INSTRUMENT AIR RECEIVER (LMU-V-14012)

0 19 Dec 2019 Issued for Bid AE MB KD AB CHLT


B 12 Dec 2019 Issued for Approval AE MB KD AB CHLT
A 02 Dec 2019 Issued for Review AE MB KD AB CHLT
Dibuat Diperiksa Disetujui Diperiksa Disetujui
Rev Tanggal Deskripsi
Synergy Pertamina EP
Pertamina EP
FEED Upgrading SP Belimbing

Client Comment Response Sheet

Document No : BELP-SPBEL-MS-EDS-F005

Document : Data Sheet Instrument Air Receiver (LMU-V-14012)

Response Date : 19 December 2019

Section/
Client Comment Contractor’s Response
Page

4 With vortex breaker Komentar sudah dimasukkan.


PT. Pertamina EP Data Sheet Instrument Air Receiver (LMU-V-14012)

Revisi
No. Dokumen : BELP-SPBEL-MS-EDS-F005
Judul Dokumen : Data Sheet Instrument Air Receiver (LMU-V-14012)
Revisi : 0

Dicek oleh
Rev Perihal Tanggal Revisi
Pertamina EP
A Issued For Review 02 Dec 2019 First Issuance
Direvisi sesuai hasil pemeriksaan
B Issued For Approval 12 Dec 2019
Pertamina EP terhadap dokumen revisi A
Direvisi sesuai hasil pemeriksaan
0 Issued For Bid 19 Dec 2019
Pertamina EP terhadap dokumen revisi B

Penambahan vortex breaker pada Drain


Connection

BELP-SPBEL-MS-EDS-F005 Page 2 of 4
FEED UPGRADING
SP BELIMBING

TITLE DOCUMENT NUMBER REV DATE PAGE

DATA SHEET INSTRUMENT AIR RECEIVER BELP-SPBEL-MS-EDS-F005 0 19-Dec-19 3 OF 4

1 Item : LMU-V-14012 Qty : 1 (ONE)


2 Service: INSTRUMENT AIR RECEIVER Client : PERTAMINA EP
3 PI&D : BELP-SPBEL-MS-EDS-F005 Sheet 24 of 26 Site : SP BELIMBING, MUARA ENIM, SUMATRA SELATAN
4 GENERAL CHARACTERISTICS
5 Design Code and Spec : ASME Sec. VIII Div. 1 (Latest Edition) Hydro Test pressure : As per ASME VIII Div. 1 sect. UG-99 (b)
6 Internal Diameter (ID) : 3'-3" ft-in Test Orientation : Vertical
7 Length (T.L / T.L.) : 10'-6" ft-in Pickling and passivating : No
8 Capacity : 89 ft3 Post Weld Heat Treatment (PWHT) : As per code and spec
9 Design Temperature : 176 °F Radiography : 100% RT
10 Design Pressure : 210 psig Ultrasonic testing : Yes (as per code)
11 Operating Temperature : AMB °F MPT/DPT : Yes (as per code)
12 Operating Pressure : 90-140 psig Inspection : MIGAS (Note 4)
13 Shell Thickness : 0.35 (*) in 0 Stamp : No
14 Head Thickness : 0.35 (*) in Impact Test : No
15 Corrosion allowance : 0.125 in Wind Speed : 1.44 (ASCE 7-10) m/s
16 Joint Efficiency : Shell : 1.0 Head : 1.0 Seismic Load : As per SNI 03-1726-2012
17 Internals : No ` APPLICABLE SPECIFICATIONS & DRAWINGS
18 Fireproofing : No 1. BELP-SPBEL-PR-PID-F002, PI&D Upgrade Facility SP Belimbing Sheet 21 of 26
19 Insulation : No 2. PEP-10-D0-SP-0001, Pressure Vessel Design & Fabrication Specification
20 Personnel Protection : No 3. BELP-SPBEL-MS-CAL-F001, Tank/Vessel Wall Thickness Calculation
21 Internal Coating : Yes, if required (Note 11) 4. PEP-00-N1-SP-0001, Painting Specification For External Metal Surface
22 Sacrificial Anode : No 5. PEP-00-L1-SP-0025, Piping Material Specification
23 External Painting : (Note 5) 6. AWS D1.1/D1.1M:2015, Structural Welding Code - Steel
24 7. ASME IX, Welding and Brazing Qualification
25 WEIGHT (ESTIMATED)
26 Empty weight : 3,200 lbs (*)
27 Operating weight : 3,400 lbs (*) 0
28 Test weight : 8,600 lbs (*)
29 CONSTRUCTION AND MATERIAL SPECIFICATION
30 Type of heads : 2:1 Ellipsoidal Piping clips : Yes, if required (Note 11)
31 Orientation : Vertical Davit & Support : Yes for manhole
32 Ladder Platform Clips : Yes, if required (Note 11) Support : Skirt
33 Insulation rings or clips : No Template for Skirt : Required
34 DESCRIPTION MATERIAL DESCRIPTION MATERIAL
35 Shell SA 516 Gr. 70 Nozzle Flanges SA 105 (Note 8)
36 Heads SA 516 Gr. 70 Nozzle Necks SA 106 Gr. B
37 Skirt SA 516 Gr. 70 (Upper Skirt) / SA 36 (Lower Skirt) Gaskets (Note 9)
38 Internals - External Studs SA 193 Gr. B7 (Hot Dip Galvanized)
39 External attachments SA 516 Gr. 70 External Nuts SA 194 Gr. 2H (Hot Dip Galvanized)
40 Fittings SA 234 Gr. WPB Internal Studs / Nuts -
41 Earthing Lug SS 316 L (Note 6) Name plate SS 316
42 Lifting lugs SA 516 Gr 70 Name plate bracket SA 516 Gr. 70
43 Material Certification Yes (Note 7) Anchor Bolt SA 307 Gr. B (By Others)
44 NOTES
45 1. (*) : Vendor to calculate / specify and confirm
46 2. Size and dimensions in ft-in unless otherwise noted.
47 3. Design Life of the equipment shall be 20 years.
48 4. MIGAS certificate is required. VENDOR is responsible to provide all required assistance and documentation to obtain MIGAS approval and certificate.
49 5. External painting is as per spec. :
50 - Doc No. PEP-00-N1-SP-0001, Painting Specification For External Metal Surface
51 - Doc No. A-007/A2.4/EP2200, Pedoman Spesifikasi Kode Warna Identifikasi untuk Tanki dan Vessel.
52 6. Two (2) Earthing Lugs at the opposite side of each other.
53 7. Certification shall include material certificate as per EN.10204 3.1 for pressure retaining parts and EN.10204 2.2 for non pressure parts.
54 8. Flanges shall be in accordance with ASME B16.5 latest edition.
55 9. Gasket shall be 0.175" thick, spiral wound, 304 SS Windings Flexible graphite filler SS inner & outer ASME B16.20 (As per PEP-00-L1-SP-0025, Piping Material Specification).
56 10. Bolt and Nut refer to PEP-10-D0-SP-0001, Pressure Vessel Design & Fabrication Specification.
57 11. All requirement specified above to be clarified in the next stage of engineering.
FEED UPGRADING
SP BELIMBING

