METHOD STATEMENT
Rubber mallet.
Shovel.
Straight Edge.
Sprit Level
Plum bob. & All other masonry tools
Measuring Device:
Dumpy Level
Total level
Theodolite
Measuring Tape
Tube level etc
Equipments:
Mixer machine
Hand cutting machine.
Water cutting machine
Hand drilling machine
Hand grinder.etc
METHOD STATEMENT FOR HARD LANDSCAPPING WORKS
Safety Shoes
Safety Helmets
Hand Gloves
Goggles
.
Procedure Site made Setting Mortar: Mix and proportion cementitious materials for site
made leveling coats, setting beds & grout.
Ensure surfaces are clean and well cured, and sloped to drains where drains are provided.
Do not commence work until surface conditions are within tolerances required for proper
installation; apply leveling material where necessary to meet required tolerances.
Clean stone before setting by thoroughly scrubbing with fiber brushes followed by
thorough sponging with clear water; use only mild cleaning compounds that contain no
caustic or harsh fillers or abrasives.
Apply Portland cement mortar setting bed to proper line and tamp firmly.
Apply setting bed over areas no greater than can be covered while setting bed remains
plastic.
Trowel or brush thin layer, 1mm to 1.5mm thickness, of cement paste over setting bed.
METHOD STATEMENT FOR HARD LANDSCAPPING WORKS
Apply stone in place and beat firmly into straight, uniform joints.
Complete beating and leveling within one hour of setting; wipe clean with soft
damp cloth
After completion of work, point open joints and replace defective work.
Do not use wire brushes, acid type-cleaning agents, cleaning compounds with caustic or
harsh fillers, or other materials or methods, which could damage stone.
Verification
1. Setting out
4. Shop drawings
Safety