CUADRO DE R E SU M E N AGREGADO PARA CONCRETO

PROYECTO : MEJORAMIENO TA 109 TRAMO: TICACO-CANDARAVE PROGRESIVA 148+000 AL 152+091.84


ENTIDAD : GOBIERNO REGIONAL DE TACNA
EJECUTA : SUB GERENCIA DE ESTUDIOS
SUPERVISA : OFICINA EJECUTIVA DE SUPERVISION

CUADRO DE R E S U M E N DE AGREGADOS PARA CONCRETO


CALICATA (C) C-1 C-2 C-3 C-4

DE LA MUESTRA
DESCRIPCION
UBICACIÓN ( Lado ) 366712.95 / 8082476.37 366851.52 / 8080562.78 366906.37 / 8082458.45 366738.87 / 8080397.31
ESPECIFICACIONES
ESTRATO (E ) E-1 E-1 E-1 E-1
TECNICAS
PROFUNDIDAD ( Metros ) De 0.00 al 0.80 metros De 0.00 al 0.60 metros De 0.00 al 0.70 metros De 0.00 al 0.90 metros

FECHA DE MUESTREO 16/04/2019 16/04/2019 16/04/2019 16/04/2019


TIPO DE AGREGADO GRAVA ARENA GRAVA ARENA GRAVA ARENA GRAVA ARENA ARENA GRAVA
2 1/2" 63.000 --- --- --- --- --- --- --- --- 94.01

2" 50.000 --- --- --- --- --- --- --- --- 92.59

1 1/2" 37.500 100.00 --- 100.00 --- 100.00 --- 100.00 --- 100

1" 25.000 94.03 95.20 97.09 97.09 95 100

3/4" 19.000 83.40 --- 84.86 --- 77.39 --- 77.39 ---

ANALISIS GRANULOMETRICO
LABORATORIO
67.49 --- 76.10 --- 64.90 --- 64.90 ---

PORCENTAJE QUE PASA


1/2" 12.500 25 60

3/8" 9.500 54.13 --- 69.54 --- 37.29 --- 37.29 --- 100

1/4" 6.250 41.06 --- 38.77 --- 26.52 --- 26.52 ---
Nº 4 4.750 16.84 100.00 19.57 100.00 15.52 100.00 15.52 100.00 95 100 0 10

Nº 8 2.360 4.86 88.94 18.28 93.44 14.21 93.62 14.21 93.62 80 100 0 5

Nº 16 1.180 0.00 72.45 0.00 76.18 0.00 77.73 0.00 77.73 50 85


EN

Nº 30 0.600 --- 44.72 --- 54.62 --- 54.02 --- 54.02 25 60

Nº 50 0.300 --- 17.47 --- 29.47 --- 35.42 --- 35.42 10 30


E N S A YO S

Nº 100 0.150 --- 10.67 --- 12.68 --- 19.02 --- 19.02 2 10

Nº 200 0.075 --- 3.49 --- 6.47 --- 6.54 --- 6.54 0 5

BASE 0.074 --- 0.00 --- 0.00 --- 0.00 --- 0.00

HUMEDAD NATURAL ( % ) 7.72 % 10.62 % 5.68 6.52 1.02

PASANTE TAMIZ N° 200 --- 4.40 % --- 6.768 --- 6.709 --- 6.213 MAXIMO 5 %

PESO ESPECIFICO DE A. FINO --- 2.62 % --- 2.606 --- 2.612 --- 2.622

ABRASION ANGELES 30.43 % ---


PRESENTA PEQUENOS DETALLES
41.92 % --- 50.915 --- 42.426 --- MAXIMO 50 %
QUE SE CORREGIRAN ALA HORA

PRESENTA PEQUENOS DETALLES


QUE SE CORREGIRAN ALA HORA

PRESENTA PEQUENOS DETALLES


QUE SE CORREGIRAN ALA HORA

PRESENTA PEQUENOS DETALLES


QUE SE CORREGIRAN ALA HORA
ESPECIFICACIONES TECNICAS

ESPECIFICACIONES TECNICAS

ESPECIFICACIONES TECNICAS

ESPECIFICACIONES TECNICAS
LA CURVA GRANUIMETRICA

LA CURVA GRANUIMETRICA

LA CURVA GRANUIMETRICA

LA CURVA GRANUIMETRICA
LA CURVA GRANULOMETRICA

LA CURVA GRANULOMETRICA

LA CURVA GRANULOMETRICA

LA CURVA GRANULOMETRICA
DE PRODUCIR EL AGREGADO

DE PRODUCIR EL AGREGADO

DE PRODUCIR EL AGREGADO

DE PRODUCIR EL AGREGADO
NO CUMPLE CON LAS

NO CUMPLE CON LAS

NO CUMPLE CON LAS

NO CUMPLE CON LAS


OBSERVACION