For Pipes:
V = 4.567x10-3xCxD0.63xS0.54
Q = 1.292x10-5xCxD2.63xS0.55
HL = 6.815x(V/C)1.852x(1/D)1.167
where,
V = Velocity in m/s as (Q/A)
C = Roughness C-efficient, Value in the above Formula have been taken as 120
(refer CPHEEO manual in Sewage Manual
R = Hydraullic Mean Depth and Defined as the ratio of crossectional area and the wetted perimeter
(A/P) = D/4 (for Pipe)
S = Slope of Pipe or Head Loss in mm
Q = Flow in m3/hr.
D = Dia. of pipe in mm
Open Channel:
Manning's Formula has been used to calculate the head loss. The Formula is as follows:
V = 1/n.R2/3.S1/2 (As per CPHEEO Manual Page no. 46, 3.4.2.1)
where,
V = Velocity in m/s as (Q/A)
C = Roughness C-efficient, Value in the above Formula have been taken as 120
(refer CPHEEO manual in Sewage Manual
R = Hydraullic Mean Depth and Defined as the ratio of crossectional area and thre wetted perimeter
(A/P) = D/4 (for Pipe)
S = Slope of Pipe or Head Loss in mm
Above values have been taken as per CPHEEO Manual on Water Supply & Treatment lastest edition,
page no. 115 & 116
Manning's Formula has been used to calculate the head loss in open channel.
The formula is as follows:
V = 1/n.R2/3.S1/2 (As per CPHEEO Manual)
or
1.0 = 1/0.015x (1.09 x 1.0)2/3x S1/2 1/n = 66.67
2x(1+1.09) R2/3 0.41
or
S= 0.00135
A = 1.2x1.0/Sin600
= 1.386 m2
vs = 0.94 m/s
2
vs = 0.88
va = 0.90 m/s
v a2= 0.80
hl = 0.04 m
Thus
hl = 0.2 m
Considering the same head loss for Manual Screen as well.
Design flow through channnel (Peak Flow) = 112.5 MLD = 1.3 m3/sec
As per calculation the width of channel works out to be 1.60* Wide x 1.0 SWD.
A= 1.92 m2
V= 0.68 m/s
Width of screen channel = 1600 mm
Flat Size = 50 x 5 mm
Clear gap between bars = 6 mm
No. of openings = 175 (As per Vendor's Drawing)
Total width of opening = 1.05 m
Depth of Liquid on U/S at Peak flow = 1200 mm
hl = {(1/0.7)x(vs2-va2)}/(0.7x2g)
where:
hl = Head Loss
vs = Velocity through screens
va = Approach Velocity
A = 1.266x1.0/Sin750
= 1.3 m2
vs = 1.00 m/s
vs 2= 1.0
va = 0.68 m/s
v a2= 0.46
hl = 0.04 m
Thus
hl = 0.3 m
Considering the same head loss for Manual Screen as well.
Grit Chamber
Manning's Formula has been used to calculate the head loss and slope in open channel.
The formula is as follows =
Manning's Formula has been used to calculate the head loss and slope in open channel.
The formula is as follows =
Considering the half flow from each direction from high point in the launder towards thel low point i.e. outlet
point.
Flow = 0.65 m3/sec
Velocity in the launder 'v' = 1.02 m/s
Manning's Formula has been used to calculate the head loss and slope in open channel.
The formulais as follows =
V= 1.18 m/sec
V= 1.18 m/sec
Considering the half flow from each direction from high point in the launder towards thel
low point i.e. outlet point.
Flow = 0.65 m3/sec
Velocity in the launder 'v' = 1.02 m/s
Manning's Formula has been used to calculate the head loss and slope in open channel.
The formulais as follows =
Manning's Formula has been used to calculate the head loss and slope in open channel.
The formulais as follows =
Provide 3 nos. (2W+1S) of Vertical Centrifugal Return Sludge Pump of capacity 740 m3/hr @ 7.5 m head
8 Head Loss from Primary Clarifier to Primary Sludge Pump House to Primary Sludge Thickner
Condition 1
TWL of receiving Unit i.e. Primary Sludge Thickner Considered = 194.90
Static Head Differeence = TWL of PST to GL+ GL to Receiving Unit Discharge Level
= 2.10 m
Required Pump Head = 6.70 m
Condition 2
TWL of Sludge Digester Considered = 199.15
Static Head Differeence = TWL of PST to GL+ GL to Receiving Unit Discharge Level
= 1.35 m
Therefore, Required Pump Head = 5.95 m
Provide 3 nos. (2W+1S) Horizontal Centrifugal Non Clog Sludge thickner feed pumps of capacity 10 m 3/hr @ 8m
head.
