PROJECT NAME : ANSA Elevated Water Tank CONTRACTOR : L.R. Joson Drilling Water Management Systems
LOCATION : ANSA Utility Lot 18
CLIENT : Manila Water

REF. NO. : BUILDING IDENTIFICATION :


DATE REQUESTED : 29-Feb-20 MAT FOUNDATION
TRUCK ARRIVAL CONTENT CONCRETE CONCRETE POURING ACTUAL GRAVEL SAMPLE SAMPLE
STRUCTURE MARK LOCATION
BODY NO. TIME (m³) STRENGTH (Mpa) START END SLUMP SIZE TAKEN I.D. NO.
35 1:15 5.50 4000 psi 1:15 1:18 MAT FOOTING Utility Lot 18 5.5 inches 3/4 inches NO N/A
36 1:15 5.50 4000 psi 1:15 1:18 MAT FOOTING Utility Lot 18 5.5 inches 3/4 inches NO N/A
37 1:24 5.50 4000 psi 1:24 1:27 MAT FOOTING Utility Lot 18 5.5 inches 3/4 inches NO N/A
38 1:25 5.50 4000 psi 1:25 1:28 MAT FOOTING Utility Lot 18 5.5 inches 3/4 inches NO N/A
39 1:34 5.50 4000 psi 1:34 1:37 MAT FOOTING Utility Lot 18 5.5 inches 3/4 inches NO N/A
40 1:34 5.50 4000 psi 1:34 1:37 MAT FOOTING Utility Lot 18 5.5 inches 3/4 inches NO N/A
41 1:44 5.50 4000 psi 1:44 1:46 MAT FOOTING Utility Lot 18 5.5 inches 3/4 inches NO N/A
42 2:01 5.50 4000 psi 2:01 2:02 MAT FOOTING Utility Lot 18 5.5 inches 3/4 inches NO N/A
43 2:21 5.50 4000 psi 2:21 2:23 MAT FOOTING Utility Lot 18 5.5 inches 3/4 inches NO N/A
44 2:28 3.50 4000 psi 2:28 2:31 MAT FOOTING Utility Lot 18 5.5 inches 3/4 inches NO N/A

PREPARED BY: CONFORME: NOTED BY:

John Lee B. Pueyo


CONTRACTOR'S SITE ENGINEER PMQS PROJECT INSPECTOR PMQS CONSTRUCTION MANAGER