7 13 NOV 2016 REVISED AS PER MARKED Y. J. Jo B. H. Lee Y. S. Kim B. H. Shim H.S. Hwang
6 21 APR 2016 REVISED AS PER MARKED S. J. Jo J. Y. JO Y. S. Kim B. H. Shim H.S. Hwang
5 6 FEB 2016 REVISED AS PER MARKED S. J. Jo J. Y. JO Y. S. Kim B. H. Shim H.S. Hwang
4 23 DEC 2015 REVISED AS PER MARKED S. J. Jo J. Y. JO Y. S. Kim B. H. Shim H.S. Hwang
3 5 SEP 2015 REVISED AS PER MARKED S. J. Jo J. Y. JO Y. S. Kim B. H. Shim H.S. Hwang
2 12 AUG 2015 REVISED AS PER MARKED S. J. Jo J. Y. JO Y. S. Kim B. H. Shim H.S. Hwang
1 27 JUL 2015 REVISED AS PER MARKED S. J. Jo J. Y. JO Y. S. Kim B. H. Shim H.S. Hwang
0 13 FEB 2015 ISSUED FOR COSTRUCTION S. J. Jo B. H. Lee Y. S. Kim B. H. Shim H.S. Hwang
A 20 NOV 2014 ISSUED FOR REVIEW B. H. Lee S. J. Ahn Y. S. Kim B. H. Shim H.S. Hwang
Joint Venture of Hyundai Engineering & Construction Co., Ltd., GS Engineering & Construction Corp., SK
Engineering & Construction Co., Ltd., and Hyundai Engineering Co., Ltd.,
Note :
a) Revision bar(vertical line) shall be placed in the right hand margin to indicate where the changes has been made
b) PRPD = Prepared by, CHKD = Checked by, REVD = Reviewed by, APPRD = Approved by
INSPECTION AND TEST PLAN
FOR EARTH WORK
REVISION HISTORY
REVISION HISTORY
TABLE OF CONTENTS
1. I T P
2. ATTACHMENTS
Section A. Definition of Inspection Points Section B. Applicable Specification, Codes and Standards
EMPLOYER :STATE COMPANY FOR OIL PROJECTS (SCOP) Personnel and/or their Inspection Representative i.g. Third party Inspection Company 2. 2342-AA00-JSD-1400-01
Inspection and testing activities conducted by Construction. These include the monitoring of installation and Construction's internal
I inspections and tests before and during the witnessing of the inspections and tests by QC and/or Company and/or EMPLOYER
Subcontractor's Inspection Representative(s).
Also, these include the review of related certificates and preparation of the documentations and reports related to the activities.
Inspection At Hold Point, the Construction shall not carry out the specified inspector(s)/test(s) without the attendance of those parties
where "H" is indicated at "Inspected by" in ITP.
The Construction shall notify QC of inspections(s)/test(s) via submittal of "Request For Inspection" notification form. This
shall be submitted a minimum of 48 hours for site works, 72 hours for weekend prior to proposed date and time of
H inspection(s)/test(s) activity. QC shall verify readness for inspection prior to forwarding "Request For Inspection" notification form
to EMPLOYER and/or EMPLOYER Inspection Representative(s). This shall be submitted a minumum of 24 hours for site works,
Hold Points 48 hours for weekend prior to proposed date and time of inspection(s)/test(s) activity.
At Witness Point, the Construction shall notify QC of inspections(s)/test(s) via submittal of "Request For Inspection" notification form.
This shall be submitted a minimum of 48 hours for site works, 72 hours for weekend prior to proposed date and time of inspection(s)/test(s)
W activity. CONTRACTOR shall verify readness for inspection prior to forwarding "Request For Inspection" notification form to EMPLOYER
and/or EMPLOYER Inspection Representative(s). This shall be submitted a minumum of 24 hours for site works, 48 hours for weekend
Witness Points prior to proposed date and time of inspection(s)/test(s) activity.
If QC and/or EMPLOYER/EMPLOYER/Representative(s) are not in attendance at proposed inspection(s)/test(s) at date and time notified,
Construction may proceed after confirming whether these parties intend to witness inspection(s) or not.
This is Spot Witness of test(s) or inspection(s) activity by QC and/or EMPLOYER and/or EMPLOYER Inspection Representative(s). The
(W) Spot Witness is surveillance Inspection(s)/test(s). The Construction should notify QC and/or EMPLOYER and/or EMPLOYER Inspection
Spot witness Representative(s) for surveillance inspections(s)/test(s) as Witness Point, however, the Construction can proceed within these
points inspection(s)/test(s) activity with no requirement to confirming whether these pasrties intend to witness inspection(s) or
not(But Confirm to QC). Test reports will be made available for the Review at a later date.