TITLE DOCUMENT NUMBER REV DATE PAGE

DATA SHEET INSTRUMENT AIR RECEIVER BELP-SPBEL-MS-EDS-F005 0 19-Dec-19 4 OF 4

1 Item : LMU-V-14012 Qty : 1 (ONE)


2 Service : INSTRUMENT AIR RECEIVER Client : PERTAMINA EP
3 PI&D : BELP-SPBEL-MS-EDS-F005 Sheet 24 of 26 Site : SP BELIMBING, MUARA ENIM, SUMATRA SELATAN
4 SKETCH
5
6
7
8
N3 N2
9
10
11 Lifting lug
12
13
14
15
16
17
N5
18
19
20
21
22
23
LMU-V-14012
10' -6" (T/T)

24
25
26
27 N1
28
29 3'-3" (ID)
30
31
32
33
34 LEVEL DIAGRAM
MH
35 HHLL : 36"
N6A
36 HLL : 30"
37 NLL : 24"
38 LLL : 18"
Skirt Vent
39 SS2 LLLL
40 SO BOV
2' -6"

N6B
41
42 N4
43 SS1
44 Earthing lug
45
46 NOZZLE SCHEDULE
47 Nozzle
Mark No Size Sch Rate Face Type Service Remarks
48 Projection
49 N1 1 2" 160 (*) 150 # RF WN Inlet 6" (*)
50 N2 1 2" 160 (*) 150 # RF WN Outlet 2'-2" (*) Nozzle projection is measured from top T.L
51 N3 1 2" 160 (*) 150 # RF WN PSV Connection 2'-2" (*) Nozzle projection is measured from top T.L
52 N4 1 2" 160 (*) 150 # RF WN Drain 6" (*) 0 c/w vortex breaker
53 N5 1 2" 160 (*) 150 # RF WN PG Connection 6" (*)
54 N6 A/B 2 2" 160 (*) 150 # RF WN LG Connection 6" (*)
55 MH 1 20" STD (*) 150 # RF WN Manhole 10" (*) c/w davit, blind flange, gasket, bolts & nuts
56 SO 1 16 (*) STD (*) 0 - - - Skirt Opening 2" (*) 0
57 SS1/2 2 8" (*) STD (*) - - - Skirt Sleeve 2" (*)
58 Skirt Vent 4 1" (*) STD (*) - - - Skirt Vent 2" (*)
59
60 NOTES
61 12. Nozzle locations are indicative only, final nozzle location and elevations shall be finalized during detail engineering stage
62 13. Gasket used in hydrostatic test should be replaced after testing.
63 14. All flange bolt hole shall be straddle to center line.
64 15. Vendor to calculate/specify and responsible with vessel final strength calculation.
65 16. Nozzle elevations refer to Doc. No. BELP-SPBEL-MS-DWG-F002, Instrument Air Receiver (LMU-V-14012) GA Drawing.