PROJECT QUALITY ASSURANCE PLAN
CHECK LIST FOR REINFORCEMENT
Single Line Dual Gauge Railway Track from Dohazari to Cox’s Bazar
ICB No: BR/PD/DCP/ADB/ICB/2016/WD1:LOT-1
EMPLOYER: CONSULTANT: CONTRACTOR:
BANGLADESH RAILWAY SMEC, CANARAIL, SYSTRA, ACE-JV with STRATEGI CREC-TOMA JV
Spec. Item : High Yield Deformed Steel Reinforcement Bar Structure Identification : Pile Cap of A2
Pay. Item : D-7.1 Name of Bridge : BR - 07
Drg No : DCRP/LOT-01/BR-07/RD/A2/14 Location : CH. 03+475
7 Long directional face bar 7 16 10 2 20 1200 1200 11.650 233.000 1.580 368.200
9250
300
Near face vertical bar at
10 5 16 7800.00 150 53 1 53 300 5685 6.285 333.110 1.580 526.400
stem wall
Conclusion:
INSPECTED BY: CREC-TOMAJV INSPECTED BY: ENGINEER IN CHARGE ON SITE
SIGNATURE: SIGNATURE:
NAME: NAME:
DATE: DATE:
Form No:DCRP/CTJV/Q/QAP01/AP-54-REV.D Page 2 of 3
PROJECT QUALITY ASSURANCE PLAN
CHECK LIST FOR REINFORCEMENT
Single Line Dual Gauge Railway Track from Dohazari to Cox’s Bazar
ICB No: BR/PD/DCP/ADB/ICB/2016/WD1:LOT-1
EMPLOYER: CONSULTANT: CONTRACTOR:
BANGLADESH RAILWAY SMEC, CANARAIL, SYSTRA, ACE-JV with STRATEGI CREC-TOMA JV
Spec. Item : High Yield Deformed Steel Reinforcement Bar Structure Identification : Pile Cap of A2
Pay. Item : D-7.1 Name of Bridge : BR - 07
Drg No : DCRP/LOT-01/BR-07/RD/A2/14 Location : CH. 03+475
15
Conclusion:
INSPECTED BY: CREC-TOMAJV INSPECTED BY: ENGINEER IN CHARGE ON SITE
SIGNATURE: SIGNATURE:
NAME: NAME:
DATE: DATE:
Form No:DCRP/CTJV/Q/QAP01/AP-54-REV.D Page 3 of 3