Sei sulla pagina 1di 2

BIRLA INSTITUTE OF TECHNOLOGY & SCIENCE, PILANI

DEPARTMENT OF CIVIL ENGINEERING


COURSE PROJECT – CONSTRUCTION PLANNING & TECHNOLOGY
TEMPLATE TO CAPTURE BASIC DETAILS

BASIC DETAILS (To be Filled)


Component: Course Project
Course Name: Construction Planning & Technology
Course Code CE F242
Course Component: Course Project
Weight: 30 marks (15%)
Nature of the project Software Based (Revit/MS Project/Prima Vera)
Name of the project BEAU MONDE
Location (City) of plot MUMBAI
Seismic Zone III
Basic Wind Speed 10.6 miles per hour

Note: Seismic Zone can be referred from IS: 1893 – 2016 and Basic Wind Speed can
be obtained from IS: 875 – Part 3 - 2015.

Preliminary Details (To be Filled)


Total Plot size (in sq.m) 548.6 (28.69m*19.12m)
Total carpet area (in sq.m) 323.67
Total height of the building (in m) 27.432
No. of floors 8
Floor Space Index (FSI) 0.72
Type of building (RCC or steel) RCC
Classification of building Residential
Type of Roof (Accessible/Inaccessible) Accessible
Front Setback 10 m
Is the plot located in return frontage? (Yes/No) NO
Estimated duration of the project (in months) 12.2
Estimated cost of construction (in lakhs) Rs. 354.64 lakhs

List of codes referred for this project IS: 1893 – 2016, IS: 875 – Part
3 - 2015,

List of softwares used Autodesk Revit, MS Excel,MS Project,


MS Word
Key facilities planned Modular kitchen, Servant room,
Study room, Parking
List the construction materials used 1. Plaster
2. Putty
3. Paint
4. Whitewash
5. Bricks

6. Glass
7. Concrete
8. Teak/Wood
9. Steel
10. Cement

GROUP DETAILS (To be filled)


Student Id. No. Name of the student Role
2017B4A20750P Rutuvi Narang Costing and Estimation,
Resource Allocation
2017B4A21194P Madhumitha Muralidharan Revit Handling
2017B1A20400P Garima Dhar Cost Estimation, Resource
Allocation
2017B4A20666P Saahil Dhaka Revit Handling
2017B3A20735P Ritwik Srivastava Revit Handling
2017B3A20690P Yatharth Agarwal Project planning and Costing
2017B2A20993P Nimma Sathvik Reddy Project Planning and Costing
2017B1A20382P Ayush Kumar Cost Estimation, Resource
Allocation

Potrebbero piacerti anche