Sei sulla pagina 1di 29

DESIGN CRITERIA AND STANDARDS

STRUCTURE DESIGN CODES AND GUIDELINES

LOADING SPECIFICATIONS

SEISMIC DESIGN

MIN : d
LAP OFFSET
MAX : d + 3mm
MATERIALS
d
1. CONCRETE
MIN = 12d 18 d MIN
28 DAY CYLINDER MAXIMUM SIZE OF DIAMETER =
STRENGTH COARSE AGGREGATE MAX = 15 d 30 d MAX
CLASS
MPa PSI MM (8) HOOKS AND BENDS
A 21 3000 38 DIMENSIONS OF 90-DEGREE AND 180-DEGREE HOOKS
AA 28 4000 20
AA1 28 4000 25 d d
AA2 28 4000 20
PP 41 6000 20 D 180° HOOK
50 90° HOOK
LEAN CONC. 17 2500 4 d OR
NON SHRINK
41 5900 20 63mm MIN
CONCRETE PIN DIAMETER = D = 6d FOR Ø10 THRU Ø25
D = 8d FOR Ø28, Ø32 AND Ø36

DIMENSIONS FOR STIRRUPS AND CROSSTIE HOOKS


2. REINFORCING STEEL 6 d or 76mm MIN FOR Ø16 OR SMALLER BARS
12d FOR Ø20 & Ø25 BARS

IN
or
M
6d
m
m
76
90° HOOK D
SUNDRY NOTES d D
(FOR CROSSTIES
ONLY) 135° HOOK
PIN DIAMETER = D = 6d FOR Ø10 THRU Ø25
D = 8d FOR Ø28, Ø32 AND Ø36

CONSTRUCTION

A
G5

NOTE:
PURSUANT TO ITEM 6.4 OF ANNEX 'B' OF THE REVISED IMPLEMENTING RULES AND
REGULATION OF R.A. 9184, THE CONSTRUCTION SUPERVISION CONSULTANT SHALL BE
RESPONSIBLE FOR VERIFICATION AND CHECKING OF QUANTITIES AND QUALITIES OF
WORK ACCOMPLISHED BY THE CONTRACTOR AS AGAINST THE APPROVED PLANS,
SPECIFICATIONS AND PROGRAM OF WORKS.

THE CONSTRUCTION SUPERVISION CONSULTANT SHALL BE HELD FULLY


RESPONSIBL EFOR THE FAILURE OF THE FACILITIES/STRUCTURES DUE TO POOR QUALITY
OF WORKMANSHIP ACCOMPLISHED BY THE CONTRACTOR EXCEPT FOR THOSE FAILURE
DUE TO FAULTY DESIGN AS PER APPROVED DETAILED ENGINEERING DESIGN PLAN. THE
APPROVAL BY THE AUTHORIZED GOVERNMENT OFFICIALS OF "AS-STAKED", REVISED OR
"AS-BUILT" PLANS UNDERTAKEN/CHECKED BY CONSTRUCTION SUPERVISION
CONSULTANTS NEITHER DIMINISHES THE RESPONSIBILITY OF THE LATTER FOR THE
TECHNICAL INTEGRITY OF THE SAID PLANS
NOR TRANSFER ANY PART OF THAT RESPONSIBILITY TO THE APPROVING OFFICIALS. N
HYUN IL SONG
PROJECT MANAGER

kunhwa

ILSUNG REPUBLIC OF THE PHILIPPINES 221


BAE YOUNG KIL HYUN IL SONG DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS TERESITA V. BAUZON BLESILDA A. RAMOS SHARIF MADSMO H. HASIM LEA N. DELFINADO EMIL K. SADAIN, CESO I
MANILA 304
DESIGN SCIENCE INCORPORATED

UPMO - RMC II
N

kunhwa

ILSUNG REPUBLIC OF THE PHILIPPINES 222


BAE YOUNG KIL HYUN IL SONG DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS TERESITA V. BAUZON BLESILDA A. RAMOS SHARIF MADSMO H. HASIM LEA N. DELFINADO EMIL K. SADAIN, CESO I
MANILA 304
DESIGN SCIENCE INCORPORATED

UPMO - RMC II
AASHTO GIRDER TYPE IV-B

PREPARED: SUBMITTED: PROJECT NAME AND LOCATION: CHECKED: REVIEWED: RECOMMENDED: APPROVED: SHEET NO.
SAMAR PACIFIC COASTAL ROAD PROJECT PROVINCES
kunhwa OF NORTHERN AND EASTERN SAMAR REGION VIII
Engineering & Consulting

ILSUNG
CONSTRUCTION CO., LTD
DONGSUNG
ENGINEERING
SHEET CONTENT: REPUBLIC OF THE PHILIPPINES 223
CONTRACTOR
BAE YOUNG KIL HYUN IL SONG DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS TERESITA V. BAUZON BLESILDA A. RAMOS SHARIF MADSMO H. HASIM LEA N. DELFINADO EMIL K. SADAIN, CESO I
PROJECT MANAGER PROJECT MANAGER
GENERAL PLAN & ELEVATION MANILA PROJECT MANAGER OIC, CHIEF, BRIDGE DIVISION PROJECT DIRECTOR DIRECTOR IV, BUREAU OF DESIGN ASSISTANT SECRETARY FOR UNDERSECRETARY FOR UPMO 304
DESIGN SCIENCE INCORPORATED BUREAU OF DESIGN Roads Management Cluster II Multilateral TECHNICAL SERVICES OPERATIONS AND TECHNICAL SERVICES
(SIMORA) UPMO - RMC II
DATE: DATE: DATE: DATE: DATE: DATE: DATE: DATE:
NOTE:
PURSUANT TO ITEM 6.4 OF ANNEX 'B' OF THE REVISED IMPLEMENTING RULES AND
REGULATION OF R.A. 9184, THE CONSTRUCTION SUPERVISION CONSULTANT SHALL BE
RESPONSIBLE FOR VERIFICATION AND CHECKING OF QUANTITIES AND QUALITIES OF
WORK ACCOMPLISHED BY THE CONTRACTOR AS AGAINST THE APPROVED PLANS,
SPECIFICATIONS AND PROGRAM OF WORKS.

THE CONSTRUCTION SUPERVISION CONSULTANT SHALL BE HELD FULLY


RESPONSIBL EFOR THE FAILURE OF THE FACILITIES/STRUCTURES DUE TO POOR QUALITY
OF WORKMANSHIP ACCOMPLISHED BY THE CONTRACTOR EXCEPT FOR THOSE FAILURE
DUE TO FAULTY DESIGN AS PER APPROVED DETAILED ENGINEERING DESIGN PLAN. THE
APPROVAL BY THE AUTHORIZED GOVERNMENT OFFICIALS OF "AS-STAKED", REVISED OR
"AS-BUILT" PLANS UNDERTAKEN/CHECKED BY CONSTRUCTION SUPERVISION
CONSULTANTS NEITHER DIMINISHES THE RESPONSIBILITY OF THE LATTER FOR THE
TECHNICAL INTEGRITY OF THE SAID PLANS
NOR TRANSFER ANY PART OF THAT RESPONSIBILITY TO THE APPROVING OFFICIALS.

