Date Origin Description Message Command Origin


2020-03-29 11:36:27.775 SATTENAPALLI / 400 kV / 402 TIE-1 / PROTECTION PANEL GROUP-B TRIP RELAY STATUS RESET
2020-03-29 11:36:27.198 SATTENAPALLI / 400 kV / 402 TIE-1 / PROTECTION PANEL GROUP-A TRIP RELAY STATUS RESET
2020-03-29 11:36:26.349 SATTENAPALLI / 400 kV / 402 TIE-1 / PROTECTION PANEL TRIP RELAY 86B ORDER SENT RESET OWS2 / aptransco
2020-03-29 11:36:25.771 SATTENAPALLI / 400 kV / 402 TIE-1 / PROTECTION PANEL TRIP RELAY 86A ORDER SENT RESET OWS2 / aptransco
2020-03-29 11:36:17.422 SATTENAPALLI / 400 kV / 403 SSLM-I / 21M2_SYST TRIP REL 86B SUPERVISION STATUS HEALTHY
2020-03-29 11:36:17.389 SATTENAPALLI / 400 kV / 403 SSLM-I / PROTECTION PANEL GROUP-B TRIP RELAY STATUS RESET
2020-03-29 11:36:16.874 SATTENAPALLI / 400 kV / 403 SSLM-I / PROTECTION PANEL GROUP-A TRIP RELAY STATUS RESET
2020-03-29 11:36:15.709 SATTENAPALLI / 400 kV / 403 SSLM-I / PROTECTION PANEL TRIP RELAY 86B ORDER SENT RESET OWS2 / aptransco
2020-03-29 11:36:15.288 SATTENAPALLI / 400 kV / 403 SSLM-I / PROTECTION PANEL TRIP RELAY 86A ORDER SENT RESET OWS2 / aptransco
2020-03-29 11:29:56.083 SUPERVISION / HMI / OWS2 STATUS aptransco CLEARED ALL ALARMS OWS2
2020-03-29 11:29:54.991 SUPERVISION / HMI / OWS2 STATUS aptransco ACKNOWLEDGED ALL ALARMS OWS2
2020-03-29 11:29:40.114 SATTENAPALLI / 400 kV / 403 SSLM-I / 79_SYST A/R LOCKING SET
2020-03-29 11:29:38.931 SATTENAPALLI / 400 kV / 403 SSLM-I / MEASUREMENT ACTIVE POWER Low 0.000279
2020-03-29 11:29:38.931 SATTENAPALLI / 400 kV / 403 SSLM-I / MEASUREMENT R PHASE VOLTAGE LowLow 0.251103
2020-03-29 11:29:38.931 SATTENAPALLI / 400 kV / 403 SSLM-I / MEASUREMENT B-R RMS VOLTAGE LowLow 0.258392
2020-03-29 11:29:38.931 SATTENAPALLI / 400 kV / 403 SSLM-I / MEASUREMENT Y-B RMS VOLTAGE LowLow 0.195375
2020-03-29 11:29:38.931 SATTENAPALLI / 400 kV / 403 SSLM-I / MEASUREMENT Y PHASE VOLTAGE LowLow 0.238384
2020-03-29 11:29:38.931 SATTENAPALLI / 400 kV / 403 SSLM-I / MEASUREMENT R-Y RMS VOLTAGE LowLowLow 0.175996
2020-03-29 11:29:38.931 SATTENAPALLI / 400 kV / 403 SSLM-I / MEASUREMENT B PHASE VOLTAGE LowLow 0.252139
2020-03-29 11:29:38.510 SATTENAPALLI / 400 kV / 406 SSLM-II / MEASUREMENT R-Y RMS VOLTAGE LowLowLow 0.180427
2020-03-29 11:29:38.114 SBUS / BCU_403 / Modbus / SEC_PREM / SPS Communication with the IED SPS Communication with the IED FAULTY
2020-03-29 11:29:37.684 SATTENAPALLI / 400 kV / 403 SSLM-I / 21M2_SYST FAULT DISTANCE Normal 52.39349
2020-03-29 11:29:37.548 SATTENAPALLI / 400 kV / 402 TIE-1 / 79_SYST LOCKOUT_SPS RESET
