Sei sulla pagina 1di 16

612600823126

WP10/WP12 Series Gas Engine

Operation and Maintenance


Manual and Service Manual

WEICHAI WESTPORT INC.


Address: No.26. Minsheng East Street, Weifang, Shandong, China
Tel: +86-536-8197777
Fax:+86-536-8221210
Postcode: 261001
Service Hotline:800 860 3066/400 618 3066
E-mail: weichai@weichai.com
Website: http://www.weichai.com

Part No.:612600823126
Design Version No. : ppbsj sjzl 0901
Revised in March 2009
This manual is for reference only,product parameters are subject to alteration
without notice,whichever is the physical product.
Operation and Maintenance Manual
And Service Manual of WP10/WP12 Series Gas Engine

Foreword
WP10NG series engine is designed improving fouel supply system,
adding relevant firing system and other devices on the basis of WP615
series diesel dngine. Please read cardfully this manual and Operation and
Miantenaance Manual for WP series CGN Diesel Engine before operation.
In recent years, gas vehicles have developed atg a very fast speed in
China. But the relevant rules and standards are still being established.
Please pay attention to the latest and standards about gas vehicle .
Due to continues development of gas engine technologies andver more
stringent emission requirements the WP10 CNG engine products are
updated continuously. Therefore the instruction in this manual might have
some differences with engine, but it has no influence on the operation.
We ai to you maximum satisfaction. Please do not hesitate to contact us
if you any quires or suggestions in regard to this manual.
If you have any problems or difficulties in operating theengine, please
us know, and we will provide sincere service for you.
Let’s cooperate in good faith and hand in hand, contribute our efforts to
the development of clean automobile project.

Mar. 2009
Operation and Maintenance Manual
And Service Manual of WP10/WP12
of WP10 Series
SeriesCNG
Gas Engine

Caution and Operating Prcocedure

The engine has been tested strictly in accordance with the test stipula-
tions before delivery. Adjusting casually the ECM data and supercharge
radio and increasing the power of engine were forbidden. Otherwise the
factory guarantee would lose its validity, please pay attention.
The engine operator must read this Operation Maintenance Manual
carefully to know the engine’s structure. The every operation should be
under specification.
Before operating a new engine, check the fuel gas pipeline, gas supply
device and electrical parts for leakage or unreliable contact. Remedy the
trouble in time. Pay special attention to the electric circuit for loose
connection,especially the electromagnet valve plug adapter. Check the
igition wire for false conncection.
Check the votage of the battery. Enough voltage should be provided
for ignition and electric control system of the engine. So pay special
attention to the voltage of the battery.
Before using a new engine, test running should be done. Before using
a new engine, 50 hours running-in operation should be done.
After a cold starting, the speed of engine should be increased slowly.
It is forbidden to run the engine in high speed suddenly and in idling for a
long time.When stopping an engine with a heavy load, running the engine
for 5-10minutes at low idling speed firstly, and then stop it .
The engine working without air filter was forbidden.
Please check gas capacity of bottle regularly and fill bottle in
time.Charging of gas bottle should be done by special personnel of gas
station .Check the sealing of the gas system when charging.
The driver of the gas vehicle should learn and know the principle of the
gas engine and the related knowledge.
Operation and Maintenance Manual Operation and Maintenance Manual
And Service Manual of WP10/WP12 Series Gas Engine And Service Manual of WP10/WP12 Series Gas Engine