HYUN IL SONG
PROJECT MANAGER

PREPARED: SUBMITTED: PROJECT NAME AND LOCATION: CHECKED: REVIEWED: RECOMMENDED: APPROVED: SHEET NO.
SAMAR PACIFIC COASTAL ROAD PROJECT PROVINCES
kunhwa OF NORTHERN AND EASTERN SAMAR REGION VIII
Engineering & Consulting

ILSUNG
CONSTRUCTION CO., LTD
DONGSUNG
ENGINEERING
SHEET CONTENT: REPUBLIC OF THE PHILIPPINES 224
CONTRACTOR
BAE YOUNG KIL HYUN IL SONG DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS TERESITA V. BAUZON BLESILDA A. RAMOS SHARIF MADSMO H. HASIM LEA N. DELFINADO EMIL K. SADAIN, CESO I
PROJECT MANAGER PROJECT MANAGER
ABUTMENT A & B DETAIL DIMENSION & SECTIONS MANILA PROJECT MANAGER OIC, CHIEF, BRIDGE DIVISION PROJECT DIRECTOR DIRECTOR IV, BUREAU OF DESIGN ASSISTANT SECRETARY FOR UNDERSECRETARY FOR UPMO 304
DESIGN SCIENCE INCORPORATED BUREAU OF DESIGN Roads Management Cluster II Multilateral TECHNICAL SERVICES OPERATIONS AND TECHNICAL SERVICES
(SIMORA) UPMO - RMC II
DATE: DATE: DATE: DATE: DATE: DATE: DATE: DATE:
NOTE:
PURSUANT TO ITEM 6.4 OF ANNEX 'B' OF THE REVISED IMPLEMENTING RULES AND
REGULATION OF R.A. 9184, THE CONSTRUCTION SUPERVISION CONSULTANT SHALL BE
RESPONSIBLE FOR VERIFICATION AND CHECKING OF QUANTITIES AND QUALITIES OF
WORK ACCOMPLISHED BY THE CONTRACTOR AS AGAINST THE APPROVED PLANS,
SPECIFICATIONS AND PROGRAM OF WORKS.

THE CONSTRUCTION SUPERVISION CONSULTANT SHALL BE HELD FULLY


RESPONSIBL EFOR THE FAILURE OF THE FACILITIES/STRUCTURES DUE TO POOR QUALITY
OF WORKMANSHIP ACCOMPLISHED BY THE CONTRACTOR EXCEPT FOR THOSE FAILURE
DUE TO FAULTY DESIGN AS PER APPROVED DETAILED ENGINEERING DESIGN PLAN. THE
APPROVAL BY THE AUTHORIZED GOVERNMENT OFFICIALS OF "AS-STAKED", REVISED OR
"AS-BUILT" PLANS UNDERTAKEN/CHECKED BY CONSTRUCTION SUPERVISION
CONSULTANTS NEITHER DIMINISHES THE RESPONSIBILITY OF THE LATTER FOR THE
TECHNICAL INTEGRITY OF THE SAID PLANS
NOR TRANSFER ANY PART OF THAT RESPONSIBILITY TO THE APPROVING OFFICIALS.

HYUN IL SONG
PROJECT MANAGER

kunhwa

ILSUNG REPUBLIC OF THE PHILIPPINES 225


BAE YOUNG KIL HYUN IL SONG DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS TERESITA V. BAUZON BLESILDA A. RAMOS SHARIF MADSMO H. HASIM LEA N. DELFINADO EMIL K. SADAIN, CESO I
MANILA 304
DESIGN SCIENCE INCORPORATED

UPMO - RMC II
NOTE:
PURSUANT TO ITEM 6.4 OF ANNEX 'B' OF THE REVISED IMPLEMENTING RULES AND
REGULATION OF R.A. 9184, THE CONSTRUCTION SUPERVISION CONSULTANT SHALL BE
RESPONSIBLE FOR VERIFICATION AND CHECKING OF QUANTITIES AND QUALITIES OF
WORK ACCOMPLISHED BY THE CONTRACTOR AS AGAINST THE APPROVED PLANS,
SPECIFICATIONS AND PROGRAM OF WORKS.

THE CONSTRUCTION SUPERVISION CONSULTANT SHALL BE HELD FULLY


RESPONSIBL EFOR THE FAILURE OF THE FACILITIES/STRUCTURES DUE TO POOR QUALITY
OF WORKMANSHIP ACCOMPLISHED BY THE CONTRACTOR EXCEPT FOR THOSE FAILURE
DUE TO FAULTY DESIGN AS PER APPROVED DETAILED ENGINEERING DESIGN PLAN. THE
APPROVAL BY THE AUTHORIZED GOVERNMENT OFFICIALS OF "AS-STAKED", REVISED OR
"AS-BUILT" PLANS UNDERTAKEN/CHECKED BY CONSTRUCTION SUPERVISION
CONSULTANTS NEITHER DIMINISHES THE RESPONSIBILITY OF THE LATTER FOR THE
TECHNICAL INTEGRITY OF THE SAID PLANS
NOR TRANSFER ANY PART OF THAT RESPONSIBILITY TO THE APPROVING OFFICIALS.

HYUN IL SONG
PROJECT MANAGER

kunhwa

ILSUNG REPUBLIC OF THE PHILIPPINES 226


BAE YOUNG KIL HYUN IL SONG DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS TERESITA V. BAUZON BLESILDA A. RAMOS SHARIF MADSMO H. HASIM LEA N. DELFINADO EMIL K. SADAIN, CESO I
MANILA 304
DESIGN SCIENCE INCORPORATED

UPMO - RMC II
NOTE:
PURSUANT TO ITEM 6.4 OF ANNEX 'B' OF THE REVISED IMPLEMENTING RULES AND
REGULATION OF R.A. 9184, THE CONSTRUCTION SUPERVISION CONSULTANT SHALL BE
RESPONSIBLE FOR VERIFICATION AND CHECKING OF QUANTITIES AND QUALITIES OF
WORK ACCOMPLISHED BY THE CONTRACTOR AS AGAINST THE APPROVED PLANS,
SPECIFICATIONS AND PROGRAM OF WORKS.

THE CONSTRUCTION SUPERVISION CONSULTANT SHALL BE HELD FULLY


RESPONSIBL EFOR THE FAILURE OF THE FACILITIES/STRUCTURES DUE TO POOR QUALITY
OF WORKMANSHIP ACCOMPLISHED BY THE CONTRACTOR EXCEPT FOR THOSE FAILURE
DUE TO FAULTY DESIGN AS PER APPROVED DETAILED ENGINEERING DESIGN PLAN. THE
APPROVAL BY THE AUTHORIZED GOVERNMENT OFFICIALS OF "AS-STAKED", REVISED OR
"AS-BUILT" PLANS UNDERTAKEN/CHECKED BY CONSTRUCTION SUPERVISION
CONSULTANTS NEITHER DIMINISHES THE RESPONSIBILITY OF THE LATTER FOR THE
TECHNICAL INTEGRITY OF THE SAID PLANS
NOR TRANSFER ANY PART OF THAT RESPONSIBILITY TO THE APPROVING OFFICIALS.

HYUN IL SONG
PROJECT MANAGER

kunhwa

ILSUNG REPUBLIC OF THE PHILIPPINES 227


BAE YOUNG KIL HYUN IL SONG DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS TERESITA V. BAUZON BLESILDA A. RAMOS SHARIF MADSMO H. HASIM LEA N. DELFINADO EMIL K. SADAIN, CESO I
MANILA 304
DESIGN SCIENCE INCORPORATED

UPMO - RMC II
NOTE:
PURSUANT TO ITEM 6.4 OF ANNEX 'B' OF THE REVISED IMPLEMENTING RULES AND
REGULATION OF R.A. 9184, THE CONSTRUCTION SUPERVISION CONSULTANT SHALL BE
RESPONSIBLE FOR VERIFICATION AND CHECKING OF QUANTITIES AND QUALITIES OF
WORK ACCOMPLISHED BY THE CONTRACTOR AS AGAINST THE APPROVED PLANS,
SPECIFICATIONS AND PROGRAM OF WORKS.

THE CONSTRUCTION SUPERVISION CONSULTANT SHALL BE HELD FULLY


RESPONSIBL EFOR THE FAILURE OF THE FACILITIES/STRUCTURES DUE TO POOR QUALITY
OF WORKMANSHIP ACCOMPLISHED BY THE CONTRACTOR EXCEPT FOR THOSE FAILURE
DUE TO FAULTY DESIGN AS PER APPROVED DETAILED ENGINEERING DESIGN PLAN. THE
APPROVAL BY THE AUTHORIZED GOVERNMENT OFFICIALS OF "AS-STAKED", REVISED OR
"AS-BUILT" PLANS UNDERTAKEN/CHECKED BY CONSTRUCTION SUPERVISION
CONSULTANTS NEITHER DIMINISHES THE RESPONSIBILITY OF THE LATTER FOR THE
TECHNICAL INTEGRITY OF THE SAID PLANS
NOR TRANSFER ANY PART OF THAT RESPONSIBILITY TO THE APPROVING OFFICIALS.

