Project Manager,
Referring to PT. PLN (Persero) UPP Kitring Sumbawa Letter No. 0161/KIT.03.01/A520200/2020
dated on April 23th, 2020 with subject Pending Item PLTMG Bima 50 MW, herewith we instruct
contractor to:
Furthermore, contractor instructed to submit working permit to commence every work (repair,
closing pending or punch list, etc.).
MANAGER
Laboratory Equipment (some equipment not yet on site) 21 April 2020 Close
1 Construction
Missing panel GCP of engine #3 (109) 27 May 2019 Close
Commissioning of gas related system (GAS not ready at Site) - On Going
Line Charging Test 25 May 2019 Close
2 Commisioning
Implementation and testing of “Island Mode” operation of the engine and plant 25 June 2019 Close
Final Commissioning of CEMS system 10 December 2019 Close
Izin Pembuangan Limbah Cair (IPLC) - On Going
3 Permits and Licenses
Surat Izin Angkutan (SIA) & Surat Izin Operator (SIO) 25 Februari 2020 Close
SUMMARY CLAIM REPORT IN PLTMG BIMA 50 MW
Date of Expected
Sr. No. Claim ID Reference No. Titel Qty Unit Power Plant Date Issue Status Remarks
Damage Delivery Date
Claim Report Mechanical
1 BCR-M001 300280850 NCW Threaded Socked 1 PC PLTMG Bima 04/10/2019 04/10/2019 Installed CLOSED
2 BCR-M002 TCA88-42107V Turbo Charger Engine#2 1 SET PLTMG Bima 22/5/2019 18/6/2019 Installed on Engine#2 CLOSED
3 BCR-M004 300284690 Axial Compensator 1 PC PLTMG Bima 22/5/2019 20/6/2019 30/08/2019 Installed on Engine#2 CLOSED
4 BCR-M003 300284682 Drive Belt DO 1 PC PLTMG Bima 06/10/2019 15/6/2019 Received, spare part CLOSED
5 BCR-M005 300285047 Feed Pipe for Oil to Rocker Arm 1 PC PLTMG Bima 06/12/2019 21/6/2019 27/08/2019 Installed on Engine#1 CLOSED
6 BCR-M006 300285619 LO Feed Pipe LO - Engine#1 1 PC PLTMG Bima 07/06/2019 07/06/2019 Installed on Engine#2 CLOSED
7 BCR-M007 300286983 Pressure Gas Spring Engine#1 2 PC PLTMG Bima 07/09/2019 23/07/2019 Install on Engine #1 CLOSED
8 BCR-M008 300286986 Pressure Gas Spring Engine#2 8 PC PLTMG Bima 13/07/2019 23/07/2019 Has been received 11 pcs and CLOSED
9 BCR-M009 300286988 Pressure Gas Spring Engine#3 2 PC PLTMG Bima 07/09/2019 23/07/2019 has been installed on each CLOSED
10 BCR-M010 300287021 Pressure Gas Spring Engine#1 1 PC PLTMG Bima 26/7/2019 26/7/2019 Engine CLOSED
11 BCR-M011 N/A Flexible Hose DO Unloading 4 PC PLTMG Bima 13/08/2019 13/08/2019 Received 5 pcs, Spare part. CLOSED
Has been received 3 pc (Will be
12 BCR-M012 300289288 Pressure Gas Spring Engine#1 3 PC PLTMG Bima 09/06/2019 09/06/2019 CLOSED
installed during PM)
13 BCR-M013 300289323 Pressure Gas Spring Engine#3 5 PC PLTMG Bima 09/06/2019 09/09/2019 Installed on Engine #3 CLOSED
14 BCR-M014 300289327 Gasket for Compensator 1 PC PLTMG Bima 22/5/2019 09/09/2019 Received, spare part CLOSED
Pressure Compensation FO Booster Module
15 BCR-M015 300289821 1 PC PLTMG Bima 16/9/2019 16/09/2019 Has been Installed CLOSED
Engine#2
16 BCR-M016 VTA Spindle drive Master & Slave 1 PC PLTMG Bima 16/10/2019 17/10/2019 Installed on Engine #1 CLOSED
17 BCR-M017 Pilot Fuel Oil Filter Engine #3 1 SET PLTMG Bima 21/11/2019 21/11/2019 Installed on Engine #3 CLOSED
Has been received 3 pc (Will be
18 BCR-M018 Lubricating for Rocker Arm Engine #3 2 SET PLTMG Bima 26/11/2019 27/11/2019 CLOSED
installed during PM)
19 BCR-M019 Fuel Oil Piping Engine #3 5 SET PLTMG Bima 26/11/2019 27/11/2019 Installed on Engine#3 CLOSED
Has been received 3 pc (Will be
20 BCR-M020 Pressure gas spring Engine #2 3 PC PLTMG Bima 05.12.19 10.12.19 CLOSED
installed during PM)
Has been received on Site (Will
21 BCR-M021 Pneumatic slewing function / actuator 1 PC PLTMG Bima 06.01.20 06.01.20 CLOSED
be installed during PM)
Has been received on Site (Will
22 BCR-M022 Drive Belt of DO Separator 1 PC PLTMG Bima 14/01/2020 14/01/2020 CLOSED
be installed during PM 8K)
Mechanic seal O-ring HT Pre-heating Pump Has been received on Site (Will
23 BCR-M023 1 PC PLTMG Bima 15/01/2020 15/01/2020 CLOSED
Engine #3 be installed during PM)
Container/Bowl with display of DO Shut-off Has been received, will be install
24 BCR-M024 3 PC PLTMG Bima 23/01/2020 23/01/2020 CLOSED
valve during PM (BY WIKA)
DO Automatic Filter : 1. Selenoid Valve 1 The Claim has been sent to
25 BCR-M025 2. High Pressure Control Device 1 PC PLTMG Bima 29/01/2020 30/01/2020 Augsburg, waiting confirmation
3. Non Return Valve 1 delivery date
The Claim has been sent to
26 BCR-M026 Fuel Oil Piping Engine #1 10 PC PLTMG Bima 03/02/2020 03/10/2020
Surabaya
The Claim has been sent to
27 BCR-M027 Pressure Gas Spring Engine #2 3 PC PLTMG Bima 25/3/2020 27/3/2020
Surabaya
The Claim has been sent to