The engine working without air filter was forbidden. Special Attention
Please check gas capacity of bottle regularly and fill bottle in
In order to ensure your safety and to bring into full play of superior
time.Charging of gas bottle should be done by special personnel of gas
performance of the gas engine ,please read earnestly the “Operation and
station .Check the sealing of the gas system when charging.
Maintenance Manual ”,and strictly obey the operation and maintenance
The driver of the gas vehicle should learn and know the principle of
procedures specifice by this manual before operation.
the gas engine and the related knowledge.
In order to protect your legal right,it is forbidden to change the ECM
For WP10/WP12NG engine,vehicle NG conforming to the national
data without authorization.Otherwise the company’s promise will be
standards should be used.
invalid .
As the combustion resultants of NG engine is different from that of
The ECM,injection valve and ignition system are of precision
diesel engine,special oil should be used NG single fuel engine.
components,it is forbidden to dismantle without permaission,otherwise
For the pressure reducer of the NG engine,it is required to heat the
the factory guarantee would lose its validity.
NG with engine coolant.If hard water is used as the coolant,scale would
The ECM,common rail pump and injection are of precise
deposit easily on the water cavity of the pressure reducer and frosting
components,it is forbidden to impact on it or dismantle without permis-
would occur when starting the engine.
sion ,otherwise the factory guarantee would lose its validity.
There are strict demands for the torque and turned angle of main
bearing bolts and connceting rod bolts ,it is forbidden to loose/dismantle
without permission,otherwise the factory guarantee would lose its
validity.
Please check the filling status of coolant and lubricating oil before
working .
Connecting rod bolts can be used only once.
Please screw the spark plug under prescribed load,leave the correct
space ,and ensure the ceramic part of spark plug clean when changing
it .
Please take apart the power supply and grounding of the electric
system before welding vehicle .Otherwise it may break the ECM.
After starting the engine ,run it at the idle speed for a while in cold
area .And don’t accelerate it to operate at heavy load at first.
Operation and Maintenance Manual
And Service Manual of WP10 Series Gas Engine

Contents

Chapter I. Directions for the Operation and Maintenance of


WP10 NG Series Gas Engine for construction
Operational program
1. Fuel, Lubricant, Coolantand Auxiliary Materials Used for Gas Engine
1.1 Fuel............................................................................................................1
1.2 Lubricant oil ...............................................................................................1
1.3 grease .......................................................................................................1
1.4 coolant .......................................................................................................1
1.5 The characteristics of Weichai special oil ...............................................1
1.6 The difference between Weichai special oil and regular engine oil ...........2
1.7 Some commonly used special oil products of Weichai Power ..................3
1.8 Weichai special oil for different engine models ..........................................3
1.9 How to choose appropriate viscosity .........................................................3
1.10 Auxiliary materials....................................................................................4
2. Operational program ....................................................................................5
3. Attentions in maintenace of gas system......................................................6
4. Maintenance of the engine regular maintenance..........................................7
5. Trubleshooting................................................. ............................................9

ChapterⅡ.Service Manual
Weichai Power warranty Card(for user) .....................................................13
Warranty Explanation ................................................................................14
Three Guarantees Service Period for Products..........................................16
Overseas Service Center of weichai power Company Limited ..................17
Maintenance Record Table ( Filled by service member) ......................18
Weichai Power Product Warranty Card(for company) ...............................20
User Satisfaction Degree Examination Table ...........................................21
Operation and Maintenance Manual
For WP10/WP12 Series Gas Engine

1. Fuel, Lubricant, Coolant and Auxiliary Materi-


als Used for Gas Engine
1.1 Fuel
CNG or LNG
1.2 Lubricating oil
1)Gas Engine only use CF-4 or high-class NG dedicated oil
2)Before starting the engine,it is imperative to check the oil level
in the oil sump.
1.3 Grease
Fill the grease nipples of the grease cup of water pump and the
front support and fan bearing with general purpose lithium base
grease GB/T5671-85 vehicle.
1.4 Coolant
The cooling system should be filled with long-lasting coolant.This
liquid possesses the abilities to prevent rusting and freezing.For the
mixing ratio of long-lasting coolant ,please refer to application
instructions of the antifreeze liquid.There are two kinds of antifreeze
available in China market.

1). JFL-336 type long-lasting antifreeze liquid.


2). FK-30*long-lasting antifreeze liquid.

1.When the air temperature is lower than 0℃,the concentration of


the antifreeze and anti-rust liquid should be checked reqularly.
! 2. For the engine running ,the water that has been processed
through rust prevention and antifouling can be used as coolant.It
is forbidden to use untreated water water as engine coolant.