Static Head Differeence = TWL of Thickened Sludge Sump to GL+ GL to Receiving Unit
Discharge Level
= 4.35 m
Therefore, Required Pump Head = 9.35 m
Provide 2 nos. (1W+1S) Progressive cavity Digester feed Pumps to Thickened Sludge Pumps of 14 m 3/hr
capacities @ 11.5
Provide 2 nos. (1W+1S) Progressive Cavity feed pumps of 9 m3/hr capacities @ 9 m Head
Provide 4 nos. (3W+1S) Re-circulation Pumps of capacity 275 m3/hr capacities @ 7 m head afer
considering differential head margin.
RAW SEWAGE CHARACTERISTICS
Average Flow (MLD) 50 0.5787037037037 m^3/s
Peak Factor 2.25 0.0115741
Peak Flow 112.5 1.3020833333333 m^3/s
Lean Flow 22.2222222222222 0.2572016460905 m^3/s
pH 7.2 - 7.9
Suspended Solids 600 mg/l upto
BOD 300 mg/l upto
COD 700 mg/l upto
Amonial Nitrogen Upto 35 mg/l as N mg/l
Total Kjedahal Nitrogen Upto 55 mg/l as N mg/l
Total Phosphates Upto 16 mg/l as P mg/l
Total Sulphates 82 - 130
INLET CHAMBER
Design Basis
Average Flow (MLD) 50 0.5787037037037
Peak Flow 112.5 1.3020833333333
Detension time Considered(Sec) 26 (As per Standard Practice)
Dimensioning
Length of the Inlet Chamber 4.37995750867263
Width of the Inlet Chamber 2.57644559333684
Volume of Sump Provided 33.8541666666667
Free board 0.3
Number 1
Check………
Detension Time at Pear flow (Sec) 27
CHANNEL
No. of Channel 1
Peak Flow for Each Channel 1.30208333333333
Average Flow for Each channel 0.578703703703704
Velocity in the Channel 1.2 m/s
Area Required 1.09
BYPASS PIPE
Peak Flow for Pipe 205 MLD 2.3726851851852 m^3/s
Velocity in the Channel 1.54 m/s
Area Required 1.54070466570467
Diameter of Pipe 1.40060205166676
BYEPASS PIPE
Design Basis
FFL of River 118.93
Invert of outfall Pipe 189.13
Outlet of Intermediate Effluent Chamber 191.65
Approx Distance 2500
Available Slope 1in 1265 0.000790513833992
Peak Flow 205 MLD 2.3726851851852
Consider
Dia. Of Pipe 1.4 m
Slope ,S 1 in 1265 0.000790513833992
Manning's coeff. N 0.015
Using Chezy"s eq. v= c(R*S)^.5
For Circular Channel c= ((1.486*R^(1/6))/n)
Hydaulic Radius R=A/P= (D/4)*(1-360sin(θ)/(2πθ))
Depth of Flow consiered at peak flow 0.8 m
θ at .80 depth 253.74 m
Therefore, R 0.30 m
Normal Requirement :
Max Velocity through Rack Opening (m/s) 1 (at maximum flow) As per NIT
Velocity ahead of screen(not less then) (m/s) 0.4 (at maximum flow)
Free Board 0.3 m
Depth of Flow(assumed) 1m
Clear Width of opening 1.128 m
Total No of Clear Opening 24
Total No of Racks 23
Width of the Screen 1358 mm
Width of Screen provided 1450 mm
Velocity of Channel at Peak 0.90 m/s
Hyraulic Radius 0.420 m
Coefficient of Friction 0.015
Slope, S 0.000576313594336
Depth at Average Flow 0.51 m
Depth at Lean Flow 0.23 m
Check………
Velocity at Peak flow in the Channel 0.90 m/s
Velocity at Average Flow through the racks 0.83 m/s
Velocity at Average flow in the Channel 0.78 m/s
Velocity at Lean flow through the racks 0.83 m/s
Velocity at Lean flow in the Channel 0.78 m/s
Velocity at Peak flow through the racks 0.96 m/s
Normal requirement
Max Velocity through Rack Opening 1 (at maximum flow)
Velocity ahead of Screen(not less than) 0.4 m/s
Free Board 0.3 m
Depth of Flow(assumed) 0.9 m
Clear Width of Opening 0.930 m