HYUN IL SONG
PROJECT MANAGER

kunhwa

ILSUNG REPUBLIC OF THE PHILIPPINES 228


BAE YOUNG KIL HYUN IL SONG DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS TERESITA V. BAUZON BLESILDA A. RAMOS SHARIF MADSMO H. HASIM LEA N. DELFINADO EMIL K. SADAIN, CESO I
MANILA 304
DESIGN SCIENCE INCORPORATED

UPMO - RMC II
NOTE:
PURSUANT TO ITEM 6.4 OF ANNEX 'B' OF THE REVISED IMPLEMENTING RULES AND
REGULATION OF R.A. 9184, THE CONSTRUCTION SUPERVISION CONSULTANT SHALL BE
RESPONSIBLE FOR VERIFICATION AND CHECKING OF QUANTITIES AND QUALITIES OF
WORK ACCOMPLISHED BY THE CONTRACTOR AS AGAINST THE APPROVED PLANS,
SPECIFICATIONS AND PROGRAM OF WORKS.

THE CONSTRUCTION SUPERVISION CONSULTANT SHALL BE HELD FULLY


RESPONSIBL EFOR THE FAILURE OF THE FACILITIES/STRUCTURES DUE TO POOR QUALITY
OF WORKMANSHIP ACCOMPLISHED BY THE CONTRACTOR EXCEPT FOR THOSE FAILURE
DUE TO FAULTY DESIGN AS PER APPROVED DETAILED ENGINEERING DESIGN PLAN. THE
APPROVAL BY THE AUTHORIZED GOVERNMENT OFFICIALS OF "AS-STAKED", REVISED OR
"AS-BUILT" PLANS UNDERTAKEN/CHECKED BY CONSTRUCTION SUPERVISION
CONSULTANTS NEITHER DIMINISHES THE RESPONSIBILITY OF THE LATTER FOR THE
TECHNICAL INTEGRITY OF THE SAID PLANS
NOR TRANSFER ANY PART OF THAT RESPONSIBILITY TO THE APPROVING OFFICIALS.

HYUN IL SONG
PROJECT MANAGER

kunhwa

ILSUNG REPUBLIC OF THE PHILIPPINES 229


BAE YOUNG KIL HYUN IL SONG DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS TERESITA V. BAUZON BLESILDA A. RAMOS SHARIF MADSMO H. HASIM LEA N. DELFINADO EMIL K. SADAIN, CESO I
MANILA 304
DESIGN SCIENCE INCORPORATED

UPMO - RMC II
NOTE:
PURSUANT TO ITEM 6.4 OF ANNEX 'B' OF THE REVISED IMPLEMENTING RULES AND
REGULATION OF R.A. 9184, THE CONSTRUCTION SUPERVISION CONSULTANT SHALL BE
RESPONSIBLE FOR VERIFICATION AND CHECKING OF QUANTITIES AND QUALITIES OF
WORK ACCOMPLISHED BY THE CONTRACTOR AS AGAINST THE APPROVED PLANS,
SPECIFICATIONS AND PROGRAM OF WORKS.

THE CONSTRUCTION SUPERVISION CONSULTANT SHALL BE HELD FULLY


RESPONSIBL EFOR THE FAILURE OF THE FACILITIES/STRUCTURES DUE TO POOR QUALITY
OF WORKMANSHIP ACCOMPLISHED BY THE CONTRACTOR EXCEPT FOR THOSE FAILURE
DUE TO FAULTY DESIGN AS PER APPROVED DETAILED ENGINEERING DESIGN PLAN. THE
APPROVAL BY THE AUTHORIZED GOVERNMENT OFFICIALS OF "AS-STAKED", REVISED OR
"AS-BUILT" PLANS UNDERTAKEN/CHECKED BY CONSTRUCTION SUPERVISION
CONSULTANTS NEITHER DIMINISHES THE RESPONSIBILITY OF THE LATTER FOR THE
TECHNICAL INTEGRITY OF THE SAID PLANS
NOR TRANSFER ANY PART OF THAT RESPONSIBILITY TO THE APPROVING OFFICIALS.

HYUN IL SONG
PROJECT MANAGER

kunhwa

ILSUNG REPUBLIC OF THE PHILIPPINES 230


BAE YOUNG KIL HYUN IL SONG DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS TERESITA V. BAUZON BLESILDA A. RAMOS SHARIF MADSMO H. HASIM LEA N. DELFINADO EMIL K. SADAIN, CESO I
MANILA 304
DESIGN SCIENCE INCORPORATED

UPMO - RMC II
NOTE:
PURSUANT TO ITEM 6.4 OF ANNEX 'B' OF THE REVISED IMPLEMENTING RULES AND
REGULATION OF R.A. 9184, THE CONSTRUCTION SUPERVISION CONSULTANT SHALL BE
RESPONSIBLE FOR VERIFICATION AND CHECKING OF QUANTITIES AND QUALITIES OF
WORK ACCOMPLISHED BY THE CONTRACTOR AS AGAINST THE APPROVED PLANS,
SPECIFICATIONS AND PROGRAM OF WORKS.

THE CONSTRUCTION SUPERVISION CONSULTANT SHALL BE HELD FULLY


RESPONSIBL EFOR THE FAILURE OF THE FACILITIES/STRUCTURES DUE TO POOR QUALITY
OF WORKMANSHIP ACCOMPLISHED BY THE CONTRACTOR EXCEPT FOR THOSE FAILURE
DUE TO FAULTY DESIGN AS PER APPROVED DETAILED ENGINEERING DESIGN PLAN. THE
APPROVAL BY THE AUTHORIZED GOVERNMENT OFFICIALS OF "AS-STAKED", REVISED OR
"AS-BUILT" PLANS UNDERTAKEN/CHECKED BY CONSTRUCTION SUPERVISION
CONSULTANTS NEITHER DIMINISHES THE RESPONSIBILITY OF THE LATTER FOR THE
TECHNICAL INTEGRITY OF THE SAID PLANS
NOR TRANSFER ANY PART OF THAT RESPONSIBILITY TO THE APPROVING OFFICIALS.

HYUN IL SONG
PROJECT MANAGER

kunhwa

ILSUNG REPUBLIC OF THE PHILIPPINES 231


BAE YOUNG KIL HYUN IL SONG DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS TERESITA V. BAUZON BLESILDA A. RAMOS SHARIF MADSMO H. HASIM LEA N. DELFINADO EMIL K. SADAIN, CESO I
MANILA 304
DESIGN SCIENCE INCORPORATED

UPMO - RMC II
kunhwa

ILSUNG REPUBLIC OF THE PHILIPPINES 232


BAE YOUNG KIL HYUN IL SONG DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS TERESITA V. BAUZON BLESILDA A. RAMOS SHARIF MADSMO H. HASIM LEA N. DELFINADO EMIL K. SADAIN, CESO I
MANILA 304
DESIGN SCIENCE INCORPORATED

UPMO - RMC II
NOTE:
PURSUANT TO ITEM 6.4 OF ANNEX 'B' OF THE REVISED IMPLEMENTING RULES AND
REGULATION OF R.A. 9184, THE CONSTRUCTION SUPERVISION CONSULTANT SHALL BE
RESPONSIBLE FOR VERIFICATION AND CHECKING OF QUANTITIES AND QUALITIES OF
WORK ACCOMPLISHED BY THE CONTRACTOR AS AGAINST THE APPROVED PLANS,
SPECIFICATIONS AND PROGRAM OF WORKS.

