule
and release schedule to planning
Despatch
statement
Despatch
Che ck for Yes Lead time f or
schedules, Capacity
PPC In charge capacity manuf acture,
Preventive availability transportation verification report
Maintenance
Capacity
E-Mail / Internal
verification PPC In charge No
Inform m arketing on
modifications required (If Any) Communication
report
Relevant
Delivery Monthly
Process Production Planning DM/3/PPC
Schedule Production Plan
Owner
Monthly Weekly
PPC In charge Weekly Production plan DM/3/PPC
Production Plan production plan
Monthly
Core Production
Production Plan Core shop In Core Production
Plan
/ Weekly Charge plan
production plan
Customer
Urgent
Communication Updated Weekly
Marketing Customer
for Urgent requirement Production Plan
Requirement
Disa loading
Weekly Disa
PPC In charge Daily Plan DWM Report sheet
loading sheet
FIPL/PPC/01
Disa loading Manufacturing Relevant
sheet supervisors / production as per plan Procedures / Production log
FIPL/PPC/01 operators WI's
Production
Daily works management Board / DWM
Plan, Previous meeting
PPC In charge DM/3/PPC report -
day
FIPL/PPC/02
performance
Gap
Board / DW M Manufacturing Board / DWM
report - supervisors / Gap Analysis And report -
Implementation of the
FIPL/PPC/02 operators FIPL/PPC/02
corrective Action
PPC &
Weekly Weekly Review
Marketing In W eekly Review DM/3/PPC
schedule Minutes
charge
Finishing In
Daily warehouse
charge/marketi Movement to warehouse
stock statement
ng
Customer Advance
Despatch to customer and DM/3/CSR /
schedule/ Marketing inform them if required shipment
precontract
Warehouse Rep. notification /
review
statement inspection reports
Delivery
Marketing Update weekly despatch
performance Weekly Schedule
Rep. schedules and adjust the
report arrears in the next week
Delivery Delivery
Marketing
performance Prepare delivery Performance
Rep.
report performance report report
Mr. S. Chandramouli
XXX INDIA PRIVATE LIMITED Page : 7 of 9
Quality Procedure Manual Issue : 1
DM/2/FDY/P11 Date : May’17
DAILY WORK MANAGEMENT
Reference
Documents /
document /
Input Job Position Activity Records
Details of
generated
activity
Monthly
Daily plan Previous day
Production PPC In charge Production Plan
performance
Schedule
No
Board / DWM Manufacturing Board / DWM
report - supervisors / Identify the gap and analyse DM/3/PPC report -
FIPL/PPC/02 operators FIPL/PPC/02
Board / DWM Manufacturing Board / DWM
report - supervisors / Identify the corrective action DM/3/PPC report -
FIPL/PPC/02 operators FIPL/PPC/02
Board / DWM Manufacturing
report - supervisors / Implement the corrective action DM/3/PPC
FIPL/PPC/02 operators
* DWM is only followed at manufacturing functions
Notes:
Every Purchase Order / amendment received from customer, after the development
of castings is to be reviewed by Marketing Department, for the requirements against the
agreed customer requirements as documented in COD. If there are any differences,
marketing is to resolve the same with the customer and after resolving / ascertaining
that internal capability exists to meet the differences. COD to be amended if required.
Similarly for regular schedules received from customers, Marketing is to review the
schedule for internal capability to meet the requirements and against the current COD
and if acceptable, the same is to be incorporated in the dispatch schedule as required
by reviewing authority in marketing. COD to be amended if required. If discrepancy is
noticed, the same is to be informed to customer suitably and agreed upon.
Authorized By:
Mr. S. Chandramouli
XXX INDIA PRIVATE LIMITED Page : 8 of 9
Quality Procedure Manual Issue : 1
DM/2/FDY/P11 Date : May’17
Monthly dispatch schedule is to have foundry code issue no. Reference for each
foundry code.
The number of shots made in each pattern plate is to be monitored through history
card and recorded in the number of shots monitoring register on a monthly basis.
Whenever the number of shots reaches the number of shots specified, inspection is to
be intimated for carrying out layout inspection.
When the deviation of actual from the plan is within + 5% / - 10% the deviation is
accepted. No actions will be initiated generally. If it exceeds this norm the corrective
actions are initiated. Wherever required actions and follow up will be carried out by the
Department heads.
Castings are to be dispatched as per the current COD till the validity, as mentioned in
the COD to be amended if required
Marketing department is to inform the customers about the changes from the
scheduled quantity and is to take care of the previous month's changes in the
subsequent month's dispatch schedules.
LOGISTICS PROCESS:
Container is to be booked from approved shipping lines once sufficient stock available
in warehouse. This is ensured with the information from warehouse & finishing.
Container capacity, packing list will be ensured for its statutory requirements by
marketing.
Authorized By:
Mr. S. Chandramouli
XXX INDIA PRIVATE LIMITED Page : 9 of 9
Quality Procedure Manual Issue : 1
DM/2/FDY/P11 Date : May’17
Packing method, packaging control will be carried out by warehouse as per DM/3/WHP
Authorized By:
Mr. S. Chandramouli