2020-03-29 11:29:35.941 SATTENAPALLI / 400 kV / 423 TIE-8 / MEASUREMENT RUNNING VOLTAGE-1 Normal 0.610398
2020-03-29 11:29:35.591 SATTENAPALLI / 400 kV / 403 SSLM-I / 21M1_PROT ZONE-2 R-PH PROTECTION RESET
2020-03-29 11:29:35.591 SATTENAPALLI / 400 kV / 403 SSLM-I / 21M1_SYST TRIP REL 86A SUPERVISION STATUS HEALTHY
2020-03-29 11:29:35.591 SATTENAPALLI / 400 kV / 403 SSLM-I / 21M1_PROT ZONE-2 B-PH PROTECTION RESET
2020-03-29 11:29:35.591 SATTENAPALLI / 400 kV / 403 SSLM-I / 21M1_PROT ZONE-2 Y-PH PROTECTION RESET
2020-03-29 11:29:35.586 SATTENAPALLI / 400 kV / 403 SSLM-I / 21M1_SYST TRIP REL 86A SUPERVISION STATUS HEALTHY
2020-03-29 11:29:35.454 SATTENAPALLI / 400 kV / 408 TIE-3 / MEASUREMENT R PHASE VOLTAGE Normal 236.353363
2020-03-29 11:29:35.453 SATTENAPALLI / 400 kV / 414 TIE-5 / MEASUREMENT R PHASE VOLTAGE Normal 236.30513
2020-03-29 11:29:35.453 SATTENAPALLI / 400 kV / 411 TIE-4 / MEASUREMENT R PHASE VOLTAGE Normal 236.47467
2020-03-29 11:29:35.415 SATTENAPALLI / 400 kV / 417 TIE-6 / MEASUREMENT R PHASE VOLTAGE Normal 236.674652
2020-03-29 11:29:35.407 SATTENAPALLI / 400 kV / 402 TIE-1 / 79_PROT AR LOCK SET AUTOMATICBAY / AR_1PH_1SHOT_ISA
2020-03-29 11:29:35.393 SATTENAPALLI / 400 kV / 413 VIJAYAWADA / MEASUREMENT ACTIVE POWER Normal 32.221287
2020-03-29 11:29:35.393 SATTENAPALLI / 400 kV / 402 TIE-1 / MEASUREMENT R PHASE VOLTAGE Normal 236.981049
2020-03-29 11:29:35.391 SATTENAPALLI / 400 kV / BUS-1 SIGNALS / MEASUREMENT B PHASE VOLTAGE Normal 228.393661
2020-03-29 11:29:35.389 SATTENAPALLI / 400 kV / 402 TIE-1 / 79_SYST LOCKOUT_SPS SET
2020-03-29 11:29:35.354 SATTENAPALLI / 400 kV / 416 VEMAGIRI / MEASUREMENT B PHASE VOLTAGE Normal 226.895096
2020-03-29 11:29:35.333 SATTENAPALLI / 400 kV / 412 PODILI-II / MEASUREMENT B PHASE VOLTAGE Normal 224.34549
2020-03-29 11:29:35.314 SATTENAPALLI / 400 kV / 409 PODILI-I / MEASUREMENT B PHASE VOLTAGE Normal 223.762161
2020-03-29 11:29:35.314 SATTENAPALLI / 400 kV / 415 ICT-I HV / MEASUREMENT B PHASE VOLTAGE Normal 226.090561
2020-03-29 11:29:35.314 SATTENAPALLI / 400 kV / 401 VTPS-I / MEASUREMENT ACTIVE POWER Normal 46.831348
2020-03-29 11:29:35.314 SATTENAPALLI / 400 kV / 401 VTPS-I / MEASUREMENT B PHASE VOLTAGE Normal 223.942627
2020-03-29 11:29:35.314 SATTENAPALLI / 400 kV / 421 ICT-III HV / MEASUREMENT B PHASE VOLTAGE Normal 226.163116
2020-03-29 11:29:35.297 SATTENAPALLI / 400 kV / 403 SSLM-I / 21M1_PROT ZONE-2 Y-PH PROTECTION OPERATED
2020-03-29 11:29:35.297 SATTENAPALLI / 400 kV / 403 SSLM-I / 21M1_PROT ZONE-2 R-PH PROTECTION OPERATED