THE CONSTRUCTION SUPERVISION CONSULTANT SHALL BE HELD FULLY


RESPONSIBL EFOR THE FAILURE OF THE FACILITIES/STRUCTURES DUE TO POOR QUALITY
OF WORKMANSHIP ACCOMPLISHED BY THE CONTRACTOR EXCEPT FOR THOSE FAILURE
DUE TO FAULTY DESIGN AS PER APPROVED DETAILED ENGINEERING DESIGN PLAN. THE
APPROVAL BY THE AUTHORIZED GOVERNMENT OFFICIALS OF "AS-STAKED", REVISED OR
"AS-BUILT" PLANS UNDERTAKEN/CHECKED BY CONSTRUCTION SUPERVISION
CONSULTANTS NEITHER DIMINISHES THE RESPONSIBILITY OF THE LATTER FOR THE
TECHNICAL INTEGRITY OF THE SAID PLANS
NOR TRANSFER ANY PART OF THAT RESPONSIBILITY TO THE APPROVING OFFICIALS.

HYUN IL SONG
PROJECT MANAGER

kunhwa

ILSUNG REPUBLIC OF THE PHILIPPINES 233


BAE YOUNG KIL HYUN IL SONG DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS TERESITA V. BAUZON BLESILDA A. RAMOS SHARIF MADSMO H. HASIM LEA N. DELFINADO EMIL K. SADAIN, CESO I
MANILA 304
DESIGN SCIENCE INCORPORATED

UPMO - RMC II
kunhwa

ILSUNG REPUBLIC OF THE PHILIPPINES 234


BAE YOUNG KIL HYUN IL SONG DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS TERESITA V. BAUZON BLESILDA A. RAMOS SHARIF MADSMO H. HASIM LEA N. DELFINADO EMIL K. SADAIN, CESO I
MANILA 304
DESIGN SCIENCE INCORPORATED

UPMO - RMC II
NOTE:
PURSUANT TO ITEM 6.4 OF ANNEX 'B' OF THE REVISED IMPLEMENTING RULES AND
REGULATION OF R.A. 9184, THE CONSTRUCTION SUPERVISION CONSULTANT SHALL BE
RESPONSIBLE FOR VERIFICATION AND CHECKING OF QUANTITIES AND QUALITIES OF
WORK ACCOMPLISHED BY THE CONTRACTOR AS AGAINST THE APPROVED PLANS,
SPECIFICATIONS AND PROGRAM OF WORKS.

THE CONSTRUCTION SUPERVISION CONSULTANT SHALL BE HELD FULLY


RESPONSIBL EFOR THE FAILURE OF THE FACILITIES/STRUCTURES DUE TO POOR QUALITY
OF WORKMANSHIP ACCOMPLISHED BY THE CONTRACTOR EXCEPT FOR THOSE FAILURE
DUE TO FAULTY DESIGN AS PER APPROVED DETAILED ENGINEERING DESIGN PLAN. THE
APPROVAL BY THE AUTHORIZED GOVERNMENT OFFICIALS OF "AS-STAKED", REVISED OR
"AS-BUILT" PLANS UNDERTAKEN/CHECKED BY CONSTRUCTION SUPERVISION
CONSULTANTS NEITHER DIMINISHES THE RESPONSIBILITY OF THE LATTER FOR THE
TECHNICAL INTEGRITY OF THE SAID PLANS
NOR TRANSFER ANY PART OF THAT RESPONSIBILITY TO THE APPROVING OFFICIALS.

HYUN IL SONG
PROJECT MANAGER

kunhwa

ILSUNG REPUBLIC OF THE PHILIPPINES 235


BAE YOUNG KIL HYUN IL SONG DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS TERESITA V. BAUZON BLESILDA A. RAMOS SHARIF MADSMO H. HASIM LEA N. DELFINADO EMIL K. SADAIN, CESO I
MANILA 304
DESIGN SCIENCE INCORPORATED

UPMO - RMC II
NOTE:
PURSUANT TO ITEM 6.4 OF ANNEX 'B' OF THE REVISED IMPLEMENTING RULES AND
REGULATION OF R.A. 9184, THE CONSTRUCTION SUPERVISION CONSULTANT SHALL BE
RESPONSIBLE FOR VERIFICATION AND CHECKING OF QUANTITIES AND QUALITIES OF
WORK ACCOMPLISHED BY THE CONTRACTOR AS AGAINST THE APPROVED PLANS,
SPECIFICATIONS AND PROGRAM OF WORKS.

THE CONSTRUCTION SUPERVISION CONSULTANT SHALL BE HELD FULLY


RESPONSIBL EFOR THE FAILURE OF THE FACILITIES/STRUCTURES DUE TO POOR QUALITY
OF WORKMANSHIP ACCOMPLISHED BY THE CONTRACTOR EXCEPT FOR THOSE FAILURE
DUE TO FAULTY DESIGN AS PER APPROVED DETAILED ENGINEERING DESIGN PLAN. THE
APPROVAL BY THE AUTHORIZED GOVERNMENT OFFICIALS OF "AS-STAKED", REVISED OR
"AS-BUILT" PLANS UNDERTAKEN/CHECKED BY CONSTRUCTION SUPERVISION
CONSULTANTS NEITHER DIMINISHES THE RESPONSIBILITY OF THE LATTER FOR THE
TECHNICAL INTEGRITY OF THE SAID PLANS
NOR TRANSFER ANY PART OF THAT RESPONSIBILITY TO THE APPROVING OFFICIALS.

HYUN IL SONG
PROJECT MANAGER

BAR BENDING DIAGRAM

kunhwa

ILSUNG REPUBLIC OF THE PHILIPPINES 236


BAE YOUNG KIL HYUN IL SONG DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS TERESITA V. BAUZON BLESILDA A. RAMOS SHARIF MADSMO H. HASIM LEA N. DELFINADO EMIL K. SADAIN, CESO I
MANILA 304
DESIGN SCIENCE INCORPORATED

UPMO - RMC II
NOTE:
PURSUANT TO ITEM 6.4 OF ANNEX 'B' OF THE REVISED IMPLEMENTING RULES AND
REGULATION OF R.A. 9184, THE CONSTRUCTION SUPERVISION CONSULTANT SHALL BE
RESPONSIBLE FOR VERIFICATION AND CHECKING OF QUANTITIES AND QUALITIES OF
WORK ACCOMPLISHED BY THE CONTRACTOR AS AGAINST THE APPROVED PLANS,
SPECIFICATIONS AND PROGRAM OF WORKS.

THE CONSTRUCTION SUPERVISION CONSULTANT SHALL BE HELD FULLY


RESPONSIBL EFOR THE FAILURE OF THE FACILITIES/STRUCTURES DUE TO POOR QUALITY
OF WORKMANSHIP ACCOMPLISHED BY THE CONTRACTOR EXCEPT FOR THOSE FAILURE
DUE TO FAULTY DESIGN AS PER APPROVED DETAILED ENGINEERING DESIGN PLAN. THE
APPROVAL BY THE AUTHORIZED GOVERNMENT OFFICIALS OF "AS-STAKED", REVISED OR
"AS-BUILT" PLANS UNDERTAKEN/CHECKED BY CONSTRUCTION SUPERVISION
CONSULTANTS NEITHER DIMINISHES THE RESPONSIBILITY OF THE LATTER FOR THE
TECHNICAL INTEGRITY OF THE SAID PLANS
NOR TRANSFER ANY PART OF THAT RESPONSIBILITY TO THE APPROVING OFFICIALS.

HYUN IL SONG
PROJECT MANAGER

kunhwa

ILSUNG REPUBLIC OF THE PHILIPPINES 237


BAE YOUNG KIL HYUN IL SONG DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS TERESITA V. BAUZON BLESILDA A. RAMOS SHARIF MADSMO H. HASIM LEA N. DELFINADO EMIL K. SADAIN, CESO I
MANILA 304
DESIGN SCIENCE INCORPORATED

UPMO - RMC II
NOTE:
PURSUANT TO ITEM 6.4 OF ANNEX 'B' OF THE REVISED IMPLEMENTING RULES AND
REGULATION OF R.A. 9184, THE CONSTRUCTION SUPERVISION CONSULTANT SHALL BE
RESPONSIBLE FOR VERIFICATION AND CHECKING OF QUANTITIES AND QUALITIES OF
WORK ACCOMPLISHED BY THE CONTRACTOR AS AGAINST THE APPROVED PLANS,
SPECIFICATIONS AND PROGRAM OF WORKS.

