Sei sulla pagina 1di 1

This drawing is for engineering services only and is to be read in conjunction with all relevant architectural,

structural, CONSULT drawings and the specification.

THIS IS NOT AN INSTALLATION DRAWING

All service routes and equipment locations and indicative, actual location to be determined from site
dimensions.

DO NOT SCALE FROM THIS DRAWING

REV DATE REVISIONS BY CHK

clear
min.
150

300 min. clear

300 min. clear


clear
min.
150
POWER
FRONT FRONT
450 min. clearance CONNECTION

610 min. clearance


COOLANT HOSE

FRONT

FRONT
FRONT
FIBER ENTRANCE

FIBER ENTRANCE

610 min. clearance


COOLANT HOSE 450 min. clearance
CONNECTION

POWER

clear
min.
150
FRONT
300 min. clear 300 min. clear 300 min. clear 300 min. clear

clear
min.
150
COOLANT HOSE
ENTRANCE COOLANT HOSE
ENTRANCE

300 min. clear

300 min. clear


ENTRANCE ENTRANCE
COOLANT HOSE COOLANT HOSE

DRAWING STATUS

CLIENT

PROJECT & COST MANAGEMENT

ARCHITECT

STRUCTURAL CONSULTANT

MEP CONSULTANT

FIRST CITI-CONSULT,
P.O. BOX 43119,
ABELA BLDG., MEZZANINE FLOOR, KHALIDIYA STREET,
ABU DHABI, UNITED ARAB EMIRATES.
OFFICES ALSO: LONDON / ABU DHABI / DUBAI
ACOUSTIC

LOCAL ARCHITECT

P.O. Box 341904 RIYADH 11333


KINGDOM OF SAUDI ARABIA
Tel. No. 966-1-464-9529 info@echoarchitecture.com
Fax No. 966-1-293-2795 www.echoarchitecture.com

PROJECT

DRAWING TITLE

OPTION-B ENGINEER CHECKED PROJECT MANAGER

SCALE DATE DRAWN BY

DRAWING NUMBER

Potrebbero piacerti anche