Sei sulla pagina 1di 1

EPO666: SELECTED TOPICS FOR POWER ENGINEERING

ENERGY SAVINGS MEASUREMENT AND VERIFICATION FOR ASSIGNMENT

Total
Marks
Specific task CO PO Marks
Very Weak Weak Fair Good Very Good 100
Introduction: CO1: Discuss Multiplying
0 1 2 3 4
State the retrofit or activities outside PO6: Explain the factor 5
energy savings engineering field latest technologies Introduction is Introduction is
Introduction is Introduction is
program, ECM/M&V but related to available in complete but complete and
No introduction given but not given but not
objectives and working industries without includes
appropriate complete
constraints environment references references
PO7: Identify the Multiplying
Contents: 0 1 2 3 4
impact of factor 10
Describe content of the
professional
M&V plan; Perform
CO2: Explain the engineering
measurement option Perform Perform Perform assigned tasks
latest solutions in societal Does not
and boundary, assigned tasks assigned tasks assigned tasks within the
technologies and environmental perform
baseline data, within the scope within the scope within the scope scope of work
available in contexts and assigned tasks
regression modelling, of work but not of work and of work and and beyond
industries demonstrate within the
adjustment, savings meets meets exceeds expectation,
knowledge of and scope of work
algorithm, metering expectation expectation expectation complete with
need for sustainable
specification etc. references
development
PO12: Demonstrate Multiplying
0 1 2 3 4
knowledge and factor 10
Contents:
understanding of
Calculate the project
engineering and
energy savings, cost CO3: Discuss the
management
and estimate the necessary Only partial All analyses
principles, and work All analyses are
expected simple industrial process analysis is given All analyses are are given with
as a member and No analysis is given correctly
payback period and related to correctly and given with references and
leader in a team to given without
return on investment engineering field. without references exceeds
manage projects references
derived from the references expectation
and in
savings
multidisciplinary
environments.

Potrebbero piacerti anche