THE CONSTRUCTION SUPERVISION CONSULTANT SHALL BE HELD FULLY


RESPONSIBL EFOR THE FAILURE OF THE FACILITIES/STRUCTURES DUE TO POOR QUALITY
OF WORKMANSHIP ACCOMPLISHED BY THE CONTRACTOR EXCEPT FOR THOSE FAILURE
DUE TO FAULTY DESIGN AS PER APPROVED DETAILED ENGINEERING DESIGN PLAN. THE
APPROVAL BY THE AUTHORIZED GOVERNMENT OFFICIALS OF "AS-STAKED", REVISED OR
"AS-BUILT" PLANS UNDERTAKEN/CHECKED BY CONSTRUCTION SUPERVISION
CONSULTANTS NEITHER DIMINISHES THE RESPONSIBILITY OF THE LATTER FOR THE
TECHNICAL INTEGRITY OF THE SAID PLANS
NOR TRANSFER ANY PART OF THAT RESPONSIBILITY TO THE APPROVING OFFICIALS.

HYUN IL SONG
PROJECT MANAGER

kunhwa

ILSUNG REPUBLIC OF THE PHILIPPINES 238


BAE YOUNG KIL HYUN IL SONG DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS TERESITA V. BAUZON BLESILDA A. RAMOS SHARIF MADSMO H. HASIM LEA N. DELFINADO EMIL K. SADAIN, CESO I
MANILA 304
DESIGN SCIENCE INCORPORATED

UPMO - RMC II
NOTE:
PURSUANT TO ITEM 6.4 OF ANNEX 'B' OF THE REVISED IMPLEMENTING RULES AND
REGULATION OF R.A. 9184, THE CONSTRUCTION SUPERVISION CONSULTANT SHALL BE
RESPONSIBLE FOR VERIFICATION AND CHECKING OF QUANTITIES AND QUALITIES OF
WORK ACCOMPLISHED BY THE CONTRACTOR AS AGAINST THE APPROVED PLANS,
SPECIFICATIONS AND PROGRAM OF WORKS.

THE CONSTRUCTION SUPERVISION CONSULTANT SHALL BE HELD FULLY


RESPONSIBL EFOR THE FAILURE OF THE FACILITIES/STRUCTURES DUE TO POOR QUALITY
OF WORKMANSHIP ACCOMPLISHED BY THE CONTRACTOR EXCEPT FOR THOSE FAILURE
DUE TO FAULTY DESIGN AS PER APPROVED DETAILED ENGINEERING DESIGN PLAN. THE
APPROVAL BY THE AUTHORIZED GOVERNMENT OFFICIALS OF "AS-STAKED", REVISED OR
"AS-BUILT" PLANS UNDERTAKEN/CHECKED BY CONSTRUCTION SUPERVISION
CONSULTANTS NEITHER DIMINISHES THE RESPONSIBILITY OF THE LATTER FOR THE
TECHNICAL INTEGRITY OF THE SAID PLANS
NOR TRANSFER ANY PART OF THAT RESPONSIBILITY TO THE APPROVING OFFICIALS.

HYUN IL SONG
PROJECT MANAGER

kunhwa

ILSUNG REPUBLIC OF THE PHILIPPINES 239


BAE YOUNG KIL HYUN IL SONG DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS TERESITA V. BAUZON BLESILDA A. RAMOS SHARIF MADSMO H. HASIM LEA N. DELFINADO EMIL K. SADAIN, CESO I
MANILA 304
DESIGN SCIENCE INCORPORATED

UPMO - RMC II
NOTE:
PURSUANT TO ITEM 6.4 OF ANNEX 'B' OF THE REVISED IMPLEMENTING RULES AND
REGULATION OF R.A. 9184, THE CONSTRUCTION SUPERVISION CONSULTANT SHALL BE
RESPONSIBLE FOR VERIFICATION AND CHECKING OF QUANTITIES AND QUALITIES OF
WORK ACCOMPLISHED BY THE CONTRACTOR AS AGAINST THE APPROVED PLANS,
SPECIFICATIONS AND PROGRAM OF WORKS.

THE CONSTRUCTION SUPERVISION CONSULTANT SHALL BE HELD FULLY


RESPONSIBL EFOR THE FAILURE OF THE FACILITIES/STRUCTURES DUE TO POOR QUALITY
OF WORKMANSHIP ACCOMPLISHED BY THE CONTRACTOR EXCEPT FOR THOSE FAILURE
DUE TO FAULTY DESIGN AS PER APPROVED DETAILED ENGINEERING DESIGN PLAN. THE
APPROVAL BY THE AUTHORIZED GOVERNMENT OFFICIALS OF "AS-STAKED", REVISED OR
"AS-BUILT" PLANS UNDERTAKEN/CHECKED BY CONSTRUCTION SUPERVISION
CONSULTANTS NEITHER DIMINISHES THE RESPONSIBILITY OF THE LATTER FOR THE
TECHNICAL INTEGRITY OF THE SAID PLANS
NOR TRANSFER ANY PART OF THAT RESPONSIBILITY TO THE APPROVING OFFICIALS.

HYUN IL SONG
PROJECT MANAGER

kunhwa

ILSUNG REPUBLIC OF THE PHILIPPINES 240


BAE YOUNG KIL HYUN IL SONG DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS TERESITA V. BAUZON BLESILDA A. RAMOS SHARIF MADSMO H. HASIM LEA N. DELFINADO EMIL K. SADAIN, CESO I
MANILA 304
DESIGN SCIENCE INCORPORATED

UPMO - RMC II
NOTE:
PURSUANT TO ITEM 6.4 OF ANNEX 'B' OF THE REVISED IMPLEMENTING RULES AND
REGULATION OF R.A. 9184, THE CONSTRUCTION SUPERVISION CONSULTANT SHALL BE
RESPONSIBLE FOR VERIFICATION AND CHECKING OF QUANTITIES AND QUALITIES OF
WORK ACCOMPLISHED BY THE CONTRACTOR AS AGAINST THE APPROVED PLANS,
SPECIFICATIONS AND PROGRAM OF WORKS.

THE CONSTRUCTION SUPERVISION CONSULTANT SHALL BE HELD FULLY


RESPONSIBL EFOR THE FAILURE OF THE FACILITIES/STRUCTURES DUE TO POOR QUALITY
OF WORKMANSHIP ACCOMPLISHED BY THE CONTRACTOR EXCEPT FOR THOSE FAILURE
DUE TO FAULTY DESIGN AS PER APPROVED DETAILED ENGINEERING DESIGN PLAN. THE
APPROVAL BY THE AUTHORIZED GOVERNMENT OFFICIALS OF "AS-STAKED", REVISED OR
"AS-BUILT" PLANS UNDERTAKEN/CHECKED BY CONSTRUCTION SUPERVISION
CONSULTANTS NEITHER DIMINISHES THE RESPONSIBILITY OF THE LATTER FOR THE
TECHNICAL INTEGRITY OF THE SAID PLANS
NOR TRANSFER ANY PART OF THAT RESPONSIBILITY TO THE APPROVING OFFICIALS.

HYUN IL SONG
PROJECT MANAGER

kunhwa

ILSUNG REPUBLIC OF THE PHILIPPINES 241


BAE YOUNG KIL HYUN IL SONG DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS TERESITA V. BAUZON BLESILDA A. RAMOS SHARIF MADSMO H. HASIM LEA N. DELFINADO EMIL K. SADAIN, CESO I
MANILA 304
DESIGN SCIENCE INCORPORATED

UPMO - RMC II
NOTE:
PURSUANT TO ITEM 6.4 OF ANNEX 'B' OF THE REVISED IMPLEMENTING RULES AND
REGULATION OF R.A. 9184, THE CONSTRUCTION SUPERVISION CONSULTANT SHALL BE
RESPONSIBLE FOR VERIFICATION AND CHECKING OF QUANTITIES AND QUALITIES OF
WORK ACCOMPLISHED BY THE CONTRACTOR AS AGAINST THE APPROVED PLANS,
SPECIFICATIONS AND PROGRAM OF WORKS.