2020-03-29 11:29:35.297 SATTENAPALLI / 400 kV / 403 SSLM-I / 21M1_PROT ZONE-2 B-PH PROTECTION OPERATED
2020-03-29 11:29:35.297 SATTENAPALLI / 400 kV / 403 SSLM-I / 21M1_PROT ZONE-3 PROTECTION RESET
2020-03-29 11:29:35.294 SATTENAPALLI / 400 kV / 413 VIJAYAWADA / MEASUREMENT B PHASE VOLTAGE Normal 222.105881
2020-03-29 11:29:35.291 SATTENAPALLI / 400 kV / BUS-1 SIGNALS / MEASUREMENT B PHASE VOLTAGE Low 218.835571
2020-03-29 11:29:35.291 SATTENAPALLI / 400 kV / BUS-1 SIGNALS / MEASUREMENT R PHASE VOLTAGE Normal 239.351196
2020-03-29 11:29:35.254 SATTENAPALLI / 400 kV / 418 ICT-II HV / MEASUREMENT B PHASE VOLTAGE Normal 222.242249
2020-03-29 11:29:35.253 SATTENAPALLI / 400 kV / BUS-2 SIGNALS / MEASUREMENT B PHASE VOLTAGE Normal 222.445892
2020-03-29 11:29:35.243 SATTENAPALLI / 400 kV / 403 SSLM-I / 79_PROT INITIATION Y PHASE RESET
2020-03-29 11:29:35.240 SATTENAPALLI / 400 kV / 403 SSLM-I / 79_PROT INITIATION B PHASE RESET
2020-03-29 11:29:35.238 SATTENAPALLI / 400 kV / 403 SSLM-I / 79_PROT INITIATION R PHASE RESET

Page 1 Footer
Event List

Printed by aptransco on 2020-04-03 09:49:40

Date Origin Description Message Command Origin


2020-03-29 11:29:35.237 SATTENAPALLI / 400 kV / 402 TIE-1 / 79_PROT INITIATION Y-PHASE RESET
2020-03-29 11:29:35.235 SATTENAPALLI / 400 kV / 402 TIE-1 / 79_PROT INITIATION B-PHASE RESET
2020-03-29 11:29:35.234 SATTENAPALLI / 400 kV / 402 TIE-1 / 79_PROT INITIATION R-PHASE RESET
2020-03-29 11:29:35.193 SATTENAPALLI / 400 kV / 403 SSLM-I / PROTECTION PANEL DISTANCE PROTECTION RESET
2020-03-29 11:29:35.180 SATTENAPALLI / 400 kV / 403 SSLM-I / 21M1_PROT ZONE-3 PROTECTION OPERATED
2020-03-29 11:29:35.117 SATTENAPALLI / 400 kV / 403 SSLM-I / 79_SYST LOCKOUT_SPS RESET
2020-03-29 11:29:35.116 SATTENAPALLI / 400 kV / 403 SSLM-I / 79_SYST A/R LOCKING RESET
2020-03-29 11:29:35.100 SATTENAPALLI / 400 kV / 403 SSLM-I / 21M1_PROT ZONE-3 PROTECTION OPERATED
2020-03-29 11:29:35.097 SATTENAPALLI / 400 kV / 403 SSLM-I / PROTECTION PANEL GROUP-A TRIP RELAY STATUS OPERATED
2020-03-29 11:29:35.096 SATTENAPALLI / 400 kV / 402 TIE-1 / PROTECTION PANEL GROUP-A TRIP RELAY STATUS OPERATED
2020-03-29 11:29:35.095 SATTENAPALLI / 400 kV / 403 SSLM-I / 21M2_PROT ZONE-2 B-PH PROTECTION RESET
2020-03-29 11:29:35.095 SATTENAPALLI / 400 kV / 403 SSLM-I / 21M2_PROT ZONE-2 R-PH PROTECTION RESET
2020-03-29 11:29:35.095 SATTENAPALLI / 400 kV / 403 SSLM-I / 21M2_PROT ZONE-2 Y-PH PROTECTION RESET
2020-03-29 11:29:35.092 SATTENAPALLI / 400 kV / 403 SSLM-I / 79_SYST LOCKOUT_SPS SET
