L
e y = y ' − =0( one way)
2
B
e x =x ' − =12.4−12.67=−0.27
2
M x =Q × e y
L B 3 21.33 ×25.3 33 4
IY= = =28887.84 f t
12 12
3. If the pile system is designing to transfer the ultimate column load of 135 kips. please calculate the number and
center to center spacing between piles. (please ignore tip resistance while calculating pile group efficiency).
3 FT
Sand 62.9 psf
L1=¿4 FT
L3=¿ 2
Q p =9× Cu × A p
clay
C u → givin
A p =π ¿
Q p =9× 900 × π ׿
clay
16
L' =15 × D=15× =20'
12
k =1−sin (ϕ)
f 4=325.7
Qs =∑ p× ∆ L × f
f 1+ f 2 f 2+ f 3
× L1 + × L2 +f 4 × L3
2 2
Q s =π ( 1612 ) ×[ 62.9+146.8
2
× 4+
146.8+325.7
2
×16+325.7 × 2 ]=20319 lb → 20.31 kips
Q=Q P +Q s
Qu
Q all =
FS
31.62
Q all = =10.54 KIPS
3
3. If the pile system is designing to transfer the ultimate column load of 135 kips. please calculate the number and
center to center spacing between piles. (please ignore tip resistance while calculating pile group efficiency).
column load 135 kips
Number of piles requred= = =12.80 kips
Q all 10.54 kips
Use 16 piles
11.31 kips
Q pg=16 × =60.32 kips
3
Qsg =135−60.32=74.68
Qs g=∑ p g × ∆ L× f
Q g(u)
η=
∑ Qu
60.32
η= ×100=18.5 %
16 × 20.31
η=¿ ¿
2 × ( 4+ 4−2 ) d+ 4 ×1.33
0.185=
4 ×4 × π × 1.33
d=0.587 ft