report and OML 112 respectively) were analysed. pressure data for
xxx However, the cobany did not include the both Okoro and
current reservoir pressure for Okoro field Ima field should
and the initial pressure for Ima field in their be provided.
report.
The aim of this analysis is for reservoir
pressure surveillance, without coblete
pressure data, it is difficult to determine the
pressure performance of the respective
reservoirs.
BHP Six wells namely 1D, 4C, 7B, 13LS, 13SS and The cobany should
program 14SS were proposed. The date of survey was provide the
yyyy not included in the programme. proposed date of
survey.
10 Exploration BHP Eroton did not execute the xxx BHP survey A requisition
and report analysis and no information was provided should be made to
Production. xxx with respect to that. the cobany for a
cobrehensive
report on how the
reservoir pressure
in xxx was
monitored,
without carrying
out the BHP
survey analysis.
BHP A total of 34 reservoirs and 34 wells were An explanation is
program proposed for the yyyy BHP survey required from the
yyyy programme. cobany on the
reason why the
It was observed from the first half yyyy TA, listed reservoirs
that nine reservoirs namely: D7000A, were not included
D5000A, E1000X, F1700B, C6000C, F2000A, in the yyyy survey.
D2000C, S9000A and C5400E were allocated
TA but were omitted from the yyyy BHP A proposed yyyy
survey plan. BHP survey with
provisional date
Furthermore, Eroton did not incorporate a and type of survey
time schedule and type of survey for the should be
proposed yyyy BHP survey programme. provided.
Furthermore, the
BHP report for
Njaba A2 and
Njaba AA-4 should
be provided.
BHP 50 reservoirs and 59 wells were proposed for The cobany should
program the BHP programme without the date of furnish the
yyyy survey. Department with
tentative dates for
It was observed from the first half yyyy TA, the survey.
that 19 reservoirs from six different fields
P a g e 2 | 12
were allocated TA but were omitted from Information
the yyyy BHP survey plan. The reservoirs are should be
as follows: P5 (Adang field), AA-01J (Ebughu provided as to
field), A1.1, A2 and AA3 (Izombe field), AA1.6, why the listed
AA1.3, and AA1.4 (OSSU field), BO, OR-A and reservoirs were
RE-A (NDA field), GN, GO, BO, OR-A, PI-A, PI- not included in the
C, RE-A and RE-B (Okwori field). yyyy survey.
23 Nigerian B Oil BHP 10 reservoirs from six fields were analysed. To maintain the
Cobany report Three reservoirs namely T, IV-C and J2 met reservoir pressure
Limited. xxx the conditions for pressure maintenance. and sustain
The first reservoir T had 45% pressure production, the
decline, P1+P2 = 15.63MMB and fractional three reservoirs
recovery = 7%. should undergo
Mbede IV-C pressure decline provided is 69%, pressure
remaining reserves= 27.81MMB and maintenance.
fractional recovery = 26%.
And lastly, J2 had 31% pressure decline,
11.45MMB P1+P2 and 2% fractional recovery.
The diagram on figure 5, page 20 provides a
clear picture of the decline in pressure from
initial to current. Figure 6. indicates the
remaining reserves.
Continuous production from the above-
mentioned reservoir will result in further
depletion.
BHP NAOC proposed a survey programme in two Proposed dates of
program areas namely land and swab. survey should be
yyyy For the land area a total of 55 reservoirs and provided.
55 wells were included without specific
dates. A total of 26 reservoirs were The cobany should
proposed for the swab area without the provide
date of survey. explanation why
the listed
When cobared with the 1H yyyy TA 109 reservoirs were
reservoirs from 26 fields were omitted, the omitted from the
following are the omitted reservoirs and yyyy BHP
their respective fields: Afuo field (G), Agwe programme.
P a g e 3 | 12
field (R), Akiri field (R, P2, QQ1), Alinso field
(F2AO), Azuzuama field (E-central, M),
Benboye field (A,B,Clw, C, FI,G,H, J, L,M),
Beniku field (IIH), Ebegoro field (J3, J2, J1, H,
J2/J3), Ebocha field (IVD 2, IIE, IVD 1, IVB 2,
IV_2A, IIIF, IIA, IIIG, III_12A, IV_2A, IVB 1), IDU
(F,L,U,S,E,C), Isoko field (Q&P, O), Kwali field
(AH 26, AH 9, Kw 24, Kw17, AH3, Kw29A,
(AH22)M, AH2, (AH3), Mbede field (IIF,IIE,
IIID,IIM, IIIE, IIIC and IIIB), Nimbe south field
(B and S), Obama field (L, J P, K, H, Z O, M, N
and L), Obiafu field (K,KI, N), Obrikomi field
(K), Odugri field(M, F) , Ogainbiri field (G, F,
Go, I E, D, J, W, TI, TI Z), Oleh field (X,
HI,D/F,G), Omoku W field (N), Oshi field (T, R,
T30), Osiama Creek field (K4A, K 2DO-N),
K2DO-S), KSCO, Pririgbene field (EA,BI,I, IO,
B), Samabri field (AI H5, H2), Tebidaba field
(A,C), Umuoru field (M).
24 Mobil BHP 130 reservoirs were included in the report. BN did not provide
Producing report From the analysis carried out it was the remaining
Nigeria xxx observed that Asabo-IQI-4 with initial reserves.
Limited. pressure of 2140 psia and current reservoir
pressure of 2152psia had -1% pressure decline. The cobany should
Awawa_F8.0S with initial pressure of 2940 furnish the
psia and current reservoir pressure of department with
3549psia had -21% pressure decline. the fracture
Yoho_IBI-L with initial reservoir pressure of information of the
3310 psia and current reservoir pressure of reservoirs.