28 BCR-M028 Condensed Water Drain E#2 2 set PLTMG Bima 25/3/2020 27/3/2020
Surabaya
The Claim has been sent to
29 BCR-M029 Condensation Trap E#2 2 PC PLTMG Bima 25/3/2020 27/3/2020
Surabaya
The Claim has been sent to
30 BCR-M030 Fuel oil Piping E#3 7 PC PLTMG Bima 25/3/2020 27/3/2020
Surabaya
The Claim has been sent to
31 BCR-M031 Piston Ring E#2 (2nd) 18 PC PLTMG Bima 26/3/2020 28/3/2020
Surabaya
The Claim has been sent to
32 BCR-M032 Condensed Water Drain Engine #3 1 PC PLTMG Bima 25/3/2020 27/3/2020
Surabaya
The Claim has been sent to
33 BCR-M033 Fuel oil piping Engine #1 5 PC PLTMG Bima 27/3/2020 04/01/2020
Surabaya
The Claim has been sent to
34 BCR-M034 Fuel oil piping Engine #2 3 PC PLTMG Bima 04/01/2020 04/01/2020
Surabaya
The Claim has been sent to
35 BCR-M035 Condensation Trap Engine #1 2 PC PLTMG Bima 04/01/2020 04/01/2020
Surabaya
The Claim has been sent to
36 BCR-M036 Injection nozzle E#3 18 PC PLTMG Bima 13/3/2020 04/01/2020
Surabaya
The Claim has been sent to
37 BCR-M037 Injection nozzle E#1 18 PC PLTMG Bima 20/3/2020 04/01/2020
Surabaya
The Claim has been sent to
38 BCR-M038 Injection nozzle E#2 18 PC PLTMG Bima 27/3/2020 04/01/2020
Surabaya
The Claim has been sent to
39 BCR-M039 Pilot fuel oil duplex filter Engine #1 1 set PC PLTMG Bima 04/01/2020 04/03/2020
Surabaya
The Claim has been sent to
40 BCR-M040 Pilot fuel oil duplex filter Engine #2 1 set PC PLTMG Bima 04/01/2020 04/03/2020
Surabaya
The Claim has been sent to
41 BCR-M041 Parts Cylinder head A3 & B5 Engine #3 2 set PC PLTMG Bima 13/3/2020 04/01/2020
Surabaya
The Claim has been sent to
42 BCR-M042 Parts Cylinder head A3 & B3 + B4 Engine #2 18 set PC PLTMG Bima 27/3/2020 04/01/2020
Surabaya
The Claim has been sent to
43 BCR-M043 Parts Cylinder head A5 & B4 Engine #1 2 set PC PLTMG Bima 20/3/2020 04/01/2020
Surabaya
The Claim has been sent to
44 BCR-M044 Parts Cylinder head A3 & B5 Engine #3 2 set PC PLTMG Bima 13/3/2020 04/01/2020
Surabaya
The Claim has been sent to
45 BCR-M045 Parts Cylinder head A3 & B3 + B4 Engine #2 18 set PC PLTMG Bima 27/3/2020 04/01/2020
Surabaya
46 BCR-M046 Parts Cylinder head A5 & B4 Engine #1 2 set PC PLTMG Bima 20/3/2020 04/01/2020 The Claim has been sent to
General Claim
1 HMI Restart SCB 1 PC PLTMG Bima 25/02/2020 26/02/2020 By WIKA
2 Flowmeter Inlet and Outlet WWTP 2 SET PLTMG Bima 27/5/2019 28/5/2019 By WIKA CLOSED
3 CCTV 1 PC PLTMG Bima 06/04/2019 06/04/2019 By WIKA
4 AC Server Room CCR 1 PC PLTMG Bima 06/04/2019 06/04/2019 By WIKA CLOSED
5 Dokumentasi Proyek 1 PC PLTMG Bima 17/04/2020 17/04/2020 By WIKA
6 IMB Tambahan (Laboratorium dan B3) 1 PC PLTMG Bima 17/04/2020 17/04/2020 By WIKA
7 Surat Affidavid (Terkait Bebas Hutang antara Mainkon
1 dengan
PCSubkon)
PLTMG Bima 17/04/2020 17/04/2020 By WIKA
8 BA Penyelesaian FI dan Laporan 1 PC PLTMG Bima 17/04/2020 17/04/2020 By WIKA
9 BA Penyelesaian Pending Item dan Laporan 1 PC PLTMG Bima 17/04/2020 17/04/2020 By WIKA
10 BA Pemeliharaan Selama Masa Warranty 1 PC PLTMG Bima 17/04/2020 17/04/2020 By WIKA
Note :
Has been Received & Installed (Closed)
The Claim has been sent to Augsburg, waiting confirmation delivery date
Has been Received (Available on Site)
On the way
MONITORING PUNCH LIST WALK DOWN ITP
PLTMG BIMA 50 MW PROJECT
UPDATE 30 APRIL 2020
Open Close
Open PLN-E Close PLN-E
No Walk Down Item Area/System Inspection Area Punchlist Item TOTAL Internal Internal Closing Date
UPP UPP
WIKA Wika
1 BUILDING POWER HOUSE Steel Structure and Grating Repainting bekas las 1 - 1 - 1 21 April 2020
2 BUILDING POWER HOUSE Brick wall Crack sambungan antara dinding dan Steel Structure 1 - 1 - 1 21 April 2020
5 BUILDING POWER HOUSE Brick wall Crack dinding antara CCR dan Power House 1 - 1 - 1 21 April 2020
7 BUILDING POWER HOUSE Sanitary Pipa air bersih bocor 1 - 1 - 1 21 April 2020
8 BUILDING POWER HOUSE Fire protection Cleaning hydrant box 1 - 1 - 1 21 April 2020
9 BUILDING STACK Foundation Buang bekisting pondasi Akses Tangga 1 - 1 - 1 21 April 2020
10 BUILDING STACK Steel Structure and Grating Cleaning hand rail sisa pengecoran 1 - 1 - 1 21 April 2020
11 BUILDING STACK Steel Structure and Grating Repainting pipe support (bawah Stack) 1 - 1 - 1 21 April 2020
12 BUILDING STACK Steel Structure and Grating Repainting Steel Structure 1 - 1 - 1 21 April 2020
13 BUILDING STACK Steel Structure and Grating Repainting hand rail 1 - 1 - 1 21 April 2020
14 BUILDING STACK Floor Cleaning area landscaping gravel dari rumput 1 - 1 - 1 21 April 2020
16 BUILDING CCB / E-ANNEX BUILDING Steel Structure and Grating Tambahan akses antara pintu Cable Room dan Grating tangga (bordes)