1.5 The characteristics of Weichai special oil


1) Good ingredients are the guarantee of high-quality oil
Imported hydrocracking base oil and compound additives are favorable
to guarantee the good quality of lubricating oil.
2) Under normal use, oil drain interval can be extended by 3500-7000
kilometers (CH-4 can be extended by 10000 kilometers)
Outstanding high-temperature oxidation resistance and good Total
Base Number(TBN)retention can extend oil drain interval.

1
Operation and
Operation and Maintenance
Maintenance Manual
Manual Operation
Operation and
and Maintenance
Maintenance Manual
Manual
ForWP10NG
of WP10/WP12 Series
Series Gas Engine
Bus gas Engine for Construction Machinery For WP10/WP12
of WP10NG Series Bus gas Engine Series Gas
for Construction Engine
Machinery

3) Professional protection can extend the engine life 1.7 Some commonly used special oil products of Weichai Power
Professional lubricating oil for high-power and high-load engines, which
Type Class Specification Packaging capacity
can extend the engine life (special oil can be extended the engine life by
15W/40
30~40%), has been developed based on a great deal of engine perfor- WP-E1(CD) 20W/50 4L,18L, 200L
mance and endurance tests. 10W/30
15W/40
4) Better performance requirements WP-E2(CF-4) 20W/50 4L,18L, 200L
10W/30
The engine performance can be improved in terms of abrasion diesel engine oil
5W/30
resistance, TBN retention, oxidation resistance, soot dispersion capacity, WP-E3(CH-4) 15W/40 4L, 18L, 200L
20W/50
fuel control as well as shear stability and the precipitate in turbocharger
10W/30
can be reduced. WP-E4(CI-4) 15W/40 4L,18L
5) Saving energy heavy duty gear oil for 85W/90
GL-5 4L,18L
automobiles 80W/90
The energy-saving formula “low viscosity+ multi-polarity+ friction
engine coolant (antifreeze) -25
4KG,18KG
modifier” is the guarantee of high-viscosity index and good film strength -35
and flexibility of Weichai special oil, which can ensure smooth operation,
low operation resistance and better economy capability. 1.8 Weichai special oil for different engine models
6) Protecting environment: low ash, low sulphur and low phosphorous Standard No.
Type of special oil Major applied engine models
The ash content is controlled within 1.0% in order to extend the life of
WP-E1
Diesel Particulate Filter <DPF>; the sulphur content is within 0.4% to medium-speed engine sets
high-speed (CD)
prevent the deactivation of oxidation catalyst〈DOC〉and reduce particu- engines, Euro I and Euro II engines;construction machinery such as 50、30 loaders;
high-power WP-E2 WD618/WD12 series engines、WD615/WD10 series engines;226B and
lates; the phosphorus content is within 0.12% to prevent the deactivation and (CF-4)
medium-speed engines; Heavy-duty trucks with a load capacity of above 15 tonnes
medium-
of oxidation catalyst〈DOC〉and NOX control system; and volatility can Euro III engines;Landking engines;heavy-duty trucks with super large
speed
WP-E3
be controlled within13%。 engines
(CH-4)
tonnage; coaches; WP4、 WP6( 180~ 240HP) 、 WP10( 240~
360HP)、WP12 (400 ~480HP) 、WD10、WD12.
WP-E4
National IV engines(including heavy-duty trucks with super large tonnage)
(CI-4)

1.6 The difference between Weichai special oil and regular engine oil gas compressed natural gas engines;coaches and gensets equipped with
engines CNG
compressed natural gas engines

Term Special oil Regular engine oil


domestic class I base oil and a little 1.9 How to choose appropriate viscosity
base oil imported class III hydrocracking base oil
class II base oil
additive imported high-quality compound additives domestic additives SAE viscosity level Applicable temperature(℃)
5W/30 -30 ~ 35
professional formula with strong points,good
lubrication,clean,low fuel consumption(fuel 10W/30 -25 ~35
performance general lubricating performance lubricating oil
consumption can be reduced by 3~8%),and 15W/40 -20~40
professional protection for engines under poor
20W/50 -15~50
working conditions
85W/90 -15~49
Under normal use, oil drain interval can be
oil drain gear oil 80W/90 -25~49
extended by 3500-7000 kilometers (CH-4 can be normal value
interval
extended by 10000 kilometers) 85W/140(above 85W/90) -15~49

