I.E.

MTH 50,775,000

TRANSFER TOWERS VACUUM RISER AND


1 HOUSEKEEPING VACUUM LINES (including at SEC1 COM NICE TO HAVE STRATEGIC
Boiler, PHASE 1)

2 STORM DRAIN FILTERING SYSTEM COM MUST HAVE REGULATORY 1,000,000

HEAVY EQUIPMENT PARKING WITH WASHING AREA


3 AND MATERIALS HANDLING MULTI-PURPOSE COM NICE TO HAVE STRATEGIC
FUNCTION ROOM

4 ASH POND SPRAYING SYSTEM COM MUST HAVE REGULATORY

5 TIRE BATH AT COAL SHELTERS AND OPEN YARD COM MUST HAVE REGULATORY 500,000

ROAD CURVES/ACCESS MODIFICATION FOR LONG


6 COM NICE TO HAVE STRATEGIC 500,000
VEHICLE UNITS
7 CCTV FOR COAL SHELTER 2 COM

8 LFO UNLOADING BAY LORRY BUNDWALL (HUMP) COM MUST HAVE REGULATORY 75,000

9 ACQUISITION OF NEW WATER TRUCK COM NICE TO HAVE STRATEGIC

WASHDOWN SYSTEM FOR TRANSFER TOWERS AND


10 COM NICE TO HAVE STRATEGIC 3,000,000
CRUSHER BUILDING (SEC1 AREA ONLY)

11 COAL SAMPLER LOGIC AND SYSTEM MODIFICATION COM NICE TO HAVE STRATEGIC

DRY FOGGING SYSTEM EXTENSION AT CRUSHER


12 COM 2,500,000
BUILDING

13 Sprinkler for the belt conveyor from CV-00 to CV-03 COM 32,000,000

14 Dry Fog System At Ash Handling System COM 4,100,000

Rehabilitation And Installation Of Cathodic


15 COM 5,300,000
Protection For Temporary Jetty

Repair, Maintenance, And Modification Of Moving


16 COM 1,500,000
Hoppers Extensions

17 FIRE TRUCK REHABILITATION COM MUST HAVE STRATEGIC 300,000

18
NICE TO HAVE STRATEGIC
COAL SILO RECLAIMING SYSTEM SEC 1
19 Emergency Discharging Ports For Fly Ash SEC 1