9  BHP The result for Ima and Okoro field (OML 117 The coblete

report and OML 112 respectively) were analysed. pressure data for
xxx However, the cobany did not include the both Okoro and
current reservoir pressure for Okoro field Ima field should
and the initial pressure for Ima field in their be provided.
report.
The aim of this analysis is for reservoir
pressure surveillance, without coblete
pressure data, it is difficult to determine the
pressure performance of the respective
reservoirs.
 BHP Six wells namely 1D, 4C, 7B, 13LS, 13SS and The cobany should
program 14SS were proposed. The date of survey was provide the
yyyy not included in the programme. proposed date of
survey.

10 Exploration  BHP Eroton did not execute the xxx BHP survey A requisition
and report analysis and no information was provided should be made to
Production. xxx with respect to that. the cobany for a
cobrehensive
report on how the
reservoir pressure
in xxx was
monitored,
without carrying
out the BHP
survey analysis.
 BHP A total of 34 reservoirs and 34 wells were An explanation is
program proposed for the yyyy BHP survey required from the
yyyy programme. cobany on the
reason why the
It was observed from the first half yyyy TA, listed reservoirs
that nine reservoirs namely: D7000A, were not included
D5000A, E1000X, F1700B, C6000C, F2000A, in the yyyy survey.
D2000C, S9000A and C5400E were allocated
TA but were omitted from the yyyy BHP A proposed yyyy
survey plan. BHP survey with
provisional date
Furthermore, Eroton did not incorporate a and type of survey
time schedule and type of survey for the should be
proposed yyyy BHP survey programme. provided.

11  BHP Four reservoirs in Umuseti field was The drive


report analysed. All five reservoirs had pressure mechanism for the
xxx decline < 10% and P1+P2 < 5MMB. reservoirs in
Umuseti field
The rate of pressure decline for the should be
reservoirs in Umuseti field does not investigated.
correspond to Np produced, the rate is low.
A good knowledge of the drive mechanism
would justify the decline rate.

12 

13 

14 


15 
16 

17 

18 

19 

20 

21 B Petroleum  BHP B submitted BHP survey report for only one The BHP survey
report reservoir AA-3 from Njaba field. report for the
xxx reservoirs in the
following fields
should be
provided: Adanga,
Adanga North,
Ebughu, Inanga,
North Oron, Oron
west, Kita Marine,
Izombe, Ossu,
Okwori and Nda.

Furthermore, the
BHP report for
Njaba A2 and
Njaba AA-4 should
be provided.
 BHP 50 reservoirs and 59 wells were proposed for The cobany should
program the BHP programme without the date of furnish the
yyyy survey. Department with
tentative dates for
It was observed from the first half yyyy TA, the survey.
that 19 reservoirs from six different fields

P a g e 2 | 12
were allocated TA but were omitted from Information
the yyyy BHP survey plan. The reservoirs are should be
as follows: P5 (Adang field), AA-01J (Ebughu provided as to
field), A1.1, A2 and AA3 (Izombe field), AA1.6, why the listed
AA1.3, and AA1.4 (OSSU field), BO, OR-A and reservoirs were
RE-A (NDA field), GN, GO, BO, OR-A, PI-A, PI- not included in the
C, RE-A and RE-B (Okwori field). yyyy survey.

22 Total Upstream  BHP Five reservoirs namely: A, B, D, EF and G Remaining


Nigeria report from Akpo field was submitted. The reserves not
Limited. xxx remaining reserves was not included in the included in the
report. report.
 BHP A total of five reservoirs and 36 wells were BHP programme
program proposed for the yyyy BHP programme. The analysed.
yyyy BHP programme would be executed in the
fourth quarter (Q4) yyyy.