This consists of informal inspection or observation during manufacture and testing. It may be undertaken whilst the inspector is attending
S fore Hold or Witness Points or during separately arranged surveillance on quality plans when visits are arranged solely for this purpose.
Surveillance points
The Construction shall submit to QC and/or EMPLOYER and/or EMPLOYER Inspection Representative(s) for Review the documents prior
R to
Review Points and/or after the performance of the dedicated activity.
INSPECTION AND TEST PLAN FOR EARTH WORK
LEGEND: I ( Inspection Point ), T/C ( Test Certificate required ), R ( Review results of inspection, examination or test ), S (Surveillance), W ( Witness Point), (W); Spot Witness, H ( Hold Point)
Reference Verified by
No. Description of Inspection or Test Inspection & Test Requirement Form No. Remarks
[Code/std/Spec./Proc.] Const. QC EMPLOYER
1 General
1) Replacement Soil, Type A - 2342-AA00-JSD-1440-01 - 1 test per every 1,500 m3 Laboratory Test Report H R S
- AASHTO M 145 Table 2. - MDD, OMC as per ASTM 1557
Classification of Soils and Soil - Type of soil : inorganic and free draining
Aggregate Mixtures Max. organic content : 2%
- Geotechnical Investigation Max. gypsum content : 3%
Report Max. particle size : 50 mm
- ASTM D1557 Max. fines content : 20%
- ASTM C117 Gradation : well graded
Max liquid limit : 25% (if fine content ≤ 15%.
liquid limit does not require assessment)
LEGEND: I ( Inspection Point ), T/C ( Test Certificate required ), R ( Review results of inspection, examination or test ), S (Surveillance), W ( Witness Point), (W); Spot Witness, H ( Hold Point)
Reference Verified by
No. Description of Inspection or Test Inspection & Test Requirement Form No. Remarks
[Code/std/Spec./Proc.] Const. QC EMPLOYER
3 Site Preparation
4 Excavation/Soil Cut
2) Soil Replacement under foundation - In case of depth of foundation < 2 Laboratory Test Report R R S
1 test per every 100m
- Gypsum content ≤ 20%
: proceed with the next construction
Gypsum content > 20%
: soil replacement (min T 500mm)
LEGEND: I ( Inspection Point ), T/C ( Test Certificate required ), R ( Review results of inspection, examination or test ), S (Surveillance), W ( Witness Point), (W); Spot Witness, H ( Hold Point)
Reference Verified by
No. Description of Inspection or Test Inspection & Test Requirement Form No. Remarks
[Code/std/Spec./Proc.] Const. QC EMPLOYER
2-1) Sand Stone under Foundation - BS 5930 - Schmidt Hammer Test ITRF-CS-0003-07 H H W
- 1 test per every 5000㎡
- Soil bearing capacity ≥ 500 Kpa (0.5 N/m㎡ )
INSPECTION AND TEST PLAN FOR EARTH WORK
LEGEND: I ( Inspection Point ), T/C ( Test Certificate required ), R ( Review results of inspection, examination or test ), S (Surveillance), W ( Witness Point), (W); Spot Witness, H ( Hold Point)
Reference Verified by
No. Description of Inspection or Test Inspection & Test Requirement Form No. Remarks
[Code/std/Spec./Proc.] Const. QC EMPLOYER
3-1) Trenches for Cables and Piping - IONE-AA00-DW-CS-10003 - Subgrade : visual inspection ITRF-CS-0003-01 H W S
- IONE-AA00- DW-EL-20001 - Sand bedding ITRF-CS-0003-02
- IONE-AA00-MS-PI-0002 1) Visual inspection after water compaction ITRF-CS-0003-03
- IONE-AA00-MS-PI-0008 2) Thickness ITRF-CS-0003-04
- Approved IFC drawing : Min 150 mm (GRV) ITRF-CS-0003-05
: Min 100 mm (HDPE, Steel, Concrete)
: 150 mm (Cables for unpaved areas)
: 100 mm (Cables for paved areas)
- Primary initial sand backfill
1) Visual inspection after water compaction
2) Thickness
: Max 250 mm per lift (GRV, Steel, Concrete)
: 75% of pipe dia (HDPE)
: Max 150 mm per lift (Cables for all areas)
- Secondary initial sand backfill
1) Visual inspection per after water compaction
2) Thickness
: Min 300 mm from top of (GRV)
: Min 100 mm from top of (HDPE, Steel,
Concrete)
: Min 350 mm from bottom of (Cables for
unpaved area)
: Min 450 mm from bottom of (Cables for
