Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
PREPARED BY:
PROJECT.
JUNLY, 2019
REMARKS: - INSTALLING THE CABLE FEEDERS TO THESE BOARDS, CURRENT SYSTEMS & LOW VOLTAGE POWER CABLES IS
1.THE LAYOUT DRAWINGS DO NOT SHOW ALL THE SYSTEMS , HOOKING UP OF EQUIPMENT WILL BE THE SYSTEM SUPPLIER 300MM.
ITEMS, OR ACCESSORIES COVERED UNDER THE SCOPE OF RESPONSIBILITY. .23 THE MAXIMUM FILLING RATIO FOR POWER &
ELECTRICAL WORKS TO BE EXECUTED THE LAYOUT .10 CONDUCTORS FOR SINGLE PHASE SOCKETS OUTLETS COMMUNICATION CONDUITS IN SITE WORK ARE:
DRAWINGS SHALL BE READ IN CONJUNCTION WITH ALL CIRCUITS SHALL BE 4MM COPPER CONDUCTORS AND · MIN50. MMD FOR POWER CABLE WITH MAX 40%.
RELEVANT OR SPECIALIST DRAWINGS AND SPECIFICATIONS . PROTECTED BY 16A CIRCUIT BREAKERS UNLESS OTHERWISE OF CONDUIT CAPACITY.
2.DO NOT SCALE FROM THE LAYOUT DRAWINGS WORK INDICATED. · MIN50. MMD FOR LOW CURRENT SYSTEMS WITH
ACCORDING TO ARCHITECTURAL OR ELECTRICAL DETAILS .11 IN THE ABSENCE OF ANY INDICATION ON THE DRAWINGS MAX 40%. OF CONDUIT CAPACITY.
UNLESS OTHERWISE AUTHORIZED . OR THE SPECIFICATIONS, THE INSTALLATIONS SHALL BE .24 ALL C.BS WITH FRAME RATING LARGER THAN 100A
3.ALL EQUIPMENT LAYOUTS ARE PROVISIONAL . FINAL DONE TO THE SATISFACTION OF THE ENGINEER. SHOULD HAVE ADJUSTABLE THERMAL OVERLOAD SETTING.
LAYOUT SHALL BE DETERMINED BY THE CONTRACTOR FROM .12 THE CONTRACTOR SHALL PROVIDE ALL IRON ANGLES, .25 CONTRACTOR SHALL PROVIDE CONTROL CONDUIT &
THE CONSTRUCTION /SHOP DRAWINGS AND AFTER AND FIXING ACCESSORIES REQUIRED FOR COMPLETE WIRING AS PER OPERATIONAL REQUIREMENTS SHOWN ON
COORDINATION WITH OTHER TRADES . INSTALLATION OF LIGHTING FIXTURES, OUTLETS & ROUTES. HVAC AND PLUMBING DRAWING.
4.THE SIZE OF CONDUITS AND /OR CABLE TRAYS IS IN .13 FOR EXACT QUANTITY, TYPE & LOCATION OF ELECTRICAL .26 EXACT METHOD OF JOINING CABLE TRAYS,AND CABLE
GENERAL NOT SHOWN ON DRAWINGS . THE SIZE OF ALL OUTLETS REFER TO INTERIOR DESIGN DOCUMENT. TRUNKING SHALL BE IN ACCORDANCE WITH THE
CONDUITS AND/OR CABLE TRAYS SHALL BE SELECTED BY .14 THE CONTRACTOR SHALL BE RESPONSIBLE FOR RESPECTIVE MANUFACTURERS RECOMMENDATION USING
THE CONTRACTOR IN ACCORDANCE WITH BOQ , MODIFYING THE NO. OF CIRCUIT BREAKERS, RATING, AND PROPER COMPONENT.
REGULATIONS AND /OR STANDARDS AND WILL BE FUNCTION WIRING ACCORDING TO MANUFACTURER DATA WITHOUT .27 GROUNDING TO LOW CURRENT SYSTEMS SHALL BE
OF THE NUMBER AND SIZE OF THE RESPECTIVE ANY EXTRA COST. SEPARATE GROUNDING PIT AND CONNECTED TO BUILDING
CONDUCTORS. .15 ALL DISCONNECT SWITCHES FOR A/C SHALL BE GROUNDING NETWORK.