THE CONSTRUCTION SUPERVISION CONSULTANT SHALL BE HELD FULLY


RESPONSIBL EFOR THE FAILURE OF THE FACILITIES/STRUCTURES DUE TO POOR QUALITY
OF WORKMANSHIP ACCOMPLISHED BY THE CONTRACTOR EXCEPT FOR THOSE FAILURE
DUE TO FAULTY DESIGN AS PER APPROVED DETAILED ENGINEERING DESIGN PLAN. THE
APPROVAL BY THE AUTHORIZED GOVERNMENT OFFICIALS OF "AS-STAKED", REVISED OR
"AS-BUILT" PLANS UNDERTAKEN/CHECKED BY CONSTRUCTION SUPERVISION
CONSULTANTS NEITHER DIMINISHES THE RESPONSIBILITY OF THE LATTER FOR THE
TECHNICAL INTEGRITY OF THE SAID PLANS
NOR TRANSFER ANY PART OF THAT RESPONSIBILITY TO THE APPROVING OFFICIALS.

HYUN IL SONG
PROJECT MANAGER

BAR BENDING DIAGRAM

kunhwa

ILSUNG REPUBLIC OF THE PHILIPPINES 242


BAE YOUNG KIL HYUN IL SONG DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS TERESITA V. BAUZON BLESILDA A. RAMOS SHARIF MADSMO H. HASIM LEA N. DELFINADO EMIL K. SADAIN, CESO I
MANILA 304
DESIGN SCIENCE INCORPORATED

UPMO - RMC II
NOTE:
PURSUANT TO ITEM 6.4 OF ANNEX 'B' OF THE REVISED IMPLEMENTING RULES AND
REGULATION OF R.A. 9184, THE CONSTRUCTION SUPERVISION CONSULTANT SHALL BE
RESPONSIBLE FOR VERIFICATION AND CHECKING OF QUANTITIES AND QUALITIES OF
WORK ACCOMPLISHED BY THE CONTRACTOR AS AGAINST THE APPROVED PLANS,
SPECIFICATIONS AND PROGRAM OF WORKS.

THE CONSTRUCTION SUPERVISION CONSULTANT SHALL BE HELD FULLY


RESPONSIBL EFOR THE FAILURE OF THE FACILITIES/STRUCTURES DUE TO POOR QUALITY
OF WORKMANSHIP ACCOMPLISHED BY THE CONTRACTOR EXCEPT FOR THOSE FAILURE
DUE TO FAULTY DESIGN AS PER APPROVED DETAILED ENGINEERING DESIGN PLAN. THE
APPROVAL BY THE AUTHORIZED GOVERNMENT OFFICIALS OF "AS-STAKED", REVISED OR
"AS-BUILT" PLANS UNDERTAKEN/CHECKED BY CONSTRUCTION SUPERVISION
CONSULTANTS NEITHER DIMINISHES THE RESPONSIBILITY OF THE LATTER FOR THE
TECHNICAL INTEGRITY OF THE SAID PLANS
NOR TRANSFER ANY PART OF THAT RESPONSIBILITY TO THE APPROVING OFFICIALS.

HYUN IL SONG
PROJECT MANAGER

BAR BENDING DIAGRAM

kunhwa

ILSUNG REPUBLIC OF THE PHILIPPINES 243


BAE YOUNG KIL HYUN IL SONG DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS TERESITA V. BAUZON BLESILDA A. RAMOS SHARIF MADSMO H. HASIM LEA N. DELFINADO EMIL K. SADAIN, CESO I
MANILA 304
DESIGN SCIENCE INCORPORATED

UPMO - RMC II
NOTE:
PURSUANT TO ITEM 6.4 OF ANNEX 'B' OF THE REVISED IMPLEMENTING RULES AND
REGULATION OF R.A. 9184, THE CONSTRUCTION SUPERVISION CONSULTANT SHALL BE
RESPONSIBLE FOR VERIFICATION AND CHECKING OF QUANTITIES AND QUALITIES OF
WORK ACCOMPLISHED BY THE CONTRACTOR AS AGAINST THE APPROVED PLANS,
SPECIFICATIONS AND PROGRAM OF WORKS.

THE CONSTRUCTION SUPERVISION CONSULTANT SHALL BE HELD FULLY


RESPONSIBL EFOR THE FAILURE OF THE FACILITIES/STRUCTURES DUE TO POOR QUALITY
OF WORKMANSHIP ACCOMPLISHED BY THE CONTRACTOR EXCEPT FOR THOSE FAILURE
DUE TO FAULTY DESIGN AS PER APPROVED DETAILED ENGINEERING DESIGN PLAN. THE
APPROVAL BY THE AUTHORIZED GOVERNMENT OFFICIALS OF "AS-STAKED", REVISED OR
"AS-BUILT" PLANS UNDERTAKEN/CHECKED BY CONSTRUCTION SUPERVISION
CONSULTANTS NEITHER DIMINISHES THE RESPONSIBILITY OF THE LATTER FOR THE
TECHNICAL INTEGRITY OF THE SAID PLANS
NOR TRANSFER ANY PART OF THAT RESPONSIBILITY TO THE APPROVING OFFICIALS.

HYUN IL SONG
PROJECT MANAGER

PREPARED: SUBMITTED: PROJECT NAME AND LOCATION: CHECKED: REVIEWED: RECOMMENDED: APPROVED: SHEET NO.
SAMAR PACIFIC COASTAL ROAD PROJECT PROVINCES
kunhwa OF NORTHERN AND EASTERN SAMAR REGION VIII
Engineering & Consulting

C:\Users\PC\Desktop\LOGO\ILSUNG LOGO.jpg

ILSUNG
CONSTRUCTION CO., LTD
DONGSUNG
ENGINEERING
SHEET CONTENT: REPUBLIC OF THE PHILIPPINES 244
CONTRACTOR
BAE YOUNG KIL HYUN IL SONG DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS TERESITA V. BAUZON BLESILDA A. RAMOS SHARIF MADSMO H. HASIM LEA N. DELFINADO EMIL K. SADAIN, CESO I
APPROACH SLAB DETAIL, RAILING & POST DETAILS & MANILA 304
PROJECT MANAGER PROJECT MANAGER PROJECT MANAGER OIC, CHIEF, BRIDGE DIVISION PROJECT DIRECTOR DIRECTOR IV, BUREAU OF DESIGN ASSISTANT SECRETARY FOR UNDERSECRETARY FOR UPMO
DESIGN SCIENCE INCORPORATED SCHEDULE OF REINFORCEMENT BUREAU OF DESIGN Roads Management Cluster II Multilateral TECHNICAL SERVICES OPERATIONS AND TECHNICAL SERVICES
(SIMORA) UPMO - RMC II
DATE: DATE: DATE: DATE: DATE: DATE: DATE: DATE:
NOTE:
PURSUANT TO ITEM 6.4 OF ANNEX 'B' OF THE REVISED IMPLEMENTING RULES AND
REGULATION OF R.A. 9184, THE CONSTRUCTION SUPERVISION CONSULTANT SHALL BE
RESPONSIBLE FOR VERIFICATION AND CHECKING OF QUANTITIES AND QUALITIES OF
WORK ACCOMPLISHED BY THE CONTRACTOR AS AGAINST THE APPROVED PLANS,
SPECIFICATIONS AND PROGRAM OF WORKS.

THE CONSTRUCTION SUPERVISION CONSULTANT SHALL BE HELD FULLY


RESPONSIBL EFOR THE FAILURE OF THE FACILITIES/STRUCTURES DUE TO POOR QUALITY
OF WORKMANSHIP ACCOMPLISHED BY THE CONTRACTOR EXCEPT FOR THOSE FAILURE
DUE TO FAULTY DESIGN AS PER APPROVED DETAILED ENGINEERING DESIGN PLAN. THE
APPROVAL BY THE AUTHORIZED GOVERNMENT OFFICIALS OF "AS-STAKED", REVISED OR
"AS-BUILT" PLANS UNDERTAKEN/CHECKED BY CONSTRUCTION SUPERVISION
CONSULTANTS NEITHER DIMINISHES THE RESPONSIBILITY OF THE LATTER FOR THE
TECHNICAL INTEGRITY OF THE SAID PLANS
NOR TRANSFER ANY PART OF THAT RESPONSIBILITY TO THE APPROVING OFFICIALS.

