Sei sulla pagina 1di 13

SPECIFICATION FOR CORE & JACKET

0 14.07.2015 First Issue NV US SVK


Rev. Date Revision Description Issued By Checked By Approved By

TABLE OF CONTENTS
1.0 GENERAL..................................................................................................................................................4
1.1 INTRODCUTION........................................................................................................................................4
Page 2 of 20
Title: Specification for Steam Jacketing
1.2 SCOPE......................................................................................................................................................4
2.0 STEAM JACKETING SYSTEM......................................................................................................................4
2.1 GENERAL..................................................................................................................................................4
2.2 TYPES OF JACKETING................................................................................................................................4
2.3 IDENTIFICATION.......................................................................................................................................4
2.4 APPLICATIONS..........................................................................................................................................5
2.5 STEAM SUPPLY TO JACKET.......................................................................................................................5
2.6 INDIVIDUAL STEAM JACKET SERVICE........................................................................................................5
3 MATERIAL...................................................................................................................................................7
4 FABRICATION AND ERECTION.....................................................................................................................7
5 INSPECTION AND TESTING..........................................................................................................................7
6 FABRICATION, INSPECTION & TESTING SEQUENCE FOR FULLY JACKETED PIPING ITEMS...........................8
7 INSPECTION AND TESTING..........................................................................................................................8
Page 3 of 20
Title: Specification for Steam Jacketing

1.0 INTRODUCTION

2.1 GENERAL
The steam jacketing system consists of:

 The steam supply piping to the jackets

 The individual steam jacket circuits

 The condensate outlet piping to condensate header; steam traps & traps installation.

2.2 TYPES OF JACKETING


Continuous Jacketing

All straight lengths, flanges, fittings, valves and branch connections are fully jacketed.

Discontinuous Jacketing

Only straight lengths of pipes are jacketed. Flanges, tees, elbows, branch connections and welds are not
jacketed.

2.3 IDENTIFICATION
All piping requiring steam jacketing shall be shown on the P&ID and piping drawings indicating continuous
(The steam supply to each jacketed circuit should be taken from the main header or sub headers for jacketing.
The steam header or sub header shall be provided with steam traps.

 The supply line to each circuit shall be provided with a globe valve. Size to be ½” NB for 4” x 3” jackets
and smaller and ¾” NB for 6” x 4” jackets and larger.

 All take offs from the steam header or sub headers shall be taken from the top.

 The valves at the steam supply stations and also the steam traps shall be provided with a name-plate
with the line no. of the pipe being jacketed.

2.6 INDIVIDUAL STEAM JACKET SERVICE


2.6.1 Jacketed Circuits – Construction of pipe sections

a) A steam jacket pipe consists of a process line which passes through the centre of a large
diameter steam line. The nominal sizes of the inner pipe (core) and outer pipe (jacket) in
inches are as given in the table below:

Inner Pipe (Process) Outer Pipe (Jacket)


(In Inches) (In Inches)
Page 4 of 20
Title: Specification for Steam Jacketing

¾“ 1½ “
1” 2”
a. Condensate drain lines from each circuit to steam traps to be as short as possible for gravity drainage.

b. The discharge line of the steam trap shall be as short as possible and self draining.

c. Each steam jacket circuit shall be provided with its own trap.

d. Arrangement of condensate manifold is shown in sheet 10 of 19.

e. The steam traps must be installed in the horizontal line.

f. The discharge from a number of steam traps may be combined into a common sub-header which is
connected to main condensate header

3 MATERIAL
All piping materials for process line (inner core) and outer jacket shall be in accordance with material
specifications. Material

NOTE: For cases when the inner core is 150# carbon steel and is being jacketed by MP / HP Steam. Contractor
to check the thickness for the core pipe and shall use the same after getting Pyramid approval. However, in no
case thickness to be decreased less than the thickness of core pipe as per the original specification.

4 FABRICATION AND ERECTION


 Fabrication and erection of piping systems shall be done as per Pyramid specification.

 Each weld of the inner pipe shall be accessible for X-raying and shall be visible during hydro testing.
Therefore, split jackets shall be used to enable inspection of each inner pipe weld.

 Longitudinal welds from the split pipe jackets and split tees or reducers shall be staggered to avoid
cross weld.

 When a jump over or condensate return connection is required in split jacket, first the connection
shall be

 return piping are connected to the jacket.

6 FABRICATION, INSPECTION & TESTING SEQUENCE FOR FULLY JACKETED PIPING


ITEMS
(TYPICAL SEQUENCE FOR JACKETED PIPE SPOOL)

1. Weld one end flange onto inner pipe.

2. Weld guide strips onto inner pipe.

3. Weld wears plates onto inner plate.

4. Slide jacket pipe (minus split collar) over inner pipe.


Page 5 of 20
Title: Specification for Steam Jacketing
5. Weld remaining and flange to other end of inner pipe.

6. Perform N.D.E. of inner pipe as per Pyramid specification.

7. Hydro test inner pipe spool.

Steam Supply Manifold (Typical)

Condensate Manifolds (Typical)

Modified Blind Flange

Fully jacketed Pipe spool

Jump overs, Cross and Branch connection details for continuous jacketing

Details of Reducers, Vent, Drains and instrument connection for continuous jacketing

Baffle usage in jacketed (continuous) line

Discontinuous Jacketing Piping details

Centering Guides for Jacket

Fully Jacketed Branch Connection on non jacketed pipe

NOTES:

1. Minimum size of sub-header and the supply line will be 1” for Max. 4 x ¾ “ OR 6 x ½ “ supply lines to
jacket 1½ “ for maximum 6 x ¾ “ OR 8 x ½ “ supply lines to jacket.

