DISEÑO DE LA VIGA 100

VP : 15 x 40

a) Determinación del Peralte :


DP
d  h  (Re c.  estribo  )
h = 40 cm 2
r = 4 cm
Ø Estr. = 3/8 ´´ = 0.95 cm
DP = 5/8 ´´ = 1.59 cm

d = 34.26 cm
b) Deter. Refuerzo Mínimo :

b = 15 cm fy = 4200 Kg/cm2
d = 34.26 cm f´c = 210 Kg/cm2

As min = 1.71 cm2

As min = 1.42 cm2

Tomamos el Mayor : As min = 1.71 cm2

1 Ø 1/2 ´´ + 2 Ø 3/8´´ As = 2.71 cm2

c) Deter. Refuerzo Máximo :

ρb = 0.0216

ρ max = 0.016 ( Norma E 0.60 )

As max = 8.22 cm2

5 Ø 5/8 ´´ + 1 Ø 3/4´´ As = 12.75 cm2

d) Deter. de los Momentos Ultimos:

* Para el Acero Mínimo : As min = 2.71 cm2

= 4.25 cm

= 3,291.85 Kg - m = 3.29 Tn.m


* Para el Acero Máximo : As max = 12.75 cm2

= 20.00 cm

= 11,692.11 Kg - m = 11.69 Tn.m


Ø AREA
3/8 ´´ 0.71
1/2 ´´ 1.29
5/8 ´´ 1.98
3/4 ´´ 2.85
1 5.1
1 1/8 ´´ 6.45
DISEÑO DE LA VIGA

VP 500 : 55 x 20

a) Determinación del Peralte : Ø AREA


d = h - ( r + Ø estribo + DP/2) 3/8 ´´ 0.71
h = 20 cm 1/2 ´´ 1.29
r = 4 cm 5/8 ´´ 1.98
Ø Estr. = 3/8 ´´ = 0.95 cm 3/4 ´´ 2.85
DP = 5/8 ´´ = 1.59 cm 1 5.1
d = ### 1 1/8 ´´ 6.45
1 1/4 ´´ 8.19
b) Momento Último Actuante :
Cálculo SAP
Mu : 6.30 Tn.m

c) Momento Max. que resiste la Sección :

fy = 4200 Kg/cm2
f´c = 210 Kg/cm2
β = 0.85
b = 55 cm

ρ max = 0.016 As max = 12.55 cm2

1 Ø 3/4 ´´ + 5 Ø 5/8´´ As = 12.75 cm2

= 5.455 cm

Mr max = 5.56 Tn.m

Mr max : 5.56 < Mu : 6.30 Tn.m

Diseñar con Acero en Compresión

d) Deter. del acero en Compresión :

Asumiendo que el acero en compresión entra en Fluencia " Fs = Fy "

; Δ M = Mu - Mr = 0.74 Tn.m

As´ = 2.30 cm2


2 Ø 1/2 ´´ As = 2.58 cm2
e) Deter. del acero en Tracción :

As = As max + A´s = 12.55 + 2.58 = 15.13 cm2

3 Ø 1 ´´ + 0 Ø 1/2´´ As = 15.30 cm2

f ) Verificación si el acero en Compresión entra en Fluencia :

; Es= 2.1*10^6 Kg/cm2

ρ= 0.0193 ; ρ´ = 0.0033 ; d´ = 5.74 cm

Reemplazando en la fórmula :

0.0160 < 0.0436 Acero en Compresión entra en Fluencia

Por lo tanto :

= 1894.2 Kg/cm2 Fs = 1894 Kg/cm2

ρ max = 0.0175

Cuantía del Acero : ρ= 15.30 = 0.0195


55 x 14.26

ρ: 0.0195 > ρ max : 0.0175

Modificar Sección de Viga


0.0120 < 0.0436 Acero en Compresión entra en Fluencia

Por lo tanto :

Fs = Fy Fs = 4200 Kg/cm2

ρ max = 0.0193

Cuantía del Acero : ρ= 15.30 = 0.0195


55 x 14.26

ρ: 0.0195 > ρ max : 0.0193

Modificar Sección de Viga


DISEÑO DE LA VIGA

VP 500 : 55 x 20
Datos :
5Ø 5/8 ´´ A´s = 9.90 cm2 fy = 4200 Kg/cm2
f´c = 210 Kg/cm2
r = 4 cm
5Ø 5/8 ´´ As = 9.90 cm2

a) Determinación del Peralte :


d = h - ( r + Ø estribo + DP/2)
h = 20 cm
Ø Estr. = 3/8 ´´ = 0.95 cm
DP = 5/8 ´´ = 1.59 cm d = 14.26 cm

b) Deter. la Cuantia de acero :


b= 55 cm
ρ = 0.0126 ; ρ´ = ### β = 0.85

= 0.0159

ρ = 0.0126 < ρ max = 0.0159 No necesita acero en


compresión
c) Deter. del bloque rectangular de Withney "a" :

C
C´s

C + C´s - T = 0
0.85*f´c * b*a + A´s * fs - As*fy = 0 …… (α ) ; c = a /β ;

d´ = 5.74 cm

= 0.003* a - 4.88
a
f s = ε´s * Es = 6000 * a - 4.88 …….. ( β )
a
Reemplazando β en α :

### 59400 a - 4.88 - 41580 a = 0

a 2 1.82 a - 29.53 = 0 a = 4.60 cm

Fs = -365.2 Kg/cm2 < Fy = 4200 Kg/cm2


El acero No esta entrando en Fluencia
Cuando el acero en compresión No entra en Fluencia el Valor de Fs esta dado por :

Fs = 1894.2 Kg/cm2

d) Momento Ultimo Resistente :

Mu = C x ( d - a /2) + C´s (d -d´) ; a = As1 . Fy


0.85* F´c * b
Mu = As1 . Fy. (d - a/2) + A´s. Fs. (d - d´)

Mu = 0.85* F´c * b * a*( d - a /2) + A´s * Fs (d -d´)

Mu = 699,89 5.75 Kg.cm = 7.00 Tn.m ; Ø= 0.90

Mur = Ø* Mu = 6.30 Tn.m


Ø AREA
3/8 ´´ 0.71
1/2 ´´ 1.29
5/8 ´´ 1.98
3/4 ´´ 2.85
1 5.10
1 1/8 ´´ 6.45
1 1/4 ´´ 8.19

a= 1
b= 1.82
c= -29.53
b -4ac = 121.4
2

x1= 4.6
x2= -6.42
MOMENTOS PROPORCIONADOS POR EL SAP

I) VIGAS VS 503 ( Dirección Y - Y )