2 3
Operation and Maintenance Manual Operation and Maintenance Manual
For WP10/WP12 Series Gas Engine For WP10/WP12 Series Gas Engine

1. 10 Auxiliary materials: 2. Operational Program


1.10.1 Sealant and cementing compound of LOCTITE510,242,275 ,648
and 277 grades will be used in the processes of assembling and mainte- 1) Check the fastness of gas bottle/bracket and gas supply
nance. device/crossbeam, the gas equipment and all gas pipe joints before every
1.10.2 Fine molybdenum Powder. travel.
1.10.3 For application position of each kind of auxiliary materials,see the 2) Check all sensor joints for fastness before start the engine.
table below. 3) Before start the engine, switch on ignition on firstly and then start the
engine after 1s delay.
Table 1-1 Auxiliary materials use in WP10NG/WP12NG series gas engines 4) After the engine is started, run the engine for 30s at idling speed and
check oil pressure and water temperature.
NO. Name Color Use and application
5) For NG engine, when the ambient temperature is lower, there might be
Coat on smooth metal surface to prevent against
seizure.e.g.:Coat on the outer surface of cylinder some white smoke or water drip from exhaust pipe for short time after
1 Black
liner engine started. The cause is that the “H” content is higher in NG, and much
Molykote Gu.plus
Offer lubrication before oil pressure is built up H2O resulted after combustion. The water forms white drip at lower
2 Molubdenum Dark grey e.g. Coating on the inlet valve stem
disulfide oil temperature and can not be vaporized. With the rising of temperature,
Loctite 242 Coat on thread and outer surface of bearing to there will be no white smoke or water drips.
hold it and prevent it from loosing by vibration,
3 Blue medium strength e.g. The threaded portion of the
Loctite 262 pressure limiting valve of main oil passage.
Coat on outer surface of thread to lock up, seal and
4 Red prevent loosing by vibration, high strength e.g.
Loctite 275 Cylinder head bolt theread
Coat on the surface of pipes and connecting
sections ,serves to fix the parts e.g. The
5 Green extermal surfaces of the water outlet pipe and
Loctite 510
water inlet pipe of heating device

Red Coat on the bright metal surface for sealing effect


6 Loctite 277
(orange) e.g. Coat on the junction surfaces of the cylinder
block and the crankshaft box
Used for sealing between core and hole ,appli-
Loctite 648
7 Red cable to oil cavity or oil duct e.g. All the
cylindrical faces of core plugs
Coat on the bright metal surface for fixation e.g.
8 Green :The bearing bore of tensioning wheel and the
external surface of shaft

4 5
Operation and Maintenance Manual Operation and Maintenance Manual
For WP10/WP12 Series Gas Engine For WP10/WP12 Series Gas Engine