1 - 1 - 1 21 April 2020
17 BUILDING CCB / E-ANNEX BUILDING Steel Structure and Grating Touch up bekas marking 1 - 1 - 1 21 April 2020
18 BUILDING CCB / E-ANNEX BUILDING Brick wall Tambal bekas pemasangan pipa/kabel 1 - 1 - 1 21 April 2020
19 BUILDING CCB / E-ANNEX BUILDING Brick wall Crack dinding lantai 1 depan toilet 1 - 1 - 1 21 April 2020
20 BUILDING CCB / E-ANNEX BUILDING Floor Crack keramik kamar mandi lantai 1 1 - 1 - 1 21 April 2020
21 BUILDING CCB / E-ANNEX BUILDING Floor Crack concrete Cable Room 1 - 1 - 1 21 April 2020
22 BUILDING CCB / E-ANNEX BUILDING Floor Tutup lubang bekas jalur kabel 1 - 1 - 1 27 April 2020
23 BUILDING CCB / E-ANNEX BUILDING Floor Crack keramik (pintu dekat tangga) 1 - 1 - 1 21 April 2020
24 BUILDING CCB / E-ANNEX BUILDING Cladding Lubang pada cladding Cable Room 1 - 1 - 1 21 April 2020
25 BUILDING CCB / E-ANNEX BUILDING Ceiling Plafon geser pada CCR 1 - 1 - 1 30 April 2020
26 BUILDING CCB / E-ANNEX BUILDING Ceiling Sebagian Plafon ruang SCADA belum dicat 1 - 1 - 1 21 April 2020
27 BUILDING CCB / E-ANNEX BUILDING Doors & Window Cleaning bekas konstruksi 1 - 1 - 1 21 April 2020
28 BUILDING CCB / E-ANNEX BUILDING Doors & Window Repainting pintu exit Cable Room 1 - 1 - 1 21 April 2020
29 BUILDING CCB / E-ANNEX BUILDING Sanitary Sanitari tempat wudhu airnya menggenang 1 - 1 - 1 21 April 2020
30 BUILDING CCB / E-ANNEX BUILDING Sanitary Clamp pipa down pipe dan AC 1 - 1 - 1 21 April 2020
31 BUILDING RADIATOR COOLER Steel Structure and Grating Repainting Steel Structure (korosi) 1 - 1 - 1 21 April 2020
32 BUILDING RADIATOR COOLER Steel Structure and Grating Repainting tangga akses ke Stack 1 - 1 - 1 21 April 2020
33 BUILDING RADIATOR COOLER Steel Structure and Grating Dynabolt support tangga belum ada 1 - 1 - 1 27 April 2020
35 BUILDING RADIATOR COOLER Floor Cleaning area landscaping gravel dari rumput 1 - 1 - 1 21 April 2020
37 BUILDING RADIATOR COOLER Drainage Cleaning Drainage potensi tersumbat 1 - 1 - 1 21 April 2020
38 BUILDING SWITCHYARD DAN GT TRAFO Floor Cover Cable Tranch goyang 1 - 1 - 1 21 April 2020
39 BUILDING SWITCHYARD DAN GT TRAFO Floor Cleaning area landscaping gravel dari rumput 1 - 1 - 1 27 April 2020
Open Close
Open PLN-E Close PLN-E
No Walk Down Item Area/System Inspection Area Punchlist Item TOTAL Internal Internal Closing Date
UPP UPP
WIKA Wika
40 BUILDING SWITCHYARD DAN GT TRAFO Floor Cover Oil Pit Trafo korosi 1 - 1 - 1 21 April 2020
41 BUILDING SWITCHYARD DAN GT TRAFO Fire protection Kebocoran pada pipa Fire Fighting 1 - 1 - 1 21 April 2020
42 BUILDING SWITCHYARD DAN GT TRAFO Drainage Pipa saluran drainage lepas 1 - 1 - 1 21 April 2020
46 BUILDING SCB Floor Sambungan lantai luar dan dalam tidak rapi 1 - 1 - 1 21 April 2020
47 BUILDING SCB Floor Bekisting akses jalan belum dilepas 1 - 1 - 1 21 April 2020
48 BUILDING SCB Floor Cleaning all area luar SCB 1 - 1 - 1 21 April 2020
51 BUILDING BLACKSTART UNIT Doors & Window Repainting Pintu 1 - 1 - 1 21 April 2020
53 BUILDING MAIN OIL TANK (EL= +5.50) Steel Structure and Grating Repainting hand rail 1 - 1 - 1 21 April 2020
54 BUILDING MAIN OIL TANK (EL= +5.50) Floor Cleaning area landscaping gravel dari rumput 1 - 1 - 1 27 April 2020
55 BUILDING MAIN OIL TANK (EL= +5.50) Floor Slab tidak ada join filler 1 - 1 - 1 21 April 2020
56 BUILDING MAIN OIL TANK (EL= +5.50) Drainage Clening Area drainase terdapat material pipa 1 - 1 - 1 21 April 2020
57 BUILDING TANK FARM (EL= +7.00) Steel Structure and Grating Repainting hand rail 1 - 1 - 1 21 April 2020
58 BUILDING TANK FARM (EL= +7.00) Drainage Cleaning area drainase 1 - 1 - 1 21 April 2020
59 BUILDING PUMP HOUSE Steel Structure and Grating Repainting hand rail dan akses tangga ke Stack 1 - 1 - 1 21 April 2020
60 BUILDING PUMP HOUSE Steel Structure and Grating Repainting Steel Structure 1 - 1 - 1 21 April 2020
61 BUILDING PUMP HOUSE Steel Structure and Grating Cleaning Support Pump 1 - 1 - 1 27 April 2020
62 BUILDING PUMP HOUSE Steel Structure and Grating Repainting checker plat depan Pump House 1 - 1 - 1 21 April 2020
63 BUILDING PUMP HOUSE Brick wall Flake dinding duct unloading 1 - 1 - 1 21 April 2020
65 BUILDING PUMP HOUSE Floor Cleaning area landscaping gravel dari rumput 1 - 1 - 1 21 April 2020
66 BUILDING PUMP HOUSE Doors & Window Handle pintu lepas 2 buah 1 - 1 - 1 21 April 2020
67 BUILDING PUMP HOUSE Fire protection (APAR) Cleaning hydrant box 1 - 1 - 1 21 April 2020
68 BUILDING PUMP HOUSE Drainage Clening area drainase air tidak mengalir 1 - 1 - 1 21 April 2020
69 BUILDING PUMP HOUSE Drainage Clamp pipa down pipe 1 - 1 - 1 21 April 2020