2020-03-29 11:29:35.092 SATTENAPALLI / 400 kV / 403 SSLM-I / 21M2_PROT ZONE-2 B-PH PROTECTION RESET
2020-03-29 11:29:35.092 SATTENAPALLI / 400 kV / 403 SSLM-I / PROTECTION PANEL DISTANCE PROTECTION OPERATED
2020-03-29 11:29:35.092 SATTENAPALLI / 400 kV / 403 SSLM-I / 79_SYST A/R LOCKING SET
2020-03-29 11:29:35.092 SATTENAPALLI / 400 kV / 403 SSLM-I / 21M2_PROT ZONE-2 Y-PH PROTECTION OPERATED
2020-03-29 11:29:35.092 SATTENAPALLI / 400 kV / 403 SSLM-I / 21M2_PROT ZONE-2 R-PH PROTECTION RESET
2020-03-29 11:29:35.091 SATTENAPALLI / 400 kV / 402 TIE-1 / CB 4-0252 CB POSITION OPEN PROCESS /
2020-03-29 11:29:35.091 SATTENAPALLI / 400 kV / 402 TIE-1 / CB 4-0252 R PHASE POSITION OPEN
2020-03-29 11:29:35.091 SATTENAPALLI / 400 kV / BUS-1 SIGNALS / MEASUREMENT Y PHASE VOLTAGE Normal 239.211441
2020-03-29 11:29:35.090 SATTENAPALLI / 400 kV / 403 SSLM-I / CB 4-0352 CB POSITION OPEN PROCESS /
2020-03-29 11:29:35.090 SATTENAPALLI / 400 kV / 403 SSLM-I / CB 4-0352 B PHASE POSITION OPEN
2020-03-29 11:29:35.089 SATTENAPALLI / 400 kV / 403 SSLM-I / CB 4-0352 R PHASE POSITION OPEN
2020-03-29 11:29:35.089 SATTENAPALLI / 400 kV / 403 SSLM-I / 21M1_SYST TRIP REL 86A SUPERVISION STATUS FAULTY
2020-03-29 11:29:35.089 SATTENAPALLI / 400 kV / 402 TIE-1 / CB 4-0252 Y PHASE POSITION OPEN
2020-03-29 11:29:35.089 SATTENAPALLI / 400 kV / 402 TIE-1 / CB 4-0252 B PHASE POSITION OPEN
2020-03-29 11:29:35.088 SATTENAPALLI / 400 kV / 403 SSLM-I / CB 4-0352 Y PHASE POSITION OPEN
2020-03-29 11:29:35.086 SATTENAPALLI / 400 kV / 403 SSLM-I / 21M1_SYST TRIP REL 86A SUPERVISION STATUS FAULTY
2020-03-29 11:29:35.081 SATTENAPALLI / 400 kV / 403 SSLM-I / 21M1_LED ZONE-2 PROTN LED OPERATED
2020-03-29 11:29:35.081 SATTENAPALLI / 400 kV / 403 SSLM-I / 21M1_LED B-PH PROTN LED OPERATED
2020-03-29 11:29:35.081 SATTENAPALLI / 400 kV / 403 SSLM-I / 21M1_LED Y-PH PROTN LED OPERATED
2020-03-29 11:29:35.076 SATTENAPALLI / 400 kV / 401 VTPS-I / 21M2_SYST TRIP REL 86B SUPERVISION STATUS HEALTHY
2020-03-29 11:29:35.065 SATTENAPALLI / 400 kV / 401 VTPS-I / 21M2_SYST TRIP REL 86B SUPERVISION STATUS FAULTY
2020-03-29 11:29:35.060 SATTENAPALLI / 400 kV / 402 TIE-1 / 79_PROT PRIORITY HOLD SET
2020-03-29 11:29:35.055 SATTENAPALLI / 400 kV / 403 SSLM-I / 79_SYST A/R READY RESET
2020-03-29 11:29:35.054 SATTENAPALLI / 400 kV / 402 TIE-1 / PROTECTION PANEL GROUP-B TRIP RELAY STATUS OPERATED
2020-03-29 11:29:35.054 SATTENAPALLI / 400 kV / 403 SSLM-I / PROTECTION PANEL GROUP-B TRIP RELAY STATUS OPERATED
2020-03-29 11:29:35.053 SATTENAPALLI / 400 kV / BUS-2 SIGNALS / MEASUREMENT B PHASE VOLTAGE Low 219.374847