A) PRIMER PISO
EJE A - A

Momentos Positivos Momentos Negativos

1 M 12 : 1.64 Tn - m 1 M1: 2.95 Tn - m

2 M 23 : 0.36 Tn - m 2 M2: 2.91 Tn - m

3 M 34 : 0.64 Tn - m 3 M3: 1.40 Tn - m

4 M 45 : 0.79 Tn - m 4 M4: 1.52 Tn - m

5 M 56 : 0.49 Tn - m 5 M5: 1.61 Tn - m

6 M 67 : 0.67 Tn - m 6 M6: 1.15 Tn - m

7 M7: 1.16 Tn - m

A-1. Deter. del refuerzo Positivo :

Datos para el análisis : Ø AREA


3/8 ´´ 0.71
b = 55 cm 1/2 ´´ 1.29
d = 34.26 cm 5/8 ´´ 1.98
f´c = 210 Kg/cm2 3/4 ´´ 2.85
fy = 4200 Kg/cm2 1 5.1
Ø = 0.9 1 1/8 ´´ 6.45

1 Para M 12(+) = 1.64 Tn - m

ITERACIONES
1 era. 2 da 3 era
As = 1.41 1.278 1.28 cm2 1Ø 5/8 ´´ + 1Ø 1/2 ´´
a = 0.600 0.550 0.55 cm As = 3.27 cm2

2 Para M 23(+) = 0.36 Tn - m

ITERACIONES
1 era. 2 da 3 era
As = 0.31 0.279 0.28 cm2 1Ø 3/8 ´´
a = 0.130 0.120 0.12 cm As = 0.71 cm2
3 Para M 34(+) = 0.64 Tn - m

ITERACIONES
1 era. 2 da 3 era
As = 0.55 0.496 0.50 cm2 1Ø 1/2 ´´
a = 0.240 0.210 0.21 cm As = 1.29 cm2

4 Para M 45(+) = 0.79 Tn - m

ITERACIONES
1 era. 2 da 3 era
As = 0.68 0.613 0.61 cm2 1Ø 5/8 ´´
a = 0.290 0.260 0.26 cm As = 1.98 cm2

5 Para M 56(+) = 0.49 Tn - m

ITERACIONES
1 era. 2 da 3 era
As = 0.42 0.379 0.38 cm2 1Ø 1/2 ´´
a = 0.180 0.160 0.16 cm As = 1.29 cm2

6 Para M 67(+) = 0.67 Tn - m

ITERACIONES
1 era. 2 da 3 era
As = 0.57 0.519 0.52 cm2 1Ø 1/2 ´´
a = 0.240 0.220 0.22 cm As = 1.29 cm2
A-2. Deter. del refuerzo Negativo :

Datos para el análisis : Ø AREA


3/8 ´´ 0.71
b = 55 cm 1/2 ´´ 1.29
d = 34.26 cm 5/8 ´´ 1.98
f´c = 210 Kg/cm2 3/4 ´´ 2.85
fy = 4200 Kg/cm2 1 5.1
Ø = 0.9 1 1/8 ´´ 6.45

1 Para M 1(-) = 2.95 Tn - m

ITERACIONES
1 era. 2 da 3 era
As = 2.53 2.314 2.31 cm2 2Ø 5/8 ´´ + 2Ø 1/2 ´´
a = 1.080 0.990 0.99 cm As = 6.54 cm2

2 Para M 2(-) = 2.91 Tn - m

ITERACIONES
1 era. 2 da 3 era
As = 2.50 2.283 2.28 cm2 2Ø 5/8 ´´ + 2Ø 1/2 ´´
a = 1.070 0.980 0.98 cm As = 6.54 cm2

3 Para M 3(-) = 1.40 Tn - m

ITERACIONES
1 era. 2 da 3 era
As = 1.20 1.089 1.09 cm2 1Ø 5/8 ´´ + 1Ø 1/2 ´´
a = 0.510 0.470 0.47 cm As = 3.27 cm2

4 Para M 4(-) = 1.52 Tn - m

ITERACIONES
1 era. 2 da 3 era
As = 1.30 1.183 1.18 cm2 1Ø 5/8 ´´ + 1Ø 1/2 ´´
a = 0.560 0.510 0.50 cm As = 3.27 cm2

5 Para M 5(-) = 1.61 Tn - m

ITERACIONES
1 era. 2 da 3 era
As = 1.38 1.254 1.25 cm2 1Ø 5/8 ´´ + 1Ø 1/2 ´´
a = 0.590 0.540 0.53 cm As = 3.27 cm2
6 Para M 6(-) = 1.15 Tn - m

ITERACIONES
1 era. 2 da 3 era
As = 0.99 0.893 0.89 cm2 1Ø 5/8 ´´ + 1Ø 1/2 ´´
a = 0.420 0.380 0.38 cm As = 3.27 cm2

7 Para M 7(-) = 1.16 Tn - m

ITERACIONES
1 era. 2 da 3 era
As = 1.00 0.901 0.90 cm2 1Ø 5/8 ´´ + 1Ø 1/2 ´´
a = 0.430 0.390 0.39 cm As = 3.27 cm2
MOMENTOS PROPORCIONADOS POR EL SAP

I) VIGAS VS 503 ( Dirección Y - Y )

A) PRIMER PISO
EJE B - B

Momentos Positivos Momentos Negativos

1 M 12 : 0.60 Tn - m 1 M1: 1.47 Tn - m

2 M 23 : 0.57 Tn - m 2 M2: 0.80 Tn - m

3 M 34 : 0.67 Tn - m 3 M3: 1.34 Tn - m

4 M 45 : 0.87 Tn - m 4 M4: 1.72 Tn - m

5 M 56 : 0.50 Tn - m 5 M5: 1.19 Tn - m

6 M 67 : 0.36 Tn - m 6 M6: 1.62 Tn - m

7 M7: 0.62 Tn - m

A-1. Deter. del refuerzo Positivo :

Datos para el análisis : Ø AREA


3/8 ´´ 0.71
b = 55 cm 1/2 ´´ 1.29
d = 34.26 cm 5/8 ´´ 1.98
f´c = 210 Kg/cm2 3/4 ´´ 2.85
fy = 4200 Kg/cm2 1 5.1
Ø = 0.9 1 1/8 ´´ 6.45

1 Para M 12(+) = 0.60 Tn - m

ITERACIONES
1 era. 2 da 3 era
As = 0.51 0.465 0.46 cm2 1 Ø ###
a = 0.220 0.200 0.20 cm As = 1.29 cm2

2 Para M 23(+) = 0.57 Tn - m

ITERACIONES
1 era. 2 da 3 era
As = 0.49 0.441 0.44 cm2 1 Ø ###
a = 0.210 0.190 0.19 cm As = 1.29 cm2
3 Para M 34(+) = 0.67 Tn - m