Total No of Clear Opening 13
Total No of Racks 12
Width of Screen 1104.11566332794 m
Width of Screen Provided 1150 (mm) say
Velocity in the Channel at Peak 1.26 m/s
Hydraulic Radius 0.351 m
Coefficient of Friction 0.015
Slope, S (m/m) 0.0015
Depth at Average Flow 0.62 m
Depth at Lean Flow 0.28 m
Checks…………
Velocity at Peak Flow in the Channel 1.26 m/s
Velocity at Average Flow through the racks 0.84 m/s
Velocity at AverageFlow in the Channel 0.81 m/s
Velocity at Lean Flow through the racks 0.84 m/s
Velocity at Lean Flow in the Channel 0.81 m/s
Normal Reuirement
Max velocity through Rack Opening 1 (at Maximum flow) (as per NIT)
Velocity ahead of Screen( not less than) 0.4 (at Maximum flow)
Parshall Flume
Peak Flow 112.5 MLD
Average Flow 50 MLD
Lean Flow 22.2 MLD
Design Flow
Minimum(MLD) 10 115.740740740741 lps 0.12 m^3/s
Maximum 125 1446.75925925926 lps 1.45 m^3/s
Assume Throat Width(W) 900 mm 0.9 m
Now:
(Ref: CPHEEO Manual)
Ha = (Qmax/2264W)2/3
Where,
Qmax= Maximum flow in lps
Ha= Depth of flow in upstream leg of the flume in m
W= throat width in m
Therefore, Ha 0.80
Consider the standard dimension for 900 Throat width Parshall Flume(Ref: Manual,UP Jal Board)
W 91.5 cm 0.915 m
A 167.64 cm 1.6764 m
B 164.55 cm 1.6455 m
C 121.92 cm 1.2192 m
D 157.16 cm 1.5716 m
F 60.96 cm 0.6096 m
G 91.44 cm 0.9144 m
K 7.5 cm 0.075 m
N 22.86 cm 0.2286 m
At Qmax:
Dc 0.634
Dc' 0.524
At Qmin:
Dc 0.12
Dc' 0.10
Dc 0.634 m(Approx)
Providing:
Channel Length u/s of Parshall Flume 7500 mm
Channel Length d/s of Parshall Flume 3000 mm
Incoming channel width 1300 mm (Tentative)
SWD 1000 mm
Dimensioning
Length 6m
Width 1.47 m
Provided Width 1.5 m
Free Board 0.3
Volume Provided 8.7
Type
Design Basin
Flow 0.33 m^3/s
Setting Velocity as per Stoke's Law, Vs 1.80*10^-2 m/s
Check for Reynold's Number ,R 2.37
If the value of the Reynold's No. is greater than 0.5, then Stoke's Law does not apply.
In that case, apply as per Transitions Law for
0.5<R<1000
Settting Velocity as per Transition Law Formula, 0.0168 m/s
Vs
Now,
0.0168 m/s
or 1451.52 m^3/m^2/day
Dimensioning
Plan Area required per grit unit 31.25 m^2
Minimum SWD as per NIT 0.8 m
Free board 0.3 m(As per NIT)
Grit Storage Space 0.25 m(As per CPHEEO)
Total Depth of Grit Chamber 1.05 m
Check……………..
The critical displacement velocity to Initiate resus 0.161 m/s (As per CPHEEO)
The Horizontal velocity of flow should be kept less than the critical displacement velocity Horizontal Ve(OK)
PRIMARY CLARIFIER
Design Flow Avg. Flow + Return Flows
Average Flow 50000
TSS concentration after grit removal 540 mg/l (As per NIT)
Assumed that there is no loss in TSS after Grit Separator
Return Flows
Mechnical
Centrifuge
Thickener Supernatant Digester Supernatant Thickner
centrate supernatant
Flow (m^3/d) 164.51 94.29 109 270.91
Check…………
Surface Overflow Rate
SOR at Average Flow 29.48 m^3/m^2/d <50 m^3/m^2/d
SOR at Peak Flow 65.50 m^3/m^2/d <120 m^3/m^2/d
Weir loading(considering single weir) 243.6 m^3/m^2/d
Considering double weir & weir loading of 125 m^3/m.d
Weir Length required 202.55 m
Therefore dia. Of Clarifier required 33.1 m
Provided Clarifier Diameter 33.1 m
Detension Time 2.3 Hrs.