23 Nigerian B Oil  BHP 10 reservoirs from six fields were analysed. To maintain the
Cobany report Three reservoirs namely T, IV-C and J2 met reservoir pressure
Limited. xxx the conditions for pressure maintenance. and sustain
The first reservoir T had 45% pressure production, the
decline, P1+P2 = 15.63MMB and fractional three reservoirs
recovery = 7%. should undergo
Mbede IV-C pressure decline provided is 69%, pressure
remaining reserves= 27.81MMB and maintenance.
fractional recovery = 26%.
And lastly, J2 had 31% pressure decline,
11.45MMB P1+P2 and 2% fractional recovery.
The diagram on figure 5, page 20 provides a
clear picture of the decline in pressure from
initial to current. Figure 6. indicates the
remaining reserves.
Continuous production from the above-
mentioned reservoir will result in further
depletion.
 BHP NAOC proposed a survey programme in two Proposed dates of
program areas namely land and swab. survey should be
yyyy For the land area a total of 55 reservoirs and provided.
55 wells were included without specific
dates. A total of 26 reservoirs were The cobany should
proposed for the swab area without the provide
date of survey. explanation why
the listed
When cobared with the 1H yyyy TA 109 reservoirs were
reservoirs from 26 fields were omitted, the omitted from the
following are the omitted reservoirs and yyyy BHP
their respective fields: Afuo field (G), Agwe programme.
P a g e 3 | 12
field (R), Akiri field (R, P2, QQ1), Alinso field
(F2AO), Azuzuama field (E-central, M),
Benboye field (A,B,Clw, C, FI,G,H, J, L,M),
Beniku field (IIH), Ebegoro field (J3, J2, J1, H,
J2/J3), Ebocha field (IVD 2, IIE, IVD 1, IVB 2,
IV_2A, IIIF, IIA, IIIG, III_12A, IV_2A, IVB 1), IDU
(F,L,U,S,E,C), Isoko field (Q&P, O), Kwali field
(AH 26, AH 9, Kw 24, Kw17, AH3, Kw29A,
(AH22)M, AH2, (AH3), Mbede field (IIF,IIE,
IIID,IIM, IIIE, IIIC and IIIB), Nimbe south field
(B and S), Obama field (L, J P, K, H, Z O, M, N
and L), Obiafu field (K,KI, N), Obrikomi field
(K), Odugri field(M, F) , Ogainbiri field (G, F,
Go, I E, D, J, W, TI, TI Z), Oleh field (X,
HI,D/F,G), Omoku W field (N), Oshi field (T, R,
T30), Osiama Creek field (K4A, K 2DO-N),
K2DO-S), KSCO, Pririgbene field (EA,BI,I, IO,
B), Samabri field (AI H5, H2), Tebidaba field
(A,C), Umuoru field (M).

24 Mobil  BHP 130 reservoirs were included in the report. BN did not provide
Producing report From the analysis carried out it was the remaining
Nigeria xxx observed that Asabo-IQI-4 with initial reserves.
Limited. pressure of 2140 psia and current reservoir
pressure of 2152psia had -1% pressure decline. The cobany should
Awawa_F8.0S with initial pressure of 2940 furnish the
psia and current reservoir pressure of department with
3549psia had -21% pressure decline. the fracture
Yoho_IBI-L with initial reservoir pressure of information of the
3310 psia and current reservoir pressure of reservoirs.
3589 psia had -8% pressure decline. Furthermore, they
should explain
how the current
pressure
exceeded the
initial reservoir
pressure.
 BHP BN proposed to execute two set of BHP The proposed
program survey. The first is the BHP survey from date and type of
yyyy PDHG, a total of 75 reservoirs and 127 wells survey should be
were included. The second is the BHP survey provided
from wireline, a total of 68 reservoirs and 77
wells was proposed. The date of survey was
not included in the programme.

25  BHP A total of eight reservoirs and 136 wells were Already under
report included in the report. Seven reservoirs are injection.
P a g e 4 | 12
xxx already under injection.
 BHP Two categories of BHP were proposed, the The date of survey
program first is BHP survey from PDHG with a total of should be
yyyy 13 reservoirs and 49 wells. There are 13 provided.
producer’s reservoirs, five under water
injection and eight under gas injection. The
second is from WHP extrapolation with a
total of six reservoirs and eight wells were
proposed for the 109-survey programme.
Four reservoirs are under water injection
while two reservoirs are under gas injection.
The date of survey was not included.