ITERACIONES
1 era. 2 da 3 era
As = 0.57 0.519 0.52 cm2 1 Ø ###
a = 0.240 0.220 0.22 cm As = 1.29 cm2

4 Para M 45(+) = 0.87 Tn - m

ITERACIONES
1 era. 2 da 3 era
As = 0.75 0.675 0.67 cm2 1Ø 1/2 ´´ + 1Ø 3/8 ´´
a = 0.320 0.290 0.29 cm As = 2.00 cm2

5 Para M 56(+) = 0.50 Tn - m

ITERACIONES
1 era. 2 da 3 era
As = 0.43 0.387 0.39 cm2 1Ø 1/2 ´´ + 1Ø 3/8 ´´
a = 0.180 0.170 0.17 cm As = 2.00 cm2

6 Para M 67(+) = 0.36 Tn - m

ITERACIONES
1 era. 2 da 3 era
As = 0.31 0.279 0.28 cm2 1Ø 1/2 ´´ + 1Ø 3/8 ´´
a = 0.130 0.120 0.12 cm As = 2.00 cm2
A-2. Deter. del refuerzo Negativo :

Datos para el análisis : Ø AREA


3/8 ´´ 0.71
b = 55 cm 1/2 ´´ 1.29
d = 34.26 cm 5/8 ´´ 1.98
f´c = 210 Kg/cm2 3/4 ´´ 2.85
fy = 4200 Kg/cm2 1 5.1
Ø = 0.9 1 1/8 ´´ 6.45

1 Para M 1(-) = 1.47 Tn - m

ITERACIONES
1 era. 2 da 3 era
As = 1.26 1.144 1.14 cm2 2Ø 1/2 ´´ + 1Ø 3/8 ´´
a = 0.540 0.490 0.49 cm As = 3.29 cm2

2 Para M 2(-) = 0.80 Tn - m

ITERACIONES
1 era. 2 da 3 era
As = 0.69 0.620 0.62 cm2 2Ø 1/2 ´´ + 1Ø 3/8 ´´
a = 0.300 0.270 0.27 cm As = 3.29 cm2

3 Para M 3(-) = 1.34 Tn - m

ITERACIONES
1 era. 2 da 3 era
As = 1.15 1.042 1.04 cm2 2Ø 1/2 ´´ + 1Ø 3/8 ´´
a = 0.490 0.450 0.44 cm As = 3.29 cm2

4 Para M 4(-) = 1.72 Tn - m

ITERACIONES
1 era. 2 da 3 era
As = 1.48 1.340 1.34 cm2 2Ø 1/2 ´´ + 1Ø 3/8 ´´
a = 0.630 0.570 0.57 cm As = 3.29 cm2

5 Para M 5(-) = 1.19 Tn - m

ITERACIONES
1 era. 2 da 3 era
As = 1.02 0.925 0.92 cm2 2Ø 1/2 ´´ + 1Ø 3/8 ´´
a = 0.440 0.400 0.39 cm As = 3.29 cm2
6 Para M 6(-) = 1.62 Tn - m

ITERACIONES
1 era. 2 da 3 era
As = 1.39 1.262 1.26 cm2 2Ø 1/2 ´´ + 1Ø 3/8 ´´
a = 0.590 0.540 0.54 cm As = 3.29 cm2

7 Para M 7(-) = 0.62 Tn - m

ITERACIONES
1 era. 2 da 3 era
As = 0.53 0.480 0.48 cm2 2Ø 1/2 ´´ + 1Ø 3/8 ´´
a = 0.230 0.210 0.21 cm As = 3.29 cm2
MOMENTOS PROPORCIONADOS POR EL SAP

I) VIGAS VS 503 ( Dirección Y - Y )

A) CUARTO PISO
EJE A - A

Momentos Positivos Momentos Negativos

1 M 12 : 1.64 Tn - m 1 M1: 2.95 Tn - m

2 M 23 : 0.36 Tn - m 2 M2: 2.91 Tn - m

3 M 34 : 0.66 Tn - m 3 M3: 1.44 Tn - m

4 M 45 : 0.79 Tn - m 4 M4: 1.65 Tn - m

5 M 56 : 0.49 Tn - m 5 M5: 1.56 Tn - m

6 M 67 : 0.70 Tn - m 6 M6: 1.15 Tn - m

7 M7: 1.13 Tn - m

A-1. Deter. del refuerzo Positivo :

Datos para el análisis : Ø AREA


3/8 ´´ 0.71
b = 55 cm 1/2 ´´ 1.29
d = 34.26 cm 5/8 ´´ 1.98
f´c = 210 Kg/cm2 3/4 ´´ 2.85
fy = 4200 Kg/cm2 1 5.1
Ø = 0.9 1 1/8 ´´ 6.45

1 Para M 12(+) = 1.64 Tn - m

ITERACIONES
1 era. 2 da 3 era
As = 1.41 1.278 1.28 cm2 1Ø 5/8 ´´ + 1Ø 1/2 ´´
a = 0.600 0.550 0.55 cm As = 3.27 cm2

2 Para M 23(+) = 0.36 Tn - m

ITERACIONES
1 era. 2 da 3 era
As = 0.31 0.279 0.28 cm2 1Ø 3/8 ´´
a = 0.130 0.120 0.12 cm As = 0.71 cm2
3 Para M 34(+) = 0.66 Tn - m

ITERACIONES
1 era. 2 da 3 era
As = 0.57 0.511 0.51 cm2 1Ø 1/2 ´´
a = 0.240 0.220 0.22 cm As = 1.29 cm2

4 Para M 45(+) = 0.79 Tn - m

ITERACIONES
1 era. 2 da 3 era
As = 0.68 0.613 0.61 cm2 1Ø 1/2 ´´ + 1Ø 3/8 ´´
a = 0.290 0.260 0.26 cm As = 2.00 cm2

5 Para M 56(+) = 0.49 Tn - m

ITERACIONES
1 era. 2 da 3 era
As = 0.42 0.379 0.38 cm2 1Ø 1/2 ´´ + 1Ø 3/8 ´´
a = 0.180 0.160 0.16 cm As = 2.00 cm2

6 Para M 67(+) = 0.70 Tn - m

ITERACIONES
1 era. 2 da 3 era
As = 0.60 0.543 0.54 cm2 2Ø 3/8 ´´
a = 0.260 0.230 0.23 cm As = 1.42 cm2
A-2. Deter. del refuerzo Negativo :

Datos para el análisis : Ø AREA


3/8 ´´ 0.71
b = 55 cm 1/2 ´´ 1.29
d = 34.26 cm 5/8 ´´ 1.98
f´c = 210 Kg/cm2 3/4 ´´ 2.85
fy = 4200 Kg/cm2 1 5.1
Ø = 0.9 1 1/8 ´´ 6.45