3 Attentions in maintenace of gas system 4 Maintenance of the engine regular maintenance


Regular maintenance and repair of the fuel system should be Item Maintenance period Maintenance items
conducted at the specialized maintenance factory with certificate Check the mounting brackets for gas bottle,electromagnetic
issued by the relevant authority. valve and pressure regulator and their tightening
conditions.Retighten the loosened parts.
Maintenance personnel must be trained specially and get certificate.
No smoking at maintenance site. Fire protection equipments should Check gas capacity ,switch on the power source and the
ignition switch (without starting the engine ),and check the
be provided. Open fire is prohibited less than 10m from the vehicle with
indicated gas capacity.
gas-charged bottle(s).
Check if there is any leaked in gas supply pipeline and pipe joint
Prohibit form knocking or striking gas bottle, relief valv e, pipeline, (by the peculier smell in surroundings);For highed
steel bottle and various valves in maintenance. Daily vehicle,check specially if there are any rubbed marks on the
Every day
During vehicle maintenance and trouble shooting, if it is needed to maintenance high-pressure hose at the hinged plate and chap and ageing
cracks on the surface.If there exists any leakage,drivers should
dismantle or adjust the pipe connectors, valves, instruments, pressure notify the special repair works in time instead of disassembling
relief devices, cut off the battery power supply, close the main valve and the parts by self.
bottle valve at first. Check and dismantle the failure parts pressure Check the ignition system and the generator for electrical
relieved. If the leaking/faulty position is difficult to diagnose exactly, check- leakage or spark over.Repair them in time if necessary.
Check if there are loosened parts of the harness and various
ing by open the main gas valve is permissible with the precondition of no sensors inserts.
open fire within 10m from the vehicle. As soon as the leaking position is
Check and tighten the CNG bottle fixing fittings:
confirmed, close all valves immediately and dismantle and maintenance Check the CNG bottle fixing fittings for deformation or damage.
after the gas pressure is released. Tighten the fixing fitting if necessary.
During trouble locating of gas supply system, the main gas valve and Check CNG bottle valves:
all bottle valves must be closed and release the gas pressure in pipeline. 1. Check the multifunction valve and charging valve for gas
leakage with leak detector or testing liquid.
All clip sleeves must be in good condition. High pressure pipeline and
2. The gas outlet manual valve should be capable of open and
clip sleeve joint can be used only once. Leakage test should be done with close flexibly and the pipe joint without leakage.
gas leak tester or soap water after maintenance. 3. Check the charging valve and pipe joint and clip for leakage
and tightness.
Blow the pipelines after dismantling and checking of pipelines and
Check the pipelines and joints:
various connectors to prevent dirt form entering the fuel pipelines. 1.Without damage and chap on the pipe body.Without leakage
During washing vehicles , the engine electronic system components checking by leak detector and testing liquid .
should be paid more attention, for example: spark plug、ignition coil and First order 2. Check the bracket for tightness,retightening if necessary.
5000~6000km
the injection nozzle. maintenance Check and tightening of pressure reducer:
1. Check the reducer and joins for leakage with leak detector
If the NG bus is strored for a long time ,the pressure of the gas tank and testing liquid.
shoud betweeen 0.2Mpa and 2Mpa. 2. Check the bracket for tightness, retightening if necessary.
Several instructions should be followed: turn off the tank valve\cut off Check the circulating water pipeline and joints:
the vehicle electricity supply\keep away goods and inflammable staff\ the 1. Check dirt in the warm water pipe, clean up if necessary .
2. Check the water pipes for chap and ageing cracks,damage
place where the bus is stored should be installed a ventilation system and and leakage, replace if necessary.
periodic ventilation is required. 3. Check the pipe joints for tightness, retightening if necessary.
The tank pressure must not be higher than 5Mpa when the NG Bus is Check the solenoid valve :
transportted by train\ship or trailer. 1. The action of solenoid valve should be normal,sensitive and
reliable without leakage.The power source interface must fast
During the transportation, please turn off the tank valve 、cut off the and be well contacted.
vehicle electricity supply and the busy should be tightly fastened. 2. Check and tighten the solenoid valve bracket.

6 7
Operation and Maintenance Manual Operation and Maintenance Manual
For WP10/WP12 Series Gas Engine For WP10/WP12 Series Gas Engine

