Sei sulla pagina 1di 4

Daily Drilling Report

RR-026
12/8/2019
12/8/2019
Well Data
Well Name Operator Client Field Name Well Type 1 Wellbore
RR-026 OIEC NISOC Ramshir Disposal Original Hole
Report Number Rig (Names) Original KB Elevation (m) Ground Elevation (m) Section Section Duration (days)
53.0 S201 22.00 13.00 17" 47.90
Planned End Depth (mKB) Depth Start (mKB) Depth End (mKB) Depth Progress (m) Drilling Hours (hrs) Average ROP (m/hr)
2,334.00 2,334.00 2,334.00
Last Casing String Next Casing Set Depth (mKB) Spud Date Days From Spud (days) Cum Time Log Days (days) Days LTI (days)
18 5/8" Casing (96.5#, K-55, BTC), 151.00m... 10/17/2019 52.25 52.25 53.00
Operations at Report Time
CONT. DISPLACE THE WELL W/ 106 pcf F.MUD, NL-NG.
Operations Summary
CONT. L/D ALL PREVIOUS BHA COMPONENTS. P/U & M/U 12 1/4" ROTARY DRLG BHA (BHA#7) & RIH FOLLOWED BY 126 Jts 5" DP (INSPECTED,
GRADE "G") TO 1470m, NL-NG.
Operations Next Report Period
CONT. RIH TO 1800m, DISPLACE THE WELL W/ 106 pcf F.MUD, CONT. RIH TO 2307m (TOP OF CMT PLUG), D/O SHOE TRACK & RAT HOLE TO
2334m, PERFORM FIT (EMW: 135 pcf), RUN GYRO, DISPLACE THE WELL W/ 135 pcf F.MUD, PERFORM FIT (EMW: 150 pcf), COMM. DRLG 12 1/4" H.S.
Supervisors Contact
Job Contact Position
Mehdi Farahani Operation Manager
A.Bozorgi District Manager
M.Rasouli/E.Mondanipour Sr.Companyman
H.Bonyadi Jr.Companyman
A.Asghari WS Drilling Engineer
M.Salmani NISOC Companyman
R.Rezaee/M.Ameri Tool Pusher
HSE Data
Type Last Date Next Date
BOP test 12/7/2019 12/22/2019
Fire Drill 11/13/2019 11/28/2019
STOP Cards
Number of Reports:
Operations Summary
Start Ops Code Code Code
Time End Time Dur (hrs) Category 1 2 3 Comment
00:00 02:30 2.50 17" E 04 P CONT. POOH F/ 170m TO SURF. WHILE L/D 4 Jts 8 1/2" DC & 4 Jts 9 1/2" DCs, NL-NG.

>> F/U the well w/ waste water

02:30 12:00 9.50 17" E 04 P P/U & M/U 12 1/4" ROTARY DRLG BHA (BHA#7) & RIH TO 246m, NL-NG.

>> BHA#7: 12 1/4" PDC Bit + 8 1/2" B.Sub (W/ FV) + 2 Jts 8 1/2" DC + 12 1/4" S.Stab (Full Gauge) +
12 Jts 8 1/2" DC + 8" D.Jar + 3 Jts 8 1/2" DC + XOS (6 5/8" Reg P * 4 1/2" IF B) + 9 Jts 5" HWDP
>> Bit info.: New, Burintekh, M433, SN: 4053, Dressed W/ 9*14/32" Nozzles
>> Below Jar/BHA Wt (in Air).: 67/94 Klbs
>> Put flapper type float valve inside B.Sub
>> Passed 2 5/8" rabbit F/ all BHA components
>> Washed, hammered & measured all BHA components Jt by Jt before M/U.
>> F/U String & Break Circ. after M/U 8 Jts 8 1/2" DC & @ End of BHA.
>> Use safety clamps.

12:00 12:30 0.50 17" E 20 P CHANGED OUT RIG TONGS F/ 4.5 ft TO 4 ft.
12:30 00:00 11.50 17" E 04 P CONT. RIH 12 1/4" ROTARY DRLG BHA (BHA#7) FOLLOWED BY 126 JTs INSPECTED 5"
DP-GRADE G F/ 246 TO 1470m, NL-NG.

>> Passed 2 7/8" rabbit F/ All 5" DP Jts.