paved area)
- Backfill
1) 1 test per 50m
2) Max. 250 mm per each layer
3) Every 2nd layer : FDD / ≥90%, MC / ±2%
Final layer : FDD / ≥95%, MC / ±2%
INSPECTION AND TEST PLAN FOR EARTH WORK
Doc. No. IONE-AA00-ITP-CS-0003
KARBALA REFINERY PROJECT REV. 7 Page 10 / 10
Ref. FEED DOC. No. : 2342-AA00-JSD-1440-01
LEGEND: I ( Inspection Point ), T/C ( Test Certificate required ), R ( Review results of inspection, examination or test ), S (Surveillance), W ( Witness Point), (W); Spot Witness, H ( Hold Point)
Reference Verified by
No. Description of Inspection or Test Inspection & Test Requirement Form No. Remarks
[Code/std/Spec./Proc.] Const. QC EMPLOYER
4) Earth Pad
4-2) Top Layer - Max. 100mm lift with 5mm gravel or ITRF-CS-0003-03 H W S
Crushed stone ITRF-CS-0003-04
- 1 test per every 300㎡
- FDD / ≥95%, MC / ±2%
□ We would like to have your presence for inspection / test according to the following schedule. The under noted work is completed
(Except as noted)
□ This is to inform you that the following inspection / test will be carried out at the scheduled time mentioned below :
Attachments : □ Yes, □ No
Remarks
Result of Inspection / test performed according to this RFI : □ Accepted, □ Rejected, □ Cancelled
Name
Position
Signature
Date / / / / / /
Original document : Attachment #1C of IONE-AA00-PE-QA-0005
Check Result
No. Inspection Items Remarks
Accept Reject N/A
Conformity/nonconformity between purchase
1
requirements and quality record received
□ : Rejected
Attachments □ : Yes
□ : No
Notes :
Name
Position
Signature
Date / / / / / /
Original document : Attachment #2 of IONE-AA00-PE-QA-0004
Attachment #2.3A: Survey Report
SURVEY REPORT
INSPECTION REPORT NO. INSPECTION DATE & TIME ITRF NO. DISCIPLINE SHEET NO.
ITRF-CS-0003-01 OF
REMARKS:
REFERENCE DOCUMENTS:
Position
Signature
Date / / / / / /
Form No. : ITRF-CS-0003-01
Attachment #2.3B: Clearing and Grubbing Check List
INSPECTION REPORT NO. INSPECTION DATE & TIME ITRF NO. DISCIPLINE SHEET NO.
ITRF-CS-0003-02 OF
Work site area is free from refuse trash debris, rubbish and
3
leftover or surplus materials
10
11
12
13
Remarks :
Name
Position
Signature
Date / / / / / /
Form No. : ITRF-CS-0003-02
Attachment #2.3C: Soil Inspection Check List
INSPECTION REPORT NO. INSPECTION DATE & TIME ITRF NO. DISCIPLINE SHEET NO.
ITRF-CS-0003-03 OF
10
11
12
13
14
15
Remarks :
Name
Position
Signature
Date / / / / / /
Form No. : ITRF-CS-0003-03
Attachment #2.3D: Field Compaction Test Record
INSPECTION REPORT NO. INSPECTION DATE & TIME ITRF NO. DISCIPLINE SHEET NO.
ITRF-CS-0003-04 OF
Laboratory Standard :
Item Description :
Comments :
Name
Position
Signature
Date / / / / / /
Form No. : ITRF-CS-0003-04
Attachment #2.3E: Underground Embedded Item Inspection
INSPECTION REPORT NO. INSPECTION DATE & TIME ITRF NO. DISCIPLINE SHEET NO.
ITRF-CS-0003-05 OF
1 Mechanical Engineer
3 Piping Engineer
4 Electrical Engineer
5 Instrument Engineer
6 HVAC Engineer
Note :
Name
Position
Signature
Date / / / / / /
Form No. : ITRF-CS-0003-05
Attachment #2.3F: SOIL Testing Laboratory Evaluation Record
1.0 INSTRUCTIONS
1.1 This evaluation can only be made by the assigned Construction Engineer or others
qualified to inspect Soil testing laboratories.
1.2 The space to the right of each statement in this document should be completed with
one, two, or three word answers, such as: Yes, No, Satisfactory, Unsatisfactory or,
Does Not Apply, etc.
1.3 If any part of the testing laboratory has not been inspected, indicate to the right of the
appropriate statement by N.R. (Not Reviewed).
1.4 If additional comments are necessary, use the space available under each individual
statement.
1.5 The conclusions drawn by the Inspector should be based only upon observations and
documentation noted in the body of the report.
2.1.1 Is equipment available to satisfy ASTM D 1140-54 "Amount of Material In Soils Finer
Than The No. 200 Sieve?"