HYUN IL SONG
PROJECT MANAGER

PREPARED: SUBMITTED: PROJECT NAME AND LOCATION: CHECKED: REVIEWED: RECOMMENDED: APPROVED: SHEET NO.
SAMAR PACIFIC COASTAL ROAD PROJECT PROVINCES
kunhwa OF NORTHERN AND EASTERN SAMAR REGION VIII
Engineering & Consulting

ILSUNG
CONSTRUCTION CO., LTD
DONGSUNG
ENGINEERING
SHEET CONTENT: REPUBLIC OF THE PHILIPPINES 245
CONTRACTOR
BAE YOUNG KIL HYUN IL SONG DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS TERESITA V. BAUZON BLESILDA A. RAMOS SHARIF MADSMO H. HASIM LEA N. DELFINADO EMIL K. SADAIN, CESO I
PROJECT MANAGER PROJECT MANAGER
BEARING PAD DETAILS, EXPANSION JOINT DETAILS, MANILA PROJECT MANAGER OIC, CHIEF, BRIDGE DIVISION PROJECT DIRECTOR DIRECTOR IV, BUREAU OF DESIGN ASSISTANT SECRETARY FOR UNDERSECRETARY FOR UPMO 304
DESIGN SCIENCE INCORPORATED DOWEL DETAILS AND DRAIN DETAILS BUREAU OF DESIGN Roads Management Cluster II Multilateral TECHNICAL SERVICES OPERATIONS AND TECHNICAL SERVICES
(SIMORA) UPMO - RMC II
DATE: DATE: DATE: DATE: DATE: DATE: DATE: DATE:
NOTE:
PURSUANT TO ITEM 6.4 OF ANNEX 'B' OF THE REVISED IMPLEMENTING RULES AND
REGULATION OF R.A. 9184, THE CONSTRUCTION SUPERVISION CONSULTANT SHALL BE
RESPONSIBLE FOR VERIFICATION AND CHECKING OF QUANTITIES AND QUALITIES OF
WORK ACCOMPLISHED BY THE CONTRACTOR AS AGAINST THE APPROVED PLANS,
SPECIFICATIONS AND PROGRAM OF WORKS.

THE CONSTRUCTION SUPERVISION CONSULTANT SHALL BE HELD FULLY


RESPONSIBL EFOR THE FAILURE OF THE FACILITIES/STRUCTURES DUE TO POOR QUALITY
OF WORKMANSHIP ACCOMPLISHED BY THE CONTRACTOR EXCEPT FOR THOSE FAILURE
DUE TO FAULTY DESIGN AS PER APPROVED DETAILED ENGINEERING DESIGN PLAN. THE
APPROVAL BY THE AUTHORIZED GOVERNMENT OFFICIALS OF "AS-STAKED", REVISED OR
"AS-BUILT" PLANS UNDERTAKEN/CHECKED BY CONSTRUCTION SUPERVISION
CONSULTANTS NEITHER DIMINISHES THE RESPONSIBILITY OF THE LATTER FOR THE
TECHNICAL INTEGRITY OF THE SAID PLANS
NOR TRANSFER ANY PART OF THAT RESPONSIBILITY TO THE APPROVING OFFICIALS.

HYUN IL SONG
PROJECT MANAGER

DOUBLE- SINGLE PANELS


DESCRIPTIONS
NO. DIMENSIONS QUANTITY

BAILEY PANEL DPWH BAILEY 0.4L Pcs


BEARING PLATES 4 pcs 20X350X400mm 206.0 kg
PANEL PINS STD. (BB-0400) 0.4L=4 Pcs

PANEL HORIZONTAL BRACE 0.4L+2 200X100X620 0.001L+0.006 m 3


TRANSOMS 0.4L+2 200X350X5475 0.1533L+0.774 m 3
STRINGERS 0.8L 100X250X3660 0.0732L m 3
SWAY BRACINGS 0.2L 100X150X4660 0.015L m 3
FLOOR PLANKS 1.5L+2 75X200X3660 0.082L+0.110 m 3

RUNNING BOARDS 0.6L+12 50X250X3050 0.023L+0.034 m 3


WHEEL GUARDS 0.2L+12 150X150X3050 0.014L+0.016 m 3
SPLICE BLOCKS 0.2L 75X150X900 0.002L m 3
SPACERS 0.7L 75X50X3660 0.097L m 3
RAKERS 0.4L+2 50X100X1970 0.027L+0.137 m 3
FILLER BLOCKS 0.8L 50X150X300 0.0014L m 3

FILLER BLOCKS 0.8L+8 150X200X300 0.054L+0.540 m 3


BOLTING STRIPS - 75X150X3030 0.07L m 3
SPACERS 0.7L 75X50X380 0.001L m 3
GRILLAGE 8 150X150X380 0.10 m 3
GRILLAGE 8 200X200X380 0.176 m 3
BOLTS (TRANSOMS) 0.8L+8 20ØX635 0.892L+8.92 kg

BOLTS (TRANSOMS) 0.8L 16ØX481 0.472L kg


BOLTS (SWAY BRACING) 0.4L 20ØX481 0.417L kg
BOLTS (RAKERS) 0.4L+2 20ØX330 0.331L+195 kg
BOLTS (RAKERS) 0.4L+2 20ØX170 0.198L+0.99 kg
BOLTS (WHEEL GUARDS) L+4 13ØX330 0.349L+140 kg

BOLTS (SPLICE BLOCKS) 0.2L-2 13ØX330 0.005L-0.65 kg


BOLTS (ANCHOR BOLTS) 9 20ØX400 8.93 kg
BOLTS (HORIZONTAL BRACE) 0.4L+2 30ØX127 0.155L+0.78 kg

NAILS 100mm CW 0.2L kg


NAILS 125mm CW 1.2L kg
NAILS 150mm CW 1.8L kg

NOTE: L = SPAN LENGTH IN FEET

PREPARED: SUBMITTED: PROJECT NAME AND LOCATION: CHECKED: REVIEWED: RECOMMENDED: APPROVED: SHEET NO.
SAMAR PACIFIC COASTAL ROAD PROJECT PROVINCES
kunhwa OF NORTHERN AND EASTERN SAMAR REGION VIII
Engineering & Consulting

ILSUNG
CONSTRUCTION CO., LTD
DONGSUNG
ENGINEERING
SHEET CONTENT: REPUBLIC OF THE PHILIPPINES 246
CONTRACTOR
BAE YOUNG KIL HYUN IL SONG DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS TERESITA V. BAUZON BLESILDA A. RAMOS SHARIF MADSMO H. HASIM LEA N. DELFINADO EMIL K. SADAIN, CESO I
BAILEY BRIDGE GENERAL PLAN, 304
PROJECT MANAGER PROJECT MANAGER MANILA PROJECT MANAGER OIC, CHIEF, BRIDGE DIVISION PROJECT DIRECTOR DIRECTOR IV, BUREAU OF DESIGN ASSISTANT SECRETARY FOR UNDERSECRETARY FOR UPMO
DESIGN SCIENCE INCORPORATED ELEVATION AND SECTION BUREAU OF DESIGN Roads Management Cluster II Multilateral TECHNICAL SERVICES OPERATIONS AND TECHNICAL SERVICES
(SIMORA) UPMO - RMC II
DATE: DATE: DATE: DATE: DATE: DATE: DATE: DATE:
NOTE:
PURSUANT TO ITEM 6.4 OF ANNEX 'B' OF THE REVISED IMPLEMENTING RULES AND
REGULATION OF R.A. 9184, THE CONSTRUCTION SUPERVISION CONSULTANT SHALL BE
RESPONSIBLE FOR VERIFICATION AND CHECKING OF QUANTITIES AND QUALITIES OF
WORK ACCOMPLISHED BY THE CONTRACTOR AS AGAINST THE APPROVED PLANS,
SPECIFICATIONS AND PROGRAM OF WORKS.