2020-03-29 11:29:35.052 SATTENAPALLI / 400 kV / 403 SSLM-I / 79_PROT INITIATION B PHASE SET
2020-03-29 11:29:35.051 SATTENAPALLI / 400 kV / 403 SSLM-I / 79_PROT INITIATION R PHASE SET
2020-03-29 11:29:35.051 SATTENAPALLI / 400 kV / 402 TIE-1 / 79_PROT INITIATION Y-PHASE SET
2020-03-29 11:29:35.051 SATTENAPALLI / 400 kV / 403 SSLM-I / 79_PROT INITIATION Y PHASE SET
2020-03-29 11:29:35.051 SATTENAPALLI / 400 kV / 402 TIE-1 / 79_PROT INITIATION B-PHASE SET
2020-03-29 11:29:35.050 SATTENAPALLI / 400 kV / 402 TIE-1 / 79_PROT INITIATION R-PHASE SET
2020-03-29 11:29:35.048 SATTENAPALLI / 400 kV / 403 SSLM-I / 21M2_SYST TRIP REL 86B SUPERVISION STATUS FAULTY
2020-03-29 11:29:35.047 SATTENAPALLI / 400 kV / 403 SSLM-I / 21M2_LED Y-PH PROTN LED OPERATED
2020-03-29 11:29:35.047 SATTENAPALLI / 400 kV / 403 SSLM-I / 21M2_PROT ZONE-2 B-PH PROTECTION OPERATED
2020-03-29 11:29:35.047 SATTENAPALLI / 400 kV / 403 SSLM-I / 21M2_LED B PH LED OPERATED
2020-03-29 11:29:35.047 SATTENAPALLI / 400 kV / 403 SSLM-I / 21M2_PROT ZONE-2 Y-PH PROTECTION OPERATED
2020-03-29 11:29:35.047 SATTENAPALLI / 400 kV / 403 SSLM-I / 21M2_PROT ZONE-2 R-PH PROTECTION RESET
2020-03-29 11:29:35.044 SATTENAPALLI / 400 kV / 403 SSLM-I / 21M2_LED ZONE-2 PROTN LED OPERATED
2020-03-29 11:29:35.015 SATTENAPALLI / 400 kV / 401 VTPS-I / MEASUREMENT ACTIVE POWER Low 9.848934
2020-03-29 11:29:35.014 SATTENAPALLI / 400 kV / 415 ICT-I HV / MEASUREMENT B PHASE VOLTAGE Low 219.222412
2020-03-29 11:29:35.014 SATTENAPALLI / 400 kV / 421 ICT-III HV / MEASUREMENT B PHASE VOLTAGE Low 219.399948
2020-03-29 11:29:34.992 SATTENAPALLI / 400 kV / BUS-1 SIGNALS / MEASUREMENT Y PHASE VOLTAGE High 242.820084

Page 2 Footer
Event List

Printed by aptransco on 2020-04-03 09:49:40

Date Origin Description Message Command Origin


2020-03-29 11:29:34.954 SATTENAPALLI / 400 kV / 418 ICT-II HV / MEASUREMENT B PHASE VOLTAGE Low 219.394165
2020-03-29 11:29:34.894 SATTENAPALLI / 400 kV / 413 VIJAYAWADA / MEASUREMENT ACTIVE POWER Low 5.201652
2020-03-29 11:29:34.892 SATTENAPALLI / 400 kV / BUS-1 SIGNALS / MEASUREMENT B PHASE VOLTAGE LowLow 204.272751
2020-03-29 11:29:34.855 SATTENAPALLI / 400 kV / 408 TIE-3 / MEASUREMENT R PHASE VOLTAGE High 243.70546
2020-03-29 11:29:34.854 SATTENAPALLI / 400 kV / 414 TIE-5 / MEASUREMENT R PHASE VOLTAGE High 243.51889
2020-03-29 11:29:34.854 SATTENAPALLI / 400 kV / 411 TIE-4 / MEASUREMENT R PHASE VOLTAGE High 243.990295
2020-03-29 11:29:34.834 SATTENAPALLI / 400 kV / 412 PODILI-II / MEASUREMENT B PHASE VOLTAGE Low 213.543747
