Sei sulla pagina 1di 4

NALCO BWR PROJECT

Estimation of Civil Quantities with Costing


Quantity
S.No Description Unit To be Rate
Existing PO Amended

Reclaimer Foundation  
1 RCC (M25) foundation Dismantling & Disposal cum 3,200

2 Excavation  on Soft soil up to 7.5Km cum


Overburden cum 240
0 - 2 M depth cum 240
2 - 4 M depth cum 280
4 - 6 M depth cum 350
6 - 8 M depth cum

3 PCC -1:4:8 cum 4000


4 RCC -M25 cum 5,500
5 Steel shuttering sqm 600
6 Reinforcement -Fe 500 MT 9000
7 Grouting -GP2 cum 15000
8 Back filling -Excavated Soil cum 220
9 Back filling -Borrowed sand cum 1250
10 Disposal of Excavated soil cum 200

Mobile Hopper Foundation


11 Hilti bolt – M16 -200mm embedment – 75mm projection Nos 15
12 Hilti bolt – M16 -350mm embedment -125mm projection Nos 18
13 Grouting -GP2 cum 15000

14 Micro Concreting cum 20000

15 Fixing of Inserts and foundation bolts inclduing its template MT 20000

Dismantling of rail including fixing accessories after due cleaning


16 of existing bauxite over the rail top but not exceeding to 300 MT 10000
mm

Total Amount(in Rs.) =

Terms & Conditions:


The power at one point within battery limit will be furnished by us on Chargeable basis at Rs4.30/KwH and further distribution sh
1.         contractor’s scope.
2.         The water will furnished at one point within the battery limit free of cost and further distribution shall be contractor’s scope
3.         The ESI, PF for workmen and all statutory compliance shall be taken care by contractor.
4.         Safety gadgets for workmen shall be in contractor’s scope.
The space for labour accommodation will be furnished by us and the construction of labour hutment with required sanitary facili
5.       contractor’s scope.
6.         The space for fabrication and storage will be furnished by us and necessary construction shall be done by contractor.
7.         The safety watch & ward for the storage, labour colony, your office and lighting arrangement shall be in contractor’s scope.
8.         Contractor shall take care of all local labour issue if any and indemnify FLS from such issues.
The Batching plant, Mixer machines, DG sets, Transit mixer with concrete pumps, Vibrators, Scaffolding Pipes, Road machineries,
10.         hydra, tools & tackles as required for the execution of work shall be in contractor’s scope.
11.         The Unloading of Steel, Cement, Equipments is in the scope of contractor.
12 The Quantity indicated is tentative and subject to a variatio of +/- 25%
Amount Remarks

0 Disposal upto 2 Km

Disposal upto 2 Km
0
0
0
0

0
0
0
0
0
0
0
0

0
0
0

0 Not required if GP2 item


is operating
0

s4.30/KwH and further distribution shall be in

ution shall be contractor’s scope

hutment with required sanitary facilities shall be in

all be done by contractor.


nt shall be in contractor’s scope.
.
, Scaffolding Pipes, Road machineries, crane &

Potrebbero piacerti anche