1 Para M 1(-) = 2.95 Tn - m

ITERACIONES
1 era. 2 da 3 era
As = 2.53 2.314 2.31 cm2 0Ø 1/2 ´´ + 1Ø 3/8 ´´
a = 1.080 0.990 0.99 cm As = 0.71 cm2

2 Para M 2(-) = 2.91 Tn - m

ITERACIONES
1 era. 2 da 3 era
As = 2.50 2.283 2.28 cm2 0Ø 1/2 ´´ + 1Ø 3/8 ´´
a = 1.070 0.980 0.98 cm As = 0.71 cm2

3 Para M 3(-) = 1.44 Tn - m

ITERACIONES
1 era. 2 da 3 era
As = 1.24 1.121 1.12 cm2 0Ø 1/2 ´´ + 1Ø 3/8 ´´
a = 0.530 0.480 0.48 cm As = 0.71 cm2

4 Para M 4(-) = 1.65 Tn - m

ITERACIONES
1 era. 2 da 3 era
As = 1.42 1.286 1.28 cm2 0Ø 1/2 ´´ + 1Ø 3/8 ´´
a = 0.610 0.550 0.55 cm As = 0.71 cm2

5 Para M 5(-) = 1.56 Tn - m

ITERACIONES
1 era. 2 da 3 era
As = 1.34 1.215 1.21 cm2 0Ø 1/2 ´´ + 1Ø 3/8 ´´
a = 0.570 0.520 0.52 cm As = 0.71 cm2
6 Para M 6(-) = 1.15 Tn - m

ITERACIONES
1 era. 2 da 3 era
As = 0.99 0.893 0.89 cm2 0Ø 1/2 ´´ + 1Ø 3/8 ´´
a = 0.420 0.380 0.38 cm As = 0.71 cm2

7 Para M 7(-) = 1.13 Tn - m

ITERACIONES
1 era. 2 da 3 era
As = 0.97 0.878 0.88 cm2 0Ø 1/2 ´´ + 1Ø 3/8 ´´
a = 0.410 0.380 0.38 cm As = 0.71 cm2
MOMENTOS PROPORCIONADOS POR EL SAP

I) VIGAS VS 503 ( Dirección Y - Y )

A) CUARTO PISO
EJE B - B

Momentos Positivos Momentos Negativos

1 M 12 : 1.17 Tn - m 1 M1: 2.57 Tn - m

2 M 23 : 0.73 Tn - m 2 M2: 0.53 Tn - m

3 M 34 : 0.70 Tn - m 3 M3: 1.52 Tn - m

4 M 45 : 0.86 Tn - m 4 M4: 1.64 Tn - m

5 M 56 : 0.61 Tn - m 5 M5: 1.81 Tn - m

6 M 67 : 0.36 Tn - m 6 M6: 1.15 Tn - m

7 M7: 0.71 Tn - m

A-1. Deter. del refuerzo Positivo :

Datos para el análisis : Ø AREA


3/8 ´´ 0.71
b = 55 cm 1/2 ´´ 1.29
d = 34.26 cm 5/8 ´´ 1.98
f´c = 210 Kg/cm2 3/4 ´´ 2.85
fy = 4200 Kg/cm2 1 5.1
Ø = 0.9 1 1/8 ´´ 6.45

1 Para M 12(+) = 1.17 Tn - m

ITERACIONES
1 era. 2 da 3 era
As = 1.00 0.909 0.91 cm2 2 Ø ###
a = 0.430 0.390 0.39 cm As = 2.58 cm2

2 Para M 23(+) = 0.73 Tn - m

ITERACIONES
1 era. 2 da 3 era
As = 0.63 0.566 0.57 cm2 2 Ø ###
a = 0.270 0.240 0.24 cm As = 2.58 cm2
3 Para M 34(+) = 0.70 Tn - m

ITERACIONES
1 era. 2 da 3 era
As = 0.60 0.543 0.54 cm2 2 Ø ###
a = 0.260 0.230 0.23 cm As = 2.58 cm2

4 Para M 45(+) = 0.86 Tn - m

ITERACIONES
1 era. 2 da 3 era
As = 0.74 0.667 0.67 cm2 1Ø 1/2 ´´ + 1Ø 3/8 ´´
a = 0.320 0.290 0.29 cm As = 2.00 cm2

5 Para M 56(+) = 0.61 Tn - m

ITERACIONES
1 era. 2 da 3 era
As = 0.52 0.473 0.47 cm2 1Ø 1/2 ´´ + 1Ø 3/8 ´´
a = 0.220 0.200 0.20 cm As = 2.00 cm2

6 Para M 67(+) = 0.36 Tn - m

ITERACIONES
1 era. 2 da 3 era
As = 0.31 0.279 0.28 cm2 1Ø 1/2 ´´ + 1Ø 3/8 ´´
a = 0.130 0.120 0.12 cm As = 2.00 cm2
A-2. Deter. del refuerzo Negativo :

Datos para el análisis : Ø AREA


3/8 ´´ 0.71
b = 55 cm 1/2 ´´ 1.29
d = 34.26 cm 5/8 ´´ 1.98
f´c = 210 Kg/cm2 3/4 ´´ 2.85
fy = 4200 Kg/cm2 1 5.1
Ø = 0.9 1 1/8 ´´ 6.45

1 Para M 1(-) = 2.57 Tn - m

ITERACIONES
1 era. 2 da 3 era
As = 2.21 2.012 2.01 cm2 0Ø 1/2 ´´ + 1Ø 3/8 ´´
a = 0.950 0.860 0.86 cm As = 0.71 cm2

2 Para M 2(-) = 0.53 Tn - m

ITERACIONES
1 era. 2 da 3 era
As = 0.45 0.410 0.41 cm2 0Ø 1/2 ´´ + 1Ø 3/8 ´´
a = 0.190 0.180 0.18 cm As = 0.71 cm2

3 Para M 3(-) = 1.52 Tn - m

ITERACIONES
1 era. 2 da 3 era
As = 1.30 1.183 1.18 cm2 0Ø 1/2 ´´ + 1Ø 3/8 ´´
a = 0.560 0.510 0.50 cm As = 0.71 cm2

4 Para M 4(-) = 1.64 Tn - m

ITERACIONES
1 era. 2 da 3 era
As = 1.41 1.278 1.28 cm2 0Ø 1/2 ´´ + 1Ø 3/8 ´´
a = 0.600 0.550 0.55 cm As = 0.71 cm2