70 BUILDING EFFLUENT TRATMENT / WWTP Floor Cleaning area landscaping gravel dari rumput 1 - 1 - 1 21 April 2020
71 BUILDING EFFLUENT TRATMENT / WWTP Steel Structure and Grating Repainting korosi 1 - 1 - 1 21 April 2020
72 BUILDING CHAMICAL SKID Steel Structure and Grating Repainting korosi 1 - 1 - 1 21 April 2020
73 BUILDING SLUDGE OIL TANK Floor Cleaning area landscaping gravel dari rumput 1 - 1 - 1 21 April 2020
74 BUILDING EFFLUENT COLLECTING WATER POND Floor Cleaning area landscaping gravel dari rumput 1 - 1 - 1 21 April 2020
75 BUILDING WTP Floor Cleaning area landscaping gravel dari rumput 1 - 1 - 1 21 April 2020
76 BUILDING WTP Floor Repainting tangga akses checker plate 1 - 1 - 1 21 April 2020
78 BUILDING BWRO SYSTEM TRANSFER TANK Floor Cleaning area landscaping gravel dari rumput 1 - 1 - 1 21 April 2020
79 BUILDING BWRO SYSTEM TRANSFER TANK Drainage Ceaning drainage banyak endapan 1 - 1 - 1 27 April 2020
80 BUILDING RAW WATER POND Floor Cleaning area landscaping gravel dari rumput 1 - 1 - 1 21 April 2020
Open Close
Open PLN-E Close PLN-E
No Walk Down Item Area/System Inspection Area Punchlist Item TOTAL Internal Internal Closing Date
UPP UPP
WIKA Wika
81 BUILDING RAW WATER POND Floor Repainting tangga akses checker plate 1 - 1 - 1 21 April 2020
82 BUILDING BACK WASH POND Floor Cleaning area landscaping gravel dari rumput 1 - 1 - 1 21 April 2020
83 BUILDING BACK WASH POND Floor Repainting tangga akses checker plate 1 - 1 - 1 21 April 2020
84 BUILDING FRESH WATER TANK Floor Cleaning area landscaping gravel dari rumput 1 - 1 - 1 21 April 2020
85 BUILDING FIRE PUMP CONTAINER Floor Cleaning area landscaping gravel dari rumput 1 - 1 - 1 21 April 2020
86 BUILDING FIRE PUMP CONTAINER Floor Repainting checker plat container korosi 1 - 1 - 1 21 April 2020
87 BUILDING FIRE PUMP CONTAINER Doors & Window Cleaning sisa konstruksi di kaca pintu 1 - 1 - 1 21 April 2020
88 BUILDING SERVICE / FIRE WATER TANK Steel Structure and Grating Repainting hand rail 1 - 1 - 1 21 April 2020
89 BUILDING SERVICE / FIRE WATER TANK Floor Cleaning area landscaping gravel dari rumput 1 - 1 - 1 21 April 2020
90 BUILDING ADMINISTRATION BUILDING Brick wall Painting ada yang tidak sama bagian luar 1 - 1 - 1 09 April 2020
91 BUILDING ADMINISTRATION BUILDING Brick wall Painting ada yang tidak sama bagian dalam 1 - 1 - 1 09 April 2020
92 BUILDING ADMINISTRATION BUILDING Floor Cleaning area landscaping gravel dari rumput 1 - 1 - 1 09 April 2020
93 BUILDING ADMINISTRATION BUILDING Floor Crack di beberapa area teras 1 - 1 - 1 09 April 2020
94 BUILDING ADMINISTRATION BUILDING Ceiling Plafon crack pada sambungan (luar) 1 - 1 - 1 09 April 2020
98 BUILDING ADMINISTRATION BUILDING Doors & Window Penambahan sealent di satu Jendela 1 - 1 - 1 09 April 2020
99 BUILDING ADMINISTRATION BUILDING Doors & Window Cleaning Kusen Pintu Dalam 1 - 1 - 1 09 April 2020
100 BUILDING ADMINISTRATION BUILDING Sanitary Penambahan clamp pipa AC 1 - 1 - 1 09 April 2020
101 BUILDING MOSQUE Brick wall Dinding crack beberapa spot 1 - 1 - 1 09 April 2020
102 BUILDING MOSQUE Brick wall Dinding cat ulang beberapa spot 1 - 1 - 1 21 April 2020
103 BUILDING MOSQUE Brick wall Flake beberapa spot 1 - 1 - 1 21 April 2020
104 BUILDING MOSQUE Floor Cleaning area landscaping gravel dari rumput 1 - 1 - 1 09 April 2020
105 BUILDING MOSQUE Floor Cleaning area paving dari rumput 1 - 1 - 1 09 April 2020
109 BUILDING MOSQUE Sanitary Penambahan clamp pipa air bersih 1 - 1 - 1 09 April 2020
112 BUILDING WAREHOUSE Steel Structure and Grating Repainting bekas las 1 - 1 - 1 27 April 2020
114 BUILDING WAREHOUSE Floor Cleaning area landscaping gravel dari rumput 1 - 1 - 1 21 April 2020
115 BUILDING WAREHOUSE Cladding Cleaning area landscaping gravel dari rumput 1 - 1 - 1 21 April 2020
116 BUILDING WAREHOUSE Sanitary Penambahan clamp down pipe 1 - 1 - 1 21 April 2020
117 BUILDING WAREHOUSE Fire protection Cleaning hydrant box 1 - 1 - 1 21 April 2020
118 BUILDING WORKSHOP Ceiling Repainting Plafon beberpa spot 1 - 1 - 1 21 April 2020
119 BUILDING WORKSHOP Doors & Window Sealent rongga kusen Jendela 1 - 1 - 1 21 April 2020
120 BUILDING WORKSHOP Doors & Window Cleaning bekas konstruksi 1 - 1 - 1 27 April 2020
121 BUILDING WORKSHOP Sanitary Penambahan clamp down pipe 1 - 1 - 1 21 April 2020
Open Close
Open PLN-E Close PLN-E
No Walk Down Item Area/System Inspection Area Punchlist Item TOTAL Internal Internal Closing Date
UPP UPP
WIKA Wika
122 BUILDING LABORATORY Brick wall Repainting dinding luar (diatas kanopi) 1 - 1 - 1 21 April 2020
