Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
FOR
Internal Cleaning, Inspection, New Nozzle installation & Coating Repairs
after re-sizing of Dehydration Tank Nozzle of T-1202/A
It is intended to carry out Draining down, Internal cleaning, Inspection, Provision of additional
6”-150# New Flanged Nozzle with reinforcement Pad, Internal Coating repairs, & any other
modification to the Dehydration Tank T-1202/A at the Production Station.
Reference Documents :-
Materials :-
All materials shall be used as per the fabrication drawings / data sheets provided by Daleel.
The Welding consumables shall be as per the approved welding Procedure Specifications
which suits the Tank material of Construction.
Welding :-
All welding shall be carried out by the Qualified Welders as per the approved Welding
Procedures.
Detailed Scope :-
*******