AERATION TANK
Dimensioning
Length 3.5
Width 2.83
Free Board 0.3 m
Volume Provided 15.87 m^3
Length Provided 3.5 m
Width Provided 3.00 m
AERATION TANK
Food to mass Ratio , F/M= Qso/XV 0.33 (As per CPHEEO .2-0.4 Hrs.)
Provided
Type Rectangular
Number 2
Total Volume required 9979.47 m^3
Volume of each aeration tank required 4989.74 m^3
SWD 4.2 m
Plan area required for each tank 1188.03256381381 m^2
Length 60
Width 19.9000
Provided 20
Free Board 0.6 (As per NIT)
Volume of each aeration tank provided 4990 m^3
Total volume Provided for Aeration 9979 m^3
Check: Oxygen Requirement (As per CPHEEO 0.8-1.0 kg/Kg of BOD removed)
BOD removed 8861.77 kg/d
Kgo2/Kg BOD removed 1.05
SECONDARY CLARIFIER
DISTRIBUTION CHAMBER OF SECONDARY CLARIFIER
Dimensioning
Total Surface Area Required 2301.8
Type Circular
Number 2 (AS per NIT)
Surface Area of Each 1150.9 m^2
Diameter Required 38.3 m
Diameter Provided 38.5 m
SWD 3m (AS per NIT, From 3.0 to 4.5)
Free Board 0.5 m
Check ……………….
Surface Loading Peak Flow 48.9 m^3/m^2/d Range 40-50 as per CPHEEO
Consider Solids Loading (Avg Flow) 80 kg/m^2/d
Area Required 949.5 m^2
SLR at Peak Flow 210 kg/m^2/d
Area Required for Peak Flow 813.8 m^2
Hence considering the largest of the Required area , provided 2 Nos. Clarifier each with area 1150.9 m^2
Check for Weir loading (Considering Single Weir) 210 not < 185 m^3/m/d
Excess Sludge :
Due to BOD Stabilization:
1) Based on kinetics Equation:
QY(So-S)
Using: Px=
(1+kd*SRT)
Solid Loading when all the Unit are operating 114.7 kg/m^2/d
The Thickener Supernatant shall be recycled back ti the Common Distribution Chamber.
Check…………………..
Solids Loading when all the units are operting 29.67 kg/m^2/d
Supenatant
Total Volume 233.43 m^3/d
Suspended Solids in Thickener Overflow 155.081 m^3/d
TSS 664.36 mg/l
The DAF Subnatant shall flow by gravity to the filtrate sump and thereafter shall be recycled back to
the Distribution Chamber of Primary Clarifier
Dry Well
Digested Sludge
Digester Supernatant
Flow 122.29 m^3/d
Digester Sizing
Retention Time Considered for Design 20 days (As per NIT)
Design Flow 316.45 m^3/d
No. of Digester 2 Nos.
Design Flow for Each Digester 158.23 m^3/d
Total Volume Required 6329 m^3
Assume Dia. Of the Digester 20.5 m
Area 330.20 m^2
Height 9.59 m
Free Board 0.3 m
Total Height Required 9.89 m
Height Provided 10 m
Volume Provided 3265.64 m^3
Total Volume Provided 6531.29 m^3
Number of Digesters 2
Volume of Sludge to be Handled 6328.91 m^3/d
Pumping Hours per Day 4 hrs
No. of Pumps Provided 4(3W + 1S)= 24
Capacity of each Pump Required 263.70 m^3/hr
Capacity of each Pump Provided 275.00 m^3/hr
Pump Head 7m
Centrifuge
Digested Sludge from Digesters 194.16 m^3/d
No. of Centrifuge Units to be Provided 3(2W + 1S)
No. of Working Hours/day 12 Hrs.
Capacity of Centrifuge Units Required 8.09 m^3/hr
Capacity of Centrifuge Units Provided 8.1 m^3/hr