CARBON PORTFOLIO - PERU 2010

Energy, Industry and Others

CAÑA BRAVA Hydroelectric Power Plant H5


Description: Is a new hydropower project connected to the grid with an installed capacity and estimated generation of 5.6 MW and 38 GWh per year,
respectively. It will be located in the department of Cajamarca.

Current Status: Projects Benefits:


Earliest project start date: November 2008. Number of direct and indirect jobs generated:
Operation start date: February 2009. It will generate around 300 to 400 local jobs and more economic activi-
Project lifetime: 40 years. ty in surrounding towns, plus 50 jobs for maintenance work.
Current Status: Energy and Water concession have been issued. DNA Sustainable development contribution:
approval was obtained. Registered at the Executive Board on February, It increases possibilities for rural electrification around the project site.
2008. It will improve the irrigation system of La Ramada area.
It introduces a new energy generation source with more reliability and
Estimated Annual Emission Reductions (tCO2/year): quality to the current distribution electric system.
An average of 22,622 tCO2-equivalent per year.
CER´s negotiation:
Project Participant and Financing Sell Commitment
Total project cost: US$ 9,500,000

Contact Information:
Sources of finance to be sought or already identified:
Name: Richard Rosas
Equity: NA. Company: Duke Energy Egenor S. en C. por A. (EGENOR)
Debt: NA. Title: Senior Business Development Engineer
Phone: (51-1) 6154600
E-mail: rjrosas@duke-energy.com

SAN DIEGO Hydroelectric Power Plant H6


Description: Is a new hydropower project connected to the grid with an installed capacity and projected yearly average generation of 3.8 MW and
21 GWh, respectively. It will be located in the department of Ancash, province of Huaylas.

Current Status: Projects Benefits:


Earliest project start date: To de defined Sustainable development contribution:
Operation start date: To be defined It increases possibilities for rural electrification around the project site.
Project lifetime: 40 years. It introduces a new energy generation source with more reliability and
Current Status: Water concession has been issued. Authorization by quality to the current distribution electric system.
M.E.M. received but it needs updating. It is a small demonstrative project for clean renewable energy gene-
ration.
Estimated Annual Emission Reductions (tCO2/year):
An average of 11,955 tCO2-equivalent per year. CER´s negotiation:
Open
Project Participant and Financing
Total project cost:
US$ 4,000,000

Contact Information:
Sources of finance to be sought or already identified:
Name: Richard Rosas
Equity: NA. Company: Duke Energy Egenor S. en C. por A. (EGENOR)
Debt: NA. Title: Senior Business Development Engineer
Phone: (51-1) 6154600
E-mail: rjrosas@duke-energy.com

www.fonamperu.org

National Environmental Fund - Peru