Item Maintenance period Maintenance items 5.Troubleshooting


Clean and check spark plug,check ignition cable.
Trouble Possible causes checking and troubleshooting
All first order maintenance.
Engine can not 1. No gas in bottles or manual
Clean CNG filter: be started valve not open
1. Check and clean filter and filter element. Switch on the ignition key, there
2. High voltage solenoid vaive should be clatter from solenoid
2. Check the reassembled filter and joint for leakage. no electricity or fault valve.Replace the failure solenoid
valve.
Ignition system: Engine can not
First order Check 3 supply wires. Switch on
5000~6000km 1. Without damage of ignition coil insulation ,electrical leakage or spark be started
maintenance 3.The relays of engine ignition key, check if there is 24V
over,The supporting is reliable fastened. control Module fault Voltage on the relay and fuse with
universal meter according to electric
2. With right spark plug clearance;replace the spark plug with 15000km principle circuit.
service mileage (before change long service life spark plug).
4. Gas pressure low Check gas pipe for leakage.
Check ignition coil with ignition
5. Ignition module fault timing lamp, the coil misfire. Check
Clean mixer: fault code, spark plug and ignition
The gas ports of mixer throat must be unblocked. wire.
Check with portable computer, after
6. Low voltage solenoid on switch on ignition key, the gas
FMV does not open or open pressure is lower than 850kPa.
insufficiently Replace solenoid valve and check
valve core.

7. Insufficient aspiration Check air filter and intake system for


blocking and leakage.
8. Start speed low (Min Check battery voltage, it should be
start speed:100rpm) 24V.
9. Improper adjustment of Check valve clearance according to
intake and exhaust valve Diesel Engine Operation Manual.
10. Engine control module
(ECM) fault Replace ECM.

11. Short circuit caused by


molten Oxygen sensor insert Replace oxygen sensor.

Engine can not 12. Electronic gas throttle Test gas throttle with software
be started fault
13. Circuit fault, like neutral
Check circuit.
switch etc.
Software testing. There will be fault
14. Speed sensor fault code. Check clearance between gear
plate and sensor.
Unsteady
1. Air intake pipe leaking Check intake pipe
idle speed

8 9
Operation and Maintenance Manual
For WP10/WP12 Series Gas Engine

Unsteady 2. Spark plug or ignition system Check spark plug, and diagnose ignition
idle speed fault system with testing software.
3. Gas metering valve low Check pressure reducer and gas pipeline
pressure fault for blocking.
Check gas throttle with testing software
4. Electrical gas throttle fault

5. Electrical system fault Check electrical system with testing


software.
It is mainly caused by unburned
gas combusting in exhaust pipe
1.One or several cylinder(s) not
working (such as ignition module Check spark plug, check ignition
orignition coil fault, ignition coils system with testing software.
ofsome cylinders interchanged,
Exhaust pipe
spark plug fault)
detonation
2.Rich or lean gas (pressure Diagnose with testing software,
reducer fault) check gas pressure.
3. Advance angle difference large Check ignition advance angle,
Check phase sensor clearance.
4.Mixer core blocked Clean mixer core.
1. Gas bottle manual valve not Check gas bottle
opened fully
Check pressure reducer, gas pipeline,gas
2.Gas pressure low
filter for blocking.
Unhandy
3.Fuel pedal position insert Diagnose with testing software, test
Speedup
part bad fuel pedal position.

4.Ignition system fault Check spark plug. Diagnose ignition-


system with testing software.
5.Mixer core blocked Clean mixer core.
Diagnose ignition system with testing
6.Pressure reducer failure
software. Check gas pressure.
Check air filter and intake system for
7. Insufficient aspiration
blocking and leaking.
8. Advance angle difference large Check ignition advance, check
phasesensor clearance.

10
Service Manual
of WP10 Series Gas Engines

Chapter II Service Manual

Dear customers:
Welcome to use the products of Weichai Power, and thank you for
your great support to our products.
In order to guide you to operate the engine correctly, please read
the Operation and Maintenance Manual carefully and abide by the operations
rules in the manual. If the engine was failed, please contact Weichai
Maintenance and Service Center or Weichai User Service Center as soon
as possible. We will offer effective service to you timely.

“Maintenance Record Table” should be filled by Maintenance and


Service Centre in repair and preserved by user.

Weichai Power Warranty Card (for user)

Item Content Item Content


User Name User Postcode

User Phone User Mobile Phone

User Address

Distributor Distributor Tel.

Distributor Address

Engine Model Engine Order No.