124 BUILDING LABORATORY Floor Cleaning bekas konstruksi (cat) 1 - 1 - 1 21 April 2020
125 BUILDING LABORATORY Floor Cleaning area landscaping gravel dari rumput 1 - 1 - 1 21 April 2020
126 BUILDING LABORATORY Doors & Window Repainting Stell Door dr bekas konstruksi 1 - 1 - 1 21 April 2020
127 BUILDING GUARD HOUSE Brick wall Ceaning dan repainting 1 - 1 - 1 21 April 2020
128 BUILDING GUARD HOUSE Brick wall Repair dinding wastafel 1 - 1 - 1 21 April 2020
129 BUILDING GUARD HOUSE Floor Crack pada selasar 1 - 1 - 1 21 April 2020
130 BUILDING GUARD HOUSE Floor Cleaning area landscaping 1 - 1 - 1 21 April 2020
132 BUILDING GUARD HOUSE Ceiling Repair sambungan plafon dan fittig lampu 1 - 1 - 1 21 April 2020
133 BUILDING GUARD HOUSE Doors & Window Cleaning dan Sealent Jendela 1 - 1 - 1 21 April 2020
134 BUILDING GUARD HOUSE Sanitary Repair kran wastafel 1 - 1 - 1 21 April 2020
135 BUILDING GUARD HOUSE Sanitary Penambahan clamp pipa air bersih 1 - 1 - 1 21 April 2020
136 BUILDING CAR SHELTER Steel Structure and Grating Cleaning dan repainting bolt dan Steel Structure korosi 1 - 1 - 1 09 April 2020
137 BUILDING CAR SHELTER Floor Cleaning area paving dari rumput 1 - 1 - 1 09 April 2020
138 BUILDING CAR SHELTER Floor Cleaning sisa konstruksi bekas cor 1 - 1 - 1 09 April 2020
139 BUILDING B3 BUILDING Floor Cleaning area landscaping gravel dari rumput 1 - 1 - 1 21 April 2020
140 BUILDING B3 BUILDING Doors & Window Repainting pintu 1 - 1 - 1 21 April 2020
141 BUILDING MAIN ROAD Floor Cleaning area landscaping gravel dari rumput 1 - 1 - 1 27 April 2020
142 BUILDING MAIN ROAD Floor Cleaning bekas cor area Pump House 1 - 1 - 1 27 April 2020
143 BUILDING MAIN ROAD Floor Potong besi bekas konstruksi 1 - 1 - 1 27 April 2020
144 BUILDING MAIN ROAD Floor Cleaning pasir all area 1 - 1 - 1 27 April 2020
145 BUILDING MAIN ROAD Canstin Repainting canstin beberapa spot 1 - 1 - 1 27 April 2020
146 BUILDING MAIN ROAD Canstin Crak canstin beberapa spot 1 - 1 - 1 30 April 2020
147 BUILDING MAIN ROAD Sidewalk/Pedestrian Crack pada beberapa spot 1 - 1 - 1 27 April 2020
148 BUILDING MAIN ROAD Box Culvert Cover concrete box culvert flake 1 - 1 - 1 27 April 2020
149 BUILDING MAIN ROAD Box Culvert Repainting cover box culvert main gate 1 - 1 - 1 27 April 2020
150 BUILDING MAIN ROAD Drainage Drainage cleaning dari tanaman, sampah, dan pasir batu 1 - 1 - 1 30 April 2020
151 BUILDING MAIN ROAD Drainage Potong rebar bekas konstruksi pada Retention Pond 1 - 1 - 1 27 April 2020
152 BUILDING MAIN ROAD Main Gate Repainting korosi 1 - 1 - 1 30 April 2020
153 BUILDING MAIN ROAD Fence Cleaning tanaman rambat 1 - 1 - 1 27 April 2020
154 DO SYSTEM UNLOADING AREA - FUEL UNLOADING - MAIN OIL TANK Joint connection (flanges) Kebocoran lokal level indikator 1 - 1 - 1 17 April 2020
155 DO SYSTEM UNLOADING AREA - FUEL UNLOADING - MAIN OIL TANK Cleanliness Clean main pipe unloading sisi jalan 1 - 1 - 1 17 April 2020
156 DO SYSTEM UNLOADING AREA - FUEL UNLOADING - MAIN OIL TANK Piping Touch up main pipe unloading sisi jalan 1 - 1 - 1 17 April 2020
157 DO SYSTEM UNLOADING AREA - FUEL UNLOADING - MAIN OIL TANK Piping Penambahan Flow direction 1 - 1 - 1 17 April 2020
158 DO SYSTEM UNLOADING AREA - FUEL UNLOADING - MAIN OIL TANK Main Oil Tank Touch up tangga Main Oil Tank 1 - 1 - 1 17 April 2020
159 DO SYSTEM UNLOADING AREA - FUEL UNLOADING - MAIN OIL TANK Main Oil Tank Touch up roofing Main Oil Tank 1 - 1 - 1 17 April 2020
160 DO SYSTEM UNLOADING AREA - FUEL UNLOADING - MAIN OIL TANK Main Oil Tank Touch up kepala Main Oil Tank 1 - 1 - 1 17 April 2020
161 DO SYSTEM MAIN OIL TANK - DO SEPARATOR - DAILY TANK Pipe support Touch up support Daily Tank 1 - 1 - 1 17 April 2020
162 DO SYSTEM MAIN OIL TANK - DO SEPARATOR - DAILY TANK Pipe support Bongkar Pondasi sisa pipe support 1 - 1 - 1 17 April 2020
Open Close
Open PLN-E Close PLN-E
No Walk Down Item Area/System Inspection Area Punchlist Item TOTAL Internal Internal Closing Date
UPP UPP
WIKA Wika
163 DO SYSTEM MAIN OIL TANK - DO SEPARATOR - DAILY TANK Fix & Sliding U-bolt Cleaning anchore bolt Daily Oil Tank 1 - 1 - 1 17 April 2020
164 DO SYSTEM MAIN OIL TANK - DO SEPARATOR - DAILY TANK Pipe accessories Touch up pipa kabel 1 - 1 - 1 17 April 2020
165 DO SYSTEM MAIN OIL TANK - DO SEPARATOR - DAILY TANK Pipe accessories Penambahan cover T Pipa 1 - 1 - 1 17 April 2020
166 DO SYSTEM MAIN OIL TANK - DO SEPARATOR - DAILY TANK Piping Touch up pipa DO Separator 1 - 1 - 1 17 April 2020
167 DO SYSTEM MAIN OIL TANK - DO SEPARATOR - DAILY TANK Daily Oil Tank Touch up base plate Daily Tank 1 - 1 - 1 17 April 2020