5.PERFORATED CABLE TRAY SHALL BE FIXED AND COVER ADJACENT TO THE UNIT.. .28 THE DISTANCE BETWEEN EARTH PIT SHALL BE DOUBLE
PROPERLY AND SHALL NOT FIXED DIRECT TO ROOF SLAB . .16 UNLESS OTHERWISE INDICATED MINIMUM SIZE CONDUIT; OR MORE THAN LENGTH OF EARTHING ROD.
6.TEARTH CONTINUITY CONDUCTORS ARE NOT INDICATED · FOR EXTERIOR INSTALLATION IS 25MM DIAMETER .29 THE CONTRACTOR SHOULD PROVIDE COMPLETE
ON THE DRAWINGS , BUT SHALL BE RUN WITH ALL CIRCUITS OR AS SHOWN IN PANEL SCHEDULE. CENTRAL INTERFACE BETWEEN THE SOLAR GENERATION
IN ACCORDANCE WITH SPECIFICATIONS , REGULATIONS · FOR INTERIOR INSTALLATION IS 25MM DIAMETER SYSTEM & GENERATOR SET.
AND/OR STANDARDS. OR AS SHOWN IN PANEL SCHEDULE. .30 THE DIMENSION OF ELECTRICAL PANELS AND
7.THE COLOR CODE FOR A FOUR WIRE CIRCUIT IS - ONE .17 CONTRACTOR SHALL PROVIDE MATCHING PLUG IN FOR EQUIPMENT'S SHALL BE AS PER APPROVED FABRICATOR /
BLACK, - ONE RED , ONE BLUE AND ONE YELLOW ANY ALL SPECIAL OUTLETS. SUPPLIER SHOP DRAWING.
CONDUCTOR INTENDED FOR GROUNDING PURPOSE SHALL .18 CONTRACTOR RESPONSIBLE FOR CHANGE ALL EXISTING .31 CONTRACTOR SHALL BE RESPONSIBLE FOR INSTALL
BE GREEN WITH YELLOW STRIPE . FLORESCENT TUBE (T) 8LIGHT BY LED TUBE (T) 8INCLUDE SUITABLE VENTILATION SYSTEM IN BATTERY ROOM TO
8.CONTRACTOR RESPONSIBLE TO DISCONNECT ALL WIRING ALL OPERATION ACCESSORIES FOR ALL LIGHTING FIXTURES ASSURING REFRESHING AIR FLOW INSIDE ROOM .
IN EXISTING DISTRIBUTION BOARD AND RECONNECTED IN AS PER BOQ. .32 CONTRACTOR RESPONSIBLE TO DISTRIBUTE ALL
NEW DISTRIBUTION BOARD AS PER SINGLE LINE DIAGRAM . .19 LED LAMPS SHALL BE FURNISHED AND INSTALLED IN ALL DISTANCE BETWEEN ALL SYSTEM COMPONENTS INSIDE
9.THE CONTROL AND /OR SWITCHBOARDS FOR THE LIGHTING FIXTURES. BATTERY ROOM AS PER MANUFACTURE INSTALLATION
DIFFERENT SYSTEMS SUCH AS THE AIR CONDITIONING .20 ALL OUTDOOR WIRING ACCESSORIES SHALL BE WEATHER INSTRUCTION.
EQUIPMENT MACHINES , ....ETC . WILL BE IN THE SCOPE OF PROOF TYPE.
SUPPLY OF THE SYSTEM SUPPLIER . THE ELECTRICAL .21 FOR GROUND-FAULT CIRCUIT INTERRUPT (GFCI) REFER
CONTRACTOR WILL BE RESPONSIBLE FOR FURNISHING AND TO PLANS AND PANEL SCHEDULES.
.22 THE MINIMUM SEPARATE DISTANCE BETWEEN LOW
PREPARED BY: FUNED BY: PROJECT TITLE: DRAWING TITLE: T-DSGN-BY PAPER SIZE: SCALE: PURPOSE REV. DATE DRAWING NO:
ASH-SHAHEED DESIGNED BY: A3 AS SHOWN OF ISSUE
MAIN REMARK IFA 9/7/19
AL-HADHIQ SCHOOL
S2-00
REVIEWED BY: PROJECT NO:
OPERATIONAL EXCELLENCE IUS-OPS-ECS-AMR-003.4
FOR RESULTS THAT MATTER. DRAWING TYPE: DATE:
SANA'A - YEMEN. Amran CITY-YEMEN ELECTRICAL DESIGN APPROVED BY:
UNOPS DESIGN REVIEW JULY 9 2019
1. ALL DIMENSIONS AND ELEVATIONS ARE IN
CENTIMETERS AND METERS RESPECTIVELY,
UNLESS OVER WISE MENTIONED.