2020-03-29 11:29:34.815 SATTENAPALLI / 400 kV / 417 TIE-6 / MEASUREMENT R PHASE VOLTAGE High 243.029221
2020-03-29 11:29:34.815 SATTENAPALLI / 400 kV / 401 VTPS-I / MEASUREMENT B PHASE VOLTAGE Low 215.584717
2020-03-29 11:29:34.814 SATTENAPALLI / 400 kV / 409 PODILI-I / MEASUREMENT B PHASE VOLTAGE Low 215.387085
2020-03-29 11:29:34.795 SATTENAPALLI / 400 kV / 402 TIE-1 / MEASUREMENT R PHASE VOLTAGE High 242.593201
2020-03-29 11:29:34.794 SATTENAPALLI / 400 kV / 413 VIJAYAWADA / MEASUREMENT B PHASE VOLTAGE Low 216.033905
2020-03-29 11:29:34.792 SATTENAPALLI / 400 kV / BUS-1 SIGNALS / MEASUREMENT R PHASE VOLTAGE High 243.125458
2020-03-29 11:29:34.755 SATTENAPALLI / 400 kV / 416 VEMAGIRI / MEASUREMENT B PHASE VOLTAGE Low 218.410599
2020-03-29 11:29:34.713 SATTENAPALLI / 400 kV / 406 SSLM-II / MEASUREMENT R-Y RMS VOLTAGE Normal 0
2020-03-29 11:29:34.692 SATTENAPALLI / 400 kV / BUS-1 SIGNALS / MEASUREMENT B PHASE VOLTAGE Low 219.231369
2020-03-29 11:29:34.635 SATTENAPALLI / 400 kV / 403 SSLM-I / MEASUREMENT ACTIVE POWER Normal 40.653679
2020-03-29 11:29:34.568 SATTENAPALLI / 400 kV / 403 SSLM-I / 21M2_SYST CARRIER CHANNEL-1/2 RECEIVE STATUS RESET
2020-03-29 11:29:34.501 SATTENAPALLI / 400 kV / 403 SSLM-I / 21M2_SYST CARRIER CHANNEL-1/2 RECEIVE STATUS RECEIVED
2020-03-29 11:29:27.910 SATTENAPALLI / 400 kV / 403 SSLM-I / 21M1_PROT ZONE-2 B-PH PROTECTION RESET
2020-03-29 11:29:27.879 SATTENAPALLI / 400 kV / 403 SSLM-I / 21M1_PROT ZONE-2 R-PH PROTECTION RESET
2020-03-29 11:29:27.879 SATTENAPALLI / 400 kV / 403 SSLM-I / 21M1_PROT ZONE-2 Y-PH PROTECTION RESET
2020-03-29 11:29:27.614 SATTENAPALLI / 400 kV / 403 SSLM-I / 21M1_PROT ZONE-2 B-PH PROTECTION OPERATED
2020-03-29 11:29:27.583 SATTENAPALLI / 400 kV / 403 SSLM-I / 21M1_PROT ZONE-2 R-PH PROTECTION OPERATED
2020-03-29 11:29:27.583 SATTENAPALLI / 400 kV / 403 SSLM-I / 21M1_PROT ZONE-2 Y-PH PROTECTION OPERATED
2020-03-29 11:29:24.627 SATTENAPALLI / 400 kV / 403 SSLM-I / 21M1_PROT ZONE-2 Y-PH PROTECTION RESET
2020-03-29 11:29:24.627 SATTENAPALLI / 400 kV / 403 SSLM-I / 21M1_PROT ZONE-2 B-PH PROTECTION RESET
2020-03-29 11:29:24.611 SATTENAPALLI / 400 kV / 403 SSLM-I / 21M1_PROT ZONE-2 R-PH PROTECTION RESET
2020-03-29 11:29:24.346 SATTENAPALLI / 400 kV / 403 SSLM-I / 21M1_PROT ZONE-2 Y-PH PROTECTION OPERATED
2020-03-29 11:29:24.346 SATTENAPALLI / 400 kV / 403 SSLM-I / 21M1_PROT ZONE-2 B-PH PROTECTION OPERATED
2020-03-29 11:29:24.315 SATTENAPALLI / 400 kV / 403 SSLM-I / 21M1_PROT ZONE-2 R-PH PROTECTION OPERATED