2.1.2 Is equipment available to satisfy ASTM D 1883-73 "Bearing Ratio of Laboratory-Compacted Soils?"
2.1.4 Is equipment available to satisfy ASTM D 3017-78 "Moisture Content of Soils, and
Soil Aggregate in Place By Nuclear Methods (Shallow Depth)?"
2.1.5 Is equipment available to satisfy ASTM D 2216-80 "Moisture Content of Soil, Laboratory?"
2.1.6 Is equipment available to satisfy ASTM D 698-78 "Moisture-Density Relations of Soils, Using 5.5 LB.
(2.5kg) Rammer, and 12-inch (304.8 mm) Drop?"
2.1.7 Is equipment available to satisfy ASTM D 1557-78 "Moisture-Density Relations of Soils Using 10-LB
(4.5kg) Rammer, and 18-inch (457.8 mm) Drop?"
2.1.8 Is equipment available to satisfy ASTM D 424-59 "Plastic Limit and Plasticity Index of Soils?"
2.1.9 Is equipment available to satisfy ASTM D 2049-69 "Relative Density of Cohesion-less Soils?"
2.1.1 Is equipment available to satisfy ASTM D 2922-78 "Density of Soil and Soil Aggregates
in Place of Nuclear Methods (Shallow Depth)?"
2.2.1 Is equipment available to satisfy ASTM D 2922-78 "Density of Soil and Soil Aggregates
in Place of Nuclear Methods (Shallow Depth)?"
3.1 Is the Agency under the direction of a person charged with engineering managerial responsibility?
3.2 Does that peson have a Masters Degree in Soils from an accredited College or University, and is he/she
a full time employee of the Agency?
3.3 Does he/she have at least five years of engineering experience in inspection and testing of soils?
3.4 Does the Supervising Laboratory Technician have at least five years experience performing tests on soils?
3.5 Does he/she demonstrate an ability to perform the tests normally required in the manner stipulated under
ASTM or other governing procedures?
3.6 Does the Supervising Field Technician have at least five years experience in the kind of work involved
on construction projects?
3.6 Does that person demonstrate either by oral or written examination, or both, the ability to perform
correctly the duties required?
6.0 RECOMMENDATIONS
_____________________ ____________________________________
_____________________ ____________________________________
_____________________ ____________________________________
_____________________ ____________________________________
_____________________ ____________________________________
_____________________ ____________________________________
_____________________ ____________________________________
_____________________ ____________________________________
_____________________ ____________________________________
Evaluated By : Date :
Date :
INSPECTION REPORT NO. INSPECTION DATE & TIME ITRF NO. DISCIPLINE SHEET NO.
ITRF-CS-0003-07 OF
CODE &
IFC DWG NO.
STANDARDS NO.
Rebound Value
1
COMP.STR. (N/mm2)
Rebound Value
2
COMP.STR. (N/mm2)
Rebound Value
3
COMP.STR. (N/mm2)
Rebound Value
4
COMP.STR. (N/mm2)
Rebound Value
5
COMP.STR. (N/mm2)
Rebound Value
6
COMP.STR. (N/mm2)
Rebound Value
7
COMP.STR. (N/mm2)
: In case that rebound value is below 10, field definition should be carried out according to below table of BS 5930.
Unconfined
Compressive
Term Field Definition
Strength
(MN/m2)
Very weak Gravel size lumps can be crushed between finger and thumb < 1.25
Weak Gravel size lumps can be broken in half by heavy hand pressure 1.25 to 5
Moderately weak Only thin slabs, corners or edges can be broken off with heavy hand pressure. 0.5 to 12.5
Moderately strong When held in the hand, rock can be broken by hammer blows. 12.5 to 50
Strong When resting on a solid surface, rock can be broken by hammer blows. 50 to 100
Very strong Rock chipped by heavy hammer blows 100 to 200
Extremely strong Rock rings on hammer blows. Only broken by sledgehammer > 200
* Remark : 1 MN/m2 = 1 N/mm2
Name
Position
Signature
Date / / / / / /
Form No. : ITRF-CS-0003-07
Attachment #2.3H : Exfiltration Test
Exfiltration Test
INSPECTION REPORT NO. INSPECTION DATE & TIME ITRF NO. DISPLINE SHEET NO.
OF
JOB DESCRIPTION AREA DESCRIPTION
HDGSK
No. Inspection Reference Constrcution Remarks
JV QC
Note
: Recommended acceptance criteria for fall in water level (over 30 min after a period of absorption of up to 20 h)
Age of construction
upto 1.5m above Brickwork Concrete sections
invert level Clayware, Plastics or
More than any 'one piece' chambers
1m or less deep
1m deep
3 to 7 days 30 mm 20 mm 5 mm
over 30 days 5 mm 5 mm 5 mm
Position
Signature
Date / / / / / /
Form No. : ITRF-CS-0003-08