I PRELIMINARY WORKS
II CONCRETING WORKS
J. Aggregates MTQC
Requested by:
ROEL C. BRIONES, CE
NIA-Midsayap Office
I. PRELIMINARY WORKS
A. Plans and Specifications
[ ] – Plans are approved for Construction, Revision properly noted.
II. CONCRETING WORKS
A. Lines and Grades
[ ] – Station, coordinates, elevationsand grades and grade are checked & verified as per
GFC Plan & Specs.
B. Formworks Installation
[ ] – Constructed, braced, cleaned and shaped as to required lines and grades.
[ ] – Formworks are free from defects, concrete covering meet the minimum
requirements.
C. Reinforced Steel Bars
[ ] – Bar sizes, class, length, number of bars, spacing, splicing, bar bending, and concrete
covering conforms to the GFC plan and specifications.
D. Embedded Items
[ ] – Items and fixtures that are to be embedded are installed and in good working
condition.
E. Concrete Consolidation
[ ] – Vibration and/or other compacting devices are in place and in good working
condition.
F. Provision and Facilities
[ ] - Protective facilities were provided against sun, and rain.
[ ] – Equipment and/or apparatus needed for maintenance are provided (e.g. fuel, lube)
G. Foundation
[ ] – Excavation, dimensions, sand & gravel blanket in placed as per GFC and specs
requirements.
H. Concrete Handling and Conveyance
[ ] – Chutes were provided and are installed in conformance with specifications.
I. Mixing Equipment
[ ] – Mixer is cleaned and in good working condition and conform ASTM C-94
[ ] – Transit Mixer
[ ] – Bagger Mixer
J. Aggregates
1. Fine Aggregates
[ ] – Fine aggregates are of appropriate quality as per specifications. Requirements are
free from foreign material.
2. Coarse Aggregates
[ ] – Coarse aggregates are appropriate quality as of specs. Requirements are free from
foreign material.
K. Water
[ ] – Water used for mixing was cleaned and suitable for concreting
L. Cement
[ ] – Cement were stored not more than three (3) months, hardened, lumpy or bagged
was segregated & not allowed for mixing.
M. Sampling and Testing
[ ] – Slump test & cylinder wer taken for testing. At least three (3) samples were required.