Engine ID No. Purchased Date

Construction machinery Construction machinery


manufacturer Model

13
Service Manual Service Manual
of WP10 Series Gas Engines of WP10 Series Gas Engines

3. The principle and stipulation of warranty service


Warranty Explanation
● The principle of warranty Service
1. Service promises
The engine purchased by users or fitted on other machinery, in case of
In the service region of Weichai Maintenance and Service Centre, using and maintaining normally within the guarantee period, the damage or
after received information from users and verifying that service is ne - trouble caused by manufacture and assembly etc. should be paid by our
eded, our maintenance team shall get to the place within 24 hours in company.
which the service centre is located, within 48 hours for city areas, and within
● Time limit of warranty service (shown in appendixtable)
72 hours for remote areas.
(1) For the end product of our company, the starting date of warranty
( remote areas or force majeure factors excluded)
period is in accordance with the date on our sales invoice, warranty card or
2. Special attention the formal invoice of the distributor (It should be within the 12-month oil seal
● The engine operator must read the Operation and Maintenance period of the engine).
Manual carefully and abide by the operation rules in the Manual, and (2) For the matching products, the starting date of guarantee period is in
pay attention to the warning directions and marks. accordance with the date on sales invoice or warranty card of the matched
● The engine has been tested strictly in accordance with the test stip - product ( It should be within the 12-month oil seal period of the engine).
ulations before delivery. The throttle has been sealed. It is forbidden to di- 4.Following conditions are excluded by warranty
smantle the seal optionally and to enlarge the throttle. Otherwise, Weichai ● Early wear and trouble arising from improper operation and mainten-
will not be responsible for free repair. ance, e.g.: damages from careless load and unload during transportation
● Some bolts of the engine are strictly specified for torque req - the engine by users, operation conditions beyond the specified range in
uirement and times of use. It is forbidden to loosen main bearing bolts and the operation manual, over-speed or over-load operation; run-in, inspection,
connecting rod bolts. See Operation and Maintenance Manual for detail. adjustment and tightening not abiding by the operation manual, improper
● Before using a new engine, a 50-hour commissioning should be match, usage of incorrect fuel, oil or antifreeze etc.
performed. ● Troubles arising from refitting, adjusting and disassembling the posi -
● After the engine is started from a cold state, do not increase the tions and parts that are not allowed to adjust and disassemble casually
engine speed suddenly, and do not run at idle speed for a long time. according to the product specification.
● After the engine is stopped, if the ambient temperature was lower than ● Oil, antifreeze, filter element, hose and belt etc. for normal operation
0°C and no antifreeze is used, the water in water tank and in diesel en - and maintenance are not in the range of warranty service
gine should be drained off. ● No warranty card or valid invoice, or no evidence that proves the pr -
● It is forbidden to operate the engine without a air cleaner and try to pr- oduct is in warranty period.
event unfiltered air from entering into the cylinder. In severe working ● The specification and model of product in the guarantee card or inv -
conditions, clean or replace the air filter element more frequently, so oice differs from that of the requested product for three guarantees, or the
as to prevent early abrasion of engine. card and invoice was altered.
● Applied fuel and lubricating oil must be in accordance with specified ● Instead of maintaining the original damaged situation after trouble
grades and filtered by strainer, and a special clean container should be used. occurs, user treats the trouble presumptuously and the reason or
The fuel should be settled for more than 72 hours. trouble can not be verified.

14 15
Service Manual Service Manual
of WP10/WP12 Series Gas Engines of WP10/WP12 Series Gas Engines

Three Guarantees Service Period for Products

I COMPLETE GAS ENGINE PRODUCT Three-guarantees Period

0098-21-22344130
Overseas Service Center of weichai power Company Limited

0098-9122146779

0091-9790789138

0027-787114346
008801711542654

00963999602551
00976-99911097
00249922868539
00249183233846

00244924771275

00213552950194

00254722467613

00971502827836

00966530683181
0065-96234801
Tel.