2. ALL DIMENSIONS TO BE CHECKED AND CONFIRMED
ON SITE BEFORE COMMENCEMENT OF ANY WORK.
3. ANY DISCREPANCY TO BE REPORTED TO THE
UNOPS SITE ENGINEER/ PROJECT MANAGER
PROMPTLY BEFORE PROCEEDING.
4. ALL OUTDOOR OUTLETS, SOCKET OR WIRING
ACCESSORIES SHALL BE WEATHER PROOF TYPE.
5. ALL DISTANCE BETWEEN SYSTEM COMPONENTS INSIDE
BATTERY ROOM TO BE DISTRIBUTE AS PER MANUFACTURE
INSTALLATION INSTRUCTION.
MAIN DISTRIBUTION
MDB BOARD.
WATER PROOF
BOX 15CM X 15CM
EMERGENCY MAIN
EMDB DISTRIBUTION BOARD.
AC COUPLING PANEL
OLD SDB
MTS
EMDB SDB IN
SDB IN
THE
CONNECTION BOX
BETWEEN CHARGE
THE FIRST
SECOND
FLOOR
FLOOR
CONTROLLER AND
BATTERY RACK
CABLE ROUTING
SDB
AC≈
3/4" PVC PIPE
WATER PROOF HYBRID INVERTER
SCH. 40. 3*4sqmm BOX 15CM X 15CM DC=
cable AC
COUPLN
IG
PANEL
PREPARED BY: FUNED BY: PROJECT TITLE: DRAWING TITLE: DESIGN BY: STATUS: NORTH: DRAWING NO:
FINAL ELECTRIC PLAN DETAILS. TENDER DOCUMENTS.
ASH-SHAHEED AL-HADHIQ
UNOPS
S2-01
CHECKED BY:
SCHOOL PROJECT NO: PAPER SIZE:
OPERATIONAL EXCELLENCE IUS-OPS-ECS-AMR-003.4 A3.
FOR RESULTS THAT MATTER. WORLD BANK GROUP. PROJECT LOCATION: DRAWING TYPE: APPROVED BY: DATE: SCALE:
SANA'A - YEMEN. Amran CITY-YEMEN ELECTRIC PLANS. UNOPS DESIGN REVIEW JUNLY 12 2019. 1:1
1. ALL DIMENSIONS AND ELEVATIONS ARE IN
CENTIMETERS AND METERS RESPECTIVELY,
UNLESS OVER WISE MENTIONED.
2. ALL DIMENSIONS TO BE CHECKED AND CONFIRMED
ON SITE BEFORE COMMENCEMENT OF ANY WORK.
3. ANY DISCREPANCY TO BE REPORTED TO THE
UNOPS SITE ENGINEER/ PROJECT MANAGER
PROMPTLY BEFORE PROCEEDING.
4. ALL OUTDOOR OUTLETS, SOCKET OR WIRING
ACCESSORIES SHALL BE WEATHER PROOF TYPE.
AC
COUPLING S&H D
PANEL
CONNECTION BOX
BETWEEN CHARGE
CONTROLLER AND
BATTERY RACK
AC≈
HYBRID INVERTER
DC=
340
BATTERY RACK.
AC COUPLING PANEL
EXHAUST FAN
AC≈
DC =
PREPARED BY: FUNED BY: PROJECT TITLE: DRAWING TITLE: DESIGN BY: STATUS: NORTH: DRAWING NO:
FINAL ELECTRIC PLAN DETAILS. TENDER DOCUMENTS.
ASH-SHAHEED AL-HADHIQ
UNOPS
S2-02
CHECKED BY:
SCHOOL PROJECT NO: PAPER SIZE:
OPERATIONAL EXCELLENCE IUS-OPS-ECS-AMR-003.4 A3.
FOR RESULTS THAT MATTER. WORLD BANK GROUP. PROJECT LOCATION: DRAWING TYPE: APPROVED BY: DATE: SCALE:
SANA'A - YEMEN. Amran CITY-YEMEN ELECTRIC PLANS. UNOPS DESIGN REVIEW JUNLY 12 2019. 1:4
1. ALL DIMENSIONS AND ELEVATIONS ARE IN
CENTIMETERS AND METERS RESPECTIVELY,
UNLESS OVER WISE MENTIONED.