26 Nigerian  BHP 54 reservoirs from seven fields were The four reservoirs
Petroleum report included in the report. Four reservoirs met should undergo
Development xxx the criteria for pressure maintenance. pressure
Cobany Eriemu field with reservoir (M1100X) had 12% maintenance.
Limited. pressure decline, p1+p2 = 29.82 MMB and
fractional recovery of 15%. The cobany should
P1000X in Olomoro field with 26% decline, explain why
P1+P2= 9.75MMB and fractional recovery M9500Y has a
46%. negative decline in
And lastly, P000X in Oweh field had 10% pressure.
pressure decline, P1+P2= 15.81MMB and
fractional recovery 44%. The second
reservoir (P4000X) had 12% pressure decline,
P1+P2= 13.96MMB and recovery fraction of
17%. Figure 7 and 8 in the appendix depicts
the pressure decline and remaining reserves
for the reservoirs.

It was observed that M9500Y in Uzere West


Field current reservoir pressure is greater
than the initial pressure, the reservoir had
-4% pressure decline.

 BHP The plan for yyyy survey included seven The date of survey
program fields, 45 reservoirs and 46 wells. The type of should be
yyyy survey to be carried out is static gradient provided.
(SG). The date of survey was not provided.
27 B  BHP Abana East and Abana West reservoir was B should provide
report included in the report. Abana West initial justification as to
xxx reservoir pressure provided was 1787.97 psia why the current
with 1874.76 psia as the current reservoir reservoir pressure
pressure. The reservoir had -4% pressure is greater than the
decline. initial pressure.

P a g e 5 | 12
 BHP Two reservoirs were proposed for the BHP The proposed
program programme. Abana East with 12 wells and date of survey
yyyy Abana West with five wells. The type of should be
survey is build/drawdown. The date of provided.
survey was not provided.
28 Seplat  BHP For the BHP report, five reservoirs from five The remaining
report different fields were analysed. E3000M reserves and
xxx (oben field), V2000 (Okporhuru field), cumulative
D6000N (Orogho field), I2000 (Ovohor field) production should
and G2000 (Sapele field). The cobany did not be provided to
use the teblate provided and therefore did determine the
not include Np and P1+P2 for the respective pressure
reservoirs. performance of
the reservoir.
 BHP The report has not been submitted. The cobany is yet
program to submit the yyyy
yyyy BHP plan.
29 Pan Ocean  BHP The cobany is yet to submit the survey The cobany only
report result. submitted the
xxx yyyy survey
programme.
 BHP A total of eight fields was submitted. The The names of the
program names of the respective reservoirs were not respective
yyyy included. The type of survey to be executed reservoirs should
include FG/BU/SG. be provided.
30 Chevron  BHP The remaining reserves and cumulative Request cobany to
report production were not included in the report. send remaining
xxx reserves and
cumulative
production.
 BHP 168 reservoirs from 21 fields were proposed Tentative date of
program for the yyyy BHP survey. The proposed date survey should be
yyyy of survey was not included in the plan. provided.

When cobared with the first half TA, 55 CNL should


reservoirs from 16 fields were omitted from explain why the
the BHP plan but were allocated technical listed reservoir
allowable. The reservoirs are as follows: allocated TA were
Abiteye field (C-11/ABY13, D02/ABY03, not include in the
C08/ABY-19 and C-12/ABY-03). Benin River (A- BHP survey.
16/BNR-1R). Delta (D09DEL14, D10DEL03,
F02DEL23, D11DEL09, F02DEL23 and
G12DEL15). Delta South (E05DES02,
F01DES02 and G03DES05). Dibi (D05D1B06).
Gbokoda (A07GBK07, A09GBK04, A09GBK07
and B03GBK07). Isan (D041SA01). Malu
(D07MAL05, G02MAL07, G01MAL11 and
P a g e 6 | 12
H03MAL05). Mefa (K02MEF09, H05MEF09
and N01MEF10). Meji (D03MJ131, E02MJ120,
F01MJ102, H09MJ104, H11MJ104, J07MJ101,
J01MJ101, K03MJ104 and K01MJ101). Okan
(E070KAC3, G010KA01, G010KA21, J020KA41,
J030KA71 and Q060KA62), North Apoi
(ALA7AC/NAP-04), Parabe (D03PAR18,
D03PAR11, E04PAR01, G01PAR17, G01PAR21,
H04PAR29 and J17PAR01). Tapa (J08TAP02).
Opolo (D010P002). Opuekeba (CD010PK01).
West Isan and Okubie field were not
included.
31 Green Energy  BHP Four reservoirs from Otakitikpo field was Not qualified for
report submitted. All the reservoir has less than 10 pressure
xxx pressure decline rate. maintenance.
 BHP The cobany did not submit. Not submitted yet.
report
yyyy