5 Para M 5(-) = 1.81 Tn - m

ITERACIONES
1 era. 2 da 3 era
As = 1.55 1.411 1.41 cm2 0Ø 1/2 ´´ + 1Ø 3/8 ´´
a = 0.660 0.600 0.60 cm As = 0.71 cm2
6 Para M 6(-) = 1.15 Tn - m

ITERACIONES
1 era. 2 da 3 era
As = 0.99 0.893 0.89 cm2 0Ø 1/2 ´´ + 1Ø 3/8 ´´
a = 0.420 0.380 0.38 cm As = 0.71 cm2

7 Para M 7(-) = 0.71 Tn - m

ITERACIONES
1 era. 2 da 3 era
As = 0.61 0.550 0.55 cm2 0Ø 1/2 ´´ + 1Ø 3/8 ´´
a = 0.260 0.240 0.24 cm As = 0.71 cm2
MOMENTOS PROPORCIONADOS POR EL SAP

I) VIGAS VP 500 ( Dirección X - X )

A) PRIMER PISO
EJE 1 - 1

Momentos Positivos Momentos Negativos

1 M AB : 0.44 Tn - m 1 MA: 0.78 Tn - m

2 M BC : 0.38 Tn - m 2 MB: 1.95 Tn - m

3 M CD : 0.78 Tn - m 3 MC: 1.92 Tn - m

4 MD: 1.02 Tn - m

A-1. Deter. del refuerzo Positivo :

Datos para el análisis : Ø AREA


3/8 ´´ 0.71
b = 55 cm 1/2 ´´ 1.29
d = 34.26 cm 5/8 ´´ 1.98
f´c = 210 Kg/cm2 3/4 ´´ 2.85
fy = 4200 Kg/cm2 1 5.1
Ø = 0.9 1 1/8 ´´ 6.45

1 Para M AB(+) = 0.44 Tn - m

ITERACIONES
1 era. 2 da 3 era
As = 0.38 0.341 0.34 cm2 1Ø 1/2 ´´
a = 0.160 0.150 0.15 cm As = 1.29 cm2

2 Para M BC(+) = 0.38 Tn - m

ITERACIONES
1 era. 2 da 3 era
As = 0.33 0.294 0.29 cm2 1Ø 3/8 ´´
a = 0.140 0.130 0.12 cm As = 0.71 cm2

3 Para M CD(+) = 0.78 Tn - m

ITERACIONES
1 era. 2 da 3 era
As = 0.67 0.605 0.60 cm2 1Ø 1/2 ´´ + 1Ø 3/8 ´´
a = 0.290 0.260 0.26 cm As = 2.00 cm2
A-2. Deter. del refuerzo Negativo :

Datos para el análisis : Ø AREA


3/8 ´´ 0.71
b = 55 cm 1/2 ´´ 1.29
d = 34.26 cm 5/8 ´´ 1.98
f´c = 210 Kg/cm2 3/4 ´´ 2.85
fy = 4200 Kg/cm2 1 5.1
Ø = 0.9 1 1/8 ´´ 6.45

1 Para M A(-) = 0.78 Tn - m

ITERACIONES
1 era. 2 da 3 era
As = 0.67 0.605 0.60 cm2 1Ø 1/2 ´´ + 1Ø 3/8 ´´
a = 0.290 0.260 0.26 cm As = 2.00 cm2

2 Para M B(-) = 1.95 Tn - m

ITERACIONES
1 era. 2 da 3 era
As = 1.67 1.522 1.52 cm2 2Ø 5/8 ´´
a = 0.710 0.650 0.65 cm As = 3.96 cm2

3 Para M C(-) = 1.92 Tn - m

ITERACIONES
1 era. 2 da 3 era
As = 1.65 1.498 1.50 cm2 2Ø 5/8 ´´
a = 0.710 0.640 0.64 cm As = 3.96 cm2

4 Para M D(-) = 1.02 Tn - m

ITERACIONES
1 era. 2 da 3 era
As = 0.88 0.792 0.79 cm2 1Ø 1/2 ´´ + 1Ø 3/8 ´´
a = 0.380 0.340 0.34 cm As = 2.00 cm2
MOMENTOS PROPORCIONADOS POR EL SAP

I) VIGAS VP 501 ( Dirección X - X )

A) PRIMER PISO
EJE 2 - 2

Momentos Positivos Momentos Negativos

1 M AB : 2.85 Tn - m 1 MA: 4.71 Tn - m

2 M BC : 0.96 Tn - m 2 MB: 4.41 Tn - m

3 M CD : 2.96 Tn - m 3 MC: 4.53 Tn - m

4 MD: 4.86 Tn - m

A-1. Deter. del refuerzo Positivo :

Datos para el análisis : Ø AREA


3/8 ´´ 0.71
b = 55 cm 1/2 ´´ 1.29
d = 34.26 cm 5/8 ´´ 1.98
f´c = 210 Kg/cm2 3/4 ´´ 2.85
fy = 4200 Kg/cm2 1 5.1
Ø = 0.9 1 1/8 ´´ 6.45

1 Para M AB(+) = 2.85 Tn - m

ITERACIONES
1 era. 2 da 3 era
As = 2.45 2.235 2.23 cm2 3 Ø 5/8 ´´
a = 1.050 0.960 0.95 cm As = 5.94 cm2

2 Para M BC(+) = 0.96 Tn - m

ITERACIONES
1 era. 2 da 3 era
As = 0.82 0.745 0.74 cm2 1Ø 1/2 ´´ + 1Ø 3/8 ´´
a = 0.350 0.320 0.32 cm As = 2.00 cm2

3 Para M CD(+) = 2.96 Tn - m

ITERACIONES
1 era. 2 da 3 era
As = 2.54 2.323 2.32 cm2 1Ø 1/2 ´´ + 1Ø 3/8 ´´
a = 1.090 0.990 0.99 cm As = 2.00 cm2
A-2. Deter. del refuerzo Negativo :

Datos para el análisis : Ø AREA


3/8 ´´ 0.71
b = 55 cm 1/2 ´´ 1.29
d = 34.26 cm 5/8 ´´ 1.98
f´c = 210 Kg/cm2 3/4 ´´ 2.85
fy = 4200 Kg/cm2 1 5.1
Ø = 0.9 1 1/8 ´´ 6.45

1 Para M A(-) = 4.71 Tn - m

ITERACIONES
1 era. 2 da 3 era
As = 4.04 3.731 3.72 cm2 1Ø 1/2 ´´ + 1Ø 3/8 ´´
a = 1.730 1.600 1.59 cm As = 2.00 cm2

2 Para M B(-) = 4.41 Tn - m

ITERACIONES
1 era. 2 da 3 era
As = 3.78 3.488 3.48 cm2 1Ø 1/2 ´´ + 1Ø 3/8 ´´
a = 1.620 1.490 1.49 cm As = 2.00 cm2

