Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
INSTALLATION TRENDS (MW) 2019 INSTALLATIONS (MW) STATE PROFILING INSTALLATION TRENDS (MW) 2019 INSTALLATIONS (MW) STATE PROFILING SOLAR INSTALLATIONS IN INDIA
6
6 DISCOM ratings 35000
DISCOM ratings 5
8,000
5 2,000 4 7,288 31,382
Central State Others 4 Central State Others Irradiation Ease of
Ease of 3
Maharashtra
Irradiation
Karnataka
3
potential doing 30,000
potential doing 1,500 91.9% 2
6,000 89.7% 2 business
Co
business 1
1
mm
4,000 1,000 25,000 6,647
ANNUAL
i
ssi
Project 20,355
one
Project
Energy
Energy 500 Pipeline
Capacity (MW)
2,000 Pipeline Requirements
d (20
Requirements 20,000
10.0% 1,985 MW 0.3% 142 MW 8.1%
8,539
- 10,540 MW
0 Developer's
0 perspective UTILITY
19) - 9,388 MW
INDIA
6 DISCOM ratings
6 DISCOM ratings SCALEMW 15,000
5 5
4,000 4 2,000 4 (MW)
Ease of Ease of
Irradiation 3 Irradiation 3
Tamil Nadu
potential 2 doing potential 2 doing 10,000 4,190
020)
Pradesh
3,000 72.4% business 1,500 79.4% business
1 1
Uttar
SOLAR
4,719
e (2
2,000 1,000
5,000
lin
Project Project Energy
e
Energy
500 Pipeline
p
1,000 Pipeline Requirements
Pi
Requirements
0
24.0% 1,878 MW 3.7% Developer's 63 MW 20.6% Developer's Until 2016 2017 2018 2019 Pipeline
REPORT
0 0 Until
perspective perspective 2015 Dec 2019 (As of
6
Central
6
DISCOM ratings 5
DISCOM ratings Rooftop Utility Scale State Dec 2019)
5 2,000
4000 4 4
Ease of Source: JMK Research Others
Irradiation 3 Ease of Irradiation 3
doing potential 2 doing Note: - State wise installation trends are for utility scale solar projects above 1 MW only in India. State wise split for rooftop solar projects not available
Rajasthan
potential 2
CARD
3000 64.6% 1,500 business
business 100% 1
Punjab
1 - Projects are split between Central and State basis the tendering authority that has allotted the projects. ‘Others’ include all third party/ open access projects in India.
2000 1,000 - Project pipeline includes projects allotted to developers under various central and state tenders but not yet commissioned.
Project - Rooftop solar includes all installations on open ground spaces, roof, parking lot or any other area within the premises.
Project Energy Energy
1000 Pipeline 500 Pipeline - All installtion capacity numbers mentioned in this report are AC capacity numbers unless otherwise mentioned.
Requirements Requirements
34.2% 1,315 MW 1.2% 5 MW Developer's
0 Developer's 0
perspective perspective
2019
6
6 DISCOM ratings
DISCOM ratings 5
5
4,000 2,000
Irradiation
4
3
Ease of Irradiation
4
3
Ease of STATE PROFILING: METHOLOGY
doing potential doing
3,000 potential 2 1,500
2
business
business 72.7%
Pradesh
Gujarat
Andhra
1 1 DISCOM Ratings- Ratings are given to all state DISCOMs basis their
operational and financial performance by Ministry of Power’s (MoP) for the
2,000 1,000 review period 2017-18, released in October 2019.
29.1%
(JAN-DEC) 1,000
Project
Pipeline
Energy
Requirements
500
Project
Pipeline
Energy
Requirements
6
5
Solar Irradiation potential: States are ranked basis 4 Ease of Doing business Index is based on the implementation of the
65.5% 687 MW 5.4% 5.2% 474 MW 22.3% Developer's amount of solar radiation received as per the Business Reform Action Plan (BRAP) recommended by the
0 0 3
perspective Solar Radiation Map of India by NREL. 2 Department of Industrial Policy and Promotion (DIPP) to all States
6 6 1 and UTs.
DISCOM ratings DISCOM ratings
4000 5 5
4,000
4
4 Ease of
Ease of
Irradiation 3 Irradiation 3 Project Pipeline: Score is given basis state wise
Telangana
doing potential doing
potential 2
Pradesh
Madhya
3000 91.5% 2
business 3,000 100% business pipeline of solar projects allotted to various Energy Requirement in Million units (MUs) per year for all states
1 1 as per LGBR report by Central Electricity Authority (CEA).
developers in India as of Dec 31, 2019.