3589 psia had -8% pressure decline. Furthermore, they
should explain
how the current
pressure
exceeded the
initial reservoir
pressure.
BHP BN proposed to execute two set of BHP The proposed
program survey. The first is the BHP survey from date and type of
yyyy PDHG, a total of 75 reservoirs and 127 wells survey should be
were included. The second is the BHP survey provided
from wireline, a total of 68 reservoirs and 77
wells was proposed. The date of survey was
not included in the programme.
25 BHP A total of eight reservoirs and 136 wells were Already under
report included in the report. Seven reservoirs are injection.
P a g e 4 | 12
xxx already under injection.
BHP Two categories of BHP were proposed, the The date of survey
program first is BHP survey from PDHG with a total of should be
yyyy 13 reservoirs and 49 wells. There are 13 provided.
producer’s reservoirs, five under water
injection and eight under gas injection. The
second is from WHP extrapolation with a
total of six reservoirs and eight wells were
proposed for the 109-survey programme.
Four reservoirs are under water injection
while two reservoirs are under gas injection.
The date of survey was not included.
26 Nigerian BHP 54 reservoirs from seven fields were The four reservoirs
Petroleum report included in the report. Four reservoirs met should undergo
Development xxx the criteria for pressure maintenance. pressure
Cobany Eriemu field with reservoir (M1100X) had 12% maintenance.
Limited. pressure decline, p1+p2 = 29.82 MMB and
fractional recovery of 15%. The cobany should
P1000X in Olomoro field with 26% decline, explain why
P1+P2= 9.75MMB and fractional recovery M9500Y has a
46%. negative decline in
And lastly, P000X in Oweh field had 10% pressure.
pressure decline, P1+P2= 15.81MMB and
fractional recovery 44%. The second
reservoir (P4000X) had 12% pressure decline,
P1+P2= 13.96MMB and recovery fraction of
17%. Figure 7 and 8 in the appendix depicts
the pressure decline and remaining reserves
for the reservoirs.
BHP The plan for yyyy survey included seven The date of survey
program fields, 45 reservoirs and 46 wells. The type of should be
yyyy survey to be carried out is static gradient provided.
(SG). The date of survey was not provided.
27 B BHP Abana East and Abana West reservoir was B should provide
report included in the report. Abana West initial justification as to
xxx reservoir pressure provided was 1787.97 psia why the current
with 1874.76 psia as the current reservoir reservoir pressure
pressure. The reservoir had -4% pressure is greater than the
decline. initial pressure.
P a g e 5 | 12
BHP Two reservoirs were proposed for the BHP The proposed
program programme. Abana East with 12 wells and date of survey
yyyy Abana West with five wells. The type of should be
survey is build/drawdown. The date of provided.
survey was not provided.
28 Seplat BHP For the BHP report, five reservoirs from five The remaining
report different fields were analysed. E3000M reserves and
xxx (oben field), V2000 (Okporhuru field), cumulative
D6000N (Orogho field), I2000 (Ovohor field) production should
and G2000 (Sapele field). The cobany did not be provided to
use the teblate provided and therefore did determine the
not include Np and P1+P2 for the respective pressure
reservoirs. performance of
the reservoir.
BHP The report has not been submitted. The cobany is yet
program to submit the yyyy
yyyy BHP plan.
29 Pan Ocean BHP The cobany is yet to submit the survey The cobany only
report result. submitted the
xxx yyyy survey
programme.
BHP A total of eight fields was submitted. The The names of the
program names of the respective reservoirs were not respective
yyyy included. The type of survey to be executed reservoirs should
include FG/BU/SG. be provided.
30 Chevron BHP The remaining reserves and cumulative Request cobany to
report production were not included in the report. send remaining
xxx reserves and
cumulative
production.
BHP 168 reservoirs from 21 fields were proposed Tentative date of
program for the yyyy BHP survey. The proposed date survey should be
yyyy of survey was not included in the plan. provided.
From the analysis carried out, 10 reservoirs met the criteria for the initiation of pressure maintenance,
they include the following:
The spread sheet used for the analysis of the above-mentioned reservoirs is attached to the report.
APPENDIX
P a g e 7 | 12
5800 Pressure Plot
5600
5400
5200
Pressure (Psig)
5000
4800
4600
4400
4200
4000
1 2
E-1A/RB-03 C-08/RB-11 F-01/RB-04
Reservoir
E-12/RB-01 F-01/RB-01
4
P1+P2 (MMB)
0
E-1A/RB-03 C-08/RB-11 F-01/RB-04 E-12/RB-01 F-01/RB-01
Reservoir
P a g e 8 | 12
Pressure Plot
3200
3100
3000
2900
Pressure (Psig)
2800
2700
2600
2500
2400
2300
2200
1 2
Reservoir
D5 North Upper D5 North Lower
D5 North Lower D5 North Lower
6
P1+P2 (MMB)
0
D5 North Upper D5 North Lower D5 North Lower D5 North Lower
Reservoir
P a g e 9 | 12
Pressure Plot
6000
5000
Pressure (Psig)
4000
3000
2000
1000
0
1 2
T IV-C II-C kw17 J2
Reservoir
25
20
P1+P2 (MMB)
15
10
0
T IV-C II-C kw17 J2
Reservoir
P a g e 10 | 12
Pressure Plot
4300
4100
3700
3500
3300
3100
2900
2700
1 2
Reservoir
30
25
P1+P2 (MMB)
20
15
10
0
M1100X O9000X P1000X P4000X P0000X
Reservoir
P a g e 11 | 12