Sei sulla pagina 1di 1

MECHANICAL LIST OF DRAWINGS

1. THIS DRAWING IS THE PROPERTY OF - GOLDEN SQUARE ENGINEERING


CONSULTANTS (P.O.BOX 126049, DUBAI, UAE ) IT IS FORBIDDEN TO
PRODUCE IT'S CONTENTS IN ANY FORM, EXCEPT FOR THE INTENDED
PURPOSE.

2. ALL DIMENSIONS ARE IN MILLIMETERS AND LEVELS IN METERS UNLESS


DRAWING NO. DESCRIPTION REVISION DATE NOTED OTHERWISE. ALL DIMENSIONS TO BE VERIFIED ON SITE &
APPROVED BY THE ENGINEER.
M-000 MECHANICAL LIST OF DRAWINGS A 12-07-2018 3. DO NOT SCALE THE DRAWINGS. FOLLOW WRITTEN DIMENSIONS UNLESS
OTHERWISE NOTED.
AC LAYOUT
4. EACH DRAWING SHALL BE READ IN CONJUNCTION WITH ALL OTHER
AC-001 GREEN BUILDING GENERAL NOTES A 12-07-2018 RELEVANT ARCHITECTURAL, STRUCTURAL, MECHANICAL AND
ELECTRICAL DRAWINGS & THE GENERAL STANDARD DETAILS. IN CASE
OF ANY DISCREPANCIES, BRING IT TO THE KNOWLEDGE OF ENGINEER &
AC-100 SETTING OUT PLAN AC LAYOUT A 12-07-2018 SAME TO BE RESOLVED PRIOR TO EXECUTE OF WORK.

AC-101 GROUND FLOOR PLAN AC LAYOUT A 12-07-2018


AC-102 FIRST FLOOR PLAN AC LAYOUT A 12-07-2018
AC-103 ROOF FLOOR PLAN AC LAYOUT A 12-07-2018
AC-104 SERVICE BLOCK PLAN AC LAYOUT A 12-07-2018
AC-105 SUMMARY OF THERMAL LOAD CALCULATION A 12-07-2018
AC-106 WINDOWS SCHEDULE A 12-07-2018
AC-107 STANDARD DETAILS-01 A 12-07-2018
AC-108 STANDARD DETAILS-02 A 12-07-2018
AC-109 STANDARD DETAILS-03 A 12-07-2018
AC-110 STANDARD DETAILS-04 A 12-07-2018

VENTILATION LAYOUT
VEN-100 GREEN BUILDING GENERAL NOTES A 12-07-2018
VEN-101 GROUND FLOOR PLAN VENTILATION LAYOUT A 12-07-2018
VEN-102 FIRST FLOOR PLAN VENTILATION LAYOUT A 12-07-2018
VEN-103 ROOF FLOOR PLAN VENTILATION LAYOUT A 12-07-2018
VEN-104 SERVICE BLOCK PLAN VENTILATION LAYOUT A 12-07-2018
VEN-105 SCHEMATIC DIAGRAM A 12-07-2018
VEN-106 FAHU SELECTION A 12-07-2018
VEN-107 STANDARD DETAILS-01 A 12-07-2018
VEN-108 STANDARD DETAILS-02 A 12-07-2018

DRAINAGE LAYOUT LAYOUT


DR-001 GREEN BUILDING GENERAL NOTES & DECLARATION A 12-07-2018
DR-002 DRAINAGE GENERAL NOTES A 12-07-2018
DR-100 SETTING OUT PLAN DRAINAGE LAYOUT A 12-07-2018
DR-101 GROUND FLOOR PLAN DRAINAGE LAYOUT A 12-07-2018
DR-102 FIRST FLOOR PLAN L-L DRAINAGE LAYOUT A 12-07-2018
DR-102A FIRST FLOOR PLAN H-L DRAINAGE LAYOUT A 12-07-2018
DR-103 ROOF FLOOR PLAN DRAINAGE LAYOUT A 12-07-2018
DR-104 TOP ROOF FLOOR PLAN DRAINAGE LAYOUT A 12-07-2018
A 12-07-2018 FINAL DESIGN SUBMISSION MOHD
DR-105 SERVICE BLOCK PLAN DRAINAGE LAYOUT A 12-07-2018
Rev NO. DATE DESCRIPTIONS BY
DR-106 STANDARD DETAILS-01DRAINAGE LAYOUT A 12-07-2018
REVISIONS:
DR-107 STANDARD DETAILS-02 DRAINAGE LAYOUT A 12-07-2018
CLIENT :
DR-108 STANDARD DETAILS-03 DRAINAGE LAYOUT A 12-07-2018
DR-109 STANDARD DETAILS-04 DRAINAGE LAYOUT A 12-07-2018 VERNUS INTERNATIONAL SCHOOL FZCO

WATER SUPPLY LAYOUT CONSULTANT :

WS-001 A GOLDEN SQUARE ENGINEERING


GREEN BUILDING GENERAL NOTES 12-07-2018
CONSULTANTS
WS-100 SETTING OUT PLAN WATER SUPPLY LAYOUT A 12-07-2018 P.O. BOX : 126049, DUBAI, UAE
Phone : 04 3859882 Fax: 04 3859885
WS-101 GROUND FLOOR PLAN WATER SUPPLY LAYOUT A 12-07-2018 E_mail : info@gseng.ae

WS-102 FIRST FLOOR PLAN WATER SUPPLY LAYOUT A 12-07-2018 PROJECT DESCRIPTION:
WS-103 ROOF FLOOR PLAN WATER SUPPLY LAYOUT A 12-07-2018 PROPOSED SCHOOL BUILDING
WS-104 SERVICE BLOCK PLAN WATER SUPPLY LAYOUT A 12-07-2018 G+1st+ ROOF
PLOT NO. : 11-009/B
WS-105 SCHEMATIC RISER DIAGRAM WATER SUPPLY LAYOUT A 12-07-2018 @ NADD HESSA -DUBAI
WS-106 STANDARD DETAILS-01 A 12-07-2018 BUILDING TYPE :
WS-107 STANDARD DETAILS-02 A 12-07-2018 EDUCATIONAL
WS-108 STANDARD DETAILS-03 A 12-07-2018 SHEET TITLE :

FIRE FIGHTING LAYOUT MECHANICAL LIST OF DRAWING


FF-100 SETTING OUT PLAN FIRE FIGHTING LAYOUT A 12-07-2018
FF-101 GROUND FLOOR PLAN FIRE FIGHTING LAYOUT A 12-07-2018 DESIGNED : DRAWN :
FF-102 FIRST FLOOR PLAN FIRE FIGHTING LAYOUT A 12-07-2018 AK AK
FF-103 ROOF FLOOR PLAN FIRE FIGHTING LAYOUT A 12-07-2018 CHECKED : DATE :
MOHD JULY-2018
FF-104 SERVICE BLOCK PLAN FIRE FIGHTING LAYOUT A 12-07-2018
SCALE : SHEET SIZE PROJECT NO.:
FF-105 SCHEMATIC RISER DIAGRAM FIRE FIGHTING LAYOUT A 12-07-2018
N.T.S A1 G1807
FF-106 DESIGN CRITERIA A 12-07-2018 DRAWING NO. REVISION:
FF-107 STANDARD DETAILS A 12-07-2018 M-000 A
PURPOSE OF ISSUE :
FINAL DESIGN SUBMISSION

Potrebbero piacerti anche