From the analysis carried out, 10 reservoirs met the criteria for the initiation of pressure maintenance,
they include the following:

1. A: Reservoir F-01/RB-04, pressure decline=28%, P1+P2=5.51MMB and fractional recovery=4%.


2. A: Reservoir F-01/RB-01, pressure decline=11%, P1+P2=5.51MB and fractional recovery=8%.
3. Network: Reservoir D5-North Upper, pressure decline =22%, P1+P2=7.95MMB and fractional
recovery=14%.
4. Network: Reservoir D5-North Lower, pressure decline =22%, P1+P2=7.95MMB and fractional
recovery=11%.
5. NAOC: Reservoir T, pressure decline =45%, P1+P2=15.63MMB and fractional recovery=7%.
6. NAOC: Reservoir IV-C, pressure decline =69%, P1+P2=27.81MMB and fractional recovery=26%.
7. NAOC: Reservoir J2, pressure decline =31%, P1+P2=11.45MMB and fractional recovery=2%.
8. NPDC: Reservoir M1100X, pressure decline =12%, P1+P2=29.82MMB and fractional
recovery=15%.
9. NPDC: Reservoir P1000X, pressure decline =26%, P1+P2=9.75MMB and fractional
recovery=46%.
10. NPDC: Reservoir P000X, pressure decline =10%, P1+P2=15.81MMB and fractional recovery=17 %.

The spread sheet used for the analysis of the above-mentioned reservoirs is attached to the report.

APPENDIX
P a g e 7 | 12
5800 Pressure Plot
5600

5400

5200
Pressure (Psig)

5000

4800

4600

4400

4200

4000
1 2
E-1A/RB-03 C-08/RB-11 F-01/RB-04
Reservoir
E-12/RB-01 F-01/RB-01

Figure 1: A Pressure Plot

Remaining Reserves Plot


6

4
P1+P2 (MMB)

0
E-1A/RB-03 C-08/RB-11 F-01/RB-04 E-12/RB-01 F-01/RB-01

Reservoir

Figure 2: A Remaining Reserves

P a g e 8 | 12
Pressure Plot
3200

3100

3000

2900
Pressure (Psig)

2800

2700

2600

2500

2400

2300

2200
1 2

Reservoir
D5 North Upper D5 North Lower
D5 North Lower D5 North Lower

Remaining Reserves Plot


9

6
P1+P2 (MMB)

0
D5 North Upper D5 North Lower D5 North Lower D5 North Lower

Reservoir

P a g e 9 | 12
Pressure Plot
6000

5000
Pressure (Psig)
4000

3000

2000

1000

0
1 2
T IV-C II-C kw17 J2
Reservoir

Figure 5: Nigeria B Oil Cobany Pressure Plot

Remaining Reserves Plot


30

25

20
P1+P2 (MMB)

15

10

0
T IV-C II-C kw17 J2

Reservoir

Figure 6: Nigerian B Oil Cobany Remaining Reserves

P a g e 10 | 12
Pressure Plot
4300

4100

Pressure (psig) 3900

3700

3500

3300

3100

2900

2700
1 2

Reservoir

M1100X O9000X P1000X P4000X P0000X

Remaining Reserves Plot


35

30

25
P1+P2 (MMB)

20

15

10

0
M1100X O9000X P1000X P4000X P0000X

Reservoir

P a g e 11 | 12
P a g e 12 | 12

Potrebbero piacerti anche