2. ALL DIMENSIONS TO BE CHECKED AND CONFIRMED
ON SITE BEFORE COMMENCEMENT OF ANY WORK.
3. ANY DISCREPANCY TO BE REPORTED TO THE
UNOPS SITE ENGINEER/ PROJECT MANAGER
PROMPTLY BEFORE PROCEEDING.
4. ALL CABLE SHALL BE ROUTE IN PERFORATED GI
CABLE TRAY.
5. CABLE TRAY SHALL BE FIXED ABOVE UNISTRUT NOT
DIRECT IN ROOFTOP.
PHOTOVOLTAIC MODULE
+
_
DC-COMBINER
BOX COMBINER BOX
CABLE TRAY
DC-COMBINER
BOX
COMBINER BOX
100
_ _
+ +
_ _
+ +
_ _
+ +
FROM COMBINER BOX
TO CONTROL ROOM
50
_
+
_
_
+
_
GI CABLE TRAY
+ +
_
+
_
+
100MM * 50MM
SWH
ANCHOR
BOLT
NOT TO SCALE.
PREPARED BY: FUNED BY: PROJECT TITLE: DRAWING TITLE: DESIGN BY: STATUS: NORTH: DRAWING NO:
PV MODULE DISTRIBUTION TENDER DOCUMENTS.
ASH-SHAHEED AL-HADHIQ
UNOPS
S2-03
ROOFTOP PLAN DETAILS. CHECKED BY:
SCHOOL PROJECT NO: PAPER SIZE:
OPERATIONAL EXCELLENCE IUS-OPS-ECS-AMR-003.4 A3.
FOR RESULTS THAT MATTER. WORLD BANK GROUP. PROJECT LOCATION: DRAWING TYPE: APPROVED BY: DATE: SCALE:
SANA'A - YEMEN. Amran CITY-YEMEN ELECTRIC PLANS. UNOPS DESIGN REVIEW JUNLY 12 2019. 1:1
1. ALL DIMENSIONS AND ELEVATIONS ARE IN
CENTIMETERS AND METERS RESPECTIVELY,
UNLESS OVER WISE MENTIONED.
2. ALL DIMENSIONS TO BE CHECKED AND CONFIRMED
ON SITE BEFORE COMMENCEMENT OF ANY WORK.
3. ANY DISCREPANCY TO BE REPORTED TO THE
UNOPS SITE ENGINEER/ PROJECT MANAGER
PROMPTLY BEFORE PROCEEDING.
4. LIGHTNING ARRESTER SHALL BE INSTALL IN
SUITABLE LOCATION AND HEIGHT TO COVER ALL
ROOFTOP AREA.
5. ALL EACH PV STRINGS SHALL BE EARTHED
SEPARATELY UP TO EARTHING BUS BAR IN
ROOFTOP.
PHOTOVOLTAIC MODULE
+
_
DC-COMBINER
BOX COMBINER BOX
EARTHING CABLE
LIGHTNING ARRESTOR
TO LIGHTNING
ARRESTER
1C*25 SQ.MM
TO EARTHING EARTHING
BUS BAR NO.2 BUS BAR NO.1
1C*16SQ.MM
TO EARTHING
PIT
CABLE TRAY
1C*10SQ.MM DC-COMBINER
BOX
TO EARTHING _
+
_
_
+
_
PIT +
_
+
+
_
+
FROM COMBINER BOX
TO CONTROL ROOM
_ _
+ +
_ _
+ +
_ _
1C*6
1C*6
+ +
SQ
SQ
.MM
.MM
PREPARED BY: FUNED BY: PROJECT TITLE: DRAWING TITLE: DESIGN BY: STATUS: NORTH: DRAWING NO:
PV STRINGS & COMBINER BOX TENDER DOCUMENTS.
ASH-SHAHEED AL-HADHIQ
UNOPS
S2-04
EARTHING PLAN DETAILS. CHECKED BY:
SCHOOL PROJECT NO: PAPER SIZE:
OPERATIONAL EXCELLENCE IUS-OPS-ECS-AMR-003.4 A3.