THE CONSTRUCTION SUPERVISION CONSULTANT SHALL BE HELD FULLY


RESPONSIBL EFOR THE FAILURE OF THE FACILITIES/STRUCTURES DUE TO POOR QUALITY
OF WORKMANSHIP ACCOMPLISHED BY THE CONTRACTOR EXCEPT FOR THOSE FAILURE
DUE TO FAULTY DESIGN AS PER APPROVED DETAILED ENGINEERING DESIGN PLAN. THE
APPROVAL BY THE AUTHORIZED GOVERNMENT OFFICIALS OF "AS-STAKED", REVISED OR
"AS-BUILT" PLANS UNDERTAKEN/CHECKED BY CONSTRUCTION SUPERVISION
CONSULTANTS NEITHER DIMINISHES THE RESPONSIBILITY OF THE LATTER FOR THE
TECHNICAL INTEGRITY OF THE SAID PLANS
NOR TRANSFER ANY PART OF THAT RESPONSIBILITY TO THE APPROVING OFFICIALS.

HYUN IL SONG
PROJECT MANAGER

PREPARED: SUBMITTED: PROJECT NAME AND LOCATION: CHECKED: REVIEWED: RECOMMENDED: APPROVED: SHEET NO.
SAMAR PACIFIC COASTAL ROAD PROJECT PROVINCES
kunhwa OF NORTHERN AND EASTERN SAMAR REGION VIII
Engineering & Consulting

ILSUNG
CONSTRUCTION CO., LTD
DONGSUNG
ENGINEERING
SHEET CONTENT: REPUBLIC OF THE PHILIPPINES 247
CONTRACTOR
BAE YOUNG KIL HYUN IL SONG DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS TERESITA V. BAUZON BLESILDA A. RAMOS SHARIF MADSMO H. HASIM LEA N. DELFINADO EMIL K. SADAIN, CESO I
PROJECT MANAGER PROJECT MANAGER FOUNDATION LAYOUT AND BORING LOG DETAIL MANILA PROJECT MANAGER OIC, CHIEF, BRIDGE DIVISION PROJECT DIRECTOR DIRECTOR IV, BUREAU OF DESIGN ASSISTANT SECRETARY FOR UNDERSECRETARY FOR UPMO 304
DESIGN SCIENCE INCORPORATED BUREAU OF DESIGN Roads Management Cluster II Multilateral TECHNICAL SERVICES OPERATIONS AND TECHNICAL SERVICES
(SIMORA) UPMO - RMC II
DATE: DATE: DATE: DATE: DATE: DATE: DATE: DATE:
NOTE:
PURSUANT TO ITEM 6.4 OF ANNEX 'B' OF THE REVISED IMPLEMENTING RULES AND
REGULATION OF R.A. 9184, THE CONSTRUCTION SUPERVISION CONSULTANT SHALL BE
RESPONSIBLE FOR VERIFICATION AND CHECKING OF QUANTITIES AND QUALITIES OF
WORK ACCOMPLISHED BY THE CONTRACTOR AS AGAINST THE APPROVED PLANS,
SPECIFICATIONS AND PROGRAM OF WORKS.

THE CONSTRUCTION SUPERVISION CONSULTANT SHALL BE HELD FULLY


RESPONSIBL EFOR THE FAILURE OF THE FACILITIES/STRUCTURES DUE TO POOR QUALITY
OF WORKMANSHIP ACCOMPLISHED BY THE CONTRACTOR EXCEPT FOR THOSE FAILURE
DUE TO FAULTY DESIGN AS PER APPROVED DETAILED ENGINEERING DESIGN PLAN. THE
APPROVAL BY THE AUTHORIZED GOVERNMENT OFFICIALS OF "AS-STAKED", REVISED OR
"AS-BUILT" PLANS UNDERTAKEN/CHECKED BY CONSTRUCTION SUPERVISION
CONSULTANTS NEITHER DIMINISHES THE RESPONSIBILITY OF THE LATTER FOR THE
TECHNICAL INTEGRITY OF THE SAID PLANS
NOR TRANSFER ANY PART OF THAT RESPONSIBILITY TO THE APPROVING OFFICIALS.

HYUN IL SONG
PROJECT MANAGER
AASHTO GIRDER TYPE IV-B

PREPARED: SUBMITTED: PROJECT NAME AND LOCATION: CHECKED: REVIEWED: RECOMMENDED: APPROVED: SHEET NO.
SAMAR PACIFIC COASTAL ROAD PROJECT PROVINCES
kunhwa OF NORTHERN AND EASTERN SAMAR REGION VIII
Engineering & Consulting

ILSUNG
CONSTRUCTION CO., LTD
DONGSUNG
ENGINEERING
SHEET CONTENT: REPUBLIC OF THE PHILIPPINES 248
CONTRACTOR
BAE YOUNG KIL HYUN IL SONG DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS TERESITA V. BAUZON BLESILDA A. RAMOS SHARIF MADSMO H. HASIM LEA N. DELFINADO EMIL K. SADAIN, CESO I
PROJECT MANAGER PROJECT MANAGER CRANEWAY PLATFORM AND COFFERDAM MANILA PROJECT MANAGER OIC, CHIEF, BRIDGE DIVISION PROJECT DIRECTOR DIRECTOR IV, BUREAU OF DESIGN ASSISTANT SECRETARY FOR UNDERSECRETARY FOR UPMO 304
DESIGN SCIENCE INCORPORATED BUREAU OF DESIGN Roads Management Cluster II Multilateral TECHNICAL SERVICES OPERATIONS AND TECHNICAL SERVICES
TEMPORARY WORKS
UPMO - RMC II
DATE: DATE: (SIMORA) DATE: DATE: DATE: DATE: DATE: DATE:
NOTE:
PURSUANT TO ITEM 6.4 OF ANNEX 'B' OF THE REVISED IMPLEMENTING RULES AND
REGULATION OF R.A. 9184, THE CONSTRUCTION SUPERVISION CONSULTANT SHALL BE
RESPONSIBLE FOR VERIFICATION AND CHECKING OF QUANTITIES AND QUALITIES OF
WORK ACCOMPLISHED BY THE CONTRACTOR AS AGAINST THE APPROVED PLANS,
SPECIFICATIONS AND PROGRAM OF WORKS.

THE CONSTRUCTION SUPERVISION CONSULTANT SHALL BE HELD FULLY


RESPONSIBL EFOR THE FAILURE OF THE FACILITIES/STRUCTURES DUE TO POOR QUALITY
OF WORKMANSHIP ACCOMPLISHED BY THE CONTRACTOR EXCEPT FOR THOSE FAILURE
DUE TO FAULTY DESIGN AS PER APPROVED DETAILED ENGINEERING DESIGN PLAN. THE
APPROVAL BY THE AUTHORIZED GOVERNMENT OFFICIALS OF "AS-STAKED", REVISED OR
"AS-BUILT" PLANS UNDERTAKEN/CHECKED BY CONSTRUCTION SUPERVISION
CONSULTANTS NEITHER DIMINISHES THE RESPONSIBILITY OF THE LATTER FOR THE
TECHNICAL INTEGRITY OF THE SAID PLANS
NOR TRANSFER ANY PART OF THAT RESPONSIBILITY TO THE APPROVING OFFICIALS.

HYUN IL SONG
PROJECT MANAGER

kunhwa

ILSUNG REPUBLIC OF THE PHILIPPINES 249


BAE YOUNG KIL HYUN IL SONG DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS TERESITA V. BAUZON BLESILDA A. RAMOS SHARIF MADSMO H. HASIM LEA N. DELFINADO EMIL K. SADAIN, CESO I
MANILA 304
DESIGN SCIENCE INCORPORATED

UPMO - RMC II

Potrebbero piacerti anche