3 Para M C(-) = 4.53 Tn - m

ITERACIONES
1 era. 2 da 3 era
As = 3.89 3.585 3.58 cm2 1Ø 1/2 ´´ + 1Ø 3/8 ´´
a = 1.660 1.530 1.53 cm As = 2.00 cm2

4 Para M D(-) = 4.86 Tn - m

ITERACIONES
1 era. 2 da 3 era
As = 4.17 3.853 3.85 cm2 1Ø 1/2 ´´ + 1Ø 3/8 ´´
a = 1.780 1.650 1.65 cm As = 2.00 cm2
MOMENTOS PROPORCIONADOS POR EL SAP

I) VIGAS VP 502 ( Dirección X - X )

A) PRIMER PISO
EJE 3 - 3

Momentos Positivos Momentos Negativos

1 M AB : 1.98 Tn - m 1 MA: 3.40 Tn - m

2 M BC : 0.83 Tn - m 2 MB: 2.89 Tn - m

3 M CD : 2.80 Tn - m 3 MC: 4.15 Tn - m

4 MD: 4.72 Tn - m

A-1. Deter. del refuerzo Positivo :

Datos para el análisis : Ø AREA


3/8 ´´ 0.71
b = 55 cm 1/2 ´´ 1.29
d = 34.26 cm 5/8 ´´ 1.98
f´c = 210 Kg/cm2 3/4 ´´ 2.85
fy = 4200 Kg/cm2 1 5.1
Ø = 0.9 1 1/8 ´´ 6.45

1 Para M AB(+) = 1.98 Tn - m

ITERACIONES
1 era. 2 da 3 era
As = 1.70 1.545 1.54 cm2 2Ø 5/8 ´´
a = 0.730 0.660 0.66 cm As = 3.96 cm2

2 Para M BC(+) = 0.83 Tn - m

ITERACIONES
1 era. 2 da 3 era
As = 0.71 0.644 0.64 cm2 2Ø 5/8 ´´
a = 0.300 0.280 0.27 cm As = 3.96 cm2

3 Para M CD(+) = 2.80 Tn - m

ITERACIONES
1 era. 2 da 3 era
As = 2.40 2.195 2.19 cm2 2Ø 5/8 ´´
a = 1.030 0.940 0.94 cm As = 3.96 cm2
A-2. Deter. del refuerzo Negativo :

Datos para el análisis : Ø AREA


3/8 ´´ 0.71
b = 55 cm 1/2 ´´ 1.29
d = 34.26 cm 5/8 ´´ 1.98
f´c = 210 Kg/cm2 3/4 ´´ 2.85
fy = 4200 Kg/cm2 1 5.1
Ø = 0.9 1 1/8 ´´ 6.45

1 Para M A(-) = 3.40 Tn - m

ITERACIONES
1 era. 2 da 3 era
As = 2.92 2.674 2.67 cm2 3Ø 5/8 ´´ + 1Ø 1/2 ´´
a = 1.250 1.140 1.14 cm As = 7.23 cm2

2 Para M B(-) = 2.89 Tn - m

ITERACIONES
1 era. 2 da 3 era
As = 2.48 2.267 2.26 cm2 3Ø 5/8 ´´ + 1Ø 1/2 ´´
a = 1.060 0.970 0.97 cm As = 7.23 cm2

3 Para M C(-) = 4.15 Tn - m

ITERACIONES
1 era. 2 da 3 era
As = 3.56 3.277 3.27 cm2 3Ø 5/8 ´´ + 1Ø 1/2 ´´
a = 1.520 1.400 1.40 cm As = 7.23 cm2

4 Para M D(-) = 4.72 Tn - m

ITERACIONES
1 era. 2 da 3 era
As = 4.05 3.739 3.73 cm2 3Ø 5/8 ´´ + 1Ø 1/2 ´´
a = 1.730 1.600 1.60 cm As = 7.23 cm2
MOMENTOS PROPORCIONADOS POR EL SAP

I) VIGAS VP 502 ( Dirección X - X )

A) PRIMER PISO
EJE 4 - 4

Momentos Positivos Momentos Negativos

1 M AB : 1.98 Tn - m 1 MA: 3.40 Tn - m

2 M BC : 0.83 Tn - m 2 MB: 2.89 Tn - m

3 M CD : 2.80 Tn - m 3 MC: 4.15 Tn - m

4 MD: 4.72 Tn - m

A-1. Deter. del refuerzo Positivo :

Datos para el análisis : Ø AREA


3/8 ´´ 0.71
b = 55 cm 1/2 ´´ 1.29
d = 34.26 cm 5/8 ´´ 1.98
f´c = 210 Kg/cm2 3/4 ´´ 2.85
fy = 4200 Kg/cm2 1 5.1
Ø = 0.9 1 1/8 ´´ 6.45

1 Para M AB(+) = 1.98 Tn - m

ITERACIONES
1 era. 2 da 3 era
As = 1.70 1.545 1.54 cm2 2 Ø 5/8 ´´
a = 0.730 0.660 0.66 cm As = 3.96 cm2

2 Para M BC(+) = 0.83 Tn - m

ITERACIONES
1 era. 2 da 3 era
As = 0.71 0.644 0.64 cm2 2 Ø 5/8 ´´
a = 0.300 0.280 0.27 cm As = 3.96 cm2

3 Para M CD(+) = 2.80 Tn - m

ITERACIONES
1 era. 2 da 3 era
As = 2.40 2.195 2.19 cm2 2 Ø 5/8 ´´
a = 1.030 0.940 0.94 cm As = 3.96 cm2
A-2. Deter. del refuerzo Negativo :

Datos para el análisis : Ø AREA


3/8 ´´ 0.71
b = 55 cm 1/2 ´´ 1.29
d = 34.26 cm 5/8 ´´ 1.98
f´c = 210 Kg/cm2 3/4 ´´ 2.85
fy = 4200 Kg/cm2 1 5.1
Ø = 0.9 1 1/8 ´´ 6.45

1 Para M A(-) = 3.40 Tn - m

ITERACIONES
1 era. 2 da 3 era
As = 2.92 2.674 2.67 cm2 3Ø 5/8 ´´ + 1Ø ###
a = 1.250 1.140 1.14 cm As = 7.23 cm2

2 Para M B(-) = 2.89 Tn - m

ITERACIONES
1 era. 2 da 3 era
As = 2.48 2.267 2.26 cm2 3Ø 5/8 ´´ + 1Ø ###
a = 1.060 0.970 0.97 cm As = 7.23 cm2

3 Para M C(-) = 4.15 Tn - m

ITERACIONES
1 era. 2 da 3 era
As = 3.56 3.277 3.27 cm2 3Ø 5/8 ´´ + 1Ø ###
a = 1.520 1.400 1.40 cm As = 7.23 cm2