168 DO SYSTEM MAIN OIL TANK - DO SEPARATOR - DAILY TANK Daily Oil Tank Touch up Roofing Daily Tank 1 - 1 - 1 17 April 2020
169 DO SYSTEM MAIN OIL TANK - DO SEPARATOR - DAILY TANK Daily Oil Tank Touch up kepala Daily Tank 1 - 1 - 1 17 April 2020
170 DO SYSTEM MAIN OIL TANK - DO SEPARATOR - DAILY TANK Daily Oil Tank Touch up lokal level Daily Tank 1 - 1 - 1 17 April 2020
DAILY TANK - DO SUPPLY - DO FILTER MODULE - FUEL
171 DO SYSTEM Piping Touch up pipa 1 - 1 - 1 17 April 2020
IOL BOOSTER MODULE - ENGINE
LUBE OIL UNLOADING AREA - LUBE OIL UNLOADING
172 LUBE OIL SYSTEM Piping Touch up pipa 1 - 1 - 1 17 April 2020
PUMP - LO STORAGE TANK
LUBE OIL UNLOADING AREA - LUBE OIL UNLOADING
173 LUBE OIL SYSTEM Maintenance LO Tank Cleaning and touch up flange 1 - 1 - 1 17 April 2020
PUMP - LO STORAGE TANK
LUBE OIL UNLOADING AREA - LUBE OIL UNLOADING
174 LUBE OIL SYSTEM Maintenance LO Tank Touch up valve 1 - 1 - 1 17 April 2020
PUMP - LO STORAGE TANK
LUBE OIL UNLOADING AREA - LUBE OIL UNLOADING
175 LUBE OIL SYSTEM Maintenance LO Tank Touch up valve 1 - 1 - 1 17 April 2020
PUMP - LO STORAGE TANK
LUBE OIL UNLOADING AREA - LUBE OIL UNLOADING
176 LUBE OIL SYSTEM LO Storge Tank Touch up baut 1 - 1 - 1 17 April 2020
PUMP - LO STORAGE TANK
LUBE OIL UNLOADING AREA - LUBE OIL UNLOADING
177 LUBE OIL SYSTEM LO Storge Tank Taouch up base plate tangki 1 - 1 - 1 17 April 2020
PUMP - LO STORAGE TANK
LUBE OIL STORAGE OIL TANK - SERVICE TANK - LUBE
178 LUBE OIL SYSTEM Pipe support Clean support module 1 - 1 - 1 17 April 2020
OIL MODULE - ENGINE
LUBE OIL STORAGE OIL TANK - SERVICE TANK - LUBE
179 LUBE OIL SYSTEM Piping Touch up pipa 1 - 1 - 1 17 April 2020
OIL MODULE - ENGINE
PILOT UNLOADING AREA - PILOT FUEL PUMP - PILOT
180 PILOT OIL SYSTEM Pipe support Touch up lokal level Pilot Tank 1 - 1 - 1 17 April 2020
TANK
PILOT UNLOADING AREA - PILOT FUEL PUMP - PILOT
181 PILOT OIL SYSTEM Cleanliness Clean dan touch up pipa 1 - 1 - 1 17 April 2020
TANK
PILOT UNLOADING AREA - PILOT FUEL PUMP - PILOT
182 PILOT OIL SYSTEM Piping Touch up pipa di Pump House 1 - 1 - 1 17 April 2020
TANK
PILOT UNLOADING AREA - PILOT FUEL PUMP - PILOT
183 PILOT OIL SYSTEM Pilot Tank Baut angkur longgar 1 - 1 - 1 17 April 2020
TANK
PILOT UNLOADING AREA - PILOT FUEL PUMP - PILOT
184 PILOT OIL SYSTEM Pilot Tank Touch up base plate tangki 1 - 1 - 1 17 April 2020
TANK
Cooling Water Collecting Tank - Replenishing Pump -
185 COOLING WATER Joint connection (flanges) Korosi pada flange 1 - 1 - 1 17 April 2020
Expantion Tank
Cooling Water Collecting Tank - Replenishing Pump -
186 COOLING WATER Pipe accessories Cleaning handle butterfly 1 - 1 - 1 17 April 2020
Expantion Tank
Cooling Water Collecting Tank - Replenishing Pump -
187 COOLING WATER Piping Touch up pipa 1 - 1 - 1 17 April 2020
Expantion Tank
188 COOLING WATER Expantion Tank - Pompa HT Cooling Joint connection (flanges) Touch up flange HT 1 - 1 - 1 17 April 2020
189 COOLING WATER Expantion Tank - Pompa HT Cooling Joint connection (flanges) Taouch up valve HT 1 - 1 - 1 17 April 2020
190 COOLING WATER Expantion Tank - Pompa HT Cooling Piping Touch up pipa 1 - 1 - 1 17 April 2020
191 COOLING WATER Expantion Tank - Pompa LT Cooling - Engine Piping Touch up pipa 1 - 1 - 1 17 April 2020
Transfer Pump - Diesel treatment - Wash Table - LO
192 Water Distribution Separator - TC Washing - Radiator Washing - Cooling Pipe support Korosi pipe support 1 - 1 - 1 30 April 2020
Water Collecting Tank
Transfer Pump - Diesel treatment - Wash Table - LO
193 Water Distribution Separator - TC Washing - Radiator Washing - Cooling Pipe accessories Korosi valve 1 - 1 - 1 30 April 2020
Water Collecting Tank
Transfer Pump - Diesel treatment - Wash Table - LO
194 Water Distribution Separator - TC Washing - Radiator Washing - Cooling Piping Korosi pipa beberapa spot 1 - 1 - 1 30 April 2020
Water Collecting Tank
Cooling Water Collecting Tank - Replenishing Pump - HT
195 Water Distribution Pipe support Touch up pipe support 1 - 1 - 1 30 April 2020
Cooling Water - LT Cooling Water - Nozzle Cooling Water
197 Fire Fighting System Service Water Tank - Fire Pump Container - Main Ring Pipe support korosi pipe support 1 - 1 - 1 21 April 2020
Open Close
Open PLN-E Close PLN-E
No Walk Down Item Area/System Inspection Area Punchlist Item TOTAL Internal Internal Closing Date
UPP UPP
WIKA Wika
198 Fire Fighting System Service Water Tank - Fire Pump Container - Main Ring Joint connection (flanges) Leakage dan korosi 1 - 1 - 1 21 April 2020
199 Fire Fighting System Service Water Tank - Fire Pump Container - Main Ring Joint connection (flanges) Change bolt container pump 1 - 1 - 1 21 April 2020