>> Washed, hammered & measured all 5" DP's Jt by Jt before M/U.
>> F/U String & Break Circ. on every 20-25 Jts

1/4
Daily Drilling Report
RR-026
12/8/2019
12/8/2019
Operations Summary
Start Ops Code Code Code
Time End Time Dur (hrs) Category 1 2 3 Comment
00:00 00:00 09-Dec-2019
--------------------

00:00 - 04:00 : CONT. RIH 12 1/4" ROTARY DRLG BHA (BHA#7) FOLLOWED BY 30 JTs NEW 5"
DP-GRADE G F/ 1470 TO 1800m, NL-NG.

>> M/U New 5" DP Jts as break-in procedure (M/U the Jt w/ 30 klb.ft TQ then B/O the Conn. & fully
opened using chain tong, M/U using chain tong & TQ up the Conn. up to 30 klb.ft)
>> Passed 2 7/8" rabbit F/ All 5" DP Jts.
>> Washed, hammered & measured all 5" DP's Jt by Jt before M/U.
>> F/U String & Break Circ. on every 20-25 Jts

04:00 - 06:00 : M/U TDS, DISPLACED THE WELL W/ 106 pcf F.MUD W/ (FR: 300-500 gpm, SPP:
60-1100 psi), NL-NG.

>> Dumped 950 bbls contaminated mud & water (Wt: 68-94 pcf)

Mud Information
Depth (mKB) Type Density (lbs/ft³) T (fl) (°C) Funnel Viscosity (s/qt) PV Calc (cp) YP Calc (lbf/100ft²) P (bh) (psi)
2,234.00 Salt Polymer mud 106.0 46 23.0 9.000
Percent Oil (%) Percent Water (%) Oil Water Ratio Solids (%) Lubricant (%) Glycol (%) KCl (% / lb/bbl) MBT (lb/bbl)
0.0 75.0 0/100 25.0 0.00
pH Pf (mL/mL) Mf (mL/mL) Pm (mL/mL) Calcium (mg/L) Chlorides (mg/L) Magnesium (mg/L) Potassium (mg/L)
10.0 0.100 0.200 0.800 320.000 182,000.000 40.000
Vis 3rpm Vis 6rpm Gel 10 sec (lbf/100ft²) Gel 10 min (lbf/100ft²) Gel 30 min (lbf/100ft²) Filtrate (mL/30min) Filter Cake (/32") YS Calc (lbf/100ft²)
2 3 3.000 4.000 5.000 1.000
Active Mud Volume (S... Mud Vol (Act) (bbl) Mud Vol (Res) (bbl) Mud Lost (Surf) (bbl) Mud Lost to Hole (bbl) Cum Mud Added (bbl) High Gravity Solids (%) Low Gravity Solids (%)
0.0 1237.0 1449.0 0.0 0.0 18440.5 16.8
Mud Additives
Description Units Size Consumed Rec Returned On Loc
Ferobar MT 1.5 45.0 45.0
XC-Polymer Sxs 25.0 1.0 116.0
Soda Ash Sxs 40.0 4.0 62.0
Bulk Amounts
Supply Item Description Unit Label Unit Sz Consumed Received Returned Cum On Loc
CMT G KERMAN Sxs 1,960.0
D.WATER bbl 1,292.0
DIESEL FUEL Litr 10,490.0 29,000.0 108,375.0
Bit/BHA Information
BHA No. Size (in) Make Model Serial Number Bit Type IADC Codes Nozzles (/32")
7 12 1/4 Burintekh BT616YCBM.382 4053 PDC BIT M433 14/14/14/14/14/14/14/14/14
TFA (incl Noz) (in²) Drilling Time (hrs) Bit Revs Depth In (mKB) Depth Out (mKB) Depth Drilled (m) BHA ROP (m/hr) IADC Bit Dull
1.35 0.00 -------
Flow Rate (min) (gpm) Flow Rate (max) (gpm) SPP (min) (psi) SPP (max) (psi) WOB (min) (1000lbf) WOB (max) (1000lbf) RPM (min) (rpm) RPM (max) (rpm)

Circulating Time (hrs) Rotating Time (hrs) % Rotating Time (%) % Sliding Time (%) PU HL (max) (1000lbf) Rot HL (max) (1000lbf) SO HL (min) (1000lbf) String Wt (1000lbf)
94
Drilling Parameters
Start (mKB) End (mKB) Drill Time (hrs) Drilling Torque Q (flow) (gpm) RPM (rpm) SPP (psi) WOB (1000lbf) Drill Str Wt (1... Int ROP (m/hr) Formation