FOR RESULTS THAT MATTER. WORLD BANK GROUP. PROJECT LOCATION: DRAWING TYPE: APPROVED BY: DATE: SCALE:
SANA'A - YEMEN. Amran CITY-YEMEN ELECTRIC PLANS. UNOPS DESIGN REVIEW JUNLY 12 2019. 1:1
1. ALL DIMENSIONS AND ELEVATIONS ARE IN
CENTIMETERS AND METERS RESPECTIVELY,
UNLESS OVER WISE MENTIONED.
2. ALL DIMENSIONS TO BE CHECKED AND CONFIRMED
ON SITE BEFORE COMMENCEMENT OF ANY WORK.
3. ANY DISCREPANCY TO BE REPORTED TO THE
UNOPS SITE ENGINEER/ PROJECT MANAGER
PROMPTLY BEFORE PROCEEDING.
4. EARTHING PIT SHALL BE CARRY OUT AS BE SITE
ENGINEER INSTRUCTION.
PREPARED BY: FUNED BY: PROJECT TITLE: DRAWING TITLE: DESIGN BY: STATUS: NORTH: DRAWING NO:
EARTNING PIT AND BUSBAR TENDER DOCUMENTS.
ASH-SHAHEED AL-HADHIQ
UNOPS
S2-05
DETAILS. CHECKED BY:
SCHOOL PROJECT NO: PAPER SIZE:
OPERATIONAL EXCELLENCE IUS-OPS-ECS-AMR-003.4 A3.
FOR RESULTS THAT MATTER. WORLD BANK GROUP. PROJECT LOCATION: DRAWING TYPE: APPROVED BY: DATE: SCALE:
SANA'A - YEMEN. Amran CITY-YEMEN ELECTRIC PLANS. UNOPS DESIGN REVIEW JUNLY 12 2019. AS SHOWEN.
1. ALL DIMENSIONS AND ELEVATIONS ARE IN
CENTIMETERS AND METERS RESPECTIVELY,
UNLESS OVER WISE MENTIONED.
2. ALL DIMENSIONS TO BE CHECKED AND CONFIRMED
ON SITE BEFORE COMMENCEMENT OF ANY WORK.
3. ANY DISCREPANCY TO BE REPORTED TO THE
UNOPS SITE ENGINEER/ PROJECT MANAGER
PROMPTLY BEFORE PROCEEDING.
4. NEW DISTRIBUTION BOARD SHALL BE INSTALL IN
THE SAME LOCATION OF EXISTING ONE.
MANUAL TRANSFER
SWITSH
SURGE ARRESTER
AC FUSE
CIRCUIT BREAKER
(MCCB/MCB)
HYBRID SOLAR SYSTEM INVERTER OUTPUT
AC FUSE
MTS 100A
NEW EMDB
RCBO
63A,300mA
40A, 2P 40A, 2P 40A, 2P 25A, 2P 20A, 1P 20A, 1P 16A, 1P 16A, 1P 10A, 1P 10A, 1P
MCB 10kA
MCB, MCB, 10kA MCB, 10kA MCB, 10kA MCB, 10kA MCB 10kA
MCB, MCB
MCB, 10kA MCB
MCB, 10kA MCB 10kA
MCB, MCB, 10kA
CLASS B CLASS B CLASS B CLASS B CLASS B CLASS B CLASS B CLASS B CLASS B CLASS B
OUTDOOR LIGHTING
SDB SDB SDB SPARE SPARE SPARE SPARE SPARE SPARE
PREPARED BY: FUNED BY: PROJECT TITLE: DRAWING TITLE: DESIGN BY: STATUS: NORTH: DRAWING NO:
SOLAR SYSTEM SINGLE LINE TENDER DOCUMENTS.
ASH-SHAHEED AL-HADHIQ
UNOPS
S2-06
DIAGRAM DETAILS. CHECKED BY:
SCHOOL PROJECT NO: PAPER SIZE:
OPERATIONAL EXCELLENCE IUS-OPS-ECS-AMR-003.4 A3.
FOR RESULTS THAT MATTER. WORLD BANK GROUP. PROJECT LOCATION: DRAWING TYPE: APPROVED BY: DATE: SCALE:
SANA'A - YEMEN. AMRAN CITY-YEMEN ELECTRIC PLANS. UNOPS DESIGN REVIEW JUNLY 12 2019. AS SHOWEN.