200 Fire Fighting System Service Water Tank - Fire Pump Container - Main Ring Joint connection (flanges) Drain Diesel motor pump tersumbat 1 - 1 - 1 21 April 2020
201 Fire Fighting System Service Water Tank - Fire Pump Container - Main Ring Pipe accessories Touch up atap container (dalam) 1 - 1 - 1 21 April 2020
202 Fire Fighting System Service Water Tank - Fire Pump Container - Main Ring Pipe accessories Touch up gate valve + greesing screw 1 - 1 - 1 21 April 2020
203 Fire Fighting System Fire Pump Container - Main Ring - Workshop Pipe accessories Touch up box hydrant dan handle gate valve 1 - 1 - 1 21 April 2020
204 Fire Fighting System Fire Pump Container - Main Ring - Power House Joint connection (flanges) korosi flange beberapa spot 1 - 1 - 1 21 April 2020
205 Fire Fighting System Fire Pump Container - Main Ring - Power House Bolt tightness korosi baut beberapa spot 1 - 1 - 1 21 April 2020
206 Fire Fighting System Fire Pump Container - Main Ring - Power House Pipe accessories Touch up box hydrant dan handle gate valve 1 - 1 - 1 21 April 2020
207 Fire Fighting System Fire Pump Container - Main Ring - Power House Piping Touch dan repainting Pipa 1 - 1 - 1 21 April 2020
208 Fire Fighting System Fire Pump Container - Main Ring - Bladder Tank Joint connection (flanges) Korosi pada flange 1 - 1 - 1 21 April 2020
209 Fire Fighting System Fire Pump Container - Main Ring - Bladder Tank Pipe accessories Touch up box hydrant 1 - 1 - 1 21 April 2020
210 Fire Fighting System Fire Pump Container - Main Ring - Bladder Tank Pipe accessories Touch up gate valve 1 - 1 - 1 21 April 2020
211 Fire Fighting System Fire Pump Container - Main Ring - Bladder Tank Pipe accessories Crack pada three way 1 - 1 - 1 24 April 2020
212 Fire Fighting System Fire Pump Container - Main Ring - Bladder Tank Piping Repainting Pipa 1 - 1 - 1 21 April 2020
213 Fire Fighting System Fire Pump Container - Main Ring - Bladder Tank Piping Touch up Pipa 1 - 1 - 1 21 April 2020
Gas Metering - Gas Flowmeter - Gas Chromatograph -
214 Gas Supply System Pipe support korosi pipe support 1 - 1 - 1 24 April 2020
Shuft off Valve
Gas Metering - Gas Flowmeter - Gas Chromatograph -
215 Gas Supply System Joint connection (flanges) korosi join flange 1 - 1 - 1 24 April 2020
Shuft off Valve
Gas Metering - Gas Flowmeter - Gas Chromatograph -
216 Gas Supply System Bolt tightness touch up bolt 1 - 1 - 1 24 April 2020
Shuft off Valve
Gas Metering - Gas Flowmeter - Gas Chromatograph -
217 Gas Supply System Pipe accessories Clening penumatic valve 1 - 1 - 1 24 April 2020
Shuft off Valve
Gas Metering - Gas Flowmeter - Gas Chromatograph -
218 Gas Supply System Pipe accessories Clening pressure gate 1 - 1 - 1 24 April 2020
Shuft off Valve
Gas Metering - Gas Flowmeter - Gas Chromatograph -
219 Gas Supply System Piping Cleaning pipa beberapa spot 1 - 1 - 1 24 April 2020
Shuft off Valve
220 Gas Supply System Shuft off Valve - Gas Metering - Engine Pipe support Touch up pipe support 1 - 1 - 1 24 April 2020
221 Gas Supply System Shuft off Valve - Gas Metering - Engine Bolt tightness Touch up bolt 1 - 1 - 1 24 April 2020
222 Gas Supply System Shuft off Valve - Gas Metering - Engine Fix & Sliding U-bolt Tightening Bolt 1 - 1 - 1 24 April 2020
223 Gas Supply System Shuft off Valve - Gas Metering - Engine Piping Repainting Elbow 1 - 1 - 1 24 April 2020
224 Gas Supply System Shuft off Valve - Gas Metering - Engine Piping Cleaning pipa beberapa spot 1 - 1 - 1 24 April 2020
225 Gas Supply System Shuft off Valve - Gas Control Line - Engine Piping Cleaning pipa beberapa spot 1 - 1 - 1 24 April 2020
226 WWTP System WWTP System Pipe support Korosi pipe support 1 - 1 - 1 27 April 2020
227 WWTP System WWTP System Pipe accessories Touch up tangga WWTP 1 - 1 - 1 27 April 2020
228 WWTP System WWTP System Cleanliness Cleaning area WWTP 1 - 1 - 1 27 April 2020
229 WTP System WTP System Pipe support Korosi pipe support 1 - 1 - 1 27 April 2020
230 WTP System WTP System Fix & Sliding U-bolt Korosi u-bolt 1 - 1 - 1 27 April 2020
231 WTP System WTP System Pipe accessories Korosi Check Valve 1 - 1 - 1 27 April 2020
232 WTP System WTP System Pipe accessories Frame Conduit korosi 1 - 1 - 1 27 April 2020
233 Service Air System Compessor Room - Air Receiver Tank - Engine Platform Joint connection (flanges) Touch up join connection 1 - 1 - 1 27 April 2020
234 Service Air System Compessor Room - Air Receiver Tank - Engine Platform Piping Clening pipa beberapa spot 1 - 1 - 1 27 April 2020
235 Service Air System Air Receiver Tank - Pump House Area Piping Korosi pipa 1 - 1 - 1 27 April 2020