Drill String Components


Item Description SN OD (in) ID (in) Top Thread Cum Wt (1000lbf) Len (m) Cum Len (m) Rot. Hrs (hrs)
9 Jts 5" HWDP 5 3.000 IF 94 83.25 246.82 0.00
XOS (6 5/8" Reg P*4 1/2" IF B) 8 1/4 3.000 IF 81 0.77 163.57 0.00
3 Jts 8 1/2" DC 8 1/2 3.000 Reg 81 25.89 162.80 0.00
8" HYD.Drlg JAR 8 3.000 Reg 67 9.48 136.91 0.00
12 Jts 8 1/2" DC 8 1/2 3.000 Reg 67 105.84 127.43 0.00
12 1/4" S.STAB (F.G) 12 1/4 3.000 Reg 10 2.45 21.59 0.00
2 Jts 8 1/2" DC 8 1/2 3.000 Reg 10 17.63 19.14 0.00
8 1/2" B.SUB (W/ F.V.) 8 1/2 2.875 Reg 0 1.14 1.51 0.00
12 1/4" PDC BIT 12 1/4 Reg 0 0.37 0.00
Mud Pumps SCR
No. Depth (mKB) Stroke (in) Strokes (spm) Pres (psi) Eff (%) Q (gpm)

LOT & FIT Data


Test Date Last Casing String Run Test Type Depth (mKB) TVD (mKB)

Applied Surface Pressure (psi) Volume Pumped (bbl) Volume (bbl) Dens Fluid (lb/gal) Leak Off Pressure (psi)

Geology Information
Formation Name Lithology Prog Top MD (mKB) Final Top MD (mKB) Final Top TVD (mKB)
Aghajari R.Marl, G.Marl, S.St 13.00 13.00

2/4
Daily Drilling Report
RR-026
12/8/2019
12/8/2019
Geology Information
Formation Name Lithology Prog Top MD (mKB) Final Top MD (mKB) Final Top TVD (mKB)
Mishan G.Marl, R.Marl, Arg Lst, Lst 1,994.00 2,004.00
Gachsaran Mbr. 7 Anhydrite, R.Marl, Lst 2,284.00 2,279.00
Gachsaran Mbr. 6 Anhydrite, R/G.Marl, Lst 2,379.00
General Remarks
Comment
Offline operation:
---------------------------

>> NIL
Comment
Technical Issues:

1. Suction line of middle tank is out of service (Not possible to pump directly from middle tank).
2. The phone and network connectivity/speed/quality is very poor.
3. Location need ground leveling by gravel to prevent inundation.
4. Electrical auxiliary brake is out of service.
5- Fresh water pool has leakage (almost 7 bbl/hr).
6. TDS panel TQ limit has malfunction. (String tending to stall @ 2-3 klb.ft less than Tq limit).**** Already worked on, Need to be checked ****
7. TDS auto brake system is out of service & could not to hold TQ in string while string stall, Obs. few reverse turns most of the time while string stalling & we
could not work on string while apply TQ in string.**** Already worked on, Need to be checked ****
8. Chinese Centrifuge is out of service.
9. PDK pump truck data acquisition system is out of service.

Comment
HSE Issues:

1. Lack of T-Card System.


2. Lack of Stop Card System.
3. Lack of fall arrestor below Rig Floor (Around BOP area).
4. Shortage of PPE (SRP)
5. Lack of Fire Fighting system in camp area.
6. Lack of Anti Slippery@R/Floor around R.T.
7. Biological & chemical test were not implemented for pot water in caravans.

Comment
Casing stock:
------------------------

13 Jts13 3/8" CSG, 68#, L-80, BTC


3 Jts 13 3/8" CSG, 72#, L-80, BTC
13 Jts 13 5/8" CSG, 88.2#, P-110, BTC
2 x 1.5 m + 1 x 2.5 m + 2 x 4 m PUP Jt 13 3/8" CSG, 68#, L-80, BTC
1 x 6 ft + 1 x 10 ft + 1 x 15 ft PUP Jt 13 3/8" CSG, 72#, L-80, BTC
13 3/8" & 13 5/8" CSG DRIFT

Comment
>> BHA Components hours:
--------------------------------------------------------------------

>> 12 1/4" PDC bit: 0 hrs, TBR: 0 , 0 hr W/R


>> 8 1/2" DC : 0
>> 12 1/4" S.Stab: 0
>> 8" D.Jar: 0
>> 5" HWPD: 0

Comment
Casual labours:

SRP: 8 No.
OIEC: 6 No.

3/4
Daily Drilling Report
RR-026
12/8/2019
12/8/2019
General Remarks
Comment
Rec.:

>> 67.5 Tons Ferro-Bar F/Giah Chasb Ahwaz Warehouse

Send:

>> Back-load 1 No. 420 bbls solution tank

Request:

>> NIL

Out Standing:

>> NIL

4/4

Potrebbero piacerti anche