1. ALL DIMENSIONS AND ELEVATIONS ARE IN
CENTIMETERS AND METERS RESPECTIVELY,
UNLESS OVER WISE MENTIONED.
2. ALL DIMENSIONS TO BE CHECKED AND CONFIRMED
ON SITE BEFORE COMMENCEMENT OF ANY WORK.
3. ANY DISCREPANCY TO BE REPORTED TO THE
UNOPS SITE ENGINEER/ PROJECT MANAGER
PROMPTLY BEFORE PROCEEDING.
4. EARTHING PIT SHALL BE CARRY OUT AS BE SITE
ENGINEER INSTRUCTION.
40A , 10 kA 20 A , 10 kA
40A , 10 kA 16A , 10 kA
40A , 10 kA 16 A , 10 kA
25A , 10 kA 10 A , 10 kA
20A , 10 kA 10 A , 10 kA
50
E
ABB
DDA204 AC
In=0.3A
PUSH
RCBO
63A,300mA N
PREPARED BY: FUNED BY: PROJECT TITLE: DRAWING TITLE: DESIGN BY:
UNOPS TEAM STATUS:
: NORTH: DRAWING NO:
MAIN DISTRIBUTION BOARD TENDER DOCUMENTS.
ASH-SHAHEED AL-HADHIQ
UNOPS
S2-07
DETAILS. CHECKED BY:
SCHOOL PROJECT NO: PAPER SIZE:
OPERATIONAL EXCELLENCE IUS-OPS-ECS-AMR-003.4 A3.
FOR RESULTS THAT MATTER. WORLD BANK GROUP. PROJECT LOCATION: DRAWING TYPE: APPROVED BY: DATE: SCALE:
SANA'A - YEMEN. AMRAN CITY- YEMEN ELECTRIC PLANS. JUNLY 12 2019. AS SHOWEN.
1. ALL DIMENSIONS AND ELEVATIONS ARE IN
CENTIMETERS AND METERS RESPECTIVELY,
UNLESS OVER WISE MENTIONED.
2. ALL DIMENSIONS TO BE CHECKED AND CONFIRMED
ON SITE BEFORE COMMENCEMENT OF ANY WORK.
PHOTOVOLTAIC MODULE
+
_
DC =
AC≈
HYBRID INVERTER
SURGE ARRESTER
Total: 0.99Kwp
3 PV MODULE
STR NO.2
85A
150 VDC
_
XPLE/PVC/CU1.0KV
3X6
4X6 SQ.mm
AC≈
Total: 0.99Kwp
3 PV MODULE
DC =
_
+
XPLE/PVC/CU1.0KV
3X6 SQ.mm DC FUSE
2(1x50 SQ.mm)
Total: 0.99Kwp
3 PV MODULE
STR NO.4
(RED& BLACK)
125A,2P
2(1x50 SQ.mm)
(RED& BLACK)
DC SWITCH ISOLATOR
2(1x50 SQ.mm)
(RED& BLACK)
125 A, 2P
Battery Rack
1x50 SQ.mm
24 Batteries
2V ,600 Ah
48 Volt
PREPARED BY: FUNED BY: PROJECT TITLE: DRAWING TITLE: DESIGN BY: STATUS: NORTH: DRAWING NO:
SOLAR SYSTEM SCHEMATIC TENDER DOCUMENTS.
ASH-SHAHEED AL-HADHIQ
UNOPS
S2-08
DIAGRAM CHECKED BY:
SCHOOL PROJECT NO: PAPER SIZE:
OPERATIONAL EXCELLENCE IUS-OPS-ECS-AMR-003.4 A3.
FOR RESULTS THAT MATTER. WORLD BANK GROUP. PROJECT LOCATION: DRAWING TYPE: APPROVED BY: DATE: SCALE:
SANA'A - YEMEN. Amran CITY-YEMEN ELECTRIC PLANS. UNOPS DESIGN REVIEW JULY 12 2019. AS SHOWEN.