236 Service Air System Air Receiver Tank - Workshop Area Piping Clening pipa beberapa spot 1 - 1 - 1 27 April 2020
237 Service Air System Air Receiver Tank - WTP Pipe accessories Korosi nozzle 1 - 1 - 1 27 April 2020
238 Service Air System Air Receiver Tank - WTP Piping Korosi pipa 1 - 1 - 1 27 April 2020
Open Close
Open PLN-E Close PLN-E
No Walk Down Item Area/System Inspection Area Punchlist Item TOTAL Internal Internal Closing Date
UPP UPP
WIKA Wika
239 Starting Air System Compessor Room - Receiver Tank - Engine Pipe support Cleaning support pipa beberapa spot 1 - 1 - 1 24 April 2020
240 Starting Air System Compessor Room - Receiver Tank - Engine Joint connection (flanges) Korosi pada flange 1 - 1 - 1 24 April 2020
241 Starting Air System Compessor Room - Receiver Tank - Engine Pipe accessories Main hole air reciver tank 1 - 1 - 1 24 April 2020
242 Starting Air System Compessor Room - Receiver Tank - Engine Pipe accessories Touch up komponen Starting air system 1 - 1 - 1 24 April 2020
243 Starting Air System Compessor Room - Receiver Tank - Engine Cleanliness Simplex kotor 1 - 1 - 1 24 April 2020
244 Starting Air System Compessor Room - Receiver Tank - Engine Piping Cleaning pipa beberapa spot 1 - 1 - 1 24 April 2020
245 Starting Air System Compessor Room - Receiver Tank - Engine Piping Touch up pipa beberapa spot 1 - 1 - 1 24 April 2020
246 Effluent Collecting Sump Power House Bolt tightness Korosi dan touch up bolt 1 - 1 - 1 17/04/2020
247 Effluent Collecting Sump Power House Bolt tightness Change bolt 1 - 1 - 1 17/04/2020
248 Effluent Collecting Sump Power House Pipe accessories Touch painting check valve 1 - 1 - 1 17/04/2020
249 Effluent Collecting Sump Power House Piping Touch up beberapa spot 1 - 1 - 1 17/04/2020
250 Effluent Collecting Condensate Drain Tank Pipe accessories Bolt Valve claning dan touch up 1 - 1 - 1 17/04/2020
251 Effluent Collecting Sump Pump House Fix & Sliding U-bolt U Bolt longgar 1 - 1 - 1 17/04/2020
252 Effluent Collecting Sump Pump House Pipe accessories Korosi Touch Up Painting 1 - 1 - 1 17/04/2020
253 Effluent Collecting Sump Pump House Pipe accessories Repainting cover drainage pump house 1 - 1 - 1 17/04/2020
254 Effluent Collecting Sump Pump House Pipe accessories Touch Up Hanle Buterfly Valve 1 - 1 - 1 17/04/2020
255 Effluent Collecting Oil Separator in Tankfarm Pipe support Korosi pipe support 1 - 1 - 1 17/04/2020
256 Effluent Collecting Oil Separator in Tankfarm Bolt tightness Touch up painting bolt korosi 1 - 1 - 1 17/04/2020
257 Effluent Collecting Oil Separator in Tankfarm Pipe accessories Tutup cover oil separator 1 - 1 - 1 17/04/2020
258 Effluent Collecting Oil Separator in Tankfarm Pipe accessories Touch up painting check valve 1 - 1 - 1 17/04/2020
259 Effluent Collecting Oil Separator in Tankfarm Piping Touch up panting 1 - 1 - 1 17/04/2020
260 Effluent Collecting Fuel Oil Pit in Tankfarm Pipe support Korosi pipe Support beberapa spot 1 - 1 - 1 17/04/2020
261 Effluent Collecting Fuel Oil Pit in Tankfarm Pipe support Painting Support beberapa spot 1 - 1 - 1 17/04/2020
262 Effluent Collecting Fuel Oil Pit in Tankfarm Joint connection (flanges) Korosi beberapa spot 1 - 1 - 1 17/04/2020
263 Effluent Collecting Fuel Oil Pit in Tankfarm Bolt tightness Korosi Bolt beberapa spot 1 - 1 - 1 17/04/2020
264 Effluent Collecting Fuel Oil Pit in Tankfarm Pipe accessories Korosi Gate Valve Main Oil Tank 1 - 1 - 1 17/04/2020
265 Effluent Collecting Fuel Oil Pit in Tankfarm Pipe accessories Korosi Gate Valve Daily Tank 1 - 1 - 1 17/04/2020
266 Effluent Collecting Fuel Oil Pit in Tankfarm Piping Korosi di beberapa spot 1 - 1 - 1 17/04/2020
267 Effluent Collecting Sump Unloading Station Pipe support Korosi Pipe Support 1 - 1 - 1 17/04/2020
268 Effluent Collecting Sump Unloading Station Joint connection (flanges) Korosi Join Flange 1 - 1 - 1 17/04/2020
269 Effluent Collecting Sump Unloading Station Joint connection (flanges) Pergantian Bolt 1 - 1 - 1 17/04/2020
270 Effluent Collecting Sump Unloading Station Fix & Sliding U-bolt Baut U Bolt longgar 1 - 1 - 1 17/04/2020
271 Effluent Collecting Sump Unloading Station Pipe accessories Korosi Check Valve 1 - 1 - 1 17/04/2020
272 Effluent Collecting Sump Unloading Station Pipe accessories Touch Up Hanle Buterfly Valve 1 - 1 - 1 17/04/2020
273 Effluent Collecting Sump Unloading Station Cleanliness Cleaning Oil Pit area unloading Pump 1 - 1 - 1 17/04/2020
274 General TEMPORARY BUILDING Cleanliness Pembersihan sisa gudang temporary dan sisa konstruksi 1 - 1 - 1 30 April 2020