1 Activity Hazard Analysis (AHA)

Activity/Work Task: Cement Stucco (Exterior Application) Work. Overall Risk Assessment Code (RAC) (Use highest code) L

Project Location: FMS PROJECT- JUBAIL NAVAL AIR BASE Risk Assessment Code (RAC) Matrix

Contract Number: W912-ER18-C0015 Probability


Severity
Frequent Likely Occasional Seldom Unlikely (U)
Date Prepared: 30th April 2020
(F) (L) (O) (S)
Catastrophic (C) E E H H M
Prepared by (Name/Title): Faruque Abdullah ( EHS Manager )
Critical (Cr) E H H M L
Marginal (M) H M M L L
Reviewed by (Name/Title): Rathesh Kumar(Al-Ayni HSE Manager)
Negligible (N) M L L L L
Step 1: Review each “Hazard” with identified safety “Controls” and determine RAC (See above) The
Employer/ Al-Ayuni RAC is developed after correctly identifying all the hazards and fully implementing all controls.

Notes: P “Probability” i s the likelihood to cause an incident, near miss, or


accident and identified as: Frequent (F), Likely (L), RAC Chart
Occasional (O), Seldom (S) or Unlikely (U).
S “Severity” is the outcome/degree if an incident, near miss, or E = Extremely High Risk
accident did occur and identified as: Catastrophic (C),
Critical (Cr), Marginal (M), or Negligible (N) H = High Risk
Step 2: Identify the RAC (Probability/Severity) as E, H, M, or L for M = Moderate Risk
each “Hazard” on AHA. Annotate the overall highest RAC
at the top of AHA. L = Low Risk

Page 1 of 3
JOB STEPS HAZARD CONTROL RAC
1. unloading and storage of  Cut injury due to edges of  Adopt cross tier system of storage. Sec. 14. C. 15. 6
L
gypsum board & other blocks.  Wear safety shoe, hand gloves. Sec. 05.A. 07
materials to site
 Adopting of proper handling method. EM 385-1-1 Sec. 14.1.A
 Improper handling stucco base
2. Preparation of Stucco L
Base

 Powder dust causing  Use hand gloves & Glass and dust mask while handling cement bags.
allergy/eye irritation. Sec. 14.A.04
 Wash eyes with clean water if cement enters in eyes. 06.B.3b/ANSI
Z358.1

3. Plastering on block or  Falling from height.  Working platform should be adequate (at least 600mm wide) and
concrete wall. securely tied with the scaffold. Sec. 21. A. 02
 No worker should be allowed to work under the area where masonry L
work in progress.
 Loos Materials should not be left on the wall or on working platform at
the end of the day.

 Allergy to hand due to use  Gloves should be used to protect hand. Sec. 05.H.03
cement mortar.
 Strain of fatigue to bad  Substitute manual work with mechanical aids. L
ergonomics
 Slip and trips  Practice good housekeeping
 Dermatitis from contact with  Practice good personal hygiene & use PPE.
cement

Page 2 of 3
9.1 Activity Hazard Analysis (AHA)

JOB STEPS HAZARD CONTROL RAC

5. Housekeeping  Injury during housekeeping the area.  Wearing PPE is mandatory to every person.
 Arrange the materials orderly.
 Separate steel materials from wood. L
 Do not leave the area unsecured.
 Practice good housekeeping.

6. Demobilization  Slip, trip, fall and employee left  Assign HSE Personnel Bus marshal to assist employees to follow one line
Leaving the site behind, unauthorized parking while mount/ dismount in the bus
 horse playing and pushing employee from the front or pushing each other
is strictly prohibited
L
 Mount in a running bus is strictly prohibited
 Driver shall pick-up employee’s in
 designated bus parking area Head count shall be conducted by bus marshal
before leaving site

Change or deviation from the work plan. Approval of alternate procedures requires a revision /changes of AHA
New changes not reviewed could cause
and review of all operators , staff sign off in writing to ensure each
many new risks H
person understands changes to be procedure
Training Requirements/Competent or Inspection Requirements
Equipment to be Used
Qualified Personnel
Skid Loader, Mixing Machine Water Truck, & Hand SH&E Site Induction. Inspection of equipment shall be performed by operators on daily basis. Consist
Tools. Daily equipment inspection (weekly of competent supervision to be provided on site as work progress. Daily Checklist
checklist) Third party operator, equipment’s
Competent person
SSHO
Supervisor

Competent Person Prepared By Reviewed By Approved By

Imran Basha Faruque Abdullah Rathesh Kumar(Al-Ayni HSE Manager) Mohammed Sharef (Project Manager)