2. Supply line to jacket shall be ½“for ¾ “jackets and smaller for ¾ “for 4” x 6” jackets and larger.

NOTE:

If line is ¾ “, use ¾ “x ½ “swage before the trap.


Page 6 of 20
Title: Specification for Steam Jacketing
No. OF DIA OF
PROCESS JACKET d2 D2 C1 C T
BOLT HOLE
LINE NB LINE NB (MM) (MM) (MM) (MM) (MM)
HOLES (MM)
½” 1” 22.4 108 51 79.5 4 15 14.5
¾” 1–½“ 27.7 127 73 98.5 4 15 17.5
1” 2” 34.5 152 92 120.5 4 19 19.1
1–½“ 3” 49.5 190 127 152.5 4 19 23.9
1)For tolerances refer Section 7 of B 16.5

2)Facing of Flange shall be as per Material Specification.

NO.O
PROCES JACKE
D1 d1 d2 D2 C1 C F DIA. OF HOLE T
S LINE T LINE
(mm) (mm) (mm) (mm) (mm) (mm) BOLT (mm) (mm)
NB NB
HOLES
1/2" 1" 33.4 21.34 22.35 107.65 50.8 79.25 4 15.75 14.22
3/4" 1-1/2" 48.26 26.67 27.69 127 73.15 98.55 4 15.75 17.53
1" 2" 60.32 33.4 34.54 152.4 91.95 120.65 4 19.05 19.05
1-1/2" 3" 88.9 48.26 49.53 190.5 127 152.4 4 19.05 23.88
2" 3" 88.9 60.32 61.98 190.5 127 152.4 4 19.05 23.88
3" 4" 114.3 88.9 90.68 229.6 157.23 190.5 8 19.05 23.88
1)Location of connection must allow for Bolt removal.

2)Guide strip height to provide clearance of maximum 1.5 mm

3)To provide space for the outer welding of the end flange to the inner pipe A split collar is required. Split
collar is made from 2 half pipe shells (cut from jacket pipe).
Page 7 of 20
Title: Specification for Steam Jacketing

NOTES:

1) For ‘Cross’ fabrication split the jacket into four longitudinal half pipe shells (dimensions as applicable for T-
fittings).

2) In process lines for equal branch, equal tee to be used reducing tee to be used if the branch size is 2” x
1.5”.

3) For fabrication of ‘Branch Connection’ split the jacket into two longitudinal half pipe shells
(dimensions as applicable for T-fittings)
Page 8 of 20
Title: Specification for Steam Jacketing

NOTES:

1) Vent size (inner core) shall be 1” NB or as per P&ID.

2) Drain size on process lines 3” NB & above shall be 1” NB.

3) Drain connections for process lines up to 2” NB shall be equal sized.

4) Jacket fitting to be 2” NB equal tee for process line size 1” NB. 3” NB & 2” NB Reducing Tee for process line
size 2” NB & for process line sizes 3” NB & above see branch off connections in PMS.

5) Drain on jacketed lines to be provided only when it is a must.

6) Temperature connections size (inner core) shall be 0.5” NB or as per P&ID.

7) Pressure connections size (inner core) shall be 1.5” NB or as per P&ID.


Page 9 of 20
Title: Specification for Steam Jacketing

PROCESS PIPE ½” ¾” 1” 1½” 2” 3” 4” 6” 8” TOLERANCES


NOMINAL
DIA +1
JACKET PIPE 1” 1½” 2” 3” 3” 4” 6” 8” 10”
-0

+1
Ø 43 58 70 99 99 124 178 229 283
-0

+ 0.5
Ø1 23 28 35 50 62 91 116 170 221
-0
BAFFLE
No. of Holes 2 2 2 2 2 3 3 3 3 -

T 6.5 6.5 10.5 14.5 12 10 16.5 15.5 16 ±1

Ø2 5 5 5 6 5 10 10 10 10 ± 0.5

NOTES:
Page 10 of 20
Title: Specification for Steam Jacketing
1) The drain holes of Baffle shall be located to vent the jacket as possible.

2) The Baffle material shall be as per Jacket material.

3) The Jacket of deadline stop valve shall be fed in parallel with the jacket of main line or in series with the
jacket of deadline.

4) Avoid process line pockets lines shall be self draining and valve stems, vertically mounted as far as possible.

5) Baffles can be replaced by flanges as per convenience.

6) Minimize the length of ends dead way on process line.


Page 11 of 20
Title: Specification for Steam Jacketing
Page 12 of 20
Title: Specification for Steam Jacketing

PROCESS LINE MAX. ROD


JACKET LINE NB Flat Bar
NB DIST. D
A B
BETWEEN
Wall GUIDES C E mm
Inch. mm Inch. mm Sch. Thk. IN M
mm mm mm mm mm  
¾“ 20 1½“ 40 80 5.08 26.67 38.1 2 - - 5
1” 25 2” 50 40 3.91 33.4 52.5 2 - - 8
1½“ 40 3” 80 40 5.49 48.26 77.92 2 6 13 -
2” 50 3” 80 40 5.49 60.32 77.92 2.5 6 7.5 -
3” 80 4” 100 40 6.02 88.9 102.26 3 6 5.5 -
4” 100 6” 150 40 7.11 114.3 154.05 4 8 18 -
6” 150 8” 200 20 6.35 168.27 206.37 4 10 18 -
8” 200 10” 250 20 6.35 219.07 260.35 4 16 19 -

NOTES:

1) Guide material shall be as per process line material and shall be supplied by fabricator.

2) The dimensions in the table above are for a 150# jacket as per specification. For 300# or higher rating
jacket the dimensions shall be suitably calculated by the fabricator.
Page 13 of 20
Title: Specification for Steam Jacketing

NOTE:

1)Location of connection must allow for bolt removal.

Potrebbero piacerti anche