0079267520188

0084904315108

0077071130129

0066830860868
1 Gas Engine for Passenger Vehicle One year or 100,000 km

005372604631

13515405118
2 Gas Engine for traffic Vehicle One year or 60,000 km
Gas engine used in vessels, diesel
3 generator and other power facilities. One year or or 1500 hours

II GAS ENGINE SPARE PARTS


Thermostat In Line Shutoff, ValveFuel
Metering, Regulator, FloTch Valve,
Passenger Vehicle gas engine
Wastegate Control Valve. ECU,
one year or 100,000km, truck gas
Exchanger Heat, ignition module,

wang yuhe
engine one year or 60,000km;
Gas fuel system Shutoff valve, wiring harness, Gas

Zhong Lei
1 Marine and generator gas engine:a
Rail, Gas Injector Assembly, Low
year or 1500 hours
pressure gas filter assembly, Vacuum

Staffer

song xiangming
Reservoir, 3-way Solenoid, 3-way

wang xianwei
chen weichao
zhang yunjian
dai liancheng

zhou jingwei
ma tianliang
wang zimao

huangjinggui
li kongjiang
xia jianning
Solenoid, Dump Valve.

liu weijun
zhang yan
Liu Xiting

liu ningyu
xue yuhui

sun jijun
Oxygen sensor, CAM sensor, Passenger Vehicle gas engine: half a

cao lei

hanjie
MAP/MAT sensor, Water temperature year or 50,000km; Truck gas engine:
2 Electronic parts sensor, exhaust sensor, and other half a year or 30,000km; Marine and
sensor, High leads, ignition loop, etc. generator gas engine: half a year or
750 hour

Engine body, crank shaft, engine base. 2 years or 200,000 km(belongs


to its original manufacturing
defects, such as sand hole etc)
Cylinder head, flywheel, flywheel
housing cover, turbocharger, timing
3 gears room, connecting rod and bolts,
Mechanical Parts piston, piston ring, piston pin,
connecting rod bearing, crank shaft Follow the three-guarantee period
bearing, camshaft, cylinder liner, valves,
valves spring, valves spring pin, oil of the above mentioned all kinds
pump, inlet and outlet manifold, oil tank, of engines
air compressor, cylinder gasket, water

Saudi Arabia
south africa
pump, steering pump, signal effect

singapore

mongolia
assembly, thermostat, etc.

Country

kazkstan
vietnam

thailand

Nigeria
algeria
angola

bengal

kenya
russia
sudan

india

syria

cuba
UAE
Passenger Vehicle gas engine:

Iran
start motor, generator ,inlet pipe
half a year or 50,000km; Truck gas
gasket, exhaust pipe gasket,
4 Normal Parts engine: half a year or 25,000km.;
turbocharger gasket, Windpipe water
Marine and generator gas engine:
pipe , etc
half a year or 750 hour

Spark plug, plugs and connectors,


Easy Damaged gaskets, O ring, Bolt,capacitance, 5000 kilometers or one month,
4 whichever expires early.
Parts etc.

Remark:
1. If for bus gas engine and truck gas engine milemeter damaged, it will follow 325km per day to calculate the
Three-guarantees.
No.

2. Marine and generator gas engine:The warranty period may be calculated form the date when the diesel

11

12
13
14
15
16
17
18

19
10
1

3
4

5
6
7
8
9
engine is readjusted and tested, but under no circumstances shall such date go beyond half a year after
purchasing such engine.

16 17
Service Manual Service Manual
of WP10/WP12 Series Gas Engines of WP10/WP12 Series Gas Engines

Maintenance Record Table ( Filled by service member) Service Date warranty Parts Quantity Signed Signed
Centre Item Changed by by User
Service
Item Content Item Content Member

User Name User Postcode

User Phone User Mobile Phone

User Address

Distributor Distributor Telephone

Distributor Address

Engine Model Engine Order No.

Engine ID No. Purchased Date


Construction machinery Construction machinery
manufacturer Model

Service Date warranty Parts Quantity Signed Signed


Centre Item Changed by by User
Service
Member

18 19

Potrebbero piacerti anche