4 Para M D(-) = 4.72 Tn - m

ITERACIONES
1 era. 2 da 3 era
As = 4.05 3.739 3.73 cm2 3Ø 5/8 ´´ + 1Ø ###
a = 1.730 1.600 1.60 cm As = 7.23 cm2
MOMENTOS PROPORCIONADOS POR EL SAP

I) VIGAS VP 500 ( Dirección X - X )

A) CUARTO PISO
EJE 1 - 1

Momentos Positivos Momentos Negativos

1 M AB : 0.44 Tn - m 1 MA: 0.78 Tn - m

2 M BC : 0.38 Tn - m 2 MB: 1.95 Tn - m

3 M CD : 0.78 Tn - m 3 MC: 1.92 Tn - m

4 MD: 1.02 Tn - m

A-1. Deter. del refuerzo Positivo :

Datos para el análisis : Ø AREA


3/8 ´´ 0.71
b = 55 cm 1/2 ´´ 1.29
d = 34.26 cm 5/8 ´´ 1.98
f´c = 210 Kg/cm2 3/4 ´´ 2.85
fy = 4200 Kg/cm2 1 5.1
Ø = 0.9 1 1/8 ´´ 6.45

1 Para M AB(+) = 0.44 Tn - m

ITERACIONES
1 era. 2 da 3 era
As = 0.38 0.341 0.34 cm2 1Ø 1/2 ´´
a = 0.160 0.150 0.15 cm As = 1.29 cm2

2 Para M BC(+) = 0.38 Tn - m

ITERACIONES
1 era. 2 da 3 era
As = 0.33 0.294 0.29 cm2 1Ø 3/8 ´´
a = 0.140 0.130 0.12 cm As = 0.71 cm2

3 Para M CD(+) = 0.78 Tn - m

ITERACIONES
1 era. 2 da 3 era
As = 0.67 0.605 0.60 cm2 1Ø 1/2 ´´ + 1Ø 3/8 ´´
a = 0.290 0.260 0.26 cm As = 2.00 cm2
A-2. Deter. del refuerzo Negativo :

Datos para el análisis : Ø AREA


3/8 ´´ 0.71
b = 55 cm 1/2 ´´ 1.29
d = 34.26 cm 5/8 ´´ 1.98
f´c = 210 Kg/cm2 3/4 ´´ 2.85
fy = 4200 Kg/cm2 1 5.1
Ø = 0.9 1 1/8 ´´ 6.45

1 Para M A(-) = 0.78 Tn - m

ITERACIONES
1 era. 2 da 3 era
As = 0.67 0.605 0.60 cm2 1Ø 1/2 ´´ + 1Ø 3/8 ´´
a = 0.290 0.260 0.26 cm As = 2.00 cm2

2 Para M B(-) = 1.95 Tn - m

ITERACIONES
1 era. 2 da 3 era
As = 1.67 1.522 1.52 cm2 2Ø 5/8 ´´
a = 0.710 0.650 0.65 cm As = 3.96 cm2

3 Para M C(-) = 1.92 Tn - m

ITERACIONES
1 era. 2 da 3 era
As = 1.65 1.498 1.50 cm2 2Ø 5/8 ´´
a = 0.710 0.640 0.64 cm As = 3.96 cm2

4 Para M D(-) = 1.02 Tn - m

ITERACIONES
1 era. 2 da 3 era
As = 0.88 0.792 0.79 cm2 1Ø 1/2 ´´ + 1Ø 3/8 ´´
a = 0.380 0.340 0.34 cm As = 2.00 cm2
MOMENTOS PROPORCIONADOS POR EL SAP

I) VIGAS VP 501 ( Dirección X - X )

A) CUARTO PISO
EJE 2 - 2

Momentos Positivos Momentos Negativos

1 M AB : 2.85 Tn - m 1 MA: 4.71 Tn - m

2 M BC : 0.96 Tn - m 2 MB: 4.41 Tn - m

3 M CD : 2.96 Tn - m 3 MC: 4.53 Tn - m

4 MD: 4.86 Tn - m

A-1. Deter. del refuerzo Positivo :

Datos para el análisis : Ø AREA


3/8 ´´ 0.71
b = 55 cm 1/2 ´´ 1.29
d = 34.26 cm 5/8 ´´ 1.98
f´c = 210 Kg/cm2 3/4 ´´ 2.85
fy = 4200 Kg/cm2 1 5.1
Ø = 0.9 1 1/8 ´´ 6.45

1 Para M AB(+) = 2.85 Tn - m

ITERACIONES
1 era. 2 da 3 era
As = 2.45 2.235 2.23 cm2 3 Ø 5/8 ´´
a = 1.050 0.960 0.95 cm As = 5.94 cm2

2 Para M BC(+) = 0.96 Tn - m

ITERACIONES
1 era. 2 da 3 era
As = 0.82 0.745 0.74 cm2 1Ø 1/2 ´´ + 1Ø 3/8 ´´
a = 0.350 0.320 0.32 cm As = 2.00 cm2

3 Para M CD(+) = 2.96 Tn - m

ITERACIONES
1 era. 2 da 3 era
As = 2.54 2.323 2.32 cm2 1Ø 1/2 ´´ + 1Ø 3/8 ´´
a = 1.090 0.990 0.99 cm As = 2.00 cm2
A-2. Deter. del refuerzo Negativo :

Datos para el análisis : Ø AREA


3/8 ´´ 0.71
b = 55 cm 1/2 ´´ 1.29
d = 34.26 cm 5/8 ´´ 1.98
f´c = 210 Kg/cm2 3/4 ´´ 2.85
fy = 4200 Kg/cm2 1 5.1
Ø = 0.9 1 1/8 ´´ 6.45

1 Para M A(-) = 4.71 Tn - m

ITERACIONES
1 era. 2 da 3 era
As = 4.04 3.731 3.72 cm2 1Ø 1/2 ´´ + 1Ø 3/8 ´´
a = 1.730 1.600 1.59 cm As = 2.00 cm2

2 Para M B(-) = 4.41 Tn - m

ITERACIONES
1 era. 2 da 3 era
As = 3.78 3.488 3.48 cm2 1Ø 1/2 ´´ + 1Ø 3/8 ´´
a = 1.620 1.490 1.49 cm As = 2.00 cm2

3 Para M C(-) = 4.53 Tn - m

ITERACIONES
1 era. 2 da 3 era
As = 3.89 3.585 3.58 cm2 1Ø 1/2 ´´ + 1Ø 3/8 ´´
a = 1.660 1.530 1.53 cm As = 2.00 cm2