PREPARED BY: FUNED BY: PROJECT TITLE: DRAWING TITLE: T-DSGN-BY PAPER SIZE: SCALE: PURPOSE REV. DATE DRAWING NO:
ASH-SHAHEED 6PV MOUNTING ANCHOR DESIGNED BY: A3 AS SHOWN OF ISSUE
IFA 9/7/19
AL-HADHIQ SCHOOL BOLTS ROOFTOP PLAN PROJECT NO:
S2-09
REVIEWED BY:
OPERATIONAL EXCELLENCE IUS-OPS-ECS-AMR-003.4
2400
GALVANIZED BASE
PLATE 200x150x4 mm
1.25
80
350
2 2
10
4∅ 10 ANCHOR
GALVANIZED CONCRETE BOLTS 40
C 80x40x1.25 14cm LENGTH
FOR ALL POSTS
350 Channel C 60x30x1.25
2900
2 BASE PLATE - PLAN
STRUCTURE DETAILS
60
1.25
4∅ 10 ANCHOR
CONCRETE BOLTS
30
14cm LENGTH CONCRETE WITH
GALVANIZED EPOXY GROUT
BASE PLATE
1 1 4 mm THICK
GALV (L)
50x50x3 MASTER
SEAL 470
ROOF TILES RSH 43 in DN
100
120
A B CEMENT
MORTAL 1.5mm
n
3/4 i
EXISTING
MASTER FLOW ROOF SLAB
GROUT
932 AN(EPOXY)
PREPARED BY: FUNED BY: PROJECT TITLE: DRAWING TITLE: T-DSGN-BY PAPER SIZE: SCALE: PURPOSE REV. DATE DRAWING NO:
C (60x30x1.25)
C 80x40x1.25
C 80x40x1.25
C (60x30x1.25)
C (60x30x1.25)
1 1 1 1
A
PREPARED BY: FUNED BY: PROJECT TITLE: DRAWING TITLE: T-DSGN-BY PAPER SIZE: SCALE: PURPOSE REV. DATE DRAWING NO:
ASH-SHAHEED DESIGNED BY: A3 AS SHOWN OF ISSUE
6PV MOUNTING IFA 9/7/19
S2-11
PROJECT NO:
OPERATIONAL EXCELLENCE AL-HADHIQ SCHOOL FULL PLAN REVIEWED BY:
IUS-OPS-ECS-AMR-003.4
420
50 860 DETAIL A
4 STAINLESS
420
420 STEEL BOLTS ∅8
860
420
2 JOINT - DETAIL A
STRUCTURE DETAILS
RSH 43 in DN,
1.5mm THICK C 80x40x1.25
DETAIL B
2 STAINLESS
SIDE SECTION A-A STEEL BOLTS ∅8
1 STRUCTURE DETAILS
3 JOINT - DETAIL B
PREPARED BY: FUNED BY: PROJECT TITLE: DRAWING TITLE: T-DSGN-BY PAPER SIZE: SCALE: PURPOSE REV. DATE DRAWING NO:
ASH-SHAHEED 6PV MOUNTING DESIGNED BY: A3 AS SHOWN OF ISSUE
IFA 9/7/19
SIDE ELEVATION
S2-12
PROJECT NO:
OPERATIONAL EXCELLENCE AL-HADHIQ SCHOOL REVIEWED BY:
IUS-OPS-ECS-AMR-003.4
DETAIL A
L25X1.25
BACK ELEVATION
1 STRUCTURE DETAILS
2 1
C 80x40x1.25
GALV (L25x1.25) 2 08mm
PL 3mm
L25x1.25
2 08mm
JOINT - DETAIL A 3 JOINT - DETAIL B
2 STRUCTURE DETAILS STRUCTURE DETAILS
PREPARED BY: FUNED BY: PROJECT TITLE: DRAWING TITLE: T-DSGN-BY PAPER SIZE: SCALE: PURPOSE REV. DATE DRAWING NO:
PROJECT NO:
IFA 9/7/19
BACK ELEVATION
AL-HADHIQ SCHOOL
S2-13
REVIEWED BY:
OPERATIONAL EXCELLENCE IUS-OPS-ECS-AMR-003.4
B 1
3D VIEW
1 STRUCTURE DETAILS
PREPARED BY: FUNED BY: PROJECT TITLE: DRAWING TITLE: T-DSGN-BY PAPER SIZE: SCALE: PURPOSE REV. DATE DRAWING NO:
ASH-SHAHEED 6PV MOUNTING DESIGNED BY: A3 AS SHOWN OF ISSUE
IFA 9/7/19
3D VIEW
S2-14
PROJECT NO:
OPERATIONAL EXCELLENCE AL-HADHIQ SCHOOL REVIEWED BY:
IUS-OPS-ECS-AMR-003.4