2000 2,000
Project Project Developer’s Perspective: States are also ranked basis
1000 Energy 1,000 Energy project developer’s viewpoint on most conducive states
Pipeline Pipeline Requirements
Requirements
to set up solar projects in India.
1.2% 664 MW 7.3% 9 MW
0 Developer's 0 Developer's
perspective perspective Score of 1 to 5 given for top 10 states: 1 being lowest and 5 being highest on each parameter
17
19
16
15 l
19 l
17
18
19
16
15 l
19 l
20 nti
20 nti
18
20 nti
20 nti
20
20
20
20
20
20
20
20
U
U
REPORT CARD
ANNUAL
JUNE 2020
Others (3.2%)
Jinerg
Delta (1.5%)
Nav
Rooftop Solar (4.4%)
)
1.6%
Tal
Hitachi Hirel (1.6%)
itas
esu
y (1.5
Kehua (2.7%) Others (14.1%) NLC (15.9%) Power procurement (6%)
n (1
(1.6%
n (1
Hero Future (1.4%)
GC
Huawei (22.7%)
Ta
Rise
%)
ta
.8%
(2.
Po
GRT (1.5%)
)
TBEA (9.7%)
we
)
%)
r(
JA Greenko (1.6%) EPC (12%)
3.0
So
lar
%
Rays Power Infra (1.8%)
)
(3.
0% )
) .6% ReNew (11.9%)
UtilitySCALE
scale solar 10 Mahindra (2.7%)
Sineng (10.2%) UTILITY SOLAR Sun e( UTILITY SCALE NEW TENDERS
market suppliers
tec
h are
7,549 MW (3.3 Wa Engie (2.7%) DEVELOPERS ISSUED Project Development
%)
Atha Group (2.7%)
(7,288 MW) (36,870 MW) utility scale solar, (54.7%)
%)
4.6
Others (7.7%) o(
Jink Vi LEADING ONSITE ROOFTOP SOLAR INSTALLERS IN INDIA IN 2019 NEW TENDER ISSUANCE AND CAPACITY ALLOTTMENT
Hitachi Hirel (0.7%) kr 120 12,000
am
Havells (1.2%) (9
.5%
)
0%
Statcon (1.3%) )
.
(6
Growatt (18.0%) 100 10,000
a
Fronius (1.6%)
ol
es
Ada
n
%)
SolarEdge (2.6%)
Re
(8.5
80 8,000
ni (9
Capacity (MW)
SMA (3.1%)
Capacity (MW)
New Tenders Issued
.4%)
Trin
TBEA (2.6%) Capacity Alloted
60 6,000
Huawei (4.4%) Note:
ROOFTOP SOLAR Sungrow (15.0%) Suppliers are ranked basis their shipment/ supplies in India market (both utility scale and rooftop solar) from Jan-Dec 2019 period.
Jinko, Suntech, JA Solar, GCL, Jinergy have not confirmed their data.
2,285 MW 40 4,000
Kehua (4.9%) CAPEX OPEX
2020
Q1 2020 RE Update Annual series: PV Financial Year 2019
Solis (13.2%) Modules Technology Trends 0 0 Jan-19 Feb-19 Mar-19 Apr-19 May-19 Jun-19 Jul-19 Aug-19 Sep-19 Oct-19 Nov-19 Dec-19
ta EL
Re y
Pr x
w
ch
Am er
us
Cl ure
En e
ro
Ha tt
Vi s
Sw m
t
un
So Na h
ni s
e
Annual series: Inverter
Su ea
ec
ll
r U vita
g
ABB (6.6%)
rs
ric
a
Ne
a
w
He
r
pl
er
nM
te
ve
P
As
dw
New Tenders Issued
ve
Am sou
oz
el
kr
35,270 MW
Az
Po
4
En
Technology Trends
ea
ea
Ad
AUGUST SEPTEMBER OCTOBER NOVEMBER DECEMBER
n
p
Capacity Alloted 12,886 MW
Cl
Ta
Delta (10.6%)
la
Monthly RE Update Monthly RE Update Monthly RE Update Monthly RE Update Monthly RE Update
Note: Inverter suppliers are ranked basis their shipment in rooftop solar market in India from Jan-Dec 2019 period. Source: JMK Research Source: JMK Research
Goodwe, TBEA, SMA have not confirmed their data. Q2 2020 RE Update Annual Report Card Q3 2020 RE Update Annual series: Note: Rooftop solar includes all installations on open ground spaces, roof, parking lot or any other area within the premises. Note: This analysis excludes wind tenders and rooftop solar tenders.
Solar+Storage in India Under the OPEX model, a third-party project developer finances and installs the solar system on consumer premises and sells power output under a long-term PPA
agreement. Under CAPEX model, project is owned by the end consumer.