4 Para M D(-) = 4.86 Tn - m

ITERACIONES
1 era. 2 da 3 era
As = 4.17 3.853 3.85 cm2 1Ø 1/2 ´´ + 1Ø 3/8 ´´
a = 1.780 1.650 1.65 cm As = 2.00 cm2
MOMENTOS PROPORCIONADOS POR EL SAP

I) VIGAS VP 502 ( Dirección X - X )

A) CUARTO PISO
EJE 3 - 3

Momentos Positivos Momentos Negativos

1 M AB : 1.98 Tn - m 1 MA: 3.40 Tn - m

2 M BC : 0.83 Tn - m 2 MB: 2.89 Tn - m

3 M CD : 2.80 Tn - m 3 MC: 4.15 Tn - m

4 MD: 4.72 Tn - m

A-1. Deter. del refuerzo Positivo :

Datos para el análisis : Ø AREA


3/8 ´´ 0.71
b = 55 cm 1/2 ´´ 1.29
d = 34.26 cm 5/8 ´´ 1.98
f´c = 210 Kg/cm2 3/4 ´´ 2.85
fy = 4200 Kg/cm2 1 5.1
Ø = 0.9 1 1/8 ´´ 6.45

1 Para M AB(+) = 1.98 Tn - m

ITERACIONES
1 era. 2 da 3 era
As = 1.70 1.545 1.54 cm2 2Ø 5/8 ´´
a = 0.730 0.660 0.66 cm As = 3.96 cm2

2 Para M BC(+) = 0.83 Tn - m

ITERACIONES
1 era. 2 da 3 era
As = 0.71 0.644 0.64 cm2 2Ø 5/8 ´´
a = 0.300 0.280 0.27 cm As = 3.96 cm2

3 Para M CD(+) = 2.80 Tn - m

ITERACIONES
1 era. 2 da 3 era
As = 2.40 2.195 2.19 cm2 2Ø 5/8 ´´
a = 1.030 0.940 0.94 cm As = 3.96 cm2
A-2. Deter. del refuerzo Negativo :

Datos para el análisis : Ø AREA


3/8 ´´ 0.71
b = 55 cm 1/2 ´´ 1.29
d = 34.26 cm 5/8 ´´ 1.98
f´c = 210 Kg/cm2 3/4 ´´ 2.85
fy = 4200 Kg/cm2 1 5.1
Ø = 0.9 1 1/8 ´´ 6.45

1 Para M A(-) = 3.40 Tn - m

ITERACIONES
1 era. 2 da 3 era
As = 2.92 2.674 2.67 cm2 3Ø 5/8 ´´ + 1Ø 1/2 ´´
a = 1.250 1.140 1.14 cm As = 7.23 cm2

2 Para M B(-) = 2.89 Tn - m

ITERACIONES
1 era. 2 da 3 era
As = 2.48 2.267 2.26 cm2 3Ø 5/8 ´´ + 1Ø 1/2 ´´
a = 1.060 0.970 0.97 cm As = 7.23 cm2

3 Para M C(-) = 4.15 Tn - m

ITERACIONES
1 era. 2 da 3 era
As = 3.56 3.277 3.27 cm2 3Ø 5/8 ´´ + 1Ø 1/2 ´´
a = 1.520 1.400 1.40 cm As = 7.23 cm2

4 Para M D(-) = 4.72 Tn - m

ITERACIONES
1 era. 2 da 3 era
As = 4.05 3.739 3.73 cm2 3Ø 5/8 ´´ + 1Ø 1/2 ´´
a = 1.730 1.600 1.60 cm As = 7.23 cm2
MOMENTOS PROPORCIONADOS POR EL SAP

I) VIGAS VP 502 ( Dirección X - X )

A) CUARTO PISO
EJE 4 - 4

Momentos Positivos Momentos Negativos

1 M AB : 1.98 Tn - m 1 MA: 3.40 Tn - m

2 M BC : 0.83 Tn - m 2 MB: 2.89 Tn - m

3 M CD : 2.80 Tn - m 3 MC: 4.15 Tn - m

4 MD: 4.72 Tn - m

A-1. Deter. del refuerzo Positivo :

Datos para el análisis : Ø AREA


3/8 ´´ 0.71
b = 55 cm 1/2 ´´ 1.29
d = 34.26 cm 5/8 ´´ 1.98
f´c = 210 Kg/cm2 3/4 ´´ 2.85
fy = 4200 Kg/cm2 1 5.1
Ø = 0.9 1 1/8 ´´ 6.45

1 Para M AB(+) = 1.98 Tn - m

ITERACIONES
1 era. 2 da 3 era
As = 1.70 1.545 1.54 cm2 2 Ø 5/8 ´´
a = 0.730 0.660 0.66 cm As = 3.96 cm2

2 Para M BC(+) = 0.83 Tn - m

ITERACIONES
1 era. 2 da 3 era
As = 0.71 0.644 0.64 cm2 2 Ø 5/8 ´´
a = 0.300 0.280 0.27 cm As = 3.96 cm2

3 Para M CD(+) = 2.80 Tn - m

ITERACIONES
1 era. 2 da 3 era
As = 2.40 2.195 2.19 cm2 2 Ø 5/8 ´´
a = 1.030 0.940 0.94 cm As = 3.96 cm2
A-2. Deter. del refuerzo Negativo :

Datos para el análisis : Ø AREA


3/8 ´´ 0.71
b = 55 cm 1/2 ´´ 1.29
d = 34.26 cm 5/8 ´´ 1.98
f´c = 210 Kg/cm2 3/4 ´´ 2.85
fy = 4200 Kg/cm2 1 5.1
Ø = 0.9 1 1/8 ´´ 6.45

1 Para M A(-) = 3.40 Tn - m

ITERACIONES
1 era. 2 da 3 era
As = 2.92 2.674 2.67 cm2 3Ø 5/8 ´´ + 1Ø ###
a = 1.250 1.140 1.14 cm As = 7.23 cm2

2 Para M B(-) = 2.89 Tn - m

ITERACIONES
1 era. 2 da 3 era
As = 2.48 2.267 2.26 cm2 3Ø 5/8 ´´ + 1Ø ###
a = 1.060 0.970 0.97 cm As = 7.23 cm2

3 Para M C(-) = 4.15 Tn - m

ITERACIONES
1 era. 2 da 3 era
As = 3.56 3.277 3.27 cm2 3Ø 5/8 ´´ + 1Ø ###
a = 1.520 1.400 1.40 cm As = 7.23 cm2

4 Para M D(-) = 4.72 Tn - m

ITERACIONES
1 era. 2 da 3 era
As = 4.05 3.739 3.73 cm2 3Ø 5/8 ´´ + 1Ø ###
a = 1.730 1.600 1.60 cm As = 7.23 cm2